Loop Qualification and Raw Loop Data - CLEC Training
Training
The EASE Users' Guide provides CLECs with information on the appropriate use of Enhanced Automated Service Order Entry Virtual Front Office (EASE) Loop Qualification Tools, the EASE Raw Loop Data Tool, and the Wire Center Raw Loop Data Tool for Loop Qualifications. This job aid may also be used for the qualification of DSL. The tools described in this guide support the pre-order functions for 2/4 wire non-loaded loops, Asymmetrical Digital Subscriber Loop (ADSL) compatible loops, Integrated Switched Digital Network (ISDN) Basic Rate Interface (BRI) capable loops, xDSL-I capable loops, Line Sharing, Line Splitting, Loop Splitting, and Shared Distribution Loops.
Note: This guide does not contain information for HICAP Service requests or Design Service requests (see the EASE User's Guide).
Training Objectives
While using this job aid you will be able to:
- Describe the terms of Facility Availability, Loop Qualification and Raw Loop Data
- Describe the likes and differences of Loop Qualifications and Raw Loop Data queries
- Navigate the EASE Loop Qualification tools, and Raw Loop Data tools
- Obtain Raw Loop Data from the Wire Center and EASE Raw Loop Data Tools
Prerequisites
- Basic Telephony course and/or equivalent industry experience
- Working knowledge of CenturyLink™ EASE ordering system
- A CLEC end-user must have telecommunication engineering knowledge to interpret the significance of raw loop data
- EASE-LSR Virtual Front Office Graphical User Interface (GUI)
- "Doing Business with CenturyLink"
Self-Paced Training
Please click on the link below to visit the page.Last Update: December 16, 2013
Last Reviewed: February 26, 2024