Title: Include PON on Subject Line of Emails Distributed to Co Providers | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4458737 |
Completed 5/16/2001 |
- | IMA GUI/7 |
Originator: Taff, Steve |
Originator Company Name: Allegiance |
Owner: Thompson, Jeff |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Allegiance requests the PON be included on the Subject Line (preferably at the beginning) of emails which are distributed to Co-Providers for the following email communications : ? For orders (LSRs) which are archived from the IMA GUI ? For Confirmations on LSR orders The PON currently exist in the email message section. |
Status History |
Date | Action | Description |
Release Information | IMA Release 7.00 | |
1/25/2000 | CR Submitted | |
1/27/2000 | Status Changed | Logged and received status of New – To be industry evaluated. Sent email to Steve Taff on CR # and status. |
1/27/2000 | Record Update | Combined information from a similar Allegiance submitted CR into this CR and sent email to Steve on comments/changes. |
2/1/2000 | Additional Information | Sent email to Steve Taff on CR Form update to version 04. |
2/16/2000 | Status Changed | Status change to Evaluated – To be reviewed |
2/18/2000 | Additional Information | Sent email to Steve Taff on status change |
2/25/2000 | Status Changed | Status change to Reviewed – Under consideration |
3/6/2000 | Additional Information | Sent email to Steve on status change. |
3/15/2000 | Additional Information | T-Shirt Size and Option provided. |
3/16/2000 | Additional Information | Received request from Phil Jones to include the following “We would like to expand the scope of CR# 4458737 to include all responses (FOC, Reject, Jeopardy, LSR), |
3/16/2000 | Additional Information | not just the FOC and LSR as the request currently shows. Second, in addition the PON which we have already requested, if they could also include the version of the LSR.” |
3/23/2000 | Additional Information | Sent email to Phil that “This is kind of out of process, but let me see what I can do. Our response to this CR was "U S WEST could provide the PON in |
3/23/2000 | Additional Information | in the subject line of E-Mails distributed to Co-Providers in a future release of IMA. The plan would be to identify the PON in the |
3/23/2000 | Additional Information | subject line for the Co-Providers ease in querying for a given request. The PON would be returned on E-Mails for FOCs |
3/23/2000 | Additional Information | Error Messages, Jeopardies, and Completions". I think we are saying we will cover what you want below except for the LSR version. |
3/24/2000 | Additional Information | Received clarification of LSR version as “In other words, the first version we send is AA. If the LSR is supped, we change the version to AB, AC, and so on. |
3/24/2000 | Additional Information | It would really help us a lot if the LSR version was included in the subject field. |
3/24/2000 | Additional Information | Sent email to Phil and Steve on CR status change and a revised Option will be provided on this CR at the next industry team meeting. |
7/19/2000 | Status Changed | Reviewed – Release Baseline Candidate for IMA Release 7.0. CR was selected by Qwest for IMA Release 7.0, not Voted/Selected as Co-Provider CR Option for 7.0. T-shirt size is Medium. |
7/26/2000 | Additional Information | Sent email to Steve Taff and Co-Provider industry team on CR status/candidate. |
8/15/2000 | Additional Information | Send email to Steve Taff with Candidate for a Release section of the CR updated to reflect selection for IMA Release 7.0. |
11/30/2000 | Status Changed | Status changed to Committed Candidate – IMA 7.0 |
12/1/2000 | Additional Information | Send email to Steve Taff with CR. |
5/16/2001 | Status Changed | Status changed to “Completed – In Production” |
5/18/2001 | Additional Information | Sent email to Steve Taff and Cindy Warren with updated CR |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 4869731 Detail |
Title: Allow auto fill of fields based on the user profile. | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4869731 |
Completed 10/24/2001 |
- | IMA GUI/8 |
Originator: Dowding, Byron |
Originator Company Name: Alltel |
Owner: Routh, Mark |
Director: |
CR PM: Routh, Mark |
Description Of Change |
ALLTEL would like IMA to auto fill certain fields (i.e., IMPCON, IMPCON TEL NO, ALT IMPCON, ALTIMPCON TEL NO, DSGCON, DRC, DSGCON TEL NO, DSGCON E-MAIL, DSGCON all address fields, ACNA and CC.) There could be values stored in either the user or company profile to populate these fields. An on/off selection could be used in IMA to turn auto fill on or off. |
Status History |
Date | Action | Description |
Release Information | IMA Release 8.00 | |
6/21/2000 | CR Submitted | Submitted |
6/29/2000 | Status Changed | New - To be industry evaluated |
6/29/2000 | Info Sent to CLEC | Sent email to Byron Dowding with CR # and status. |
7/19/2000 | Status Changed | Status changed to New - To be clarified. Byron Dowding to call with complete list of fields for AutoFill. |
7/21/2000 | Status Changed | Status changed to Evaluated - To be reviewed. |
7/21/2000 | Info Received From CLEC | Byron Dowding sent email with complete list. Description updated. |
7/28/2000 | Info Sent to CLEC | Sent email to Byron Dowding about status changes and form change to version 05. |
8/2/2000 | Status Changed | Reviewed - Under consideration |
8/16/2000 | LOE Issued | Received T-shirt size and option during industry team meeting. |
8/29/2000 | Info Sent to CLEC | Sent email to Byron Dowding with updated CR. |
10/18/2000 | Status Changed | Status changed to Reviewed - Release Baseline Candidate. Selected as Co-Provider CR for target IMA Release 8.0. T-shirt size Medium. |
11/8/2000 | Info Sent to CLEC | Sent email to Byron Dowding with updated CR. |
10/18/2001 | Discussed at Monthly CMP Meeting | Discussed at CMP meeting agreed to close |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 4869838 Detail |
Title: Allow the use of an existing LSR to create a new LSR. | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4869838 |
Completed 10/18/2001 |
- | IMA GUI/8 |
Originator: Dowding, Byron |
Originator Company Name: Alltel |
Owner: Routh, Mark |
Director: |
CR PM: Routh, Mark |
Description Of Change |
ALLTEL would like the ability to create a new LSR from a existing LSR. |
Status History |
Date | Action | Description |
Release Information | IMA Release 8.00 | |
6/21/2000 | CR Submitted | Submitted |
6/29/2000 | Status Changed | New - To be industry evaluated. Sent email to Byron Dowding with CR # and status. |
6/29/2000 | Info Sent to CLEC | Sent email to Byron Dowding with CR # and status. |
7/19/2000 | Status Changed | Status changed to Evaluated - To be reviewed. |
7/28/2000 | Info Sent to CLEC | Sent email to Byron Dowding about status change and form change to version 05. |
8/2/2000 | Status Changed | Reviewed - Under consideration |
8/16/2000 | LOE Issued | Received T-shirt size and option during industry team meeting. |
8/29/2000 | Info Sent to CLEC | Sent email to Byron Dowding with updated CR. |
10/18/2000 | Status Changed | Status changed to Reviewed - Release Baseline Candidate. Short Term Solution selected as Co-Provider CR for target IMA Release 8.0. T-shirt size Small. |
11/8/2000 | Info Sent to CLEC | Sent email to Byron Dowding with updated CR. |
10/18/2001 | Discussed at Monthly CMP Meeting | Discussed at CMP meeting agreed to close |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 4869887 Detail |
Title: Allow IMA GUI users to build LSR templates to use when creating new LSRs. | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4869887 |
Completed 2/21/2002 |
- | IMA GUI/8 | All Products |
Originator: Dowding, Byron |
Originator Company Name: Alltel |
Owner: Routh, Mark |
Director: |
CR PM: Routh, Mark |
Description Of Change |
ALLTEL would like the ability to create templates that can be used when creating new LSRs. |
Status History |
Date | Action | Description |
Release Information | IMA Release 8.00 | |
6/21/2000 | CR Submitted | Submitted |
6/29/2000 | Status Changed | New - To be industry evaluated. Sent email to Byron Dowding with CR # and status. |
6/29/2000 | Info Sent to CLEC | Sent email to Byron Dowding with CR # and status. |
7/19/2000 | Status Changed | Status changed to Evaluated - To be reviewed. |
7/28/2000 | Info Sent to CLEC | Sent email to Byron Dowding about status change and form change to version 05. |
8/2/2000 | Status Changed | Reviewed - Under consideration |
8/16/2000 | LOE Issued | Received T-shirt size and option during industry team meeting. |
8/29/2000 | Info Sent to CLEC | Sent email to Byron Dowding with updated CR. |
3/21/2001 | Status Changed | CR was put on Hold in the March CICMP meeting. |
3/28/2001 | Info Sent to CLEC | Sent email to Byron Dowding and Dave Hahn with updated CR. |
10/31/2001 | Release Ranking | Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. 4869887 ranked 38 |
1/17/2002 | Status Changed | CR # 4869887 status updated to 'Presented; CR was not packaged as part of 10.0 and is eligible for ranking in 11.0' |
2/8/2002 | Status Changed | The ability to copy an existing LSR to create a new one was put into IMA 8.0 |
2/21/2002 | Status Changed | CR was declared Completed by Byron Dowding and discussed at the Feb. CMP meeting. |
2/21/2002 | Discussed at Monthly CMP Meeting | 4869887 discussed during 'CRs to consider for Closure' portion of February Systems CMP Monthly meeting; please see Attachment E of February Systems CMP Distribution Package |
Project Meetings |
|
CenturyLink Response |
The CLEC will have the ability to copy an existing LSR that can be used to create a new one.
|
Archived System CR 4869914 Detail |
Title: Allow IMA GUI users to use telephone number spans (ranges) and single telephone numbers on the same LSR. | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4869914 |
Completed 3/21/2002 |
- | IMA Common/9 | All products that use TN |
Originator: Dowding, Byron |
Originator Company Name: Alltel |
Owner: Winston, Connie |
Director: |
CR PM: Routh, Mark |
Description Of Change |
ALLTEL would like the ability to use a span (range) of telephone numbers and single telephone numbers together on the same LSR for the same customer. Currently, users can enter 5001, 5002, 5003, and 5009 but cannot enter 5001-5003 and 5009 on same LSR. |
Status History |
Date | Action | Description |
Release Information | IMA Release 9.00 | |
6/21/2000 | CR Submitted | Submitted |
6/29/2000 | Status Changed | New -- To be clarified. |
6/29/2000 | Status Changed | New -- To be industry evaluated. Sent email to Byron Dowding with CR # and status. |
6/29/2000 | Record Update | Discussed CR clarification with Byron Dowding in phone call. |
7/19/2000 | Status Changed | Status changed to Evaluated – To be reviewed. |
7/28/2000 | Info Sent to CLEC | Sent email to Byron Dowding about status change and form change to version 05. |
8/2/2000 | Status Changed | Reviewed -- Under consideration |
8/15/2000 | Info Sent to CLEC | Sent email to Byron Dowding with updated Interfaces Impacted section per phone call. |
8/16/2000 | Discussed at Monthly CMP Meeting | Received T-shirt size and option during industry team meeting. |
8/29/2000 | Info Sent to CLEC | Sent email to Byron Dowding with updated CR. |
10/18/2000 | Status Changed | Status changed to Reviewed – Release Baseline Candidate. Selected as Co-Provider CR for target IMA Release 8.0. T-shirt size Small. |
11/8/2000 | Info Sent to CLEC | Sent email to Byron Dowding with updated CR. |
3/13/2001 | Status Changed | Status Changed to Reviewed – Under Consideration This work has been de-scoped for IMA 8.0. |
3/15/2001 | Info Sent to CLEC | Sent email to Byron Dowding and Dave Hahn with updated CR. |
10/24/2001 | Discussed at Monthly CMP Meeting | CLECs notified this CR was a selected CR Baseline Candidate. |
11/28/2001 | Info Sent to CLEC | Info sent to Alltel; see project meeting notes |
12/6/2001 | CLEC Provided Information | Byron Dowding confirmed that UR1412 (9.0 release) will accomplish what this CR is requesting. They are looking for portability |
2/25/2002 | Status Changed | 4869914 status updated to 'CLEC Test' based upon 2/25/02 implementation of IMA 9.0 |
3/21/2002 | Status Changed | Reviewed in the 3/21/02 CMP meeting and Closed. |
3/21/2002 | Discussed at Monthly CMP Meeting | 4869914 discussed March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP - Attachment E |
Project Meetings |
11/28/01 E-Mail sent to Alltel for clarification: Byron, We need to clarify a question that has come to our attention on the above CR. The description of change says, "ALLTELL would like the ability to use a span (range) of telephone numbers and single telephone numbers together on the same LSR for the same customer. Currently, users can 5001, 5002, 5003, and 5009 but cannot enter 5001-5003 and 5009 on the same LSR. There is not mention of a specific product or LSR form to be impacted by the change. The UR issued for the CR has the following listed in the assumptions and dependencies: Products associated with this candidate are UBL w/NP and UDL w/NP. This request is for ported TNs only. Loop products with number portability are the only products impacted with this request. The IMA CR is scheduled for the 9.0 Release and will "allow the entry of a range or ranges with individual numbers in any combination on a single request for LNP". Your Change Request didn't specify a product or LSR form. The UR specified Loop Service with Number Portability. The IMA CR only addresses Number Portability. Different LSR forms are required for Number Portability (NP) vs Loop Service with Number Portability (LSNP). In the 9.0 Release you will see the change for NP but not LSNP. Is this what you were expecting to see (product/form change) with the 9.0 Release. Thanks for your help in advance!
|
CenturyLink Response |
RE: CR4869914 - Allow IMA GUI Users to use TN spans (ranges) and Number Portability is what we would like. So if I read this correctly Release 9.0 would take care of this. thanks Byron Dowding OSS Coordinator CLEC Nebraska Market ALLTEL Phone: 402.436.4336 Pager: 402.790.6069 Fax: 402.436.5160 Email: Byron.Dowding@alltel.com
> --Original Message-- > From: "Lynn Stecklein" [SMTP:lsteckl@qwest.com] > Sent: Wednesday, November 28, 2001 3:24 PM > To: Dowding, Byron > Cc: "Peggy Esquibel-Reed" > Subject: CR4869914 - Allow IMA GUI Users to use TN spans (ranges) and > > Byron, We need to clarify a question that has come to our attention on the > above CR. The description of change says, "ALLTELL would like the ability > to use a span (range) of telephone numbers and single telephone numbers > together on the same LSR for the same customer. Currently, users can 5001, > 5002, 5003, and 5009 but cannot enter 5001-5003 and 5009 on the same LSR. > There is not mention of a specific product or LSR form to be impacted by > the change. > > The UR issued for the CR has the following listed in the assumptions and > dependencies: Products associated with this candidate are UBL w/NP and UDL > w/NP. This request is for ported TNs only. Loop products with number > portability are the only products impacted with this request. > > The IMA CR is scheduled for the 9.0 Release and will "allow the entry of a > range or ranges with individual numbers in any combination on a single > request for LNP". > > Your Change Request didn't specify a product or LSR form. The UR specified > Loop Service with Number Portability. The IMA CR only addresses Number > Portability. Different LSR forms are required for Number Portability (NP) > vs Loop Service with Number Portability (LSNP). In the 9.0 Release you > will > see the change for NP but not LSNP. > > Is this what you were expecting to see (product/form change) with the 9.0 > Release. > > Thanks for your help in advance!
|
Archived System CR 4869972 Detail |
Title: Allow online access to Wholesale Systems help desk trouble calls | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4869972 |
Completed 3/21/2002 |
- | Process & Documentation/ | All Products |
Originator: Dowding, Byron |
Originator Company Name: Alltel |
Owner: Routh, Mark |
Director: |
CR PM: Routh, Mark |
Description Of Change |
ALLTEL would like the ability to access trouble calls reported to the Wholesale Systems Help Desk by ALLTEL. This could be done by a report, access to them via the internet, email, or hardcopy. We have users spread out and it would be beneficial to know what trouble is being reported, what the status is and what the resolution is. |
Status History |
Date | Action | Description |
6/29/2000 | CR Submitted | Submitted |
6/29/2000 | Record Update | Discussed CR clarification with Byron Dowding in phone call. |
6/29/2000 | Status Changed | New - To be clarified. |
6/29/2000 | Status Changed | New - To be industry evaluated. |
6/29/2000 | Info Sent to CLEC | Sent email to Byron Dowding with CR # and status. |
7/19/2000 | Status Changed | Status changed to Evaluated - To be reviewed. |
7/28/2000 | Info Sent to CLEC | Sent email to Byron Dowding about status change and form change to version 05. |
8/2/2000 | Status Changed | Reviewed - Under consideration |
8/15/2000 | Info Sent to CLEC | Sent email to Byron Dowding with updated Interfaces Impacted section per phone call. |
8/16/2000 | LOE Issued | Received T-shirt size and option during industry team meeting. |
8/29/2000 | Info Sent to CLEC | Sent email to Byron Dowding with updated CR. Title of Change and Description of Change updated per phone call on 08/25. |
9/20/2000 | LOE Issued | T-shirt size and option revised. T-shirt size and option provided - size Large. |
3/21/2001 | Status Changed | Status changed to review Baseline candidate for IMA 9.0 |
3/29/2001 | Info Sent to CLEC | Sent email to Byron Dowding and Dave Hahn with updated CR |
1/10/2002 | Status Changed | CR was removed from the IMA 9.0 list |
3/14/2002 | Status Changed | Byron Dowding agreed that the monthly Trouble Ticket report will provide what he needs. He agreed that this CR can be closed. |
3/21/2002 | Status Changed | Reviewed in the 3/21/02 CMP meeting and closed. |
3/21/2002 | Discussed at Monthly CMP Meeting | 4869972 discussed March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP - Attachment E |
Project Meetings |
|
CenturyLink Response |
3/13/02 - Qwest will provide regular reports on all trouble call that have been reported to the Wholesale Systems help desk.
|
Archived System CR 4661383 Detail |
Title: Request not to do re certification for EDI upgrade | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4661383 |
Withdrawn 4/18/2001 |
- | IMA EDI/ |
Originator: Osborne-Miller, Donna |
Originator Company Name: AT&T |
Owner: Routh, Mark |
Director: |
CR PM: Routh, Mark |
Description Of Change |
AT&T does not want to do re-certification for EDI upgrades. All testing should be done in testing environment, not with real production data in US West production environment. |
Status History |
Date | Action | Description |
Release Information | IMA Release | |
4/10/2000 | CR Submitted | Submitted |
4/13/2000 | Status Changed | New - To be industry evaluated |
4/13/2000 | Info Sent to CLEC | Sent email to Adam Li on CR # and status. |
5/17/2000 | Status Changed | Status changed to Evaluated - To be reviewed |
5/26/2000 | Status Changed | Status changed to Reviewed - Under Consideration |
5/26/2000 | Record Update | U S WEST to provide T-shirt size and Option at next industry team meeting on 06/21/00 |
6/11/2000 | Info Sent to CLEC | Sent email to Adam Li on CR status. |
6/21/2000 | LOE Issued | T-shirt size and option provided at industry team meeting. |
7/6/2000 | Info Sent to CLEC | Sent email to Adam Li on CR eligibility for industry prioritization. |
10/18/2000 | Record Update | CR was removed from online CR Prioritization Form since Qwest is in process of resizing this CR. |
11/8/2000 | Info Sent to CLEC | Sent email to Donna Osborne-Miller with updated CR. |
11/15/2000 | LOE Issued | T-Shirt Size Small and Option provided in CICMP meeting. Eligible for industry prioritization. |
12/1/2000 | Info Sent to CLEC | Sent email to Donna Osborne-Miller with updated CR. |
3/21/2001 | Status Changed | CR was placed on Hold during the March CICMP meeting. Qwest provides this ability today. Pending Cancellation |
3/28/2001 | Info Sent to CLEC | Sent email to Donna Osborne-Miller, Lydell Peterson &Tim Bessey with updated CR. |
4/18/2001 | Status Changed | This CR was canceled by AT&T at the April CICMP meeting |
4/26/2001 | Info Sent to CLEC | Sent email to Donna Osborne-Miller, Lydell Peterson &Tim Bessey with updated CR. |
12/18/2001 | Record Update | Changed status from 'Cancelled CLEC' to 'Withdrawn' for database cleanup |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 4815907 Detail |
Title: Request to shorten IMA point release and release implementation time. | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4815907 |
Withdrawn 7/28/2000 |
- | IMA Common/ |
Originator: Li, Adam |
Originator Company Name: AT&T |
Owner: Routh, Mark |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Current implementation time takes entire weekend. AT&T sends requests through GUI and EDI in regular production on weekends, so requests US West take shorter time such as Sunday only if possible. |
Status History |
Date | Action | Description |
Release Information | IMA Release | |
5/30/2000 | CR Submitted | Submitted |
6/11/2000 | Status Changed | Logged and New - To be industry evaluated. Sent email to Adam on CR Status. |
6/11/2000 | Info Sent to CLEC | Sent email to Adam on CR Status. |
6/21/2000 | Status Changed | Evaluated - To be reviewed |
6/23/2000 | Status Changed | Reviewed - Under Consideration |
7/6/2000 | Info Sent to CLEC | Sent email to Adam on status change including placement of this CR in the CR Log under the new category Process and Documentation. |
7/19/2000 | LOE Issued | T-Shirt Size and Option provided in CICMP meeting. |
7/28/2000 | Info Sent to CLEC | Sent email to Donna Osborne-Miller about status change and form change to version 05. |
7/28/2000 | Status Changed | Status changed to Cancelled - Co-Provider after phone call with Donna Osborne-Miller. |
12/18/2001 | Record Update | Changed status from 'Cancelled CLEC' to 'Withdrawn' for database cleanup |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 4858202 Detail |
Title: Request for IMA EDI/GUI Documentation to be distributed 60 days prior to a release | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4858202 |
Withdrawn 7/19/2000 |
- | IMA EDI/ |
Originator: Li, Adam |
Originator Company Name: AT&T |
Owner: Routh, Mark |
Director: |
CR PM: Routh, Mark |
Description Of Change |
This is to request US West provide documentation for co-providers to prepare new major EDI/IMA releases (including Release Notes) 60 days prior to the implementation date of any release. |
Status History |
Date | Action | Description |
Release Information | IMA Release | |
6/26/2000 | CR Submitted | Submitted |
6/26/2000 | Info Sent to CLEC | Sent email to Adam Li with CR # and status. |
6/26/2000 | Status Changed | New - To be clarified |
6/27/2000 | Info Sent to CLEC | Sent email to Adam Li with CR status. |
6/27/2000 | Status Changed | New - To be industry evaluated |
7/6/2000 | Info Sent to CLEC | Sent email to Adam with a new title to reflect the description in the CR rather than a previous CR submitted. |
7/19/2000 | Status Changed | Status changed to Cancelled - Co-Provider Industry Team. |
7/28/2000 | Info Sent to CLEC | Sent email to Donna Osborne-Miller about status change and form change to version 05. |
12/18/2001 | Record Update | Changed status from 'Cancelled CLEC' to 'Withdrawn' for database cleanup |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 4267810 Detail |
Title: Extend IMA hours of operation | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4267810 |
Completed 2/28/2000 |
- | IMA Common/6 |
Originator: Bisgard, Jeff |
Originator Company Name: AT&T |
Owner: Thompson, Jeff |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Extend the IMA hours of operation to 4:00AM MST to 1:00AM MST. This would allow all work centers in the country access to the IMA system for at least 12 hours. |
Status History |
Date | Action | Description |
Release Information | IMA Release 6.00 | |
11/9/1999 | CR Acknowledged | Received, logged, and validated CR. |
11/9/1999 | Status Changed | Sent email to Jeff Bisgard and CR Manager, Surwada Martinez, log #, status of“NewTo be industry evaluated” and attached CR. Copied Lynn Notarianni, U S WEST Regulatory, to forward to Arizona PUC |
11/11/1999 | Record Update | 9 Industry team reviewed and prioritized. Changed CR to be IMA GUI only (didn’t include EDI). |
11/18/1999 | Status Changed | Changed status toEvaluated To be reviewed industry priority level, industry priority number, and prioritization process category to GUI. Notice CR included CTAS as interface and removed this reference. Sent e-mail to J Bisgard |
12/3/1999 | Status Changed | Changed status toReviewed Under Consideration. Sent email to Jeff Bisgard on status change. |
12/15/1999 | Record Update | Co-Provider Industry Team changed prioritization category to Common -- Noted above. |
1/13/2000 | Info Sent to CLEC | Updated prioritization level and number and sent email to Jeff Bisgard. |
1/24/2000 | LOE Issued | U S WEST T-shirt size and option provided at industry team meeting. Option is anticipated to be implemented on 02/28/00. |
2/28/2000 | Status Changed | CR was completed |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 4867575 Detail |
Title: Request for possible CORBA implementation to support pre order transactions | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4867575 |
Withdrawn 4/18/2001 |
- | COBRA/ |
Originator: Li, Adam |
Originator Company Name: AT&T |
Owner: Routh, Mark |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Please provide the possibilities for US West to implement CORBA for pre-order to improve performance from EDI. |
Status History |
Date | Action | Description |
6/28/2000 | CR Submitted | Submitted |
6/29/2000 | Info Sent to CLEC | Sent email to Adam Li with CR # and status |
6/29/2000 | Status Changed | New - To be industry evaluated |
7/19/2000 | Status Changed | Status changed to Evaluated - To be reviewed. |
7/28/2000 | Info Sent to CLEC | Sent email to Donna Osborne-Miller about status change and form change to version 05. |
8/2/2000 | Status Changed | Reviewed - Under consideration |
8/16/2000 | LOE Issued | Received T-shirt size and option during industry team meeting. |
8/29/2000 | Info Sent to CLEC | Sent email to Donna Osborne-Miller with updated CR. |
4/18/2001 | Status Changed | This CR was canceled by AT&T at the April CICMP meeting |
4/26/2001 | Info Sent to CLEC | Sent email to Donna Osborne-Miller, Lydell Peterson &Tim Bessey with updated CR. |
12/18/2001 | Record Update | Changed status from 'Cancelled CLEC' to 'Withdrawn' for database cleanup |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 4121257 Detail |
Title: US West IMA Internet Access | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4121257 |
Completed 5/16/2001 |
- | IMA GUI/7 |
Originator: Osborne-Miller, Donna |
Originator Company Name: AT&T |
Owner: Thompson, Jeff |
Director: |
CR PM: Routh, Mark |
Description Of Change |
This is to check if US West has plans to make IMA accessible via Public Internet (ie: GTE WISE and Bell Atlantic DCAS for CLEC) rather than Dial-Up. Dial-Up prevents NT users from accessing their network Printers, when connected to US West. |
Status History |
Date | Action | Description |
Release Information | IMA Release 7.00 | |
9/15/1999 | CR Submitted | |
9/20/1999 | CR Acknowledged | Provide initial status of New To be industry reviewed. Sent email to contact person on log # and status |
9/21/1999 | Status Changed | Update Status to Evaluated – To be reviewed. Sent email to contact person and Jeff Bisgard on status change and adding additional fields (i.e., Co-Provider Priority Level and # per team meeting.) |
9/22/1999 | Discussed at Monthly CMP Meeting | Jim Bisgard with AT&T presented this CR at the Co-Provider Industry Team Meeting. |
9/29/1999 | Status Changed | Update Status to Reviewed Under Consideration. Sent email to contact person, Jeff Bisgard, and copy to Account Manager on status change. Informed them that it is currently on a list of CRs to be considered for a release candidate for Release 5.1. |
10/18/1999 | Status Changed | Noticed status change to Evaluate – To be reviewed occurred on 09/23/99 not 09/21/99 as recorded above. Correction is seen on Co-Provider CR Log. Sent email to Martinez and Bisgard on this error/correction. |
11/2/1999 | Additional Information | Updated form to Version 03 and added in CICMP Manager Section Prioritization Process Category types and selected GUI per Co-Provider Industry Issue/Action #34. Sent email to contact person and Jeff Bisgard informing them of the addition and att CR. |
11/18/1999 | Record Update | Industry team CR review and prioritization. |
1/24/2000 | LOE Issued | U S WEST provided T-shirt size and options |
2/1/2000 | Record Update | Sent email to Jeff Bisgard and Surawud Martinez on updating the CR form to Version 04. Also, pointed out that the CR is not being considered for Release 6.0 (previously 5.1) as stated on 09/29/99. |
3/6/2000 | Record Update | Updated CR to reflect Adam Li as submitter. Sent email to Adam |
4/19/2000 | Record Update | Reviewed – Release Baseline Candidate for IMA Release 7.0 based on T-shirt size X-Large and Option Description. . Voted/Selected as Co-Provider CR Option for 7.0. |
5/1/2000 | Baseline Candidate Selection | Sent email to Adam on CR status/candidate |
11/13/2000 | Record Update | Updated prioritization level and # and sent email to Jeff Bisgard. |
5/16/2001 | Status Changed | Status changed to Completed - In production |
3/19/2002 | Record Update | Sent email to Donna Osborne-Miller, Tim Bessey and Lydell Peterson with updated CR. |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 4302504 Detail |
Title: On Line Access to Daily List of Held Orders and Missed Orders | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4302504 |
Withdrawn 9/20/2000 |
- | IMA Common/ |
Originator: Pennington, Freddi |
Originator Company Name: Covad |
Owner: Thompson, Jeff |
Director: |
CR PM: Routh, Mark |
Description Of Change |
It would be very beneficial if CLECs could have on-line access to a daily report that would show which orders went held during the day and which orders were missed. This would help facilitate better tracking of these orders and provide a way for both companies to confirm the missed orders. |
Status History |
Date | Action | Description |
11/17/1999 | CR Submitted | Submitted |
11/19/1999 | Info Sent to CLEC | 11/19/99 Received email submission |
11/22/1999 | Status Changed | Logged and validated. Corrected spelling in title. Received status of New To be industry reviewed. Sent email to Geoff Grigsby on CR status. |
12/15/1999 | Status Changed | 12/15/99 Changed status to Evaluated– To be reviewed Sent email to Geoff on CR status changed. |
1/24/2000 | LOE Issued | T-shirt size and options provided at industry team meeting. |
2/2/2000 | Info Sent to CLEC | Sent email to Geoff and Bodgan on CR Form update to Version 04. |
4/19/2000 | Status Changed | Status Hold to be reviewed after IMA 6.0 Scope Commitment agreed to by the Co-Provider Industry Team |
9/20/2000 | Status Changed | Status changed to Cancelled Co-Provider Industry Team. |
9/29/2000 | Info Sent to CLEC | Sent email to Kurt Schwartz about status change. |
11/6/2000 | Status Changed | Changed status to“Reviewed– Under Consideration |
11/13/2000 | Info Sent to CLEC | 11/13/00 Assigned priority level and number. Sent email to Geoff Grigsby on CR status and priority level and number. |
3/26/2002 | Record Update | 05/01/00 Sent email to Geoff and Kurt on CR status and changed contact from Geoff to Kurt. |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 4261631 Detail |
Title: Enhancements to ADSL Loop Pre Qualification | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4261631 |
Completed 12/20/2000 |
- | IMA Common/6 |
Originator: Pennington, Freddi |
Originator Company Name: Covad |
Owner: Thompson, Jeff |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Provide access to the following Loop Qualification information for any loop (i.e. not just for loops that fall into the parameters that support ADSL), including but not limited to: ? Loop Length ? actual (or indicator specifying the length given if the longest designed loop for the distribution area if the actual length cannot be given) ? length by segment ? length by gauge of each segment ? Gauge of Loop ? Composition/Medium of Loop (i.e. fiber, copper etc.) ? Electrical parameters of loop ? Presence, location and type of any equipment on the loop, including but not limited to: ? Load coils and quantity ? bridged taps and length ? pair gains ? DLC's (IDLC, UDLC) ? Feeders/Disturbers in the same or adjacent binder groups ? repeaters and quantity ? DAMLs ? If the loop originates at a remote switching unit
Provide the ability to issue a single request to qualify large volumes of loops (i.e. blocks of 100, by MSA, by wire center, by state, etc)
Provide database extracts of the above listed information stored in LFACS, TIRKS, ARES/Exact and other such legacy applications. The database extracts should be made available by central office on a monthly basis. |
Status History |
Date | Action | Description |
Release Information | IMA Release 6.00 | |
11/5/1999 | CR Submitted | CR submitted |
11/8/1999 | CR Acknowledged | Logged, validated, and updated to version 03 for CR. Received status of New To be industry evaluated. Sent email to Fred Baros with CR, Status, updated version, and prioritization category of Common |
11/11/1999 | Record Update | Industry team reviewed and prioritized. |
11/18/1999 | Status Changed | CR status change to Evaluated To be reviewed, priority level, and priority number. Sent email to Fred Baros on CR changes. |
12/3/1999 | Info Sent to CLEC | CR status change to Reviewed Under consideration. Sent email to Fred Baros on status change and that Karen Kincaid may be contacting him on some clarification. |
1/13/2000 | Info Sent to CLEC | Updated prioritization level and # and sent email to Jill Wiesner, new CR Manager and Industry |
1/24/2000 | Baseline Candidate Selection | Submitted revised CR which was combined with CR #4302410. During the Co-Provider Industry Team meeting this CR was selected as Co-Provider CR Option Release 6.0 inconjuction with implementation of the UNE |
2/1/2000 | Info Sent to CLEC | Sent email to Bodgan and Jill on CR update with changes discussed during the meeting on 01/24/00. |
12/20/2000 | Status Changed | Status changed to Completed In Production |
12/22/2000 | Info Sent to CLEC | Sent email to Joe Ayala and Connie Sanphy with updated CR. |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 4559169 Detail |
Title: Add DS1 and DS3 capable loop LSR to IMA | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4559169 |
Completed 5/16/2001 |
- | IMA GUI/7 | DS1, DS3 |
Originator: Tee, Mary |
Originator Company Name: ELI / Frontier |
Owner: Thompson, Jeff |
Director: |
CR PM: Routh, Mark |
Description Of Change |
This change will enable CLEC to send electronic DS1, DS3, and OCn capable loop LSR to IMA via GUI |
Status History |
Date | Action | Description |
Release Information | IMA Release 6.00 | |
Release Information | IMA Release 7.00 | |
2/9/2000 | CR Submitted | |
3/6/2000 | Status Changed | Logged and status of “New – To be industry evaluated. Sent email to Mary Tee on CR # and status |
3/15/2000 | Info Received From CLEC | Evaluated – To be reviewed. Per Mary Tee email included language on CR to include OCn capable loop. |
3/24/2000 | Info Requested from CLEC | Reviewed, Under Consideration. Sent email to Mary on 03/15 and 03/24/ update. |
4/19/2000 | Additional Information | DS 1 Reviewed. Release Baseline Candidate for IMA Release 6.0 based on only DS1 T-shirt size Medium and option description. And DS3 and OCN are under the status of HOLD -- to be reviewed when product offerings are complete |
5/1/2000 | Info Sent to CLEC | Sent email to Mary on CR statuses and candidate |
10/18/2000 | Status Changed | Status changed to Reviewed – Under consideration for DS3. |
11/8/2000 | Info Sent to CLEC | CR #4559169 was split into 2 – CR #4559169 refers to DS1 and DS3, CR #5204018 refers to OCn. Sent email to Mary with updated CR. |
11/15/2000 | Status Changed | Status changed to Reviewed – Release Baseline Candidate for DS3. |
12/1/2000 | Info Sent to CLEC | Sent email to Mary Tee with updated CR. |
1/12/2001 | Status Changed | Status changed to Committed Candidate IMA Release 7.0 |
1/12/2001 | Record Update | Sent email to Peder Gunderson and Tom Maher with updated CR. |
5/16/2001 | Status Changed | Status changed to Completed, In Production. |
5/18/2001 | Record Update | Sent email to Peder Gunderson and Tom Maher with updated CR |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 5206704 Detail |
Title: Add OCn capable loop LSR to IMA | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
5206704 |
Withdrawn 9/5/2003 |
4050 - 6750 | IMA Common/15 | OCn Loop Orders |
Originator: Tee, Mary |
Originator Company Name: ELI / Frontier |
Owner: Winston, Connie |
Director: |
CR PM: Esquibel-Reed, Peggy |
Description Of Change |
This change will enable CLEC to send electronic OCn capable loop LSR to IMA via GUI |
Status History |
Date | Action | Description |
2/29/2000 | CR Submitted | Submitted |
3/6/2000 | Status Changed | Logged and status of New - To be industry evaluated. Sent email to Mary Tee on CR # and status |
3/6/2000 | Info Sent to CLEC | Sent email to Mary Tee on CR # and status |
3/15/2000 | Info Sent to CLEC | Sent email to Mary on 03/15 update. |
3/15/2000 | Status Changed | Evaluated - To be reviewed. Per Mary Tee email included language on CR to include OCn capable loop. |
3/24/2000 | Info Sent to CLEC | Sent email to Mary on 03/24 update. |
3/24/2000 | Status Changed | Reviewed - Under Consideration |
4/19/2000 | Record Update | To be reviewed when product offerings are complete. |
4/19/2000 | LOE Issued | DS 1 Reviewed - Release Baseline Candidate for IMA Release 6.0 based on only DS1 T-shirt size Medium and option description. And DS3 and OCN are under the status of HOLD -- to be reviewed when product offerings are complete |
5/1/2000 | Info Sent to CLEC | Sent email to Mary on CR statuses and candidate |
11/8/2000 | Related Change Request | CR #4559169 was split into 2 - CR #4559169 refers to DS1 and DS3, this CR refers to Ocn |
11/8/2000 | Info Sent to CLEC | Sent email to Mary with updated CR. |
11/15/2000 | Status Changed | T-Shirt Size TBD and Option provided in CICMP meeting. This CR is in Hold status and will be reviewed when the product offering is complete. |
12/1/2000 | Info Sent to CLEC | Sent email to Mary Tee with updated CR. |
9/30/2001 | Record Update | UR2202 deployed to provide an interim solution for this CR |
1/30/2002 | UR Issued | UR2032 associated with CR 5206704; UR2032 would accomplish the remaining mechanization sought by this CR |
1/31/2002 | Status Changed | Status updated from "On Hold" to "Presented" |
2/12/2002 | Record Update | Impacted system changed from IMA GUI to IMA Common |
2/21/2002 | Additional Information | CR was updated to reflect the fact that this is Ocn capable loops only. The capability for DS1 and DS3 has already been completed. |
2/21/2002 | Discussed at Monthly CMP Meeting | CR is eligible for IMA 11.0 prioritization. |
2/21/2002 | Discussed at Monthly CMP Meeting | 5206704 discussed during 'Review of 11.0 Prioritization Eligible CRs' portion of February Systems CMP Monthly meeting; please see Attachment I of February Systems CMP Distribution Package |
3/1/2002 | Release Ranking | Ranking for Release 11.0 following the February 2002 Systems CMP Meeting. 5206704 ranked number 13 |
3/1/2002 | Status Changed | Status updated to 'Prioritized' from 'Presented' |
4/1/2002 | Release Ranking | Ranking for SATE following the March 2002 Systems CMP Meeting. 5206704 ranked number 16 |
6/7/2002 | Status Changed | 5206704 status updated to 'Pending Prioritization' based upon outcome of IMA 11.0 Packaging Selection vote |
7/18/2002 | Discussed at Monthly CMP Meeting | 5206704 discussed at July Systems CMP Monthly meeting; please see Systems CMP Distribution Package July CMP -- Attachment P |
7/26/2002 | Release Ranking | Ranking for Release 12.0 following the July 2002 Systems CMP Meeting. 5206704 ranked number 60 |
8/28/2002 | Info Requested from CLEC | Sent a note to ELI asking if they wanted to withdraw this CR |
10/30/2002 | Status Changed | 5206704 status updated to 'Pending Prioritization' based upon outcome of release 12.0 packaging effort |
12/19/2002 | Discussed at Monthly CMP Meeting | 5206704 discussed at December Systems CMP Monthly meeting; please see Systems CMP Distribution Package December CMP -- Attachment O |
12/31/2002 | Release Ranking | Ranked #38 for IMA 13.0 Release |
1/23/2003 | Release Ranking | Ranked #43 for IMA 13.0 after exception request SCR011303-02EX |
3/13/2003 | Status Changed | Status changed to Pending Prioritization after Packaging of IMA 13.0 |
3/20/2003 | Discussed at Monthly CMP Meeting | 5206704 discussed at March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP. |
4/7/2003 | Release Ranking | 14.0 Prioritization- Ranked #34 out of 53 |
4/17/2003 | Discussed at Monthly CMP Meeting | 5206704 discussed at April Systems CMP Monthly meeting; please see April Systems CMP Distribution Package, Attachment N. |
4/29/2003 | Release Ranking | Rank changed due to Late Adders- Ranked #36 |
5/30/2003 | Release Ranking | Rank changed due to Late Adders- Ranked #37 |
7/9/2003 | Status Changed | Status changed to pending prioritization with release of I MA 14.0 Packaging. |
8/21/2003 | Discussed at Monthly CMP Meeting | Discussed at the August Systems CMP Monthly Meeting; please see August Systems CMP Distribution Package, Attachment P |
8/27/2003 | Info Requested from CLEC | Sent email to ELI asking if CR is to be withdrawn. |
9/2/2003 | Release Ranking | 15.0 Prioritization- Ranked #55 out of 57 |
9/29/2003 | Release Ranking | 15.0 Revised Prioritization, due to Late Adder - Ranked #56 out of 58 |
Project Meetings |
Email from Kelly Morris/ELI: thanks - you too! Kelly
-- September 5, 2003 Email Sent to Kelly Morris at ELI: Kelly -- Thank you for your attention in this matter. I have changed the status of this CR to 'Withdrawn', based on your approval to close. Thanks and have a great weekend. Peggy Esquibel-Reed Qwest CRPM - Systems
-- September 5, 2003 Email Received from Kelly Morris/ELI: Peggy, Mary Tee is no longer with Electric Lightwave. I have reviewed this CR and feel that it can be closed at this time. Please address any future CR's for Electric Lightwave to me. I am the primary POC and attend the CMP monthly calls, however missed the August System call. Thank you, Kelly Morris Logistics Analyst Electric Lightwave
August 27, 2003 Email sent to John Sheehan at ELI/Frontier: Hello John -- This email is in regard to a CMP CR submitted by ELI/Frontier. It was originated by Mary Tee. I do not have a current telehone number or email address for her....that is how I picked you, as the Primary Point of Contact for ELI/Frontier, to be the recipient of my question. Attached is a copy of the ELI CMP CR, 5206704 Add OCn Capable Loop LSR to IMA, that the question pertains to. At the August Systems CMP Meeting, the CLEC Community stated that this CR was to have been withdrawn quite a while ago. Would you please review the CR and advise if you are still interested in the CR or if you do indeed want the CR to be withdrawn. It is currently included in the 15.0 Prioritization vote. Thank you, Peggy Esquibel-Reed Qwest CRPM -- Systems Peggy.Esquibel-Reed@qwest.com
-- August 21, 2003 Systems CMP Meeting Discussion: Liz Balvin/MCI stated that this CR had been though Prioritization several times and that she thought that ELI was going to be contacted to see if they wanted to withdraw this CR. Connie Winston/Qwest stated that Qwest would contact ELI again. There were no additional comments or questions.
-- March 20, 2003 Systems CMP Meeting Discussion Regarding IMA 14.0 Prioritization: This CR was submitted by ELI/Frontier and are not on the bridge. There were no questions or comments regarding this request. -- December 19, 2002 Systems CMP Meeting Discussion: Kit Thomte/Qwest reviewed the prioritization process as defined in the CMP document. She noted that December 30th, 2002 is the due date for submitted votes. Judy Schultz/Qwest noted that the due date would be included in the instructions in the notification that goes out with the ballot. Kit Thomte/Qwest reviewed the sample prioritization form. ELI/Frontier was not present at the meeting.
|
CenturyLink Response |
|
Archived System CR 5212925 Detail |
Title: Make the field length for IMPCON, ALT IMP CON, and DESIGNER fields at least 24 characters | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
5212925 |
Withdrawn 1/12/2001 |
- | Other/ |
Originator: Douglas, Kerrie |
Originator Company Name: Eschelon |
Owner: Routh, Mark |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Currently these fields are 15 characters and do not allow for entry of the entire name of contacts. When Qwest needs to contact the individual they may not get the appropriate person needed to resolve an issue. |
Status History |
Date | Action | Description |
11/8/2000 | CR Submitted | New - To be validated |
11/10/2000 | Status Changed | Status changed to New - To be industry evaluated |
11/10/2000 | Info Sent to CLEC | Sent email to Kerrie Douglas with CR # and status. |
12/4/2000 | Status Changed | Status changed to Reviewed - Under consideration |
12/5/2000 | Info Sent to CLEC | Sent email to Lynne Powers with updated CR. |
1/12/2001 | Status Changed | Status changed to Cancelled - Co-Provider |
1/12/2001 | Info Sent to CLEC | Sent email to Lynne Powers and Judy Rixe with updated CR. |
12/18/2001 | Record Update | Changed status from 'Cancelled CLEC' to 'Withdrawn' for database cleanup |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 5216413 Detail |
Title: Implement a process for CLECs to upload PIC information to Qwest to compare to the PICs in Predictor | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
5216413 |
Withdrawn 1/2/2001 |
- | Other/ |
Originator: Douglas, Kerrie |
Originator Company Name: Eschelon |
Owner: Routh, Mark |
Director: |
CR PM: Routh, Mark |
Description Of Change |
We would like a process created to compare CLEC PIC information to what is in Qwest’s Predictor system. Ideally we would like to upload a file to Qwest and have them run a query comparing the PIC information, which resides on a particular Qwest switch and then have the query results returned to the CLEC. We want this process to have the ability to be run on a nightly basis as needed. A second part of this request would be for Qwest to include a query based upon TN’s that would include information and verification that the number does or does not reside on the Qwest switch. |
Status History |
Date | Action | Description |
11/10/2000 | CR Submitted | New - To be validated |
11/13/2000 | Status Changed | New - To be clarified |
11/13/2000 | Info Received From CLEC | Sent email asking for CR clarification to Kerrie Douglas with CR # and status. |
1/12/2001 | Status Changed | Canceled - Co-Provider |
12/18/2001 | Record Update | Changed status from 'Cancelled CLEC' to 'Withdrawn' for database cleanup |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 5235881 Detail |
Title: CSRs for Centrex in electronic format | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
5235881 |
Completed 1/11/2001 |
- | IMA Common/6 |
Originator: Douglas, Kerrie |
Originator Company Name: Eschelon |
Owner: Routh, Mark |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Eschelon currently receives a monthly paper report of Centrex CSR’s. We would like this returned to us via IMA. In the interim while this is in development for IMA, Eschelon would like to receive the Centrex CSR information in a format such as a spread sheet or database that allows a find feature rather than have someone search through a large amount of output manually. |
Status History |
Date | Action | Description |
Release Information | IMA Release 6.00 | |
11/17/2000 | CR Submitted | New - To be validated |
11/21/2000 | Info Sent to CLEC | Sent email to Kerrie Douglas and Pat Brolsma with CR # and Status |
11/21/2000 | Status Changed | New - To be industry evaluated |
12/4/2000 | Status Changed | Status changed to Reviewed - Under consideration |
12/5/2000 | Info Sent to CLEC | Sent email to Lynne Powers with updated CR. |
1/11/2001 | Info Sent to CLEC | Sent Email to Lynne Powers and Judy Rixe with updated CR. |
1/11/2001 | Status Changed | Status changed to Completed - In Production. |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 5236278 Detail |
Title: Develop a process using the Predictor system to verify if a TN has been taken off Qwest’s switch | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
5236278 |
Completed 2/21/2002 |
- | Process & Documentation/ | Switch Information | All products that use TN |
Originator: Douglas, Kerrie |
Originator Company Name: Eschelon |
Owner: Routh, Mark |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Eschelon would like Qwest to develop a process for CLEC’s to check recently migrated TN’s and verify that the TN’s no longer reside on Qwest’s switch. This process should allow for the following: the information should be accessible at any time and should be real time information off the Predictor system rather than a batch process. |
Status History |
Date | Action | Description |
11/17/2000 | CR Submitted | New - To be validated |
11/21/2000 | Status Changed | New - To be industry evaluated |
11/21/2000 | Info Sent to CLEC | Sent email to Kerrie Douglas and Pat Brolsma with CR # and Status. |
12/4/2000 | Status Changed | Status changed to Reviewed - Under consideration |
12/5/2000 | Info Sent to CLEC | Sent email to Lynne Powers with updated CR. |
12/13/2000 | Status Changed | Status changed to Hold per Kerrie Douglas. |
12/14/2000 | Info Sent to CLEC | Sent email to Lynne Powers with updated CR. |
3/21/2001 | Status Changed | Status changed to Reviewed - Release Batch Candidate. |
3/29/2001 | Info Sent to CLEC | Sent email to Lynne Powers and Janet Houston with updated CR |
2/5/2002 | Qwest Response Issued | Qwest provided a response to this CR indicating that the CLEC already has this information |
2/5/2002 | Status Changed | CLEC Test |
2/21/2002 | Status Changed | This request was declared completed by Kathy Stichter in the Feb CMP meeting. |
2/21/2002 | Discussed at Monthly CMP Meeting | 5236278 discussed during 'CRs to consider for Closure' portion of February Systems CMP Monthly meeting; please see Attachment E of February Systems CMP Distribution Package |
Project Meetings |
|
CenturyLink Response |
Qwest does not necessarily remove a TN from the switch when it is transferred to another carrier. The TN is flagged as removed but does actually get removed right away. The actual port is visible via their access to the NPAC. With the triggers set the TN will not be removed until the port is successful. Therefore, CLECs already have access to see the actual port.
|
Archived System CR 5043011 Detail |
Title: Add an online glossary of the field title abbreviations to help menu of IMA GUI | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
5043011 |
Withdrawn 10/30/2002 |
1325 - 2225 | IMA GUI/ | All Products |
Originator: Douglas, Kerrie |
Originator Company Name: Eschelon |
Owner: Winston, Connie |
Director: |
CR PM: Nolan, Laurel |
Description Of Change |
Add an online glossary under the help menu in IMA GUI. This should identify the acronyms/abbreviations for the IMA GUI field titles so provisioners won’t need to look them up under another source.
Qwest Business Description: Add an online glossary of the field title abbreviations to the help menu of IMA GUI. |
Status History |
Date | Action | Description |
8/31/2000 | CR Submitted | New - To be validated |
9/1/2000 | Status Changed | New - To be industry evaluated |
9/1/2000 | Info Sent to CLEC | Sent email to Kerrie Douglas with CR # and status. |
9/20/2000 | Status Changed | Status changed to Evaluated - To be reviewed. |
9/22/2000 | Status Changed | Status changed to Reviewed - Under consideration. |
9/29/2000 | Info Sent to CLEC | Sent email to Kerrie Douglas about status changes. |
10/18/2000 | LOE Issued | T-Shirt Size Medium and Option provided in CICMP meeting. Eligible for industry prioritization. |
10/25/2001 | Status Changed | Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization |
10/31/2001 | Release Ranking | Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. 5043011 ranked 25 |
1/17/2002 | Status Changed | CR # 5043011 status updated to 'Presented; CR was not packaged as part of 10.0 and is eligible for ranking in 11.0' |
2/21/2002 | Discussed at Monthly CMP Meeting | Eligible for the IMA 11.0 Prioritization. |
2/21/2002 | Discussed at Monthly CMP Meeting | Eligible for the IMA 11.0 Prioritization. |
2/21/2002 | Discussed at Monthly CMP Meeting | 5043011 discussed during 'Review of 11.0 Prioritization Eligible CRs' portion of February Systems CMP Monthly meeting; please see Attachment I of February Systems CMP Distribution Package |
3/1/2002 | Release Ranking | Ranking for Release 11.0 following the February 2002 Systems CMP Meeting. 5043011 ranked number 18 |
3/1/2002 | Status Changed | Status updated to 'Prioritized' from 'Presented' |
6/7/2002 | Status Changed | 5043011 status updated to 'Pending Prioritization' based upon outcome of IMA 11.0 Packaging Selection vote |
7/18/2002 | Discussed at Monthly CMP Meeting | 5043011 discussed at July Systems CMP Monthly meeting; please see Systems CMP Distribution Package July CMP -- Attachment P |
7/26/2002 | Status Changed | Status set to Prioritized as a result of the release prioritization for IMA 12.0 |
7/26/2002 | Release Ranking | Ranking for Release 12.0 following the July 2002 Systems CMP Meeting. 5043011 ranked number 59 |
10/30/2002 | Status Changed | 5043011 status updated to 'Pending Prioritization' based upon outcome of release 12.0 packaging effort |
12/19/2002 | Discussed at Monthly CMP Meeting | 5043011 discussed at December Systems CMP Monthly meeting; please see Systems CMP Distribution Package December CMP -- Attachment O |
Project Meetings |
12/19/02- Systems CMP Meeting Bonnie Johnson-Eschelon requested that this CR be withdrawn. CR statused changed to pending withdrawal.
|
CenturyLink Response |
|
Archived System CR 5043062 Detail |
Title: IMA Monthly System Outage Reporting | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
5043062 |
Withdrawn 2/21/2001 |
- | IMA Common/ |
Originator: Powers, Lynne |
Originator Company Name: Eschelon |
Owner: Routh, Mark |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Provide a comprehensive monthly summary of unplanned IMA system outages. This report should include: date and time the system went down and date and time the issue was resolved, duration of outage, trouble ticket number, nature of problem and resolution. |
Status History |
Date | Action | Description |
Release Information | IMA Release | |
8/31/2000 | CR Submitted | New - To be validated |
9/1/2000 | Info Sent to CLEC | Sent email to Kerrie Douglas with CR # and status. |
9/1/2000 | Status Changed | New - To be industry evaluated |
9/20/2000 | Status Changed | Status changed to Evaluated - To be reviewed. |
9/22/2000 | Status Changed | Status changed to Reviewed - Under consideration. |
9/29/2000 | Info Sent to CLEC | Sent email to Kerrie Douglas and Lynne Powers about status changes. |
10/18/2000 | Record Update | CR did not receive a T-Shirt Size and Option in CICMP meeting. Not eligible for industry prioritization. |
11/8/2000 | Info Sent to CLEC | Sent email to Lynne Powers with updated CR. |
11/15/2000 | LOE Issued | T-Shirt Size NA and Option provided in CICMP meeting. CR is not eligible for industry prioritization. |
12/1/2000 | Info Sent to CLEC | Sent email to Lynne Powers with updated CR |
2/21/2001 | Status Changed | Status changed to Canceled - Qwest. CR was Declined by Qwest because Qwest provides the information to the ROC and it is publicly available on the Qwest web site. |
3/2/2001 | Info Sent to CLEC | Sent email to Lynne Powers and Judy Rixe with updated CR. |
12/18/2001 | Record Update | Changed status from 'Cancelled CLEC' to 'Withdrawn' for database cleanup |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 5043076 Detail |
Title: Create a separate field for line numbers in EDI responses | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
5043076 |
Withdrawn 3/21/2002 |
3000 - 5500 | IMA EDI/ |
Originator: Douglas, Kerrie |
Originator Company Name: Eschelon |
Owner: Winston, Connie |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Currently, line reference numbers for multiloop orders are returned embedded in the message text in the detail section of EDI responses (855Fatal, 865Fatal, 865JEOP) from Qwest. While the line numbers are detectable by provisioners, we would like this information to be placed in its own field (OREF NUM / LNUM) in the EDI response to enable automated flow through of orders. |
Status History |
Date | Action | Description |
Record Update | On Hold in STAR, Eschelon does not have EDI. | |
8/31/2000 | CR Submitted | New - To be validated |
9/1/2000 | Status Changed | New - To be industry evaluated |
9/1/2000 | Info Sent to CLEC | Sent email to Kerrie Douglas with CR # and status. |
9/20/2000 | Status Changed | Status changed to Evaluated - To be reviewed. |
9/22/2000 | Status Changed | Status changed to Reviewed - Under consideration |
9/29/2000 | Info Sent to CLEC | Sent email to Kerrie Douglas about status changes. |
10/18/2000 | LOE Issued | T-Shirt Size Medium and Option provided in CICMP meeting. Kerrie Douglas to determine if TN or ECCKT is the identifier for this CR. This CR will be resized for the November 15 CICMP meeting and is not eligible for industry prioritization. |
10/24/2000 | Info Received From CLEC | Kerrie Douglas sent email stating that feedback about this from provisioning is that they need both (TN and ECCKT). This information has been updated in the Additional Information section. |
11/8/2000 | Info Sent to CLEC | Sent email to Kerrie Douglas with updated CR. |
11/15/2000 | LOE Issued | T-Shirt Size Large and Option provided in CICMP meeting. Eligible for industry prioritization. |
12/1/2000 | Info Sent to CLEC | Sent email to Lynne Powers with updated CR. |
3/21/2001 | Status Changed | Status changed to Reviewed - Release Baseline Candidate for IMA Release 9.0 |
3/29/2001 | Info Sent to CLEC | Sent email to Lynne Powers and Janet Houston with updated CR. |
2/13/2002 | Status Changed | Status updated from On Hold to Presented; candidate is eligible for 11.0 Ranking |
2/21/2002 | Discussed at Monthly CMP Meeting | CR is eligible for IMA 11.0 prioritization. |
2/21/2002 | Discussed at Monthly CMP Meeting | 5043076 discussed during 'Review of 11.0 Prioritization Eligible CRs' portion of February Systems CMP Monthly meeting; please see Attachment I of February Systems CMP Distribution Package; Eschelon indicated that CR would be reviewed for possible withdraw |
2/25/2002 | Status Changed | Based on the following e-mail from Kathy Stichter on 2/25/02, this CR has been withdrawn by Eschelon. Mark, Eschelon has investigated the CR5043076 and have determined that Eschelon will withdraw this CR. Thanks |
3/1/2002 | Release Ranking | Ranking for Release 11.0 following the February 2002 Systems CMP Meeting. 5043076 ranked number 34 |
3/1/2002 | Status Changed | Status updated to 'Prioritized' from 'Presented' |
3/4/2002 | Status Changed | Status was changed from "Prioritized" to "Pending Withdrawl" |
3/21/2002 | Status Changed | Eschelon has withdrawn this CR. |
3/21/2002 | Discussed at Monthly CMP Meeting | 5043076 discussed March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP - Attachment E |
Project Meetings |
|
CenturyLink Response |
Qwest will consider doing this work when Eschelon implements the EDI inteface for processing order transactions.
|
Archived System CR 5043134 Detail |
Title: Populate all Billmate Fields/Columns | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
5043134 |
Completed 2/21/2002 |
- | Wholesale Billing Interfaces/ | Billmate |
Originator: Markert, William |
Originator Company Name: Eschelon |
Owner: Routh, Mark |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Qwest currently does not populate all columns/fields within billmate files. In some regions, the information is populated, but other regions it is not. One example is toll calling plans. All fields must be populated to allow proper validation of the charges. This should include the following detail data:· WTN for the OCC records· WTN on the MONSERV records· USOC itemization on the OCC records· USOC itemization on the MONSERV records· OCC text for the OCCPHRSE records |
Status History |
Date | Action | Description |
8/31/2000 | Status Changed | New - To be validated. |
8/31/2000 | CR Submitted | New - To be clarified |
9/1/2000 | Info Sent to CLEC | Sent email to Kerrie Douglas with CR # and status. |
9/1/2000 | Record Update | Discussed CR clarification with Kerrie Douglas in phone call. Changed Interfaces Impacted section |
9/1/2000 | Status Changed | New - To be industry evaluated |
9/20/2000 | Status Changed | Status changed to Evaluated - To be reviewed. |
9/22/2000 | Status Changed | Status changed to Reviewed - Under consideration. |
9/29/2000 | Info Sent to CLEC | Sent email to Kerrie Douglas and William D. Markert about status changes. |
10/18/2000 | LOE Issued | T-Shirt Size Medium and Option provided in CICMP meeting. Eligible for industry prioritization. |
11/8/2000 | Info Sent to CLEC | Sent email to William D. Markert with updated CR. |
12/14/2000 | Info Sent to CLEC | Sent email to Lynne Powers with updated CR. (Being worked) |
12/14/2000 | Info Received From CLEC | In an email from Bill Markert to Alan Zimmerman on 11/30/00, he stated that the additional detailed data is being received. |
1/17/2002 | Discussed at Monthly CMP Meeting | CR # 5043134 discussed at January CMP meeting during 'CRs to Consider for Closure' (Attachment D of Distribution Package); per discussion, CR is NOT closed |
2/12/2002 | Record Update | Eschelon indicated that this CR could be closed. |
2/21/2002 | Status Changed | This request was declared as completed by Bill Markert and discussed at the Feb CMP meeting. |
2/21/2002 | Discussed at Monthly CMP Meeting | 5043134 discussed during 'CRs to consider for Closure' portion of February Systems CMP Monthly meeting; please see Attachment E of February Systems CMP Distribution Package |
Project Meetings |
A follow up call was held with Eschelon on 2/12/02. The attendees were: Bill Markert, Ellen Copley, Kathy Stichter, Alan Zimmerman and Mark Routh. Mark opened the call by reviewing the CR and sstating that Bill had asked for this call to go over a few open issues for the CR. He indicated that the USOCs are now being populated on the MonServ file and that the line reflected in BillMate are now showing up as well as the ANI associated to the USOCs. He indicated that this CR could be closed.
|
CenturyLink Response |
|
Archived System CR 5043149 Detail |
Title: Bill Mate Uniformity | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
5043149 |
Withdrawn 2/21/2001 |
- | Wholesale Billing Interfaces/ | Billmate |
Originator: Markert, William |
Originator Company Name: Eschelon |
Owner: Routh, Mark |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Eschelon requires that Qwest provide billmate files in a uniform format for all of its states/regions. It is too difficult to create invoice validation systems when multiple formats of bill mate are received. It is sometimes impossible to properly validate Qwest invoices in a timely manner because of this. |
Status History |
Date | Action | Description |
8/31/2000 | CR Submitted | New - To be clarified |
8/31/2000 | Status Changed | New - To be validated |
9/1/2000 | Status Changed | New - To be industry evaluated |
9/1/2000 | Info Sent to CLEC | Sent email to Kerrie Douglas with CR # and status. |
9/1/2000 | Record Update | Discussed CR clarification with Kerrie Douglas in phone call. Changed Interfaces Impacted section |
9/20/2000 | Status Changed | Status changed to Evaluated -To be reviewed. |
9/22/2000 | Status Changed | Status changed to Reviewed - Under consideration. |
9/29/2000 | Info Sent to CLEC | Sent email to Kerrie Douglas and William D. Markert about status changes. |
10/18/2000 | LOE Issued | T-Shirt Size NA and Option provided in CICMP meeting. Qwest will identify a list of items that cannot be changed within BillMate and is not eligible for industry prioritization. |
11/8/2000 | Info Sent to CLEC | Sent email to William D. Markert with updated CR. |
2/21/2001 | Status Changed | Status changed to Canceled - Qwest. This is due to the fact that there will not be a single billing platform. |
2/27/2001 | Info Sent to CLEC | Sent email to William D. Markert, Lynne Powers and Judy Rixe with updated CR |
12/18/2001 | Record Update | Changed status from 'Cancelled CLEC' to 'Withdrawn' for database cleanup |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 5043176 Detail |
Title: Better Explanations of OCCs on Invoices | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
5043176 |
Completed 3/16/2005 |
- | Wholesale Billing Interfaces/ | Invoicing |
Originator: Markert, William |
Originator Company Name: Eschelon |
Owner: Winston, Connie |
Director: |
CR PM: Stecklein, Lynn |
Description Of Change |
Provide more detailed explanation/description of OC&C charges contained within billmate files. Currently, billmate reflects OC&C descriptions as either “non-recurring charges” or “fractional charges”. Rather than reflecting these vague descriptions, Eschelon would like to have the USOC listed and the description of the USOC listed, similar to how descriptions and USOCs are contained on the Monserve file. Please review the attachment of “occphrase” files for each state for examples. |
Status History |
Date | Action | Description |
8/31/2000 | CR Submitted | New - To be clarified |
8/31/2000 | Status Changed | New - To be validated. |
9/1/2000 | Status Changed | New - To be industry evaluated. Discussed CR clarification with Kerrie Douglas in phone call. Changed Interfaces Impacted section. Sent email to Kerrie Douglas with CR # and status. |
9/1/2000 | Info Sent to CLEC | Sent email to Kerrie Douglas with CR # and status. |
9/1/2000 | Record Update | Discussed CR clarification with Kerrie Douglas in phone call. Changed Interfaces Impacted section |
9/20/2000 | Status Changed | Status changed to Evaluated - To be reviewed. Request made in CICMP meeting to split this CR into 2. |
9/22/2000 | Status Changed | Status changed to Reviewed - Under consideration. |
9/27/2000 | Related Change Request | CR was split into 2 - this CR refers to OCC charges, CR #5110474 refers to termination penalty. |
9/29/2000 | Info Sent to CLEC | Sent email to Kerrie Douglas and William D. Markert about status changes. |
10/18/2000 | LOE Issued | T-Shirt Size Extra Large and Option provided in CICMP meeting. Eligible for industry prioritization. |
11/8/2000 | Info Sent to CLEC | Sent email to William D. Markert with updated CR. (Being worked) |
12/13/2001 | Status Changed | Waiting for Bill Markert to confirm that the requirements have been fully met. |
2/13/2002 | Additional Information | Alan had Tom Moynihan investigate the issue. |
2/21/2002 | Discussed at Monthly CMP Meeting | Mark Routh/Qwest presented this CR. This CR will remain open until the USOC issue in Washington and Oregon is resolved. |
2/27/2002 | Additional Information | Waiting for Alan Zimmerman to reply on the missing USOC information for Washington and Oregon. |
4/8/2002 | Additional Information | Tom Moynihan determined that the information is not provided to Billmate and should not appear on the SOACTVTY.det file. |
4/18/2002 | Status Changed | Placed back into Development. To be implemented in June. |
4/18/2002 | Discussed at Monthly CMP Meeting | 5043176 discussed at April Systems CMP Monthly meeting; please see Systems CMP Distribution Package April CMP -- Attachment E |
5/3/2002 | Info Requested from CLEC | Requested that we close this CR and open a new to specifically address USOC information for miscellaneous charges. |
5/9/2002 | CLEC Provided Information | Kathy Stichter would like to keep this CR open and address the USOC information as part of this CR. |
5/16/2002 | Discussed at Monthly CMP Meeting | This CR was was discussed at the May CMP meeting. Qwest will determine when this can be completed. |
6/20/2002 | Discussed at Monthly CMP Meeting | 5043176 discussed at June Systems CMP Monthly meeting; please see Systems CMP Distribution Package June CMP -- Attachment I; Qwest explained that development work is being scheduled |
6/21/2002 | Status Changed | Status changed back to Evaluation as Qwest works to schedule the work for the Western Region solution |
9/19/2002 | Discussed at Monthly CMP Meeting | 5043176 discussed at September Systems CMP Monthly meeting; please see Systems CMP Distribution Package September CMP -- Attachment I |
9/19/2002 | Status Changed | Status updated to "CLEC Test" |
9/19/2002 | Discussed at Monthly CMP Meeting | 5043176 discussed at September Systems CMP Monthly meeting; please see Systems CMP Distribution Package November CMP -- Attachment G |
10/17/2002 | Discussed at Monthly CMP Meeting | 5043176 discussed at October Systems CMP Monthly meeting; please see Systems CMP Distribution Package October CMP -- Attachment G |
11/12/2002 | Additional Information | Trouble Ticket 6067501 issued to address repair record order issue |
11/21/2002 | Discussed at Monthly CMP Meeting | 5043176 discussed at November Systems CMP Monthly meeting; please see Systems CMP Distribution Package November CMP -- Attachment G |
12/19/2002 | Discussed at Monthly CMP Meeting | 5043176 discussed at December Systems CMP Monthly meeting; please see Systems CMP Distribution Package December CMP -- Attachment G |
1/17/2003 | Discussed at Monthly CMP Meeting | 5043176 discussed at January Systems CMP Monthly meeting; please see Systems CMP Distribution PackageJanuary CMP -- Attachment G |
2/21/2003 | Discussed at Monthly CMP Meeting | 5043176 discussed at February Systems CMP Monthly meeting; please see Systems CMP Distribution Package February CMP -- Attachment G |
4/29/2003 | Discussed at Monthly CMP Meeting | 5043176 discussed at April Systems CMP Monthly meeting; please see Systems CMP Distribution Package April CMP |
5/22/2003 | Discussed at Monthly CMP Meeting | 5043176 Discussed at May Monthly Systems Meeting - See Distribution Package May - Attach G |
6/24/2003 | Discussed at Monthly CMP Meeting | SCR101102-01 Discussed atJune Monthly Systems Meeting - See Distribution Package June Attach G |
7/17/2003 | Discussed at Monthly CMP Meeting | Discussed at July CMP Systems Meeting - Please see July CMP Systems Distribution Package - Attachment G |
8/22/2003 | Discussed at Monthly CMP Meeting | Discussed at August CMP Monthly Meeting - See August Systems CMP Distribution Package - Attachment G |
9/22/2003 | Discussed at Monthly CMP Meeting | Discussed at the September Systems CMP Monthly Meeting; please see September Systems CMP Distribution Package - Attachment G |
10/16/2003 | Discussed at Monthly CMP Meeting | Discussed at the Oct CMP Systems Meeting - See attachment G |
10/17/2003 | Status Changed | Status changed to development |
11/20/2003 | Discussed at Monthly CMP Meeting | |
5/20/2004 | Discussed at Monthly CMP Meeting | Discussed at the May Systems CMP Meeting - See attachment I in the May Systems Distribution Package |
11/17/2004 | Discussed at Monthly CMP Meeting | Discussed at the November CMP Systems Meeting - See attachment G in Distribution Package |
11/19/2004 | Communicator Issued | SYST.11.19.04.F.02323.CRISJanTechSpecsRelNotes |
12/28/2004 | Discussed at Monthly CMP Meeting | Discussed at the December CMP Systems Meeting - See attachment G in Distribution Package |
1/19/2005 | Discussed at Monthly CMP Meeting | Discussed at the January CMP Systems Meeting - See attachment K in Distribution Package |
2/2/2005 | Communicator Issued | SYST.01.31.05.F.02511.CRISJanRelFinalNotice |
2/3/2005 | Status Changed | Status changed to CLEC Test |
2/16/2005 | Discussed at Monthly CMP Meeting | Discussed at the February Systems CMP Meeting - See attachment G in the Distribution Package |
3/16/2005 | Status Changed | Status changed to Completed |
3/16/2005 | Discussed at Monthly CMP Meeting | Discussed at the March Systems CMP Meeting - See Attachment G - Systems Distribution Package |
Project Meetings |
3/16/05 Systems CMP Meeting Discussion: Bonnie Johnson - Eschelon stated that this CR could be closed. 2/16/05 Systems CMP Meeting Jill Martain - Qwest stated that this CR was deployed on January 31st and that Qwest would like to close the CR. Kathy Stichter - Eschelon stated that Eschelon would like to leave this CR open another month until they have the opportunity to review the 25th bills. 1/19/05 Systems CMP Meeting Jill Martain/Qwest stated that this CR is still on target for the January 31, 2005 implementation date. 12/15/04 Systems CMP Meeting Connie Winston/Qwest stated that this CR was scheduled and deployed and subsequently the CLECs opened trouble tickets. Connie said that this only applies to the Western Region. Connie said that when SCR061703-01IG was submitted some complexities were identified that did not allow this functionality to work successfully. Connie said that due to this effort, the date in January should not slip. Kathy Stichter/Eschelon asked if Qwest was confident that the date would not slip because all the problems have been identified and fixed. Connie Winston/Qwest stated that we believe we have found the code to fix and have upgraded the test case. Connie said that we feel confident that the date will not slip. John Berard/Covad asked what the implementation date was. Peggy Esquibel-Reed/Qwest said that the implementation is January 31, 2005. Jill Martain/Qwest stated that this action item will be closed.
11/17/04 Systems CMP Meeting Jill Martain/Qwest stated that the targeted date for this request is 1/31/05. Kathy Stichter/Eschelon asked why the implementation date moved from December to January. Kathy said that this work started in August of 2000 and that Qwest has moved the implementation date 4 times. Kathy asked Qwest why this work has been delayed so many times. Jill Martain/Qwest said that she understood Eschelon’s concern and would research and get back to Eschelon. Bonnie Johnson/Eschelon stated that they want an explanation and commitment that this new date will not be moved out again. 5/20/04 Systems CMP Meeting Discussion: Peggy Esquibel-Reed/Qwest stated that the targeted implementation date for this CR is 12/4/04. This action item will be closed. 10/16/03 CMP Systems Meeting Kathy Stichter/Eschelon asked if this CR could be moved to another section or category. Connie Winston/Qwest stated that was a good idea since the work to complete is still underway. This status of this CR will move to development. 9/18/03 CMP Systems Meeting Lynn Notarianni/Qwest stated that trouble ticket 44886 and a CMP CR SCR061703-03IG are semi related for Western CRIS. Lynn said that we originally were looking to provide the rates with the USOCs on the BOS BDT and now will provide on all formats, not just the BOS BDT. Lynn said that we would work the trouble ticket 44886 and SCR061703-03IG together because of the common resources and common modules. Lynn stated that the targeted implementation date is June of 2004. Kathy Stichter/Eschelon stated that this CR, with that targeted implementation, will be two months shy of 4 years old. Lynn Notarianni/Qwest said that she understood. Bonnie Johnson/Eschelon asked if Qwest was asking them to close this CR. Lynn Notarianni/Qwest said that no, Qwest will be working these together. Bonnie Johnson/Eschelon asked that the CR have the notes updated to reflect this information. Lynn Notarianni/Qwest noted that Qwest would inform the CLECs if there is a change in the date. 8/21/03 CMP systems meeting Lynn Notarianni/Qwest stated that we had a meeting with Eschelon to determine what we needed to do to close this request. She said that the meeting was successful and now we are moving forward with working and scheduling the Date TBD trouble ticket based on that meeting. She indicated that this CR will remain in CLEC Test. 7/17/03 CMP Systems Meeting Lynn Notarianni/Qwest stated that there is an outstanding trouble ticket with a date of TBD. This trouble ticket is associated with USOCs in the Western Region. We are currently looking at scheduling. 6/19/03 CMP Systems Meeting Lynn Notarianni/Qwest stated that there is an event notification on this with a Date TBD. Lynn stated that there is not yet a date for the patch so the CR will remain open. Kathy Stichter/Eschelon stated that Eschelon is still having problems with Washington & Oregon. This CR will remain in CLEC Test. 5/22/03 CMP Systems Meeting Kathy Stichter/Eschelon said that this CR needs to remain open. She said that she still is not seeing the USOCs on the Washington bill. There was an event notification that went out on this and they would still like to review the bills.
4/24/03 e-mail received from Eschelon To:"Stichter, Kathleen L."
Subject:Re: CR 5043176, SCR060402-04
Hi Kathy
Thanks for the information on CR5043176 and SCR060402-04. I have advise the IT team of your trouble ticket and please let me know if you are not getting a response from the help desk.
Thanks,
Lynn Stecklein 303 896-0547 lsteckl@qwest.com
4/24/03 From: Lynn Stecklein To: Kathy Stichter Re: CR 5043176, SCR060402-04
Hi Kathy
Thanks for the information on CR5043176 and SCR060402-04. I have advise the IT team of your trouble ticket and please let me know if you are not getting a response from the help desk.
Thanks,
Lynn Stecklein 303 896-0547 lsteckl@qwest.com To:lsteckl@qwest.com cc:
Subject: CR 5043176, SCR060402-04
Lynn, For CR 5043176, Better Explanations of OCC, the USOCs for MOS (Maintenance of Service Charges) are still not showing on our April 5, 2003 bills in Oregon, 503-Z05-0182 & 503-Z05-0210 and our March 25, 2003 bills in Washington, 206-Z25-0026, 206-Z25-0041, 206-Z25-0820. There was a patch that was to fix the problem on 3/14/03. For CR SCR060402-04, BillMate to include CKT ID and date of Qwest dispatch for MOS charges, the CKT IDs are still not showing on our April 1, 2003 bill in Minnesota, 320-Z01-0310 and our March 25, 2003 bills in Washington, 206-Z25-0026, 206-Z25-0041, 206-Z25-0820. This was to be effective on March 17, 2003. I called a ticket into the Help Desk, ticket number 6213921. Kathy Stichter Senior Invoice Validation Analyst Eschelon Telecom, Inc 612-436-6022 klstichter@eschelon.com
4/17/03 CMP Systems Meeting Lynn Notarianni/Qwest indicated that there was a trouble ticket against this CR that had a patch implemented on 3/14/03 that corrected this problem and asked if Eschelon would like to close this CR. Kathy Stichter/Eschelon stated that she would like to leave this CR open one more month. She said that Eschelon’s bills are received at the end of the month and would like to review them before closing.
3/20/03 CMP Systems Meeting This CR will remain in CLEC test.
2/20/03 CMP Systems Meeting Connie Winston/Qwest stated that there was a trouble ticket with a date of TBD associated with this Change Request. There was an Event Notification issued on January 21, 2003 that provided the patch date of March 14, 2003.
January 16, 2003 Systems CMP Meeting Connie Winston/Qwest said that we are still trying to get this scheduled. The maintenance and repair USOCs are not showing up on OCC phrases for ‘R’ orders. This Change Request will remain in CLEC Test.
December 19, 2002 Systems CMP Meeting Kathy Stichter/Eschelon said that she would like this CR to remain open until the trouble ticket is cleared. Connie Winston/Qwest said this CR will remain in CLEC Test until Ticket # 6067501 (See Attachment M for details) is completed.
November 12, 2002 Trouble Ticket 6067501 issued to address record order repair issue
October 17, 2002 CMP Systems Meeting Michael Buck/Qwest stated that this has been fixed and that Qwest has been working with Kathy Stichter (Eschelon) regarding not seeing USOCs on R orders in WA & MN. Michael stated that per Dan (Busetti), would need to change Western CRIS. Kathy Stichter/Eschelon stated that the only place is seeing this is in Oregon/Utah. I got a response from Dan saying the reason that isn’t is because there would have to be a change in western CRIS, everything else is coming up fine. Jeff Thompson/Qwest stated that we would look into the record order repair issue and make sure we are squared away with that. Bill Markert/Eschelon asked if that means everything else is fixed? Jeff Thompson/Qwest responded yes. Kathy Stichter/Eschelon advised Bill Markert that she has looked at the bills. This CR remains in CLEC Test status.
Discussion from the June 20, 2002 CMP meeting Jeff Thompson/Qwest explained in researching this CR, Qwest determined what is needed to get this to work and is working with the Billing organization to get this scheduled. The Action item will be closed and Qwest will report at a later date with the scheduling details.
Discussion from the May 16 CMP meeting: Kathy Stichter/Eschelon wanted to know what is being done on this CR. Mark Routh/Qwest said that we had talked to Eschelon about closing this CR and opening another CR and they denied that. A new UR has been opened internally to do this work. This work may be completed to go into the new system that will be implemented in July. We will look into when the deployment date of the new system will be. Mark Routh/Qwest provided clarification on what the CR was asking for. Michael Buck/Qwest said that essentially part one has been developed and implemented and the 2nd part is not yet in development. Kathy Stichter/Eschelon said that part 1 has been open for forever. She read the description of Change that specifically asked for USOCs. Kathy Stichter stated that she has no idea what goes on with the Qwest back end systems but her assumption was that this work would have been done months ago. Bonnie Johnson/Eschelon asked why is Qwest only submitting an UR now for this. Mark Routh/Qwest said that Qwest has provided better explanations of OCCs on the invoices for the information that is provided by the systems by the upstream systems (identified when this was first rolled out). He added that since the Western Region does not provide the USOC information on the SOACTVTY.det file, then there was no ability to provide a better explanation of the USOCs to the CLECs. Connie Winston/Qwest said that there is an action item here—Qwest is to complete this particular CR, and we need to let them know when this work is scheduled. The status of development might be misleading; we owe Eschelon some clarification.A follow up call was held with Eschelon on 2/12/02. The attendees were: Bill Markert, Ellen Copley, Kathy Stichter, Alan Zimmerman and Mark Routh. Bill indicated that they were not getting the USOCs populated on the OCC invoice for Washington and Oregon for miscellaneous charges. Alan will look into this and provide the answer on 2/21/02 at the monthly Systems CMP meeting.
Discussion from the April 18, 2002 CMP meeting Kathy Stichter/Eschelon stated that they still have an issue in the Western Region with not giving USOCs. Mark Routh/Qwest stated that the system doesn't provide USOCs and that the development team is investigating how far up they would have to go to provide USOCs. The Wholesale Billing Interface is being upgraded and USOCs may be able to provided in June/July. Mark Routh/ Qwest will call Kathy Stichter/Eschelon off-line to discuss the column formatting issue. Evaluation of the possibility of providing the USOCs will be conducted following completion of development in June/July. That status of this CR is Development
4/8/02 - It has been determined that the USOC information for miscellaneous charges are not provided to the Billmate system and will not appear on the SOACTVTY.det file or the paper invoice. This information was provided to Bill Markert at Eschelon.
4/10/02 - Received this message from Kathy Stichter -
In the SOACTVTY (OC&C) files for our resale invoices, columns #1 and #5 have to be reformatted on the Washington and Oregon Billmate files in order to read the account numbers listed in these columns
Tom Moynihan is investigating this and Qwest will provide a response to Eschelon as soon as the answer is available.
4/22/02 - Eschelon was able to view the data after small modifications to column attributes on their Excel spreadsheet.
Discussion from the September 19 CMP meeting: Michael Buck/Qwest indicated that Eschelon had requested that status be provided on this CR. According to some recently completed work, Qwest believes this CR should be updated to “CLEC Test.” Kathy Stichter/Eschelon said that the issue is that the USOCs are still not showing in the Western region Jeff Thompson/Qwest said that the reason this stayed open is that the work had been done previously in Eastern/Central. Qwest believes it has completed this work for Western in the first part of September. Qwest would like Eschelon to go back and look at your bills to determine if the work is completed. Kathy Stichter/Eschelon said that she will check bills this month and provide feedback. Mike Buck/Qwest said indicated that the status of the CR would be updated to CLEC Test with review in October for completion. The action item is closed.
|
CenturyLink Response |
4/8/02 - Sent the following response to Bill Markert concerning the missing USOCs on the SOACTVTY report. Hi Bill, I have had the Billmate development team looking into your issue concerning the fact that there are no USOCs on the SOACTVTY.det file for miscellaneous charges. What they found is that in the Western region, we don't get associated USOC's with these miscellaneous charges from the upstream systems. And it appears that this is the way the paper bill is generated as well. I asked the Development manager to look into whether this information appears on the files in the Eastern and/or Central regions and he indicated that it does in both of those regions. I have been informed that the systems that provide the Billmate data are being updated later this year. I can't guarantee that we will be able to provide the USOC information in the Western region at that time but I can commit to investigating it and letting you know if that can be done. Based on this information, I don't believe that we need to have the call tomorrow morning but please let me know if you have any additional questions or concerns. Thank you Bill, Mark Routh
|
Archived System CR 5043187 Detail |
Title: Payment History Information on Invoices | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
5043187 |
Completed 3/1/2002 |
- | Wholesale Billing Interfaces/ | Invoicing | All Products |
Originator: Markert, William |
Originator Company Name: Eschelon |
Owner: Routh, Mark |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Provide more information on payments, such that each payment amount, payment date, check number is reflected rather than only a lump sum amount. |
Status History |
Date | Action | Description |
8/31/2000 | Status Changed | New - To be validated |
8/31/2000 | CR Submitted | New - To be clarified |
9/1/2000 | Record Update | Discussed CR clarification with Kerrie Douglas in phone call. Changed Interfaces Impacted section |
9/1/2000 | Status Changed | New - To be industry evaluated |
9/1/2000 | Info Sent to CLEC | Sent email to Kerrie Douglas with CR # and status. |
9/20/2000 | Status Changed | Status changed to Evaluated - To be reviewed. |
9/22/2000 | Status Changed | Status changed to Reviewed - Under consideration. |
9/29/2000 | Info Sent to CLEC | Sent email to Kerrie Douglas and William D. Markert about status changes. |
10/18/2000 | LOE Issued | T-Shirt Size Large and Option provided in CICMP meeting. Eligible for industry prioritization. |
11/8/2000 | Info Sent to CLEC | Sent email to William D. Markert with updated CR. (Rank 4) |
1/10/2002 | Status Changed | CR is being worked and should be completed by April 2002 |
3/21/2002 | Discussed at Monthly CMP Meeting | This CR was discussed at the March Systems CMP Monthly meeting. It had ELI as the originating CLEC. That has been corrected and is ready to be closed. |
3/22/2002 | Status Changed | This was implemented in the February CRIS release. Bill Markert has agreed that this can be closed. |
4/18/2002 | Discussed at Monthly CMP Meeting | 5043187 discussed at April Systems CMP Monthly meeting; please see Systems CMP Distribution Package April CMP -- Attachment E |
4/18/2002 | Status Changed | Status updated from 'CLEC Test' to 'Completed' |
Project Meetings |
4/11/02 - Received this message from Kathy Stichter On CR 5043187 (Payment History) we are now seeing payment history showing up on our summary BANS. Thanks Kathy Stichter ILEC Relations Manager Eschelon Telecom, Inc 612-436-6022 klstichter@eschelon.com
|
CenturyLink Response |
|
Archived System CR 5043197 Detail |
Title: Identification of PIC Code in Billmate | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
5043197 |
Completed 7/1/2002 |
- | Wholesale Billing Interfaces/ | Billmate | All Products |
Originator: Markert, William |
Originator Company Name: Eschelon |
Owner: Martinez, Dennis |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Qwest should provide the PIC code for each line contained in Billmate. It is confusing to see intraLATA toll for lines that have not been PIC’d to Qwest (US West). We need to investigate these to determine why and it is a tedious process. Currently we cannot determine the PIC without having our cost of access auditors having access to IMA. |
Status History |
Date | Action | Description |
8/31/2000 | Status Changed | New - To be validated. |
8/31/2000 | CR Submitted | New - To be clarified |
9/1/2000 | Info Sent to CLEC | Sent email to Kerrie Douglas with CR # and status. |
9/1/2000 | Status Changed | New - To be industry evaluated |
9/1/2000 | Record Update | Discussed CR clarification with Kerrie Douglas in phone call. Changed Interfaces Impacted section. |
9/20/2000 | Status Changed | Status changed to Evaluated - To be reviewed. |
9/22/2000 | Status Changed | Status changed to Reviewed - Under consideration. |
9/29/2000 | Info Sent to CLEC | Sent email to Kerrie Douglas and William D. Markert about status changes. |
10/18/2000 | LOE Issued | T-Shirt Size Large and Option provided in CICMP meeting. Eligible for industry prioritization. |
11/8/2000 | Info Sent to CLEC | Sent email to William D. Markert with updated CR. (Rank 6) |
10/1/2001 | Status Changed | Status updated to Development |
3/21/2002 | Discussed at Monthly CMP Meeting | 5043197 discussed March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP - Attachment G |
6/20/2002 | Discussed at Monthly CMP Meeting | 5043197 discussed at June Systems CMP Monthly meeting; please see Systems CMP Distribution Package June CMP -- Attachment I; Staus set to CLEC Test per Bonnie Johnson. |
7/1/2002 | Info Requested from CLEC | Sent a request to Eschelon for confirmation that this could be closed. |
7/1/2002 | CLEC Provided Information | Kathy Stichter sent a response that this CR could be closed. |
7/1/2002 | Status Changed | Status set to Closed. |
Project Meetings |
Kathy Stichter sent the following message on 7/1/02: Mark, I checked with Bill Markert and he said that this can be closed. Thanks Kathy Stichter ILEC Relations Manager Eschelon Telecom, Inc 612-436-6022 klstichter@eschelon.com
|
CenturyLink Response |
|
Archived System CR 5043226 Detail |
Title: UNE Invoice Detail | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
5043226 |
Denied 10/18/2001 |
- | Wholesale Billing Interfaces/ | Invoicing | UNE |
Originator: Markert, William |
Originator Company Name: Eschelon |
Owner: Bradley, J.J. |
Director: |
CR PM: Esquibel-Reed, Peggy |
Description Of Change |
On its UNE invoices, Qwest should provide not only SBN (MAN) identifier on the monthly recurring section of the invoice, but also the circuit ID number. The SBN (MAN) numbers change frequently but the circuit ID number does not. The circuit ID will not change. |
Status History |
Date | Action | Description |
8/31/2000 | CR Submitted | New - To be clarified |
8/31/2000 | Status Changed | New - To be validated. |
9/1/2000 | Record Update | Discussed CR clarification with Kerrie Douglas in phone call. Changed Interfaces Impacted section |
9/1/2000 | Info Sent to CLEC | Sent email to Kerrie Douglas with CR # and status. |
9/1/2000 | Info Sent to CLEC | Sent email to Kerrie Douglas with CR # and status. |
9/1/2000 | Status Changed | New - To be industry evaluated. Discussed CR clarification with Kerrie Douglas in phone call. Changed Interfaces Impacted section. Sent email to Kerrie Douglas with CR # and status. |
9/1/2000 | Record Update | Discussed CR clarification with Kerrie Douglas in phone call. Changed Interfaces Impacted section. |
9/20/2000 | Status Changed | Status changed to Evaluated - To be reviewed. |
9/22/2000 | Status Changed | Status changed to Reviewed - Under consideration. |
9/29/2000 | Info Sent to CLEC | Sent email to Kerrie Douglas and William D. Markert about status changes. |
10/18/2000 | LOE Issued | T-Shirt Size Large and Option provided in CICMP meeting. Eligible for industry prioritization. |
11/8/2000 | Info Sent to CLEC | Sent email to William D. Markert with updated CR. (Rank 2) |
9/25/2001 | Record Update | Qwest sent email to Alan Zimmerman requesting status of decision to cancel this CR. |
10/2/2001 | Info Received From CLEC | Received email from Alan Zimmerman advising that William Markert/Eschelon will make decision to cancel or not after the October CMP Meeting. |
10/18/2001 | Discussed at Monthly CMP Meeting | Discussed at the October CMP Meeting. CLECs will not get Circuit ID's. Eschelon requested the CR Status of Denied. |
10/18/2001 | Status Changed | Eschelon requested the CR Status of Denied at the October CMP Meeting |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 4441217 Detail |
Title: PIC verification on POTS, Centrex 21, Centrex Plus, and Centron lines as indicated in the USW switch. | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4441217 |
Completed 11/15/2001 |
- | IMA Common/8 |
Originator: Powers, Lynne |
Originator Company Name: Eschelon |
Owner: Routh, Mark |
Director: |
CR PM: Routh, Mark |
Description Of Change |
ATI requires the ability to verify the PIC for it’s POTS, Centrex 21, Centrex Plus and Centron lines as indicated in the switch vs. IMA. |
Status History |
Date | Action | Description |
Release Information | IMA Release 8.00 | |
1/19/2000 | CR Submitted | Received CR |
1/20/2000 | Status Changed | Logged CR. Status New - To be industry evaluated. |
1/20/2000 | Info Sent to CLEC | Sent email to Lynn Powers on CR status. |
1/24/2000 | Status Changed | Status Evaluated - To be reviewed. |
2/2/2000 | Info Sent to CLEC | Sent email to Lynn on status change on 01/24/00, update of CR form to version 04, and prioritization process category to GUI. |
2/3/2000 | Status Changed | Status Reviewed - Under Consideration |
2/8/2000 | Info Sent to CLEC | Sent email to Lynn on status change. |
2/16/2000 | LOE Issued | Received T-Shirt Size and Option during industry team meeting. Also removed the X Large Option. |
2/18/2000 | Info Sent to CLEC | Sent email to Lynn on update of CR Form. |
10/18/2000 | Status Changed | Status changed to Reviewed - Release Baseline Candidate. Selected as Co-Provider CR for target IMA Release 8.0. |
10/18/2000 | LOE Issued | |
11/8/2000 | Info Sent to CLEC | Sent email to Lynne Powers with updated CR. |
1/12/2001 | Info Sent to CLEC | Sent email to Lynne Powers and Judy Rixe with updated CR. Release Baseline Candidate IMA 8.0. |
1/12/2001 | Status Changed | Status changed back to Reviewed - Under Consideration. |
9/10/2001 | Record Update | IMA 8.0 Released |
10/18/2001 | Discussed at Monthly CMP Meeting | Discussed at CMP meeting, Eschelon agreed to change status to "CLEC Test" |
10/18/2001 | Status Changed | Eschelon agreed to change status to "CLEC Test" at October CMP Meeting |
11/15/2001 | Status Changed | Eschelon agreed to change status to "Completed" at November CMP Meeting |
11/15/2001 | Discussed at Monthly CMP Meeting | Discussed at Nov CMP meeting, Eschelon agreed to change status to "Completed" |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 4441096 Detail |
Title: Retrieval of Customer Service Record (CSR) by BTN or WTN | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4441096 |
Completed 12/20/2000 |
- | IMA Common/6 |
Originator: Powers, Lynne |
Originator Company Name: Eschelon |
Owner: Routh, Mark |
Director: |
CR PM: Routh, Mark |
Description Of Change |
ATI’s provisioning personnel require the ability to access a Customer Service Record by entering the Billing Telephone Number or Working Telephone Number (WTN) only. |
Status History |
Date | Action | Description |
Release Information | IMA Release 6.00 | |
1/19/2000 | CR Submitted | Received CR |
1/20/2000 | Info Sent to CLEC | Sent email to Lynn Flowers on CR status. |
1/20/2000 | Status Changed | Logged CR. Status New - To be industry evaluated. |
1/24/2000 | Status Changed | Status "Evaluated - To be reviewed" |
2/2/2000 | Info Sent to CLEC | Sent email to Lynne Powers on CR Form update to version 04 and added language in description per industry team meeting. |
2/3/2000 | Record Update | Noted language change to title |
2/3/2000 | Status Changed | Status "Reviewed - Under Consideration" |
2/8/2000 | Info Sent to CLEC | Sent email to Lynn on status and language change to title as reflected in description. |
2/16/2000 | Status Changed | Status Hold, to be reviewed in 6 months, and not eligible for industry prioritization. |
2/18/2000 | Info Sent to CLEC | Sent email to Lynn on status. |
3/3/2000 | Escalation Initiated | Lynn Powers escalated this CR. |
3/6/2000 | Status Changed | Changed status to "Reviewed - Under Consideration". Conducted Co-Provider Industry Team conference call to notify Co-Providers of status change with T-shirt size and level of effort to be provided at the next industry team meeting on 03/15/00. |
3/6/2000 | Record Update | Conducted Co-Provider Industry Team conference call to notify Co-Providers of status change with T-shirt size and level of effort to be provided at the next industry team meeting on 03/15/00. |
3/8/2000 | Info Sent to CLEC | Sent email to Lynn on status change |
4/19/2000 | Record Update | Reviewed - Release Baseline Candidate for IMA Release 6.0 based on T-shirt size large and option description. |
4/19/2000 | LOE Issued | Reviewed - Release Baseline Candidate for IMA Release 6.0 based on T-shirt size large and option description. |
5/1/2000 | Info Sent to CLEC | Sent email to Lynn on status/candidate and company name change. |
12/20/2000 | Status Changed | Status changed to Completed - In Production. |
12/22/2000 | Info Sent to CLEC | Sent email to Lynne Powers and Judy Rixe with updated CR. |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 5110474 Detail |
Title: Provide calculation description of each termination penalty levied on Eschelon. | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
5110474 |
Withdrawn 2/21/2001 |
- | Wholesale Billing Interfaces/ |
Originator: Markert, William |
Originator Company Name: Eschelon |
Owner: Routh, Mark |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Currently, Qwest bills Eschelon termination penalties in all states. The termination penalty charge is reflected as one lump sum amount. There is no way Eschelon can determine whether the amount is calculated properly because there is no information provided. Eschelon would like to see the following information:Rate stability agreement number (example: AC01141)Rate stability billing number (example: 206-297-2026)Customer Phone Number (example: 651-484-4035 519)Contract Start Date Contract Expire Date Months Remaining on Contract Contracted Monthly Billing Amount & USOC per line per feature (lines and features that term penalty is being applied)Number of lines and number of features penalty is being assessed Minimum Line Commitment Percentage Termination Liability Multiplier UsedOn 6/26/00, Julie Tigges (Carrier Center – Des Moines) faxed us our 5/31/00 request to see the calculation on a sample set of four (4) termination liability penalties that were billed to Eschelon. Of the four, three (3) of them were over-billed by Qwest by more than 30%. |
Status History |
Date | Action | Description |
8/31/2000 | Status Changed | New - To be clarified. |
8/31/2000 | CR Submitted | New - To be validated |
9/1/2000 | Record Update | Discussed CR clarification with Kerrie Douglas in phone call. Changed Interfaces Impacted section |
9/1/2000 | Status Changed | New - To be industry evaluated. Discussed CR clarification with Kerrie Douglas in phone call. Changed Interfaces Impacted section. Sent email to Kerrie Douglas with CR # and status. |
9/1/2000 | Info Sent to CLEC | Sent email to Kerrie Douglas with CR # and status. |
9/20/2000 | Status Changed | Status changed to Evaluated - To be reviewed. Request made in CICMP meeting to split CR #5043176 into 2. |
9/22/2000 | Status Changed | Status Reviewed - Under consideration. |
9/27/2000 | Related Change Request | CR #5043176 was split into 2 - CR #5043176 refers to OCC charges, this CR refers to termination penalty. |
9/29/2000 | Info Sent to CLEC | Sent email to Kerrie Douglas and William D. Markert about status changes. |
10/18/2000 | LOE Issued | T-Shirt Size Large and Option provided in CICMP meeting. Eligible for industry prioritization. |
11/8/2000 | Info Sent to CLEC | Sent email to William D. Markert with updated CR. |
1/10/2001 | Info Sent to CLEC | Sent Email to Lynne Powers and Judy Rixe with updated CR. |
1/10/2001 | Status Changed | Status changed by William Markert to Hold, (pending cancellation). |
2/21/2001 | Status Changed | Status changed to Canceled- Co-Provider |
3/15/2001 | Info Sent to CLEC | Sent Email to Lynne Powers, Bill Markert and Janet Houston with updated CR. |
12/18/2001 | Record Update | Changed status from 'Cancelled CLEC' to 'Withdrawn' for database cleanup |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 5155477 Detail |
Title: Automate UNE P to ensure availability and flow through of all applicable features/USOCs and identify features/USOCs not available with UNE P | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
5155477 |
Completed 2/21/2001 |
- | IMA Common/ |
Originator: Powers, Lynne |
Originator Company Name: Eschelon |
Owner: Routh, Mark |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Nancy Lubamersky of Qwest indicated that a change request was needed. During the AZ 271 workshop last week, Qwest said that Eschelon's comments brought to light an issue regarding the features that should be available with UNE-P but which are currently being rejected by Qwest's systems. (Or, orders are being processed but Qwest is removing the features later.) Generally, Qwest explained that, over time, thousands of USOCs have been developed for approximately 100 features. The same feature (i.e., a feature with the same functionality) may be associated with different USOCs depending on which of the three different regions is involved, different marketing campaigns over the years (where the same functionality was given a different name/USOC), class of service, different rates, etc. At this time, Qwest has loaded only a shorter list of features (with additional features to be added in December) and not the longer list of features that may mean the same thing. Therefore, a CLEC may order a feature using a USOC on the list of features available with UNE-P, but the system may nonetheless reject that order because the USOC doesn't match a different one that is being used within Qwest's systems in that situation. Eschelon understands that Qwest will eventually either load the full list of USOCs or provide mapping from the shorter list(s) to the full list of USOCs. Eschelon also understands that Qwest will not load USOCs until it associates prices (if any) with them. Qwest has indicated that Release 6.0 will include UNE-P-POTS. Because Qwest’s definition of UNE-P-POTS includes features, it seemed that availability and automation of features would have been a part of Release 6.0. If not, Eschelon asks Qwest to take any remaining steps necessary (including loading of all applicable USOCs and, if necessary and appropriate, rates) to ensure that CLECs may order all features that should be available with UNE-P and that Qwest will process those orders in a timely manner. Also, if Qwest is not making certain features (such as AIN or enhanced features) available with UNE-P, Eschelon asks Qwest to automate the process so that CLECs do not have to go to a separate source to identify such features. (This may involve a Feature Availability Matrix as to UNE-P.) As an interim step, Qwest indicated that it would post on its website lists of features/USOCs available with UNE-P, as well as features/USOCs that Qwest believes are not available with UNE-P (such as AIN and enhanced features). Either as part of this Change Request or as an open item, Qwest should explain these steps to the participants in CICMP and notify them when this addition to the website is complete. Rather than rely on recollections about what Qwest said about this issue, the transcript will contain Qwest's specific statements. This issue was discussed in particular on October 10-11, 2000. Much of the discussion took place in conjunction with Qwest Exhibit 4-5 (a drawing by Karen Stewart that was then printed). Nancy Lubamersky should be able to provide this documentation for circulation to CICMP participants. Eschelon requests that Ms. Lubamersky and/or Karen Stewart appear, either in person or by telephone, at the CICMP meeting to explain the particular issue for which Ms. Lubamersky indicated that a Change Request was required. |
Status History |
Date | Action | Description |
Release Information | IMA Release | |
10/17/2000 | CR Submitted | New - To be validated |
10/18/2000 | Status Changed | Status changed to New - To be clarified. Sent email to Lynne Powers asking for clarification. Send 2nd email to Lynne Powers with CR # and status. |
10/31/2000 | Status Changed | Status changed to New - To be industry evaluated. Received clarification from Karen Clauson via two emails. Sent email to Lynne Powers with CR # and status.11/15/00 Status changed to New - To be reviewed. |
12/1/2000 | Info Sent to CLEC | Sent email to Lynne Powers with updated CR. |
12/4/2000 | Status Changed | Status changed to Reviewed - Under consideration |
12/5/2000 | Info Sent to CLEC | Sent email to Lynne Powers with updated CR |
2/7/2001 | LOE Issued | T-Shirt Size Extra Large and Options Provided. Eligible for industry prioritization. |
2/8/2001 | Info Sent to CLEC | Sent email to Lynne Powers and Judy Rixe with updated CR. |
2/21/2001 | Status Changed | Status changed to Completed - In Production. The systems work on this request has been completed. However, this request is being transferred to Process CICMP control for addition work. |
2/27/2001 | Info Sent to CLEC | Sent email to Lynne Powers and Judy Rixe with updated CR. |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 5186725 Detail |
Title: Allow for Win terminal use of browser to run IMA GUI and make appropriate changes to the registry | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
5186725 |
Withdrawn 2/21/2001 |
- | IMA GUI/ |
Originator: Douglas, Kerrie |
Originator Company Name: Eschelon |
Owner: Routh, Mark |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Eschelon is not able to successfully run the current version of Netscape required for IMA GUI within our Windows Terminal Services environment without having Windows 2000 run in Install Mode. It appears that the IMA GUI Java application fails to run in execute mode. |
Status History |
Date | Action | Description |
Release Information | IMA Release | |
10/30/2000 | CR Submitted | New - To be validated |
10/31/2000 | Info Received From CLEC | Sent email to Kerrie Douglas asking for clarification. |
10/31/2000 | Info Received From CLEC | Received clarification via phone call. Sent email to Kerrie Douglas with CR # and status. |
10/31/2000 | Status Changed | Status changed to New - To be industry evaluated |
10/31/2000 | Status Changed | Status changed to New - To be clarified |
10/31/2000 | Info Sent to CLEC | Sent email to Kerrie Douglas with CR # and status. |
11/15/2000 | Status Changed | Changed status to New - To be reviewed. |
12/1/2000 | Info Sent to CLEC | Sent email to Lynne Powers with updated CR. |
12/4/2000 | Status Changed | Status changed to Reviewed - Under consideration |
12/5/2000 | Info Sent to CLEC | Sent email to Lynne Powers with updated CR. |
2/21/2001 | Status Changed | Status changed to Canceled - Qwest. This is currently an unsupported environment. |
2/21/2001 | Info Sent to CLEC | Sent email to Lynne Powers and Janet Houston with updated CR. |
12/18/2001 | Record Update | Changed status from 'Cancelled CLEC' to 'Withdrawn' for database cleanup |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 4441186 Detail |
Title: Flow thru of resale line conversions to UNE lines, with the ability to line additions on the same order. | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4441186 |
Completed 5/16/2001 |
- | IMA Common/ |
Originator: Powers, Lynne |
Originator Company Name: Eschelon |
Owner: Thompson, Jeff |
Director: |
CR PM: Routh, Mark |
Description Of Change |
ATI requires the ability to have flow-thru conversions of POTS, Centrex 21, Centrex Plus and Centron lines to UNE lines, with the ability to do line additions on the same order. |
Status History |
Date | Action | Description |
1/19/2000 | CR Submitted | Received CR |
1/20/2000 | Status Changed | Logged CR. Status New – To be industry evaluated. Sent email to Lynn Powers on CR status. |
1/24/2000 | Status Changed | Status Evaluated – To be reviewed. |
2/2/2000 | Additional Information | Sent email to Lynn Powers on CR Form update to version 04 and status update. |
2/3/2000 | Status Changed | Status Reviewed – Under Consideration |
2/8/2000 | Additional Information | Sent email to Lynn on status change. |
2/16/2000 | Additional Information | T-shirt size and option provided at industry team meeting. An additional option is to be provided at the next industry team meeting. |
2/18/2000 | Additional Information | Sent email to Lynn on CR update |
4/19/2000 | Status Changed | Reviewed – Release Baseline Candidate for IMA Release 6.0 based on T-shirt size Medium and X-Large with description. |
5/1/2000 | Additional Information | Sent email to Lynn on status/candidate and company name change |
12/20/2000 | Status Changed | Status Changed to Reviewed – Release Baseline Candidate for IMA Release 7.0 for the Flowthrough component. |
12/21/2000 | Additional Information | Sent email to Lynne Powers and Judy Rixe with updated CR. |
5/16/2001 | Status Changed | Status changed to “Completed – In Production” |
5/18/2001 | Additional Information | Sent email to Lynne Powers and Janet Houston with updated CR. |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 4559588 Detail |
Title: English features vs. USOC Codes on CSR’s. | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4559588 |
Completed 5/16/2001 |
- | IMA Common/7 |
Originator: Powers, Lynne |
Originator Company Name: Eschelon |
Owner: Thompson, Jeff |
Director: |
CR PM: Routh, Mark |
Description Of Change |
ATI would like to have to be able to request CSR’s from the USW Dallas Service Center with the features listed in English vs. just the USOC codes. |
Status History |
Date | Action | Description |
Release Information | IMA Release 7.00 | |
3/2/2000 | CR Submitted | |
3/2/2000 | Status Changed | Logged and status of New – To be industry evaluated. Sent email to Lynn on CR # and status. |
3/15/2000 | Status Changed | Evaluated – To be reviewed |
3/24/2000 | Status Changed | Reviewed – Under Consideration. Sent email to Lynn on 03/15 and 03/24 status. |
4/19/2000 | Status Changed | Reviewed – Release Baseline Candidate for IMA Release 7.0 based on T-shirt size Large and option description. . Voted/Selected as Co-Provider CR Option for 7.0. |
5/1/2000 | Additional Information | Sent email to Lynne on CR status/candidate and company name change. |
11/30/2000 | Status Changed | Changed status to Committed Candidate – IMA 7.0 |
12/1/2000 | Additional Information | Sent email to Lynne with CR. |
5/16/2001 | Status Changed | Status changed to “Completed – In Production” |
5/18/2001 | Additional Information | Sent email to Lynne Powers and Janet Houston with updated CR. |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 4868106 Detail |
Title: Directory Listing via Ordering Interface | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4868106 |
Completed 1/12/2001 |
- | IMA EDI/7 | Directory Listings |
Originator: Powers, Lynne |
Originator Company Name: Eschelon |
Owner: Thompson, Jeff |
Director: |
CR PM: Routh, Mark |
Description Of Change |
USWest currently utilizes a separate EDI Interface (other than the Ordering interface) for Directory Listings. This interface has different connectivity requirements than EDI ordering interface. Eschelon requests USWest offer DL via the EDI ordering interface by allowing the DL information be submitted on the same EDI Ordering (850). |
Status History |
Date | Action | Description |
Release Information | IMA Release 7.00 | |
Release Information | IMA Release 8.00 | |
6/29/2000 | CR Submitted | |
6/29/2000 | CR Acknowledged | |
6/29/2000 | Status Changed | New, To be industry evaluated. Sent email to Lynne Powers with CR # and status. |
7/19/2000 | Status Changed | Status changed to Evaluated, To be reviewed. |
7/28/2000 | Info Sent to CLEC | Sent email to Lynne Powers about status change and form change to version 05. |
8/2/2000 | Record Update | Reviewed – Under consideration |
8/16/2000 | LOE Issued | Received T-shirt size and option during industry team meeting. |
8/29/2000 | Info Sent to CLEC | Sent email to Lynne Powers with updated CR. |
10/18/2000 | LOE Issued | Status changed to Reviewed – Release Baseline Candidate. Selected as Co-Provider CR for target IMA. Release 8.0. T-shirt size Medium |
11/8/2000 | Info Sent to CLEC | Sent email to Lynne Powers with updated CR. |
1/12/2001 | Status Changed | Status changed to Completed – In Production per Kerrie Douglas |
1/12/2001 | Info Sent to CLEC | Sent email to Lynne Powers and Judy Rixe with updated CR |
2/7/2001 | Status Changed | Status changed to Reviewed – Release Baseline Candidate. Selected as Co-Provider CR for target IMA Release 8.0. |
2/8/2001 | Info Sent to CLEC | Sent email to Lynne Powers and Judy Rixe with updated CR. |
3/5/2001 | Status Changed | Status changed to Reviewed – Release Baseline Candidate. Selected as Co-Provider CR for target IMA Release 7.0. |
3/5/2001 | Info Sent to CLEC | Sent email to Lynne Powers and Judy Rixe with updated CR. |
5/16/2001 | Status Changed | Status changed to “Completed – In Production” |
5/18/2001 | Info Sent to CLEC | Sent email to Lynne Powers and Janet Houston with updated CR. |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 5043233 Detail |
Title: Continuing Changes to Rules Example: UNE P lines | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
5043233 |
Withdrawn 12/20/2000 |
- | Other/ | UNE-P |
Originator: Markert, William |
Originator Company Name: Eschelon |
Owner: Thompson, Jeff |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Eschelon has struggled with Qwest’s inability to set final rules/prices/etc. to UNE-P products. From Eschelon’s perspective, it appears that rules are made up as we go along. We are ready to order UNE-P product; yet when when we try, the rules are changed and rejects occur. We require a final UNE-P product manual and procedure manual. |
Status History |
Date | Action | Description |
8/31/2000 | CR Submitted | New – To be validated |
9/1/2000 | Status Changed | New – To be industry evaluated. Sent email to Kerrie Douglas with CR # and status. |
9/20/2000 | Status Changed | Status changed to Evaluated – To be reviewed. |
9/22/2000 | Status Changed | Status changed to Reviewed – Under consideration. |
9/29/2000 | Additional Information | Sent email to Kerrie Douglas and William D. Markert about status changes. |
10/18/2000 | LOE Issued | T-Shirt Size Small and Option provided in CICMP meeting. Status changed to Hold and will be addressed in the December 20 CICMP meeting when Product and Process is added to CICMP. |
10/18/2000 | Additional Information | It is not eligible for industry prioritization. |
11/8/2000 | Additional Information | Sent email to William D. Markert with updated CR. |
12/6/2000 | Additional Information | Will address in 12/20 Product/Process CICMP Meeting |
12/20/2000 | Status Changed | CR Cancelled by Lynne Powers |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 5043209 Detail |
Title: Single Billing Platform | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
5043209 |
Withdrawn 11/15/2000 |
- | Wholesale Billing Interfaces/ |
Originator: Markert, William |
Originator Company Name: Eschelon |
Owner: Thompson, Jeff |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Qwest’s billing processes, formats, procedures vary by region (central, western, eastern) and Eschelon requests that Qwest begin billing under one platform. Eschelon requests similar record format for each regional bill. Also, Eshelon requests that their bills have the ability to be billed on the same bill cycle for each region. |
Status History |
Date | Action | Description |
8/31/2000 | CR Submitted | New – To be validated |
8/31/2000 | Status Changed | New – To be clarified. |
9/1/2000 | Status Changed | New – To be industry evaluated. Discussed CR clarification with Kerrie Douglas in phone call. Changed Interfaces Impacted and Description of Change sections. Sent email to Kerrie Douglas with CR # and status. |
9/20/2000 | Status Changed | Status changed to Evaluated – To be reviewed. |
9/22/2000 | Status Changed | Status changed to Reviewed – Under consideration. |
9/29/2000 | Additional Information | Sent email to Kerrie Douglas and William D. Markert about status changes. |
10/18/2000 | Status Changed | Status changed to Cancelled – Co-Provider. |
11/8/2000 | Additional Information | Sent email to William D. Markert with updated CR. |
11/15/2000 | Status Changed | Status changed to new status Cancelled – Qwest. |
12/1/2000 | Additional Information | Sent email to Lynne Powers with updated CR. |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 5043204 Detail |
Title: Rate Change Notification | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
5043204 |
Withdrawn 12/20/2000 |
- | Process & Documentation/ |
Originator: Markert, William |
Originator Company Name: Eschelon |
Owner: Thompson, Jeff |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Eschelon seldom receives notification of billing changes (rates/terms/etc.). Qwest simply makes the changes with no explanation of why the changes were made. Proper noficiation should include the rate change or rate structure change with references to specific tariff sections, interconnection sections, or contract sections of applicable documents. |
Status History |
Date | Action | Description |
8/31/2000 | CR Submitted | New – To be validated |
9/1/2000 | Status Changed | New – To be industry evaluated. Sent email to Kerrie Douglas with CR # and status. |
9/20/2000 | Status Changed | Status changed to Evaluated – To be reviewed. |
9/22/2000 | Status Changed | Status changed to Reviewed – Under consideration. |
9/29/2000 | Additional Information | Sent email to Kerrie Douglas and William D. Markert about status changes. |
10/18/2000 | LOE Issued | T-Shirt Size Small and Option provided in CICMP meeting. Status changed to Hold and will be addressed in the December 20 CICMP meeting when Product and Process is added to CICMP. It is not eligible for industry prioritization. |
11/8/2000 | Info Sent to CLEC | Sent email to William D. Markert with updated CR. |
12/6/2000 | Additional Information | Will address in 12/20 Product/Process CICMP Meeting |
12/20/2000 | Status Changed | CR Cancelled by Lynne Powers |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 5043162 Detail |
Title: Calling Plans | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
5043162 |
Withdrawn 10/24/2000 |
- | Process & Documentation/ |
Originator: Markert, William |
Originator Company Name: Eschelon |
Owner: Thompson, Jeff |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Eschelon cannot set up a calling plan until we are billed for intraLATA toll. We should be able to request the calling plan that should be established on the resale line at the time that we provision the resale service – system change requested. |
Status History |
Date | Action | Description |
9/1/2000 | Status Changed | New – To be clarified. Spoke with Kerrie Douglas who will ask Bill Markert to call with clarification. Changed Interfaces Impacted section. Sent email to Kerrie Douglas with CR # and status. |
9/5/2000 | CLEC Provided Information | Bill Markert called to clarify the CR. The Description of Change section reflects that he is requesting a system change. |
9/5/2000 | Status Changed | New – To be industry evaluated. Sent email to Kerrie Douglas with CR # and status. |
9/20/2000 | Status Changed | Status changed to Evaluated – To be reviewed. |
9/22/2000 | Status Changed | Status changed to Reviewed – Under consideration. |
9/29/2000 | Info Sent to CLEC | Sent email to Kerrie Douglas and William D. Markert about status changes. |
10/24/2000 | Status Changed | Status changed to Cancelled – Co-Provider. Bill Markert sent email stating “Please cancel CR 5043162 related to calling plans.” Sent email to Bill Markert with CR and its status change. |
8/31/2002 | CR Submitted | New – To be validated |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 5043125 Detail |
Title: Knowledge level of Bill Inquiry Staff | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
5043125 |
Withdrawn 9/20/2000 |
- | Process & Documentation/ |
Originator: Markert, William |
Originator Company Name: Eschelon |
Owner: Thompson, Jeff |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Eschelon requires that Qwest Bill Inquiry staff be more knowledgeable when it comes to billing, tariff interpretation, and pricing questions. We have received information at one point in time and then conflicting information after the initial explanations. Although the staff is professional, we require them to be more knowledgeable of why Qwest is billing and how they are billing charges to Eschelon. |
Status History |
Date | Action | Description |
8/31/2000 | CR Submitted | New – To be validated |
9/1/2000 | Status Changed | New – To be industry evaluated. Sent email to Kerrie Douglas with CR # and status. |
9/20/2000 | Status Changed | Status changed to Cancelled – Co-Provider Industry Team. |
9/29/2000 | Info Sent to CLEC | Sent email to Kerrie Douglas and William D. Markert about status change. |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 5043086 Detail |
Title: Treatment of Administrative Lines/Features/Voicemail | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
5043086 |
Completed 12/20/2000 |
- | Wholesale Billing Interfaces/ |
Originator: Markert, William |
Originator Company Name: Eschelon |
Owner: Thompson, Jeff |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Eschelon requires Qwest to separate and bill separately Eschelon’s adminstrative lines/features and voice mail under one summary bill with each individual account billed under the summary bill—a billing scenario similar to how 1FB’s are currently billed. |
Status History |
Date | Action | Description |
8/31/2000 | CR Submitted | New – To be validated |
8/31/2000 | Status Changed | New – To be clarified. |
9/1/2000 | Status Changed | New – To be industry evaluated. Discussed CR clarification with Kerrie Douglas in phone call. Changed Interfaces Impacted section. Sent email to Kerrie Douglas with CR # and status. |
9/20/2000 | Status Changed | Status changed to Evaluated – To be reviewed. |
9/22/2000 | Status Changed | Status changed to Reviewed – Under consideration. |
9/29/2000 | Info Sent to CLEC | Sent email to Kerrie Douglas and William D. Markert about status changes. |
10/18/2000 | LOE Issued | T-Shirt Size NA and Option provided in CICMP meeting. This CR can be accommodated within current functionality and is not eligible for industry prioritization. |
11/8/2000 | Info Sent to CLEC | Sent email to Lynne Powers with updated CR. |
12/20/2000 | Status Changed | Status changed to Completed – In Production. |
12/22/2000 | Info Sent to CLEC | Sent email to Lynne Powers and Judi Rixe with Updated CR. |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 5043044 Detail |
Title: Document Interconnection Agreement Process | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
5043044 |
Withdrawn 10/18/2000 |
- | IMA Common/ |
Originator: Powers, Lynne |
Originator Company Name: Eschelon |
Owner: Thompson, Jeff |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Document and explain process for addressing provisions of interconnection agreements in interfaces – how, when, description – before systems changes are implemented and edits cause error messages and prevent orders. For example, USOCs that are in the contract that may not be in the system and an error message is returned that the USOC is not allowed per the contract, or UNE-P without an amendment, or SIG/contract intervals. |
Status History |
Date | Action | Description |
8/31/2000 | CR Submitted | New – To be validated |
8/31/2000 | Clarification Meeting Held | New – To be clarified. Left voicemail with Karen Clauson to clarify |
9/1/2000 | Info Requested from CLEC | Received voicemail from Lynne Powers but CR still needs clarification. Left voicemail with Karen Clauson. Sent email to Kerrie Douglas with CR # and status. |
9/5/2000 | Info Received From CLEC | Karen Clauson called to clarify the CR. The Description of Change section has been updated to include examples. |
9/5/2000 | Info Sent to CLEC | New – To be industry evaluated. Sent email to Kerrie Douglas with CR # and status. |
9/20/2000 | Status Changed | Status changed to Evaluated – To be reviewed. |
9/22/2000 | Status Changed | Status changed to Reviewed – Under consideration. |
9/29/2000 | Info Sent to CLEC | Sent email to Kerrie Douglas and Lynne Powers about status changes |
10/18/2000 | Status Changed | Status changed to Cancelled – Co-Provider. |
11/8/2000 | Info Sent to CLEC | Sent email to Lynne Powers with updated CR. |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 5043023 Detail |
Title: Create notification process for LSMS system outages | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
5043023 |
Completed 12/20/2000 |
- | IMA Common/6 |
Originator: Powers, Lynne |
Originator Company Name: Eschelon |
Owner: Thompson, Jeff |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Create an effective notification process for unplanned LSMS system outages. |
Status History |
Date | Action | Description |
Release Information | IMA Release 6.00 | |
8/31/2000 | CR Submitted | New – To be validated |
8/31/2000 | Clarification Meeting Held | New – To be clarified. Discussed CR clarification with Kerrie Douglas in phone call. Added clarifying words to Interfaces Impacted and Description of Change sections. |
9/1/2000 | Info Sent to CLEC | New – To be industry evaluated. Sent email to Kerrie Douglas with CR # and status. |
9/20/2000 | Status Changed | Status changed to Evaluated – To be reviewed. |
9/22/2000 | Status Changed | Status changed to Reviewed – Under consideration |
9/29/2000 | Info Sent to CLEC | Sent email to Kerrie Douglas and Lynne Powers about status changes |
10/18/2000 | Discussed at Monthly CMP Meeting | T-Shirt Size NA and Option provided in CICMP meeting. This CR will be resized for the November 15 CICMP meeting and is not eligible for industry prioritization. |
11/8/2000 | Info Sent to CLEC | Sent email to Lynne Powers with updated CR. |
11/15/2000 | Discussed at Monthly CMP Meeting | T-Shirt Size Small and Option provided in CICMP meeting. Eligible for industry prioritization. |
12/1/2000 | Info Sent to CLEC | Sent email to Lynne Powers with updated CR. |
12/20/2000 | Status Changed | Status changed to Completed – In Production |
12/22/2000 | Info Sent to CLEC | Sent email to Lynne Powers and Judi Rixe with updated CR. |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 4295615 Detail |
Title: AllowRe Cap button to work onT Outside Move of End User Location | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4295615 |
Completed 5/16/2001 |
- | IMA GUI/7 |
Originator: Essen, Marty |
Originator Company Name: Essen Communications |
Owner: Thompson, Jeff |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Re-Cap button should work on “T” outside move of end user location since all features must be recapped when doing so. (IMA Resale) |
Status History |
Date | Action | Description |
Release Information | IMA Release 7.00 | |
11/8/1999 | CR Submitted | |
11/18/1999 | CR Acknowledged | Created electronic CR based on mailed CR and cover letter. Logged and validated CR. Status of “New – To be industry reviewed”. Sent email to Marty Essen on CR changes and informed him of the Co-Provider Industry Team. |
12/15/1999 | Status Changed | Industry reviewed and status changed toEvaluated To be reviewed |
12/30/1999 | Info Sent to CLEC | Sent email to Marty on the CR status change. |
1/2/2000 | Info Sent to CLEC | 01/02/00 Sent email to Marty Essen on update of CR Form to Version 04 and provided T-Shirt Size and Option provided at industry team meeting on 01/24/00 and that it was not selected as Co-Provider Change Request Option for Release 6.0. |
1/13/2000 | Status Changed | Updated priority level/# and status and sent email to Marty Essen. |
1/24/2000 | LOE Issued | U S WEST T-Shirt Size and Options provided |
4/19/2000 | Baseline Candidate Selection | Reviewed Release Baseline Candidate for IMA Release 7.0 based on T-shirt size Medium and Option Description. . Voted/Selected as Co-Provider CR Option for 7.0. |
5/1/2000 | Info Sent to CLEC | Sent email to Marty on CR Status/Candidate. |
11/30/2000 | Status Changed | Status changed to Committed Candidate IMA 7.0 |
5/16/2001 | Status Changed | Status changed to“Completed– In Production |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 4710928 Detail |
Title: Enhance CLEC Access System Administration | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4710928 |
Completed 10/24/2001 |
- | IMA GUI/8 |
Originator: Labadie, Denis |
Originator Company Name: GTE |
Owner: Routh, Mark |
Director: |
CR PM: Routh, Mark |
Description Of Change |
When adding a new user, have the Access field default to "User" instead of blank and eliminate the access assignment step in the Add process. GTE would only need to perform the Access step if a user needed to be changed from User to Administrator. This would eliminate a very time-consuming/unnecessary step in our U S WEST admin process. Query Function – To be able to query GTE users by Name or UserId, and view the user Access field value. It would be most helpful to be able to view a listing of all GTE users on the US West access database. Listing should be sorted by User Id and include User's Id "Access Status" {i.e., Active/Inactive}. |
Status History |
Date | Action | Description |
Release Information | IMA Release 8.00 | |
5/1/2000 | Info Sent to CLEC | Sent email to Dennis on CR Status |
5/1/2000 | CR Submitted | Received/Logged CR - Status New - To be industry evaluated |
5/17/2000 | Status Changed | Status changed to Evaluated - To be reviewed |
5/26/2000 | Record Update | U S WEST to provide T-shirt size and Option at next industry team meeting on 06/21/00. |
5/26/2000 | Status Changed | Status changed to Reviewed - Under Consideration. |
6/11/2000 | Info Sent to CLEC | Sent email to Denis on CR status. |
6/30/2000 | Info Sent to CLEC | Sent email to Denis Labadie with updated CR |
6/30/2000 | Status Changed | Reviewed - Under Consideration |
6/30/2000 | Record Update | Updated Description with Denis Labadie in phone call per Action Item from 06/21/00 CICMP meeting. |
6/30/2000 | Record Update | U S WEST will provide a T-Shirt Size and Option at the next industry team meeting on 07/19/00. |
7/19/2000 | LOE Issued | T-Shirt Size and Option provided in CICMP meeting. Eligible for industry prioritization. |
7/28/2000 | Info Sent to CLEC | Sent email to Denis Labadie with updated CR, form change to version 05. |
10/18/2000 | Status Changed | Status changed to Reviewed - Release Baseline Candidate. Selected as Co-Provider CR for target IMA Release 8.0. T-shirt size Small. |
11/8/2000 | Info Sent to CLEC | Sent email to Denis Labadie with updated CR. |
10/18/2001 | Discussed at Monthly CMP Meeting | Discussed at CMP meeting agreed to close |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 4872952 Detail |
Title: Add Delete Function to IMA System Administration Options | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4872952 |
Completed 10/18/2001 |
- | IMA GUI/8 |
Originator: Labadie, Denis |
Originator Company Name: GTE |
Owner: Routh, Mark |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Add the ability to delete userIDs from IMA. |
Status History |
Date | Action | Description |
Release Information | IMA Release 8.00 | |
6/21/2000 | Record Update | This CR was split from CR #4710928 |
6/21/2000 | Status Changed | status change of Evaluated -- To be reviewed. |
6/23/2000 | Status Changed | Status changed to Reviewed -- Under Consideration |
6/30/2000 | CR Submitted | Submitted |
6/30/2000 | Info Sent to CLEC | New – To be industry evaluated. Sent email to Denis Labadie with CR # and status. |
7/6/2000 | Info Sent to CLEC | Will provide a T-Shirt Size and Option at the next industry team meeting on 07/19/00. |
7/28/2000 | Info Sent to CLEC | Sent email to Denis Labadie with updated CR, form change to version 05.. |
12/20/2000 | Status Changed | Status changed to Reviewed - Release Baseline Candidate - IMA 8.0 |
12/22/2000 | Info Sent to CLEC | Send email to Denis Labadie and Sandy Pancoast with Updated CR. |
10/18/2001 | Discussed at Monthly CMP Meeting | Discussed at CMP meeting agreed to close |
1/31/2002 | Discussed at Monthly CMP Meeting | T-Shirt Size and Option provided in CICMP meeting. Eligible for industry prioritization. |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 4543537 Detail |
Title: Include TN in “Line Information Section” | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4543537 |
Withdrawn 10/26/2000 |
- | IMA GUI/ |
Originator: Catalano, Philip |
Originator Company Name: ICG |
Owner: Thompson, Jeff |
Director: |
CR PM: Routh, Mark |
Description Of Change |
When an FOC is sent to CLEC’s The TN is not included in the “Line Information Section”. This is the case when the form is filed out by computer. When USW files out the form by hand, the TN is always included. We need confirmation that the TN was confirmed at USW, especially if we are adding an additional line, or changing the TN. If the TN is not included, then a phone call is made to USW to verify that the TN was confirmed. |
Status History |
Date | Action | Description |
2/28/2000 | CR Submitted | |
2/29/2000 | Status Changed | Logged and status CR as New – To be industry evaluated. Updated form with Phil’s title and email address and Acct Mnger from Mary Mertes to Ryan Hinkins and changed notification to 02/29/00. |
2/29/2000 | Additional Information | Sent email to Phil on CR #, update, and status. |
3/6/2000 | Additional Information | Corrected account manager to be Mary Mertes and sent email to Phil |
3/15/2000 | Status Changed | Status change to Evaluated – To be reviewed. |
3/24/2000 | Status Changed | Status change to Reviewed – Under Consideration. Sent email to Phil on 03/15 and 03/24 status change |
4/19/2000 | Status Changed | Status change to Reviewed – Release Baseline Candidate for IMA Release 6.0 based on T-shirt size Small and Description |
5/1/2000 | Additional Information | Sent email to Phil on status change/release candidate. |
10/26/2000 | Status Changed | Status changed to Cancelled – Co-Provider. Phil Catalano sent email stating “I just found out that the "Problem" we had in the past that prompted the Change Request - is no longer a problem, |
10/26/2000 | Additional Information | and we cannot find any examples. So please cancel the CR # 4543537.” Sent email to Phil Catalano with CR and its status change. |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 4559501 Detail |
Title: Open IMA 1888 number up for international calling. | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4559501 |
Withdrawn 4/19/2000 |
- | IMA GUI/ |
Originator: Bisgard, Jeff |
Originator Company Name: Jato |
Owner: Routh, Mark |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Jato has a new call center in Canada that can not access the IMA dial-up or the IMA Help Desk. The 1888 numbers need to be opened up for international calling. |
Status History |
Date | Action | Description |
Release Information | IMA Release | |
3/3/2000 | CR Submitted | Submitted |
3/6/2000 | Info Sent to CLEC | Sent email to Jeff on CR # and status. |
3/6/2000 | Status Changed | Logged and status of New - To be industry evaluated. Sent email to Jeff on CR # and status. |
3/15/2000 | Status Changed | Status Evaluated - To be reviewed. |
3/15/2000 | Info Sent to CLEC | Sent email to Jeff on 03/15 status change. |
3/24/2000 | Info Sent to CLEC | Sent email to Jeff on 03/24 status change. |
3/24/2000 | Status Changed | Status Reviewed - Under Consideration |
4/19/2000 | Status Changed | Cancelled - Other |
5/1/2000 | Info Sent to CLEC | Sent email to Jeff on CR status. |
12/18/2001 | Record Update | Changed status from 'Cancelled CLEC' to 'Withdrawn' for database cleanup |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 5088718 Detail |
Title: Extend field length of error messages. | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
5088718 |
Withdrawn 2/21/2001 |
- | IMA GUI/ | TA Error Message |
Originator: Hamed, Brian |
Originator Company Name: McLeodUSA |
Owner: Routh, Mark |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Extend the field where error messages appear when reporting trouble (TA) in IMA GUI to show what the error message is (e.g., Invalid CCNA, Resource Limitation, etc.) instead of just ‘ERRORED.” |
Status History |
Date | Action | Description |
Release Information | IMA Release | |
9/20/2000 | CR Submitted | New - To be validated. |
9/21/2000 | Record Update | Discussed CR clarification with Brian Hamed in phone call. Changed Interfaces Impacted, Description of Change, and Additional Information sections |
9/21/2000 | Info Sent to CLEC | Sent email to Brian Hamed with CR # and status. |
9/21/2000 | Status Changed | New - To be industry evaluated |
9/21/2000 | Status Changed | New - To be clarified. |
10/18/2000 | Status Changed | Status changed to Evaluated - To be reviewed |
10/27/2000 | Status Changed | Status changed to Reviewed - Under consideration. |
11/1/2000 | Info Received From CLEC | Brian Hamed sent an email with additional information that has been updated in the Additional Information section. |
11/3/2000 | Info Received From CLEC | Brian Hamed sent a fax showing errors from MLT Test Result Detail screens. |
11/8/2000 | Info Sent to CLEC | Sent email to Brian Hamed with updated CR. |
11/15/2000 | LOE Issued | T-Shirt Size NA and Option provided in CICMP meeting. CR is not eligible for industry prioritization. |
12/1/2000 | Info Sent to CLEC | Sent email to Rod Cox with updated CR. |
2/21/2001 | Status Changed | Cancelled by Co-Provider due to the correction of a problem with incorrect LMOS records. |
2/27/2001 | Info Sent to CLEC | Sent email to Rod Cox and Rosemarie Ferris with updated CR |
12/18/2001 | Record Update | Changed status from 'Cancelled CLEC' to 'Withdrawn' for database cleanup |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 4342063 Detail |
Title: CSRR Change to Include Fielded Data based on OBF Standards | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4342063 |
Completed 12/20/2000 |
- | IMA Common/6 |
Originator: Lawson, Mary |
Originator Company Name: McLeodUSA |
Owner: Thompson, Jeff |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Would like the CSRR to contain fielded data adhering to OBF standards. For example; Billing, Listed, and Service addresses would be parsed into fields for location, locality, house#, prefix, street directional, house # suffix, street name, street suffix, state, thoroughfare, and zip code. Would request that this change be made as part of the 5.0 release. |
Status History |
Date | Action | Description |
Release Information | IMA Release 6.00 | |
12/8/1999 | CR Submitted | |
12/9/1999 | CR Acknowledged | 12/09/99 Logged and validated CR. Sent email to Mary Lawson with CR log number, status, and a little bit of document clean up. |
12/15/1999 | Status Changed | During the industry team meeting an action item was take by Mary Teepe to contact Mary Lawson and clarify this CR. Status changed to“New– To be clarified |
12/30/1999 | Info Sent to CLEC | Sent email to Mary Lawson on status of CR and copied Mary Teepe. |
1/24/2000 | Status Changed | StatusEvaluated– To be reviewed. |
2/3/2000 | Status Changed | 02/03/00 Status Reviewed – Under Consideration |
2/8/2000 | Info Sent to CLEC | 02/08/00 Sent email to Mary on status change. |
2/16/2000 | LOE Issued | T-shirt size and option provided. |
2/18/2000 | Info Sent to CLEC | Sent email to Mary on updated CR form. |
2/20/2000 | Info Sent to CLEC | Sent email to Mary on CR form update and status change. |
4/19/2000 | Baseline Candidate Selection | Reviewed Release Baseline Candidate for IMA Release 6.0 based on T-shirt size Large and option description. |
5/1/2000 | Info Sent to CLEC | Sent email to Mary on CR status/candidate. |
12/20/2000 | Status Changed | Status changed to Completed In Production. |
1/11/2001 | Record Update | Update the CR to included revised language received from Mary Lawson. Sent email to Mary Lawson on status change and included CR. |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 5122428 Detail |
Title: LSR Number | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
5122428 |
Withdrawn 10/4/2000 |
- | IMA EDI/ |
Originator: Hamed, Brian |
Originator Company Name: McLeodUSA |
Owner: Thompson, Jeff |
Director: |
CR PM: Routh, Mark |
Description Of Change |
LSR number on FOCs response sent by Qwest |
Status History |
Date | Action | Description |
10/4/2000 | CR Submitted | New – To be validated |
10/4/2000 | Status Changed | New – To be industry evaluated. Sent email to Brian Hamed with CR # and status. |
10/19/2000 | Status Changed | Status changed to Cancelled – Co-Provider. Brian Hamed sent email stating “CR may be cancelled. Per a conversation that I had w/ Wendy Teepe, Qwest is currently providing the LSR number |
10/19/2000 | Additional Information | to McLeod, but we do not have the information being sent mapped in our system.” |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 5097684 Detail |
Title: Jeopardy Notification | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
5097684 |
Withdrawn 11/30/2000 |
- | IMA EDI/ | Centrex, Centrex Plus |
Originator: Hamed, Brian |
Originator Company Name: McLeodUSA |
Owner: Thompson, Jeff |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Support jeopardy notification through EDI application for Centrex and Centrex Plus. |
Status History |
Date | Action | Description |
9/25/2000 | CR Submitted | New – To be validated. |
9/25/2000 | Status Changed | New – To be clarified. |
9/25/2000 | Status Changed | New – To be industry evaluated. Discussed CR clarification with Brian Hamed in phone call. Changed Description of Change, Known Dependencies, and Additional Information sections. |
9/25/2000 | Additional Information | Sent email to Brian Hamed with CR # and status. |
10/18/2000 | Status Changed | Status changed to Evaluated – To be reviewed. |
10/27/2000 | Status Changed | Status changed to Reviewed – Under consideration. |
11/8/2000 | Additional Information | Sent email to Brian Hamed with updated CR. |
11/10/2000 | CLEC Provided Information | Brian Hamed sent email stating that this CR could be cancelled. |
11/13/2000 | Status Changed | Status changed to Cancelled – Co-Provider. Sent email to Brian Hamed with updated CR. |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 4481032 Detail |
Title: IMA Repair – greater input by co provider | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4481032 |
Withdrawn 3/15/2000 |
- | IMA GUI/ |
Originator: Gill, Glenn |
Originator Company Name: Next Link |
Owner: Routh, Mark |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Allow greater input of info via IMA – Repair.: Checkboxes for authorization of dispatch, intrusive testing, & billing. Increase size of box for text description of problem. |
Status History |
Date | Action | Description |
Release Information | IMA Release | |
2/2/2000 | CR Submitted | |
2/4/2000 | Info Sent to CLEC | Sent email to Glen Gill on CR status and update of form to include acct manager information. |
2/16/2000 | Status Changed | Status Evaluated - To be reviewed. |
2/18/2000 | Info Sent to CLEC | Sent email to Glen Gill on status change |
2/25/2000 | Status Changed | Status changed to Reviewed - Under consideration. |
3/6/2000 | Info Sent to CLEC | Sent email to Glen on status change. |
3/15/2000 | Status Changed | State change to Cancelled - Other. |
3/15/2000 | LOE Issued | Provided T-shirt size of NA and Option |
3/24/2000 | Info Sent to CLEC | Sent email to Glen on status change. |
12/18/2001 | Record Update | Changed status from 'Cancelled CLEC' to 'Withdrawn' for database cleanup |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 4481266 Detail |
Title: Remove requirement for listed name in preorder CSR request. | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4481266 |
Withdrawn 2/16/2000 |
- | IMA Common/ |
Originator: Lynch, Sr., Randall |
Originator Company Name: Next Link |
Owner: Routh, Mark |
Director: |
CR PM: Routh, Mark |
Description Of Change |
USW requires the input of listed name and TN for retrieval of CSR in PreOrder. SBCT would like the ability to pull CSR by TN only. |
Status History |
Date | Action | Description |
Release Information | IMA Release | |
2/4/2000 | Status Changed | Status New - To be evaluated |
2/4/2000 | CR Submitted | Submitted |
2/4/2000 | Info Sent to CLEC | Sent email to Randall on CR status and update of form to version 04. |
2/16/2000 | Related Change Request | CR is a duplicate of CR 441096 |
2/16/2000 | Status Changed | Cancelled - Co-Provider |
2/18/2000 | Info Sent to CLEC | Sent email to Randall on CR status. |
12/18/2001 | Record Update | Changed status from 'Cancelled CLEC' to 'Withdrawn' for database cleanup |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 4455257 Detail |
Title: Allow POTS provisioning via EDI while using TN’s reserved using IMA system | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4455257 |
Withdrawn 5/14/2001 |
- | IMA Common/ |
Originator: Brosnan, Karl |
Originator Company Name: One Point Comunications |
Owner: Routh, Mark |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Currently system limitations require that if a CLEC provisions orders resale POTS orders via EDI they must also invest extensively to develop Pre-Order via EDI. One Point recommends that US West relaxes system edits to allow pre order to include TN reservations via the IMA system and POTS provisioning via EDI system. |
Status History |
Date | Action | Description |
Release Information | IMA Release | |
12/18/2001 | Record Update | Changed status from 'Cancelled CLEC' to 'Withdrawn' for database cleanup |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 4711246 Detail |
Title: Maintain one EDI / Business rule document for each release | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4711246 |
Completed 12/20/2000 |
- | IMA EDI/ |
Originator: Waldrop, Mark |
Originator Company Name: Rhythms |
Owner: Routh, Mark |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Currently Co-Providers are required to use both the EDI disclosure document and addendum to build/upgrade to a new version of EDI IMA. NightFire/Rhythms NetConnections would like US West to maintain one document that contains all updated business rules and EDI specifications. This document will be updated when the addendum is released and can be used as the single source of EDI/BR information for a particular release. |
Status History |
Date | Action | Description |
Release Information | IMA Release | |
5/1/2000 | CR Submitted | Submitted and logged as "New - To be industry reviewed" |
5/1/2000 | Record Update | Removed reference to Manual/Nightfire as submitter of the CR. |
5/1/2000 | Info Sent to CLEC | Sent email to Mark on CR status and informed him that I removed reference to Manual/Nightfire as submitter of the CR. |
5/17/2000 | Status Changed | Status changed to Evaluated - To be reviewed |
5/26/2000 | Status Changed | Status changed to Reviewed - Under Consideration |
5/26/2000 | Record Update | U S WEST to provide T-shirt size and Option at next industry team meeting on 06/21/00. Updated form to reflect Connie San as Account Manager. |
6/11/2000 | Info Sent to CLEC | Sent email to Mark on CR status and updated form to reflect Connie San as Account Manager. |
12/20/2000 | Status Changed | CR Completed |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 4381555 Detail |
Title: Re Certification | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4381555 |
Withdrawn 2/16/2000 |
- | IMA EDI/ |
Originator: Sumner, Steve |
Originator Company Name: Sprint |
Owner: Routh, Mark |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Sprint wants USW to stop requiring CLECs re-certify for testing & production each time a new release goes out. CLECs should only have to get certified once. Having to go through the re-certification process each time a release is sent out (point or major) puts restrictions on CLECs that delay market entry and forces them to incur unneeded expense. |
Status History |
Date | Action | Description |
Release Information | IMA Release | |
12/22/1999 | CR Submitted | Submitted CR while on holiday |
12/28/1999 | Status Changed | Logged CR and status of "New - To be industry evaluated". |
12/28/1999 | Info Sent to CLEC | Sent email to Steve Sumner on log #, OSS interface, and status with copy to account manager. |
12/28/1999 | Record Update | Also, selected OSS interface as IMA EDI. |
1/24/2000 | Status Changed | Status Evaluated - To be reviewed |
2/2/2000 | Info Sent to CLEC | Sent email to Steve on status and update CR form to version 04. |
2/3/2000 | Status Changed | Status change to Reviewed - Under Consideration |
2/8/2000 | Status Changed | Sent email to Steve on status change. |
2/8/2000 | Info Sent to CLEC | Sent email to Steve on status change. |
2/16/2000 | Status Changed | Cancelled - Co-Provider |
2/18/2000 | Info Sent to CLEC | Sent email to Steve on CR status. |
12/18/2001 | Record Update | Changed status from 'Cancelled CLEC' to 'Withdrawn' for database cleanup |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 5042531 Detail |
Title: Load BANs into IMA databases for all CLECs as opposed to each CLEC loading their BANs. | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
5042531 |
Completed 1/10/2002 |
- | IMA Common/ |
Originator: McLain, Jami |
Originator Company Name: Sprint |
Owner: Routh, Mark |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Load BANs into IMA databases for all CLECs as opposed to each CLEC loading their BANs. |
Status History |
Date | Action | Description |
Release Information | IMA Release | |
8/31/2000 | Record Update | Discussed CR clarification with Hal Weintrub in phone call. Added clarifying words to Additional Information section. |
8/31/2000 | CR Submitted | New - To be clarified |
8/31/2000 | Status Changed | New - To be validated |
9/1/2000 | Info Sent to CLEC | Sent email to Hal Weintrub and Jami McLain with CR # and status. |
9/1/2000 | Status Changed | New - To be industry evaluated |
9/20/2000 | Status Changed | Status changed to Evaluated - To be reviewed. |
9/22/2000 | Status Changed | Status changed to Reviewed - Under consideration. |
9/29/2000 | Info Sent to CLEC | Sent email to Jami McLain and Hal Weintrub about status changes. |
10/18/2000 | LOE Issued | T-Shirt Size Large and Option provided in CICMP meeting. Eligible for industry prioritization. |
11/8/2000 | Info Sent to CLEC | Sent email to Hal Weintrub, Sandy Evans, and Ellen Neis with updated CR. |
3/21/2001 | Status Changed | Status changed to Committed Candidate for the FTS Release in August |
3/28/2001 | Info Sent to CLEC | Sent email to Sandy Evans, Christine Pokrandt and Henry Henry Rodighiero with updated CR. |
1/10/2002 | Status Changed | CR was closed as a result of changes in FTS not requiring the BAN |
Project Meetings |
|
CenturyLink Response |
IMA no longer requires a CLEC to populate the BAN on the CSR. IMA will determine the BAN for each CSR during the order Processing. Therefore, it is no longer necessary to have all the BANS loaded for each CLEC.
|
Archived System CR 4857173 Detail |
Title: Formal request for a process to handle any issues encountered during test and production, and related to release. | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4857173 |
Completed 10/18/2000 |
- | Process & Documentation/ |
Originator: Weintrub, Hal |
Originator Company Name: Sprint |
Owner: Thompson, Jeff |
Director: |
CR PM: Routh, Mark |
Description Of Change |
US West needs to develop and publish a formal process to identify, communicate, and resolve issues related to release. This process needs to be able to handle issues of varying severity. Additionally, a part of the resolution should include any updates that need to be made to associated documentation (e.g., developer’s worksheets). |
Status History |
Date | Action | Description |
6/23/2000 | CR Submitted | |
6/26/2000 | Status Changed | New – To be clarified. Sent email to Hal Weintrub with CR # and status. |
6/26/2000 | Status Changed | New – To be industry evaluated. Clarified in phone conversation with Hal Weintrub. Sent email to Hal Weintrub about CR status. |
7/19/2000 | Status Changed | Status changed to Evaluated – To be reviewed. |
7/28/2000 | Additional Information | Sent email to Jami McLain and Hal Weintrub about status change and form change to version 05. |
8/2/2000 | Status Changed | Reviewed – Under consideration |
8/16/2000 | LOE Issued | Received T-shirt size and option during industry team meeting. |
8/29/2000 | Additional Information | Sent email to Jami McLain and Hal Weintrub with updated CR. |
10/18/2000 | Status Changed | Status changed to Completed – In Production. When a change to the Qwest documentation or a defect in the system is found that impacts EDI Co-Providers, |
10/18/2000 | Additional Information | Qwest will publish an EDI Release Notification to all EDI users. The EDI release notifications will be made available on the CICMP web site on the Issues and Resolutions page. |
11/8/2000 | Additional Information | Sent email to Hal Weintrub, Sandy Evans, and Ellen Neis with updated CR. |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 4381492 Detail |
Title: Jeopardies | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4381492 |
Completed 3/8/2000 |
- | IMA EDI/ |
Originator: Sumner, Steve |
Originator Company Name: Sprint |
Owner: Thompson, Jeff |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Sprint wants USW to follow the industry-wide practice of sending FOCs prior to sending Jeopardies. Sprint needs confirmation of the order first. Then, other arrangements can be made for installation if necessary.
USW sends the Jeopardy before the FOC if they know facilities are not available. This can occur even when availability was confirmed through the Facility Availability Query pre-order transaction (FAQ). Sprint is familiar with USW's disclaimer in its disclosure documentation that availability is not guaranteed, but did not expect the situation to occur as frequently as it does.
USW states in its disclosure document that "A FOC form will be sent to the Co-Provider when an order has been accepted by U S WEST and successfully entered into the U S WEST Service Order Processor". It does not say a Jeopardy will precede the confirmation (full text below).
(US West SOAR, ver 4.2) - "A FOC is an indicator to the Co-Provider that the order has been entered into U S WEST’s Service Order Processor systems. A FOC form will be sent to the Co-Provider when an order has been accepted by U S WEST and successfully entered into the U S WEST Service Order Processor. A FOC will contain the U S WEST service order number in the “ORD” field. If an LSR is broken up into multiple U S WEST service orders, the “ORD” field will repeat on the FOC. Note that in this document the Firm Order Confirmation is referred to as the FOC; however, the actual OBF form is the LSC." |
Status History |
Date | Action | Description |
12/22/1999 | CR Submitted | Submitted CR while on holiday |
12/28/1999 | Additional Information | Logged CR and status of “New – To be industry evaluated”. Also, selected OSS interface as IMA EDI. Sent email to Steve Sumner on log #, OSS interface, and status with copy to account manager. |
1/24/2000 | Status Changed | Status set to Evaluated – To be reviewed |
2/2/2000 | Additional Information | Sent email to Steve on status and update CR form to version 04. |
2/3/2000 | Status Changed | Status change Reviewed – Under Consideration |
2/8/2000 | Additional Information | Sent email to Steve on status change. |
2/18/2000 | Additional Information | Sent email to Steve on CR selected for Implementation based Small T-Shirt Size and Option. Also, I will provide Steve an implementation date ASAP. |
3/8/2000 | Status Changed | Status changed to Completed. |
3/8/2000 | Additional Information | Sent email to Steve on status change per Option description. |
3/8/2000 | Additional Information | Also, informed Steve that if Sprint experiences exceptions (i.e., FOCs after a Jeopardy) to please note the order and U S WEST contact person so U S WEST may address this internally (e.g., provide retraining in this area as appropriate.) |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 5144378 Detail |
Title: Remove population requirement for approver’s name and number when the EXP, SCA, ALBR, AENG, CHC fields on the LSR form are populated with a 'Y'. | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
5144378 |
Completed 5/16/2001 |
- | IMA Common/7 | All |
Originator: McLain, Jami |
Originator Company Name: Sprint |
Owner: Thompson, Jeff |
Director: |
CR PM: Routh, Mark |
Description Of Change |
When the EXP, SCA, ALBR, AENG, or CHC fields on the LSR form are populated with a value of 'Y', then the Approver’s name and number are required in the Remarks field. We want to remove this requirement since the 'Y' should be sufficient information for our approval and the extra time for populating the Remarks field is a time-consuming and unnecessary manual effort. The population of these OBF fields provides positive proof of the acceptance of charges. Initiator information is already available on the form. |
Status History |
Date | Action | Description |
Release Information | IMA Release 7.00 | |
2/4/2000 | Status Changed | Status changed to Reviewed, Under consideration |
10/13/2000 | CR Submitted | New - To be validated |
10/13/2000 | Status Changed | New. To be industry evaluated. Sent email to Jami McLain and Hal Weintrub with CR # and status. |
11/15/2000 | Status Changed | Status changed to New, To be reviewed |
12/1/2000 | Info Sent to CLEC | Sent email to Sandy Evans with updated CR. |
12/5/2000 | Info Sent to CLEC | Sent email to Jami McLain with updated CR. |
2/2/2001 | Status Changed | Status changed to Reviewed, Release Baseline Candidate for IMA 7.0 |
2/2/2001 | Info Sent to CLEC | Sent email to Sandy Evans and Christine Pokrandt with updated CR. |
5/16/2001 | Status Changed | Status changed to 'Completed' In Production. |
5/18/2001 | Info Sent to CLEC | Sent email to Sandy Evans and Christine Pokrandt with updated CR. |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 4381561 Detail |
Title: Follow OBF standards & parse address fields on the AVQ, EU, and appropriate directory forms. | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4381561 |
Completed 5/16/2001 |
- | IMA EDI/7 |
Originator: Weintrub, Hal |
Originator Company Name: Sprint |
Owner: Thompson, Jeff |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Sprint wants USW to follow the industry-wide practice of parsing address fields according to OBF standards on the AVQ, EU, and appropriate directory forms.
USW does not follow OBF standards to parse address fields. This creates inefficiencies in processing and causes the CLECs to incur unneeded expense and delays market entry.
EXAMPLES - 1) information from both the SAPR & SANO fields have to be populated in SANO 2) information from the SASD, SASS, SATH fields have to be populated in SASN 3) information from SADLO must be populated in SASN preceded by an '@' sign 4) information from the ROUTE and/or BOX fields must be populated in SASN preceded by an '@' sign |
Status History |
Date | Action | Description |
Release Information | IMA Release 7.00 | |
12/22/1999 | CR Submitted | Submitted CR while on holiday |
12/28/1999 | Status Changed | Logged CR and status of “New – To be industry evaluated”. Also, selected OSS interface as IMA EDI. Sent email to Steve Sumner on log #, OSS interface, and status with copy to account manager. |
1/24/2000 | Status Changed | Status Evaluated – To be reviewed |
2/2/2000 | Additional Information | Sent email to Steve on status and update CR form to version 04. |
2/3/2000 | Status Changed | Status change Reviewed – Under Consideration. |
2/8/2000 | Additional Information | Sent email to Steve on status change. |
2/16/2000 | Additional Information | T-Shirt size and option provided at Co-Provider industry team meeting. |
2/18/2000 | Additional Information | Sent email to Mary on CR update. |
4/19/2000 | Status Changed | Reviewed – Release Baseline Candidate for IMA Release 7.0 based on T-shirt size Large and option description. . Voted/Selected as Co-Provider CR Option for 7.0. |
5/1/2000 | Additional Information | Sent email to Hal and Steve on CR Status/Candidate and switched Hal for Steve on CR. |
11/30/2000 | Status Changed | Changed status to Committed Candidate – IMA 7.0 |
12/1/2000 | Additional Information | Sent email to Sandy Evans with CR. |
5/16/2001 | Status Changed | Status changed to “Completed – In Production” |
5/18/2001 | Additional Information | Sent email to Sandy Evans and Christine Pokrnandt with updated CR |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 5079096 Detail |
Title: Order Review included in FOC | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
5079096 |
Withdrawn 1/17/2002 |
- | IMA Common/ | FOC | All products |
Originator: Christofferson, Aelea |
Originator Company Name: Sunriver Telecom |
Owner: Gallegos, John |
Director: |
CR PM: Routh, Mark |
Description Of Change |
When FOC is provided, a summary by USOC is included. |
Status History |
Date | Action | Description |
9/18/2000 | CR Submitted | New - To be industry evaluated. |
9/18/2000 | Info Sent to CLEC | Sent email to Aelea Christofferson with CR # and status. |
9/18/2000 | Status Changed | New - To be validated |
10/18/2000 | Status Changed | Status changed to Evaluated - To be reviewed. |
10/20/2000 | Info Received From CLEC | Aelea Christofferson faxed a copy of the FOC format she currently receives from another provider. |
10/27/2000 | Status Changed | Status changed to Reviewed - Under consideration. |
11/8/2000 | Info Sent to CLEC | Sent email to Aelea Christofferson with updated CR. |
11/15/2000 | LOE Issued | T-Shirt Sizes Medium and Extra Large and Options provided in CICMP meeting. Eligible for industry prioritization. |
12/1/2000 | Info Sent to CLEC | Sent email to Aelea Christofferson with updated CR. |
12/4/2000 | Status Changed | Status changed to Reviewed - Under consideration |
12/5/2000 | Info Sent to CLEC | Sent email to Aelea Christofferson with updated CR. |
3/21/2001 | Status Changed | Status changed to Reviewed - Release Baseline Candidate for IMA Release 9.0 |
3/29/2001 | Info Sent to CLEC | Sent email to Aelea Christofferson and Karen Mustard with updated CR. |
10/25/2001 | Status Changed | Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization |
10/31/2001 | Release Ranking | Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. 5079096 ranked 28 |
11/9/2001 | Record Update | Meeting minutes from Actions # 325 included in this CR |
1/17/2002 | Status Changed | Status updated to 'Withdrawn' because this CR is a duplicate of CR25497 |
Project Meetings |
CLEC-Qwest FOC S&E Section meeting 2:00p.m. – 3:00p.m. Friday, September 28, 2001 Conference Call INTRODUCTION The call was conducted in order to clarify the CLECs requirements for the S&E Section on the FOC that Qwest provides to the CLECs ATTACHMENTS Attachment A – List of Attendees MEETING MINUTES The meeting began with introductions of the attendees. Mark Routh-Qwest welcomed the attendees and stated the meeting was intended to confirm the CLEC’s requirements for the information to be returned on the S&E section of the Firm Order Completion (FOC). Barbara Campbell – Qwest asked if everyone had a copy of the documentation that was distributed for the meeting. Barbara Campbell – Qwest read through the Eschelon Change Request. Then she reviewed the sample FOC that was sent to the CLECs Barbara Campbell – Qwest asked if the sample met the CLECs requirements. The CLECs all agreed that it did. Barbara Campbell – Qwest asked if the CLECs would agree to receiving the FOC’s outside of the normal response time due to more information being created. The CLECs said yes. The CLECs asked if certain information would be on the FOC. Barbara Campbell – Qwest said that the S & E section on the FOC would be the same information that they would be getting on their completions notices. The CLECs asked if they would get another FOC if the information changed. Barbara Campbell – Qwest said that the FOC process was not changing, just the addition of the S & E section to the FOC, so if they were getting FOCs now when data changed, they would continue to receive them. She asked if this change would be for all products. The CLECs said yes. The CLECs asked when this would be implemented. John Gallegos - Qwest indicated that it could not be done prior release 10.0 (pending the CLEC prioritization of this CR) RESULTS OF THE DISCUSSION The CLECs agreed to having the same information on the FOC as they are currently getting on completions notifications. The CLECs agreed to a possible longer response time for the FOC since more data would be provided. The CLECs agreed that it would be for all products. The change would go in to the IMA release 10.0 Attachment A – List of Attendees First Last Company Attended Mark Routh Qwest In-Person John Gallegos Qwest In-Person Barbara Campbell Qwest In-Person Curt Anderson Qwest In-Person Lynne Powers Eschelon Called in Bonnie Johnson Eschelon Called in Jan Stafford AT&T Called in H Fluker AT&T Called in Esther Scherer AT&T Called in T Dwayne AT&T Called in Terry Bahner AT&T Called in Jonathan Spangler AT&T Called in Rose Ann Brown AT&T Called in Kelly Morris ELI Called in Lorna Megasi ELI Called in Lori Nelson Midcontinent Called in Scott Simon Premier Called in Lana Messenger Freetel Called in Bob Carias NightFire Called in
|
CenturyLink Response |
|
Archived System CR 4711270 Detail |
Title: Request to add P.O. box field to billing address | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4711270 |
Withdrawn 6/21/2001 |
- | IMA GUI/ |
Originator: Sparks, Scott |
Originator Company Name: WorldCom |
Owner: Routh, Mark |
Director: |
CR PM: Thomte, Kit |
Description Of Change |
Add field for P.O. box in billing address info for IMA GUI |
Status History |
Date | Action | Description |
Release Information | IMA Release | |
5/1/2000 | CR Submitted | Submitted and logged with status of "New - To be industry evaluated" |
5/1/2000 | Info Sent to CLEC | Sent email to Scott on status. |
5/17/2000 | Status Changed | Status changed to Evaluated - To be reviewed |
5/26/2000 | Status Changed | Status changed to Reviewed - Under Consideration. U S WEST to provide T-shirt size and Option at next industry team meeting on 06/21/00. |
6/11/2000 | Info Sent to CLEC | Sent email to Scott on CR status. |
6/21/2001 | Status Changed | Canceled - Co-Provider Industry Team |
12/18/2001 | Record Update | Changed status from 'Cancelled CLEC' to 'Withdrawn' for database cleanup |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 4185713 Detail |
Title: US West requires MCI Worldcom to track Unbundled Loop Services via the Special Billing Number (SBN) | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4185713 |
Completed 2/21/2002 |
- | Wholesale Billing Interfaces/ | CRIS | All Products |
Originator: Tarwater, Molly |
Originator Company Name: WorldCom |
Owner: Zimmerman, Alan |
Director: |
CR PM: Routh, Mark |
Description Of Change |
US West requires MCI Worldcom to track and maintain a circuit through the use of the Special Billing Number (SBN)., which is assigned by US West within the Account Number (AN) field on the End User Form. US West also requires MCI Worldcom to return the SBN on all subsequent order activity.
US West’s requirement for MCI Worldcom to track and maintain unbundled loop service through the SBN, and return the SBN on all subsequent order activity places a development impact on our facilities based systems.
MCIWORLDCOMs requested change will impact unbundled loop orders. |
Status History |
Date | Action | Description |
11/4/1999 | CR Submitted | CR submitted |
12/21/2000 | Status Changed | CR is being reviewed for alternate process solution. |
2/21/2002 | Status Changed | This request was declared completed by LeiLani Hines in the Feb CMP meeting. |
2/21/2002 | Discussed at Monthly CMP Meeting | 4185713 discussed during 'CRs to consider for Closure' portion of February Systems CMP Monthly meeting; please see Attachment E of February Systems CMP Distribution Package |
Project Meetings |
|
CenturyLink Response |
The only Activity Type that requires the SBN or Account # to be provided is a conversion. Otherwise we do not require a CLEC to provide the SBN.
|
Archived System CR 4185886 Detail |
Title: US West business rule prohibiting the migration of existing/additional facilities for end user on same Purchase Order Number (PON); in addition to end user subsequent order activity limitation for one loop per PON. | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4185886 |
Withdrawn 3/21/2001 |
- | IMA Common/ |
Originator: Rodriguez, Cecilia |
Originator Company Name: WorldCom |
Owner: Routh, Mark |
Director: |
CR PM: Routh, Mark |
Description Of Change |
With regards to unbundled loop ordering practices, US West does not allow for the migration of existing facilities and the addition of new facilities for an end user on the same Purchase Order Number (PON). In addition, once an end use has been established with MCI Worldcom, all subsequent order activity for an MCI Worldcom end user can contain only one loop per PON. MCIWORLDCOMs requested change will impact unbundled loop orders |
Status History |
Date | Action | Description |
Release Information | IMA Release | |
12/18/2001 | Record Update | Changed status from 'Cancelled CLEC' to 'Withdrawn' for database cleanup |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 4185950 Detail |
Title: US WEST Business rule change for blanket LOA | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4185950 |
Withdrawn 1/25/2000 |
- | IMA Common/ |
Originator: Najera, Judy |
Originator Company Name: WorldCom |
Owner: Routh, Mark |
Director: |
CR PM: Routh, Mark |
Description Of Change |
MCI Worldcom requests that US WEST allow for the following business rule functionality within the IMA GUI and EDI interface: Should MCI Worldcom have a blanket LOA, MCI Worldcom does not have to supply an individual date on migrations. MCIWORLDCOMs envisions this change will impact unbundled loop orders but does not preclude it would impact other services. |
Status History |
Date | Action | Description |
Release Information | IMA Release |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 4252981 Detail |
Title: HEET Query Search Limitations | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4252981 |
Withdrawn 2/21/2001 |
- | HEET/ |
Originator: Rodriguez, Cecilia |
Originator Company Name: WorldCom |
Owner: Routh, Mark |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Current functionality within HEET does not allow the user to query all held orders for an end user customer or by co-provider and display within a combined report. HEET only allows for a query on an individual held order, based off of PON and Order Number (see picture 1.0 below), which is depicted within a report showing this held order only. |
Status History |
Date | Action | Description |
12/18/2001 | Record Update | Changed status from 'Cancelled CLEC' to 'Withdrawn' for database cleanup |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 4186015 Detail |
Title: Adherence to LSR AGAUTH per OBF guidelines | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4186015 |
Withdrawn 11/15/2000 |
- | IMA Common/ |
Originator: Pennington, Freddi |
Originator Company Name: WorldCom |
Owner: Thompson, Jeff |
Director: |
CR PM: Routh, Mark |
Description Of Change |
The LSR AGAUTH Field = Agency Authorization Status. US WEST requires the population of the LSR AGAUTH field with N, for a new customer, and a V, for a customer to be converted. US WEST would only be affected when the CLEC is an agent for a conversion of an existing USW customer. The provisioning of a new customer would not require the population of the LSR AGAUTH.
MCIWORLDCOMs envisions this change will impact unbundled loop orders but does not preclude it would impact other services. |
Status History |
Date | Action | Description |
10/12/1999 | CR Acknowledged | 10/12/99 Received and validated CR. Sent email to Eric Bransky informing him of the CR log#, Status of New To be industry evaluated, &mentioned to him to be prepared to present the CR at the next industry team meeting for IMA OSS interfaces on 11/11/99 |
11/2/1999 | Record Update | 11/02/99 Updated form to Version 03 and added in CICMP Manager Section Prioritization Process Categorytypes and selected Common per Co-Provider Industry Issue/Action #34. Sent email to Carol Beaupre |
11/15/1999 | Record Update | 11/15/99 CR resubmitted with changes from industry meeting on 11/11/99. |
11/17/1999 | Record Update | Received LSOG page from Karen Kincaid and inserted to CR as discussed in emails with Carol Beaupre and Karen Kincaid. |
11/18/1999 | Status Changed | CR status change of New To be clarified priority level and number. Sent email to Carol Beaupre on CR changes and copied Karen Kincaid. Sent email to Karen with copy to Carol to discuss CR and inform me when the CR has been clarified. |
12/15/1999 | Clarification Meeting Held | CR was clarified during CICMP meeting and status changed to New to be industry reviewed. |
12/16/1999 | Status Changed | CR status change to Evaluated To be reviewed. |
12/29/1999 | Status Changed | Received resubmitted CR with new submitter and named products/services. Sent email to Liz Balvin on receipt and updated CR to be web posted on 01/03/00. Also, informed them of the status change to Evaluated To be reviewed. |
1/10/2000 | Status Changed | Status changed to Reviewed Under Consideration |
1/13/2000 | Record Update | Updated priority level and number. Sent email to Liz Balvin on CR status and priority level and number. |
1/24/2000 | LOE Issued | T-shirt size was provided. U S WEST took an action item to provided an option by the next team meeting |
2/16/2000 | Status Changed | 02/16/00 Status Hold, to be reviewed in 6 months, and not to be industry prioritzed. |
2/18/2000 | Info Sent to CLEC | 02/18/00 Sent email to Jami on status change |
9/20/2000 | Status Changed | Status changed to Evaluated To be reviewed |
9/22/2000 | Status Changed | Status changed to Reviewed Under consideration. |
9/29/2000 | Status Changed | Sent email to Liz Balvin about status changes. |
10/18/2000 | LOE Issued | 10/18/00 T-Shirt Size NA and Option provided in CICMP meeting. Not eligible for industry prioritization. |
11/8/2000 | Info Sent to CLEC | Sent email to Liz Balvin with updated CR. |
11/15/2000 | Status Changed | 11/15/00 Status changed to Cancelled Co-Provider & Qwest |
12/1/2000 | Info Sent to CLEC | 12/01/00 Sent email to Liz Balvin with updated CR. |
3/25/2002 | Info Sent to CLEC | 02/01/00 Sent email to Liz on CR form update to version 04, U S WEST action item, and eligible to be prioritized |
3/25/2002 | Info Requested from CLEC | 11/11/99 CR industry reviewed and determined additional clarification is required. Informed Carol Beaupre of clarification request |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 4185852 Detail |
Title: Request for same PON use for migration of existing facilities and additional new facilities | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4185852 |
Completed 12/20/2000 |
- | IMA Common/6 |
Originator: Rodriguez, Cecilia |
Originator Company Name: WorldCom |
Owner: Thompson, Jeff |
Director: |
CR PM: Routh, Mark |
Description Of Change |
MCI Worldcom requests that US WEST allow for the following business rule functionality within the IMA/EDI interface:
US WEST to allow for the migration of existing facilities, and the addition of new facilities (i.e. unbundled loop conversion requests with new loop facilities), for an end user, on the same Purchase Order Number (PON).
MCIWORLDCOMs requested change will impact unbundled loop orders. |
Status History |
Date | Action | Description |
Release Information | IMA Release 6.00 | |
10/12/1999 | CR Acknowledged | Received and validated CR. Sent email to Eric Bransky informing him of the CR log#, Status of New To be industry evaluated, and mentioned to him to be prepared to present the CR at the next industry team meeting for IMA OSS interfaces on 11/11/99 |
11/2/1999 | Record Update | Updated form to Version 03 and added in CICMP Manager Section “Prioritization Process Category” types and selected Common per Co-Provider Industry Issue/Action #34 |
11/11/1999 | Discussed at Monthly CMP Meeting | 99 CR presented to Industry Team for review and prioritization |
11/18/1999 | Status Changed | Updated CR status to Evaluated To be reviewed, industry priority level, and priority number. Sent email to Carol Beaupre on CR changes. |
12/3/1999 | Status Changed | 99 Update CR status to Reviewed Under Consideration and sent email to Carol Beaupre on status change |
12/29/1999 | Record Update | Received resubmitted CR with new submitter and named products/services. Sent email to Liz Balvin on receipt and updated CR to be web posted on 01/03/00. |
1/24/2000 | LOE Issued | T-Shirt size and options provided. Selected/Voted as Co-Provider CR Option for Release 6.0 Status changed to “Reviewed – Release Baseline Candidate”. |
2/1/2000 | Status Changed | Sent email to Liz Balvin on CR status update, selected for a release, and CR form update. |
12/20/2000 | Status Changed | Status changed to Completed In Production. |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 4186051 Detail |
Title: Adherence to OBF guidelines for LS CFA | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4186051 |
Completed 5/16/2001 |
- | IMA Common/7 |
Originator: Pennington, Freddi |
Originator Company Name: WorldCom |
Owner: Thompson, Jeff |
Director: |
CR PM: Routh, Mark |
Description Of Change |
MCI Worldcom requests that US WEST follow OBF guidelines for the use of virgules (/) within the LS CFA (Connecting Facility Assignment) field.
According to OBF guidelines, the virgule (/) is to be used as delimiters to separate different values of the CFA.
MCIWORLDCOMs envisions this change will impact unbundled loop orders but does not preclude it would impact other services. |
Status History |
Date | Action | Description |
Release Information | IMA Release 7.00 | |
10/12/1999 | CR Acknowledged | Received and validated CR. Sent email to Eric Bransky informing him of the CR log#, Status of New To be industry evaluated, and mentioned to him to be prepared to present the CR at the next industry team meeting for IMA OSS interfaces on 11/11/99 |
11/2/1999 | Info Sent to CLEC | 11/02/99 Updated form to Version 03 and added in CICMP Manager Section Prioritization Process Category types and selected Common per Co-Provider Industry Issue/Action #34. Sent email to Carol Beaupre |
11/11/1999 | Record Update | Industry team review and prioritization of CR |
11/18/1999 | Status Changed | Change status to Evaluated To be reviewed, industry prioritization level, and priority number. Sent email to Carol Beaupre on CR changes. |
12/3/1999 | Status Changed | Change status to Reviewed– Under consideration and sent an email to Carol Beaupre on status |
1/13/2000 | Record Update | 01/13/00 Changed prioritization # and sent email to Liz Balvin. |
1/24/2000 | LOE Issued | T-Shirt Size and Options provided at industry team meeting. |
4/19/2000 | Baseline Candidate Selection | Reviewed Release Baseline Candidate for IMA Release 7.0 based on T-shirt size Medium and option description. Voted/Selected as Co-Provider CR Option for 7.0. |
5/1/2000 | Info Sent to CLEC | Sent email to Liz and Scott Sparks on CR Status/Candidate. |
11/30/2000 | Status Changed | Status changed - Committed Candidate IMA 7.0 |
12/29/2000 | Info Received From CLEC | Received resubmitted CR with new submitter and named products/services. Sent email to Liz Balvin on receipt and updated CR to be web posted on 01/03/00. |
5/16/2001 | Status Changed | Status changed to Completed In Production |
Project Meetings |
|
CenturyLink Response |
|
Archived System CR 4873151 Detail |
Title: Notification of Changes made to published information | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
4873151 |
Withdrawn 7/27/2000 |
- | Other/ | All |
Originator: Balvin, Liz |
Originator Company Name: WorldCom |
Owner: Thompson, Jeff |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Common method of notification of changes made to printed information. Example being changes made to requirements of IMA documentation. |
Status History |
Date | Action | Description |
6/29/2000 | CR Submitted | |
6/29/2000 | CR Acknowledged | |
6/30/2000 | Info Sent to CLEC | New – To be industry evaluated. Sent email to Scott Sparks with CR # and status. |
7/19/2000 | Status Changed | Status changed to New – To be clarified |
7/27/2000 | Status Changed | Status changed to Cancelled. Liz Balvin sent email after phone call with Teri Pfenneberger and Sydney Margul stating CR “can be cancelled with the intent that Qwest's "communal web site" for documented changes would cover WCom's concern. |
7/28/2000 | Info Sent to CLEC | Sent email to Liz Balvin about status change and form change to version 05. |