Wholesale: Products & Services

2001 System CMP's in One File

Archived System CR SCR092501-1 Detail

 
Title: Capability to submit Directory Listing information at the same time the LSRs are being submitted through EDI for UNE orders.
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR092501-1 Completed
7/18/2002
-   IMA Common/10 FBDL UNE
Originator: Mendoza, Lori
Originator Company Name: Allegiance
Owner: Winston, Connie
Director:
CR PM: Stecklein, Lynn

Description Of Change

On UNE orders, Allegiance wants the capability to submit Directory Listings information at the same time the LSRs are being submitted through EDI on New Facility orders, Partial Migration orders, and Move orders. Allegiance wants the option to be able to do this through EDI or to still be able to submit DL information through the IMA GUI separately from the EDI order as is the current capability.

Status History

Date Action Description
9/25/2001 CR Submitted CR submitted 
10/8/2001 Clarification Meeting Held Clarification meeting was held with Allegiance 
10/18/2001 Discussed at Monthly CMP Meeting Presented at Oct CMP meeting 
10/25/2001 Status Changed Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization 
10/30/2001 Draft Response Issued Draft response posted to CMP database 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. SCR092501-1 ranked 5 
11/15/2001 Discussed at Monthly CMP Meeting Discussed In Nov CMP meetings (see project meetings) 
11/26/2001 Info Received From CLEC Contacted Terry Wicks to clarify the type of orders this request is asking for - UNE or UBL 
11/27/2001 Info Received From CLEC Terry advised - An Unbundled Loop order is a UNE order. 
11/28/2001 Action Item Created See action item 373 - A special conference call to discuss the CMP CR from Allegiance - Ability to submit Directory Listings at the same time that the LSR is created for UNE orders through the IMA EDI interface. 
11/28/2001 Clarification Meeting Scheduled The call will begin at 3:00 pm mountain on Friday, November 30th. The call in number is 1-866-682-6250 and the passcode is 7248183. 
1/17/2002 Discussed at Monthly CMP Meeting CR # SCR092501-1 discussed during 10.0 Packaging Presentation 
1/17/2002 Status Changed CR # SCR092501-1 status updated to 'Packaged' for 10.0 
3/7/2002 CLEC Call Call with the CLEC Community to discuss 10.0 packaging status scheduled 3/12/02 
3/8/2002 Communicator Issued CMPR.03.07.02.F.01235 Meeting with CLEC Community to discuss status scheduled 3/12 
3/13/2002 Status Changed Status updated from 'Packaged' to 'Development 
3/13/2002 Qwest CR Review Meeting Meeting was held with the CLEC community to provide the overall summary of this CR that is packaged in 10.0. 
3/21/2002 Discussed at Monthly CMP Meeting SCR092501-1 discussed March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP - Attachment G; also discussed during IMA Release 10.0 Commitment Discussion (Attachment I) 
4/5/2002 CLEC Call A call with the CLEC community was held to discuss status of CR. 
4/18/2002 Discussed at Monthly CMP Meeting SCR092501-1 discussed at April Systems CMP Monthly meeting; please see Systems CMP Distribution Package April CMP - Attachment G 
6/20/2002 Discussed at Monthly CMP Meeting SCR092501-1 discussed at June Systems CMP Monthly meeting; please see Systems CMP Distribution Package June CMP -- Attachment N 
6/20/2002 Discussed at Monthly CMP Meeting SCR092501-1 discussed at June Systems CMP Monthly meeting; please see Systems CMP Distribution Package July CMP -- Attachment G 
6/25/2002 Status Changed Status updated to CLEC Test based upon discussion at June Systems CMP Meeting and IMA 10.0 Deployment on June 17, 2002 
7/18/2002 Discussed at Monthly CMP Meeting SCR092501-1 discussed at July Systems CMP Monthly meeting; please see Systems CMP Distribution Package July CMP -- Attachment G 
7/18/2002 Status Changed Status changed to completed 

Project Meetings

4/18/02 Connie Winston/Qwest stated that the Clarification Meeting was held and that the CLECs manage and assign their own ALI codes.

4/5/02 - A meeting with the CLEC community was held to discuss the stategy and direction of this CR that is scheduled for implementation in the 10.0 release. Attendees - Jonathan Spangler - AT&T, Nancy Conant - Telecordia, Monica Avila - Vartec, Bonnie Johnson - Eschelon, Terry Wicks - Allegiance, Butch Stahlberger - XO Communications, Connie Winston - Qwest, Russ Urevig - Qwest, Lynn Stecklein - Qwest

A written summary was provided by Qwest and was reviewed during this call.

History

Up to this point in time, CLECs requesting unbundled loop would submit a request for the loop and once that request is completed, then submit a request for a facility based stand-alone listing. A request from CLECs via the CMP process has requested that Qwest update the current process so a request for an unbundled loop and a request for a facility listing can be requested via the same LSR.

Change Objectives

Allow one LSR for both Unbundled Loop and Facility Based Listings. The following UBL products are in scope for ACT = T, N, C & V, they are DS0 product 2 and 4 wire analog, 2 and 4 wire digital with the REQTYP of either AB or BB. All changes to existing Listing will be required to be modified with the same process that they were originally requested.

IMA entry issues for the CLEC

CLEC submits a request for an Unbundled Loop via normal process, they now have the availability of request a DL form with the REQTYP of AB or BB. The CLEC must now apply a CKR to the LS form, which will match the LTN of the DL form, this will be the only way Qwest will be able to associate the Listing to the circuit. This association will be critical to achieve flow through for Unbundled Loop with directory listing.

The DL form will be populated as normal, the only identified rule will be that the LTN must match a CKR in the same format on the LS form. Example for format is NPA-NXX-LLLL.

IMA will validate that the LTN on the DL form match either the CKR on the LS page or the CSR which is be modified has the matching CKR fid, if not the follow error message will be returned. The LTN on the DL form must match a CKR on LS or CKR fid on CSR.

IMA will reject UBL LSRs with directory listings requested when FBDL stand alone listing exist in LSS for the TN included on the listing request. This error message shall read: FBDL listing already exists; must submit Listing request on separate FBDL LSR. FOC FOC will be returned as normal upon a complete and accurate LSR received.

3/12/02 - A meeting was held with the CLEC Community to provide status and an overall summary of this CR. A written summary will be provided to the CLEC Community so that they can communicate the change internally. A follow-up meeting will be scheduled to discuss any questions.

11/30/01 - Meeting held with the CLEC community to discuss SCR092501-1. Connie Winston reviewed the purpose of this change request: When submitting their UBL order, the CLECs want to submit their Directory Listing at the same time, same order. Currently, the CLEC has to issue the orders separately. Connie reviewed Qwest's proposal to achieve this goal. On AB and BB req. type the CLEC would be able to submit one order for their Loop circuit and the Directory Listing (similar to the resale process that exists today) Simple or Straight Line only Listings will be accepted during this phase. The CLEC would receive one Firm Order Confirmation (FOC) . The listing will also now appear the Customer Service Record (CSR). There is an enhancement to the listing system scheduled to occur at the same time as this change. Any risks or impacts associated with this change request will be evaluated. Allegiance asked about Complex Listings. Connie said that Complex Listings will not be addressed in this phase of the request. The CLECs could re-vote on the complex listing phase of this request. Allegiance would like Connie to provide Qwests postion on the complex listing portion of this change request. A readout will be provided on the December CMP meeting as part of action item #379. 11/15/01- Discussed this CR in CMP meeting. Connie Winston advised that initially this CR had a size of large, however, now it is x-large. If you take everthing into consideration it gets very complex. None of it is impossible it just grows in complexity as we delve into further detail. We can scope it differently for a large size. This CR was ranked at #5 at the prioritization. Connie suggested a different meeting to define the scope of this (what's needed now vs later). The CLECs agreed and that we need to include EDI vendors. We need to go over possibilities so that we can determine how to deliver something feasible in 10.0. L Powers has concerns that there are already so many issues with directory issues - they have full time people to work these issues. She would be curious to find out more about Allegiances difficulty with this issue. Mark Routh will set up the clarification call. 10/8/01 Alignment/Clarification Meeting

9:00 p.m. (MDT) / Monday October 8, 2001

Attendees Terry Wicks - Allegiance Peggy Esquibel Reed, Qwest J J Bradley, Qwest Jerry Mohatt Qwest Lynn Stecklein Qwest Beth Foster Qwest Tracy Gilford Qwest

Interfaces - IMA Common Products - UNE

Process Specialists need to be included in the Clarification Meetings. This concern will be brought to the attention of the CMP system lead.

Allow CLEC’s to process Directory Listing information at the same time the LSR is submitted.

Change Request needs to be prioritized and shirt sized.

11/28/01 - See action item 373 - A special conference call to discuss the CMP CR from Allegiance - Ability to submit Directory Listings at the same time that the LSR is created for UNE orders through the IMA EDI interface. The call will begin at 3:00 pm mountain on Friday, November 30th. The call in number is 1-866-682-6250 and the passcode is 7248183. 11/28/01 - See action item 373.

CenturyLink Response

For Review by the CLEC Community and Discussion at November CMP Meeting

October 30, 2001

Terry Wicks ILEC Relations Manager Allegiance

CC: Mark Routh Gerald Mohatt Joseph J. Bradley

This letter is in response to your CLEC Change Request Form, SCR092501-1 dated September 25, 2001- Capability to submit Directory Listing information at the same time the LSRs are being submitted through EDI for UNE orders.

Description of Change - On UNE orders, Allegiance want the capability to submit Directory Listings information at the same time the LSRs are being submitted through EDI on New Facility orders, Partial Migration orders, and Move orders. Allegiance wants the option to be able to do this through EDI or to still be able to submit DL information through the IMA GUI separately from the EDI order as is the current capability.

Qwest Response: The clarification meeting with Allegiance to discuss this Change Request was held on October 8, 2001. From this meeting, the level of effort was determined to be Large. This change request is an eligible IMA 10.0 candidate.

Sincerely,

John I. Gallegos Information Technologies Manager

Archived System CR SCR092501-2 Detail

 
Title: Eliminate multiple LSRs for Moves, Changes and Disconnects of TNs
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR092501-2 Completed
7/18/2002
-   IMA Common/10 LSR UBL
Originator: Mendoza, Lori
Originator Company Name: Allegiance
Owner: Winston, Connie
Director:
CR PM: Stecklein, Lynn

Description Of Change

On unbundled loop ordering, once an end user has been established with the CLEC, all subsequent order activity for the end user must be on a separate LSR for each TN involved even when all TNs are at the same end user location. This order activity includes Move orders, Change orders, and Disconnect orders. Allegiance wants the ability to put multiple TNs on one LSR without having to supply each separate SBN for each circuit. There is no place to put multiple SBNs on one LSR. There are fields to put multiple TNs and circuit IDs.

This current practice required by Qwest greatly increases the processing time and hard dollar expense to the CLECs to have to submit separate LSRs for multiple TNs. Qwest is the only ILEC that requires separate LSRs for multiple TNs for the same End User at the same location. Allegiance is requesting that Qwest develop the ability to allow CLECs to process multiple TNs on one LSR.

Also, Qwest does not allow for the migration of existing facilities from Qwest and the addition of new facilities for the same end user at the same location to be processed on the same LSR. Allegiance is requesting that Qwest develop the ability to allow the CLECs to be able to do this as well.

Status History

Date Action Description
9/25/2001 CR Submitted CR submitted 
10/8/2001 Clarification Meeting Held Clarification meeting was held with Allegiance 
10/18/2001 Discussed at Monthly CMP Meeting Presented at Oct CMP meeting 
10/25/2001 Status Changed Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization 
10/30/2001 Draft Response Issued Draft response posted to CMP database 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. SCR092501-2 ranked 7 
11/14/2001 LOE Issued CR is priority #7. LOE is large to extra large. 
11/14/2001 Discussed at Monthly CMP Meeting CR was discussed in the Nov CMP meeting 
1/17/2002 Discussed at Monthly CMP Meeting CR # SCR092501-2 discussed during 10.0 Packaging Presentation 
1/17/2002 Status Changed CR # SCR092501-2 status updated to 'Packaged' for 10.0 
3/7/2002 CLEC Call CLEC call scheduled 3/12/02 to discuss 10.0 packaging and status 
3/8/2002 Communicator Issued CMPR.03.07.02F.01235 Meeting with CLEC Community to discuss status 3/12/02 
3/13/2002 Status Changed Status updated from 'Packaged' to 'Development 
3/13/2002 Qwest CR Review Meeting A meeting was held on 3/12/02 with the CLEC Community to provide status and an overall summary of this change request. 
3/21/2002 Discussed at Monthly CMP Meeting SCR092501-2 discussed March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP - Attachment G; also discussed during IMA Release 10.0 Commitment discussion (Attachment I) 
4/5/2002 CLEC Call Status of CR reviewed 
6/20/2002 Discussed at Monthly CMP Meeting SCR092501-2 discussed at June Systems CMP Monthly meeting; please see Systems CMP Distribution Package June CMP -- Attachment N 
6/20/2002 Discussed at Monthly CMP Meeting SCR092501-2 discussed at June Systems CMP Monthly meeting; please see Systems CMP Distribution Package July CMP -- Attachment G 
6/25/2002 Status Changed Status updated to CLEC Test based upon discussion at June Systems CMP Meeting and IMA 10.0 Deployment on June 17, 2002 
7/18/2002 Discussed at Monthly CMP Meeting SCR092501-2 discussed at July Systems CMP Monthly meeting; please see Systems CMP Distribution Package July CMP -- Attachment G 
7/18/2002 Status Changed Status changed to completed 

Project Meetings

4/5/02 A call was held to discuss the status of this CR and a written overview was provided and reviewed.

Attendees - Jonathan Spangler - AT&T, Nancy Conant - Telecordia, Monica Avila - Vartec, Bonnie Johnson - Eschelon, Terry Wicks - Allegiance, Butch Stahlberger - XO Communication, Connie Winston - Qwest, Russ Urevig - Qwest, Lynn Stecklein - Qwest 1. History

The Unbundled Loop (UBL) product initial implementation requirements were that a request for disconnects, changes, and moves would require the CLEC to submit a request for each circuit individually. The change request was made to allow these types of activities involving multiple circuits be allow on a single Loop service request (LSR) when the changes being made to the circuits are the same and at the same end user (EU) address. Change Objectives

Changes to the IMA (Interconnect Mediated Access) and FTS (Flow Through Services) will allow multiple circuit requests to be processed from one LSR for the same activity and EU. FTS will process up to 10 requests in a mechanized format, greater than 10 requests on an LSR will drop to the SDC to be handled manually. This does NOT restrict the CLEC from requesting more that 10 disconnect, changes and move on a single LSR.

IMA entry issues for the CLEC

The CLEC submits an LSR for disconnect, change, and moves with the REQTYP = AB only, the ACT field can equal D, C, T, and M.

REQTYP = AB and ACT = D (Disconnect)

The CLEC will follow the normal entries for the disconnect requests, IMA will allow the entry of additional circuits on the LS form (loop service page). Flow through will handle up to 10 disconnect request, greater than 10 will drop to manual handling for the SDC’s within Qwest. The FOC’s for greater than 10 requests will follow the manual time lines not the mechanized time lines. NO manual indicated will be set by the CLEC, this will be handled through edit coding internally. All disconnect request will be basic disconnects.

REQTYP = AB and ACT = C, T, M

The CLEC will follow the normal entries for these for these types of requests, editing will be preformed to verify the circuits on the LS page match the EU address. If the address does not match the requested change will not be allowed.

The FOC will contain information for all service orders, also loss/completions reports will remain the same.

3/12/02 - A meeting was held with the CLEC Community to provide status and an overall summary of this CR. A written summary will be provided to the CLEC Community so that they can communicate the change internally. A follow-up meeting will be scheduled to discuss any questions.Alignment/Clarification Meeting

9:00 p.m. (MDT) / Monday October 8, 2001

Attendees Terry Wicks- Allegiance Peggy Esquibel Reed, Qwest J J Bradley, Qwest Jerry Mohatt Qwest Lynn Stecklein Qwest Beth Foster Qwest Tracy Gilford Qwest

Confirm Interfaces & Products Impacted Interfaces - IMA/EDI Product - UBL

Identify/Confirm CLEC’s Expectation Change the current practice to allow the CLECs to submit multiple SBNs on one LSR.

3/12/02 - A meeting was held with the CLEC Community to provide status and an overall summary of this CR. A written summary will be provided to the CLEC Community so that they can communicate the change internally. A follow-up meeting will be scheduled to discuss any questions.

CenturyLink Response

October 30, 2001 DRAFT RESPONSE For Review by the CLEC Community and Discussion at November CMP Meeting

Terry Wicks ILEC Relations Manager Allegiance

CC: Mark Routh Gerald Mohatt Joseph J. Bradley

This letter is in response to your CLEC Change Request Form, SCR92501-2 dated September 25, 2001 - Eliminate Multiple LSRs for Moves, Changes and Disconnects of TNs.

Description of Change - On unbundled loop ordering, once an end user has been established with the CLEC, all subsequent order activity for the end user must be on a separate LSR for each TN involved even when all TNs are at the same end user location. This order activity includes Move orders, Change orders, and Disconnect orders. Allegiance wants the ability to put multiple TNs on one LSR without having to supply each separate SBN for each circuit. There is no place to put multiple SBNs on one LSR. There are fields to put multiple TNs and circuit Ids. This current practice required by Qwest greatly increases the processing time and hard dollar expense to the CLECs to have to submit separate LSRs for multiple TNs Qwest is the only ILEC that requires separate LSRs for multiple TNs for the same End User at the same location. Allegiance is requesting that Qwest develop the ability to allow CLECs to process multiple TNs on one LSR. Also, Qwest does not allow for the migration of existing facilities from Qwest and the addition of new facilities for the same end user at the same location to be processed on the same LSR. Allegiance is requesting that Qwest develop the ability to allow the CLECs to be able to do this as well.

Qwest Response: The clarification meeting with Allegiance to discuss this Change Request was held on October 8, 2001. From this meeting, the level of effort was determined to be Extra Large. At this time Qwest will not provide the functionality to allow the addition of new facilities at the same time a migration is done. This Change Request is a candidate for IMA Release 10.0.

Sincerely, John I. Gallegos Information Technologies Manager

Archived System CR SCR122701-1 Detail

 
Title: SATE X 12 Mapping Examples
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR122701-1 Completed
3/13/2002
-   SATE/ All
Originator: Coleman, Ian J.
Originator Company Name: Allegiance
Owner: Green, Wendy
Director:
CR PM: Esquibel-Reed, Peggy

Description Of Change

Qwest will provide X 12 mapping examples for all products and activities to all CLECS. These examples can be based on a test CLEC and need not utilize production or SATE facilities including Central Offices, circuits or account numbers.

Status History

Date Action Description
12/27/2001 CR Submitted  
1/3/2002 Clarification Meeting Scheduled Clarification Meeting Scheduled for January 8, 2002 
1/8/2002 Clarification Meeting Held Clarification Meeting held. See Project Meeting Notes. 
1/10/2002 LOE Issued Received LOE of Large from IT. 
1/10/2002 Draft Response Issued Issued draft response. 
1/14/2002 Info Requested from CLEC Email from Qwest to Allegiance asking what are the requirements for post-order transactions. 
1/14/2002 Info Received From CLEC Received response from Allegiance: Allegiance has no use for mapping examples in regards to post-order transactions. 
1/17/2002 Discussed at Monthly CMP Meeting CR # SCR122701-1 'Presented' at January CMP meeting 
2/25/2002 Additional Information SATE Ranking will be in the March 2002 CMP Meeting. 
3/13/2002 Status Changed Status changed to CLEC Test. See SYST.03.08.02.F.02631.EDI_Pop_X12_Map_Exmp 
3/21/2002 Discussed at Monthly CMP Meeting SCR122701-1 discussed March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP - Attachment E 
3/22/2002 Status Changed Status updated from 'CLEC Test' to 'Completed' 

Project Meetings

March 21, 2002 CMP Discussion: Wendy Green/Qwest noted that the document has been created, and was published on March 8. Wendy also noted where it is posted. Ok to close. Status changed to Completed.

01/17/02 CMP Meeting Discussion: Wendy Green/Qwest presented CR and stated that this CR came out of the SATE User’s Group and is co-sponsored by Qwest and the CLEC’s. Wendy advised this is for new documentation to provide examples based on test data. Bill Micou/AT&T Will not use SATE examples? Other ILECs provide EDI associated with test cases. Wendy responded - will populate EDI and not use SATE data, the CLEC’s know how to populate own data before move into production. Wendy advised level of effort is Large. Michael Buck/Qwest stated that this CR will move into Presented status and the ranking of SATE requests will take place at February CMP.

01/08/02 - Clarification Meeting Notes: Attendees were Ian Coleman/Allegiance, Ken Wilson/AT&T, Bob Carias/Nightfire, Peggy Esquibel-Reed/Qwest, Donna Montarone/Qwest, Jake Perlman/Qwest, Wendy Green/Qwest, Ellen Cross/Qwest, Francois Morel/Qwest. X12 data is the only requirement for this request. CLEC requested Qwest to provide X 12 mapping examples for all products and activities to all CLECS. No other questions were raised. Meeting notes emailed to all participants.

CenturyLink Response

DRAFT RESPONSE For Review by the CLEC Community and Discussion at January CMP Meeting

January 10, 2002

Ian Coleman Allegiance Telecom, Inc.

This letter is in response to your CLEC Change Request Form, number SCR122701-1 dated December 27, 2001, CR Title: SATE - X 12 Mapping Examples.

CR Description: Qwest will provide X 12 mapping examples for all products and activities to all CLECS. These examples can be based on a test CLEC and need not utilize production or SATE facilities including Central Offices, circuits or account numbers.

Qwest Response: The Clarification meeting for this request was held on January 8, 2002. There were no questions raised for this request. Based on the above noted information, the level of effort for this request is large. This request is an eligible CR for prioritization in February 2002.

Sincerely, Jeff Thompson Director, Information Technologies

Archived System CR SCR122701-2 Detail

 
Title: SATE Data NPA/NXXes
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR122701-2 Completed
6/20/2002
-   SATE/ NPA/NXX's All
Originator: Coleman, Ian J.
Originator Company Name: Allegiance
Owner: Green, Wendy
Director:
CR PM: Esquibel-Reed, Peggy

Description Of Change

All current SATE data must be altered to utilize NPA/NXXes currently in Qwest’s network footprint.

Status History

Date Action Description
12/27/2001 CR Submitted  
1/3/2002 Clarification Meeting Scheduled Clarification Meeting Scheduled for January 8, 2002 
1/8/2002 Clarification Meeting Held Clarification Meeting held. See Project Meeting Notes. 
1/10/2002 LOE Issued Received Large LOE from IT. 
1/10/2002 Draft Response Issued Issued draft response. 
1/17/2002 Discussed at Monthly CMP Meeting CR # SCR122701-2 'Presented' at January CMP meeting 
2/25/2002 Additional Information SATE Ranking will be in the March 2002 CMP Meeting. 
3/13/2002 Status Changed Status changed to Development. This item is targeted for the SATE 10.0 Release. 
5/8/2002 Status Changed To be deployed 5/18/02, status changed to 'CLEC Test' 
5/16/2002 Discussed at Monthly CMP Meeting SCR122701-2 discussed at May Systems CMP Monthly meeting; please see Systems CMP Distribution Package May CMP - Attachment F 
6/20/2002 Discussed at Monthly CMP Meeting SCR122701-2 discussed at June Systems CMP Monthly meeting; please see Systems CMP Distribution Package June CMP -- Attachment G 

Project Meetings

June 20, 2002 CMP Meeting Discussion: This effort was deployed on May 18, 2002. Terry Wicks (Allegiance) asked Ian Coleman if he had completed his testing. Ian Coleman (Allegiance) replied that he had completed the testing and indicated that it is OK to close this CR. The status of this CR will be changed to ‘Completed’.

May 16, 2002 Systems CMP Meeting Discussion: Wendy Green/Qwest stated that this effort would be deployed on 5/18 and that testing could begin on Monday, May 20th. Status is CLEC Test until June CMP Meeting.

01/17/02 CMP Meeting Discussion: Wendy Green/Qwest presented CR and stated that this CR came out of the SATE User’s Group and is co-sponsored by Qwest and the CLEC’s. Wendy advised that currently use made-up NPA/NXX’s. This CR will use actual NPA/NXXs. Wendy advised level of effort of Large. Michael Buck/Qwest stated that this CR will move into Presented status and the ranking of SATE requests will take place at February CMP.

01/08/02 - Clarification Meeting Notes: Attendees were Ian Coleman/Allegiance, Ken Wilson/AT&T, Bob Carias/Nightfire, Peggy Esquibel-Reed/Qwest, Donna Montarone/Qwest, Jake Perlman/Qwest, Wendy Green/Qwest, Ellen Cross/Qwest, Francois Morel/Qwest, Nancy Denny/Qwest. All current SATE data must be altered to utilize NPA/NXX’s currently in Qwest’s network footprint. No other data elements are required. Meeting notes emailed to all participants.

CenturyLink Response

DRAFT RESPONSE For Review by the CLEC Community and Discussion at January CMP Meeting

January 10, 2002

Ian Coleman Allegiance Telecom, Inc.

This letter is in response to your CLEC Change Request Form, number SCR122701-2 dated December 27, 2001, CR Title: SATE Data - NPA/NXX’s.

CR Description: All current SATE data must be altered to utilize NPA/NXX’s currently in Qwest’s network footprint.

Qwest Response: The Clarification meeting for this request was held on January 8, 2002. Confirmation was received that there were no other data elements involved in this request. This request is for NPA/NXX’s only. Based on this information, the level of effort for this request is large. This request is an eligible CR for prioritization in February 2002.

Sincerely, Jeff Thompson Director, Information Technologies

Archived System CR SCR122701-3 Detail

 
Title: SATE Add Loop Splitting
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR122701-3 Completed
3/20/2003
325 - 500  SATE/12 All
Originator: Wilson, Ken
Originator Company Name: AT&T
Owner: Green, Wendy
Director:
CR PM: Esquibel-Reed, Peggy

Description Of Change

This change is submitted by AT&T on behalf of NightFire Software. SATE must support Loop Splitting and all its activities. Scenarios for Loop Splitting should be added to the EDI SATE Data Document

Status History

Date Action Description
12/27/2001 CR Submitted  
1/3/2002 Clarification Meeting Scheduled Clarification Meeting Scheduled for January 8, 2002 
1/8/2002 Clarification Meeting Held Clarification Meeting Held, See Project Meeting Notes. 
1/10/2002 LOE Issued Received medium LOE from IT. 
1/10/2002 Draft Response Issued Issued draft response. 
1/17/2002 Discussed at Monthly CMP Meeting CR # SCR122701-3 'Presented' at January CMP meeting 
2/25/2002 Additional Information SATE Ranking will be in the March 2002 CMP Meeting. 
4/1/2002 Release Ranking Ranking for SATE following the March 2002 Systems CMP Meeting. SCR122701-3 ranked number 21 
6/7/2002 Status Changed SCR122701-3 status updated to 'Pending Prioritization' (for SATE) based upon outcome of IMA 11.0 Packaging Selection vote 
8/22/2002 Discussed at Monthly CMP Meeting SCR122701-3 discussed at August Systems CMP Monthly meeting; please see Systems CMP Distribution Package August CMP -- Attachment N 
8/30/2002 Release Ranking Ranking for SATE 12.0 following the August 2002 Systems CMP Meeting. SCR122701-3 ranked number 2 
10/30/2002 Status Changed SCR122701-3 status updated to 'Packaged' based upon outcome of release 12.0 packaging effort 
12/19/2002 Discussed at Monthly CMP Meeting SCR122701-3 discussed at December Systems CMP Monthly meeting; please see Systems CMP Distribution Package December CMP -- Attachments N and P 
3/13/2003 Status Changed Deployed 3/8/03 
3/20/2003 Discussed at Monthly CMP Meeting SCR122701-3 discussed at March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP. 

Project Meetings

March 20, 2003 Systems CMP Meeting Discussion: Connie Winston/Qwest stated this CR was implemented on March 8, 2003. Donna Osborne-Miller/AT&T stated that this CR is okay to close.

August 22 CMP Meeting Discussion for SATE 12.0 Prioritization Review: Donna Osborne-Miller/AT&T - this CR was sponsored for NightFire. She noted that it is clearly defined in the body of the CR. There were no questions.

01/17/02 CMP Meeting Discussion: Wendy Green/Qwest presented CR and stated that this CR came out of the SATE User’s Group and is co-sponsored by Qwest and the CLEC’s. Wendy advised the level of effort is Medium. Michael Buck/Qwest stated that this CR will move into Presented status and the ranking of SATE requests will take place at February CMP.

01/08/02 - Clarification Meeting Notes: Attendees were Ian Coleman/Allegiance, Ken Wilson/AT&T, Bob Carias/Nightfire, Peggy Esquibel-Reed/Qwest, Donna Montarone/Qwest, Jake Perlman/Qwest, Wendy Green/Qwest, Ellen Cross/Qwest, Francois Morel/Qwest, Nancy Denny/Qwest. SATE must support Loop Splitting and all its activities. Scenarios for Loop Splitting should be added to the EDI SATE Data Document. Meeting notes emailed to all participants.

CenturyLink Response

DRAFT RESPONSE For Review by the CLEC Community and Discussion at January CMP Meeting

January 10, 2002

Ken Wilson AT&T

This letter is in response to your CLEC Change Request Form, number SCR122701-3 dated December 27, 2001, CR Title: SATE - Add Loop Splitting.

CR Description: SATE must support Loop Splitting and all its activities. Scenarios for Loop Splitting should be added to the EDI SATE Data Document.

Qwest Response: The Clarification meeting for this request was held on January 8, 2002. There were no questions raised for this request. Based on the above noted information, the level of effort for this request is medium. This request is an eligible CR for prioritization in February 2002.

Sincerely, Jeff Thompson Director, Information Technologies

Archived System CR SCR122701-4 Detail

 
Title: SATE Add Line Splitting
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR122701-4 Completed
3/20/2003
325 - 500  SATE/12 All
Originator: Wilson, Ken
Originator Company Name: AT&T
Owner: Green, Wendy
Director:
CR PM: Esquibel-Reed, Peggy

Description Of Change

This change is submitted by AT&T on behalf of NightFire Software. SATE must support Line Splitting and all its activities. Scenarios for Line Splitting should be added to the EDI SATE Data Document

Status History

Date Action Description
12/27/2001 CR Submitted  
1/3/2002 Clarification Meeting Scheduled Clarification Meeting Scheduled for January 8, 2002 
1/8/2002 Clarification Meeting Held Clarification Meeting Held. See Project Meeting Notes. 
1/10/2002 LOE Issued Medium LOE received from IT. 
1/10/2002 Draft Response Issued Issued draft response. 
1/17/2002 Discussed at Monthly CMP Meeting CR # SCR122701-4 'Presented' at January CMP meeting 
2/25/2002 Additional Information SATE Ranking will be in the March 2002 CMP Meeting. 
4/1/2002 Release Ranking Ranking for SATE following the March 2002 Systems CMP Meeting. SCR122701-4 ranked number 22 
6/7/2002 Status Changed SCR122701-4 status updated to 'Pending Prioritization' (for SATE) based upon outcome of IMA 11.0 Packaging Selection vote 
8/22/2002 Discussed at Monthly CMP Meeting SCR122701-4 discussed at August Systems CMP Monthly meeting; please see Systems CMP Distribution Package August CMP -- Attachment N 
8/30/2002 Release Ranking Ranking for SATE 12.0 following the August 2002 Systems CMP Meeting. SCR122701-4 ranked number 2 
10/30/2002 Status Changed SCR122701-4 status updated to 'Packaged' based upon outcome of release 12.0 packaging effort 
12/19/2002 Discussed at Monthly CMP Meeting SCR122701-4 discussed at December Systems CMP Monthly meeting; please see Systems CMP Distribution Package December CMP -- Attachments N and P 
3/13/2003 Status Changed Status changed to CLEC Test due to 3/8/03 deployment 
3/20/2003 Discussed at Monthly CMP Meeting SCR122701-4 discussed at March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP. 

Project Meetings

March 20, 2003 Systems CMP Meeting Discussion: Connie Winston/Qwest stated this CR was implemented on March 8, 2003. Donna Osborne-Miller/AT&T stated that this CR is okay to close.

August 22 CMP Meeting Discussion for SATE 12.0 Prioritization Review: Donna Osborne-Miller/AT&T - this CR was sponsored for NightFire. She noted that it is clearly defined in the body of the CR. There were no questions.

01/17/02 CMP Meeting Discussion: Wendy Green/Qwest presented CR and stated that this CR came out of the SATE User’s Group and is co-sponsored by Qwest and the CLEC’s. Wendy advised the level of effort is Medium. Michael Buck/Qwest stated that this CR will move into Presented status and the ranking of SATE requests will take place at February CMP.

01/08/02 - Clarification Meeting Notes: Attendees were Ian Coleman/Allegiance, Ken Wilson/AT&T, Bob Carias/Nightfire, Peggy Esquibel-Reed/Qwest, Donna Montarone/Qwest, Jake Perlman/Qwest, Wendy Green/Qwest, Ellen Cross/Qwest, Francois Morel/Qwest, Nancy Denny/Qwest. SATE must support Line Splitting and all its activities. Scenarios for Line Splitting should be added to the EDI SATE Data Document. Meeting notes emailed to all participants.

CenturyLink Response

DRAFT RESPONSE For Review by the CLEC Community and Discussion at January CMP Meeting

January 10, 2002

Ken Wilson AT&T

This letter is in response to your CLEC Change Request Form, number SCR122701-4 dated December 27, 2001, CR Title: SATE - Add Line Splitting.

CR Description: SATE must support Line Splitting and all its activities. Scenarios for Line Splitting should be added to the EDI SATE Data Document.

Qwest Response: The Clarification meeting for this request was held on January 8, 2002. There were no questions raised for this request. Based on the above noted information, the level of effort for this request is medium. This request is an eligible CR for prioritization in February 2002.

Sincerely, Jeff Thompson Director, Information Technologies

Archived System CR SCR122701-5 Detail

 
Title: SATE Increase Hours of Availability
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR122701-5 Completed
11/21/2002
1 - 150  SATE/11 ALL ALL
Originator: Wilson, Ken
Originator Company Name: AT&T
Owner: Green, Wendy
Director:
CR PM: Esquibel-Reed, Peggy

Description Of Change

SATE’s hours of availability must be increased to Monday through Friday 6 am to 8 pm MST. System support must only be available from 8 am to 6 pm MST

Status History

Date Action Description
12/27/2001 CR Submitted  
1/3/2002 Clarification Meeting Scheduled Clarification Meeting Scheduled for January 8, 2002 
1/8/2002 Clarification Meeting Held Clarification Meeting Held. See Project Meeting Notes. 
1/10/2002 LOE Issued Received LOE of Small from IT. 
1/10/2002 Draft Response Issued Issued draft response. 
1/17/2002 Discussed at Monthly CMP Meeting CR # SCR122701-5 'Presented' at January CMP meeting 
2/25/2002 Additional Information SATE Ranking will be in the March 2002 CMP Meeting. 
4/1/2002 Release Ranking Ranking for SATE following the March 2002 Systems CMP Meeting. SCR122701-5 ranked number 19 
5/24/2002 Status Changed Placed into CLEC Test as a result of Notification Number SYST.05.24.02.F.04067.SATE_OpsHours 
6/7/2002 Status Changed SCR122701-5 status updated to 'Packaged' for SATE release associated with IMA 11.0 based upon outcome of Packaging Selection vote; dual status to be discussed at June Systems CMP meeting 
6/20/2002 Discussed at Monthly CMP Meeting SCR122701-5 discussed at June Systems CMP Monthly meeting; please see Systems CMP Distribution Package June CMP -- Attachment G; status updated to "Packaged" due to phased approach; portion of CR has been delivered; remaining work is packaged in 11.0 
8/5/2002 Status Changed Status changed from 'Packaged' to 'Development', targeted implementation date is 10/19/02 
8/22/2002 Discussed at Monthly CMP Meeting SCR122701-5 discussed at August Systems CMP Monthly meeting; please see Systems CMP Distribution Package August CMP -- Attachment R 
10/17/2002 Discussed at Monthly CMP Meeting SCR122701-5 discussed at October Systems CMP Monthly meeting; please see Systems CMP Distribution Package October CMP -- Attachment L 
10/29/2002 Status Changed Status changed to CLEC Test due to October 19th deployment. 
11/21/2002 Discussed at Monthly CMP Meeting SCR122701-5 discussed at November Systems CMP Monthly meeting; please see Systems CMP Distribution Package November CMP -- Attachment G 

Project Meetings

November 21, 2002 Systems CMP Meeting Discussion: Sharon Van Meter-AT&T stated that she wanted to verify with Donna Osborne-Miller. (Note- Sharon Van Meter-AT&T spoke to Donna Osborne-Miller during a break in the meeting and Donna Osborne-Miller stated that AT&T agreed it was ok to close the CR.)

August Systems CMP Meeting Discussion: Attachment R = Change Requests Committed for IMA Release 11.0 Connie Winston/Qwest - we have one small issue requiring the Sup 2 (SCR013002-8 Flowthrough on Sup 2 Category Due Date) to be a spillover for 11.1. She explained why this will be a spillover into the point release. She noted that resale and UNE sup 2 due date change orders will flow through. The unbundled loop will drop out to the Center and will be updated by the Center until 11.1. Donna Osborne-Miller/AT&T - that’s line item #4 in the Attachment? Connie Winston/Qwest - yes. Michael Buck/Qwest - stated that the NOTE at the bottom of the page needs to be changed from 'In Definition' to 'Packaged'. Liz Balvin/WorldCom - asked how the 11.0 PO2 CR is different than the one in 12.0. Connie Winston/Qwest - they are just different edits. The edits are noted on each of the 2 CRs. Liz Balvin/WorldCom - with 12.0, would you say that any of the hours devoted to this would lower the 8,000 hours? Are you looking at that when you do the design? Connie Winston/Qwest - we always look at that, but the edits are different so I could expect a reduction in the LOEs. As we get further in design, we do update the LOE. Attachment R = Change Requests Committed for SATE Release 11.0 Connie Winston/Qwest - SATE has the same spillover candidate for 11.1, SCR013002-8 Sup 2. Michael Buck/Qwest - noted that items 3, 5, and 7 are SATE specific candidates. The others are IMA with SATE impacts. Wendy Green/Qwest - noted that the SATE side has a shorter list because of the GUI only impacting CRs going into IMA having no impact to SATE. Michael Buck/Qwest - any other questions in the room or on the bridge? None.

June 20, 2002 CMP Meeting Discussion: Wendy Green (Qwest) indicated that Qwest has completed the first phase of the request (the morning hours). She said that Qwest would like to move this CR back to ‘Packaged’ while the second phase of the CR is completed Michael Buck (Qwest) stated that what Qwest is doing could be considered a phased implementation. The initial piece has been completed, and now Qwest is planning to complete the second portion. The CR is in ‘CLEC Test’ as a means of informing the CMP Community that a portion of the work has been completed. Sharon Van Meter (AT&T) asked if Qwest could just update the response to say that it is phased. Then she will make sure that the AT&T team knows about it. Bob Carias (NightFire) asked what the phases are. Wendy Green (Qwest) indicated that, effective May 27th, the current hours were change to: 6am to 6pm MT. The next phase will make the hours extend from 6am to 8pm. as packaged for IMA 11.0. Status will be updated to ‘Packaged’

01/17/02 CMP Meeting Discussion: Wendy Green/Qwest presented CR and stated that this CR came out of the SATE User’s Group and is co-sponsored by Qwest and the CLEC’s. Wendy advised of level of effort of Small. Karen Clauson/Eschelon asked for an explanation as to why these are important. Ken Wilson/AT&T responded - These CR’s are filling out some capabilities not currently in SATE. Will add testing capabilities of OSS products. Was advised in SATE meetings that resources are not the same as other OSS CR’s. Does that mean there are two lists? Jeff Thompson/Qwest responded - in re-design, we agreed to draft language to prioritize OSS candidates on a per system, per release basis. SATE is a test system and does use a different resource team. SATE does need to mirror IMA so that needs to be kept in consideration when putting in SATE. Karen/Eschelon asked if picked these, won’t they take away from IMA? Jeff/Qwest advised that these candidates have to be bounced up against IMA release candidates. Karen/Eschelon asked if there are any or are we catching up? Jeff/Qwest responded - Carla Pardee/AT&T stated that AT&T has several billing systems and asked if they have a separate priority process. Jeff/Qwest responded yes. Bill/AT&T asked . Jeff Thompson/Qwest responded- examples are examples of how EDI mapping works. We are concerned if take all SATE examples and responses, we will render useless any knowledge that CLEC’s have. Want CLECs to code based on their understanding of the requirements. Part of the purpose of this exercise is to allow the CLECs to test their understanding of the changes to be made. Susan Travis/WorlCom asked if loop splitting was added into 10.0. Jeff/Qwest responded - Already in IMA, just adding to SATE. Ken Wilson/AT&T stated that SATE only has ½ of the capabilities of the production system. Has the major elements but needs to add features and capabilities to catch up. If add features to IMA, need to keep SATE in synch. How do we create an overall SATE priority list? Jeff Thompson/Qwest responded - Qwest would not concur that SATE only has ½ the functionality of production. Jeff advised that Qwest will support and work with CLECs to test new products. The direction that Qwest has received on a going forward basis, for a candidate to go into prioritization, Qwest works concurrently with CLEC’s to determine what’s more important. Ken Wilson/AT&T asked - How will decisions be made regarding whether CR’s to IMA will or will not automatically be included in SATE? Jeff Thompson responded - we’ve not done this before and doesn’t know if the CLEC would open a corresponding SATE CR for every IMA CR. Jeff Thompson/Qwest and Ken Wilson/AT&T - will be discussed at the next SATE User Group Meeting. Karen Clauson/Eschelon asked if this is for re-design. Jeff Thompson/Qwest advised that the SATE User Group needs to decide if is 1, 3, or 10 CR’s. Karen/Eschelon asked - from the re-design aspect, is CR the answer? Stated that if that always has to happen, could that be a step in the process and it be prioritized and a CR wouldn’t be needed. It could be part of the process. Do you do a CR each time or build it into the process? Jeff Thompson/Qwest responded - each time Qwest tries to implement new functionality considered above the line, Qwest gets push back. He assumes the CLECs would like control to submit CRs for SATE. He would like it to be an issue discussed at the SATE User Group Meeting. Ken Wilson/AT&T stated that he would also like it at the SATE User Group Meeting. He thinks it may have its own priority list. Bob Carias/NightFire stated that he agrees with Ken Wilson to prioritize SATE on its own, keep separate from IMA CR’s. Michael Buck/Qwest stated that this CR will move into Presented status and the ranking of SATE requests will take place at February CMP.

01/08/02 - Clarification Meeting Notes: Attendees were Ian Coleman/Allegiance, Ken Wilson/AT&T, Bob Carias/Nightfire, Peggy Esquibel-Reed/Qwest, Donna Montarone/Qwest, Jake Perlman/Qwest, Wendy Green/Qwest, Ellen Cross/Qwest, Francois Morel/Qwest, Nancy Denny/Qwest. SATE’s hours of availability must be increased to Monday through Friday 6 am to 8 pm MST. System support must only be available from 8 am to 6 pm MST. Meeting notes emailed to all participants.

CenturyLink Response

DRAFT RESPONSE July 9, 2002

In response to the AT&T submitted CMP CR, SCR122701-5 SATE - Increase Hours of Availability. On May 24, 2002, Qwest extended the hours of SATE to 6 am-6pm mountain time. This fulfills a portion of the functionality requested by this CR. However, because the extension of the evening hours from 6pm to 8pm is not complete, this CR will remain open pending its inclusion in a future release. Sincerely, Jeff Thompson Director, Information Technologies

DRAFT RESPONSE June 20, 2002

In response to the AT&T submitted CMP CR, SCR122701-5 SATE - Increase Hours of Availability, requesting SATE hours to be 6 am to 8 pm MT. Qwest will complete this request in 2 phases. Phase 1 was effective May 27, 2002 and SATE a.m. hours were increased. With phase 1, the SATE hours are 6 am to 6 pm. Phase 2 will be completed with IMA 11.0 and will increase the SATE p.m. hours. With the completion of phase 2, the SATE hours of availability will be 6 am to 8 pm MT.

Sincerely, Jeff Thompson Director, Information Technologies

DRAFT RESPONSE For Review by the CLEC Community and Discussion at January CMP Meeting

January 10, 2002

Ken Wilson AT&T

This letter is in response to your CLEC Change Request Form, number SCR122701-5 dated December 27, 2001, CR Title: SATE - Increase Hours of Availability.

CR Description: SATE’s hours of availability must be increased to Monday through Friday 6 am to 8 pm MST. System support must only be available from 8 am to 6 pm MST.

Qwest Response: The Clarification meeting for this request was held on January 8, 2002. There were no questions raised for this request. Based on the above noted information, the level of effort for this request is small. This request is an eligible CR for prioritization in February 2002.

Sincerely, Jeff Thompson Director, Information Technologies

Announcement Date: May 24, 2002 Effective Date: May 27, 2002 Notification Number: SYST.05.24.02.F.04067.SATEOpsHours Notification Category: Systems Notification Target Audience: CLECs, Resellers Subject Reminder - IMA EDI SATE Hours of Operation Changing May 27, 2002

This Notification is to remind you that per CLEC request, the hours of operation for the Qwest Stand Alone Test Environment (SATE) will be extended from 8:00am-6:00pm Mountain Time (MT), Monday through Friday, to 6:00am-6:00pm MT, Monday through Friday effective May 27, 2002.

The availability of Qwest support for CLEC testing in SATE will not change from the current hours of 8:00am-6:00pm MT, Monday through Friday. CLECs will be able to begin testing in SATE at 6:00am (MT, Mon-Fri) and CLECs will be able to utilize Qwest support for questions or issues beginning at 8:00am (MT, Mon-Fri).

If you have questions contact Wendy Green at 303-965-2504.

Sincerely,

Qwest

Note: In cases of conflict between the changes implemented through this notification and any CLEC interconnection agreement (whether based on the Qwest SGAT or not), the rates, terms and conditions of such interconnection agreement shall prevail as between Qwest and the CLEC party to such interconnection agreement.

Archived System CR SCR120301-6X Detail

 
Title: Two Six Code Inventory For Local Interconnection Trunk Groups Ordered By Qwest (Cross over CR PC120301 6)
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR120301-6X Completed
7/18/2002
-   Other/ Ordering LIS One-Way Trunks and Facilities
Originator: Stryczek, Kathy
Originator Company Name: AT&T
Owner: Thompson, Jeff
Director:
CR PM: Esquibel-Reed, Peggy

Description Of Change

An SCR needs to be opened to address the system changes that must be implemented to address AT&Ts request for Two-Six Code Inventory For Local Interconnection Trunk Groups Ordered By Qwest This was previously known as PC120301-6.

When Qwest orders a local interconnection trunk group, AT&T assigns the two-six code and returns it to Qwest on the FOC. Qwest should be inventorying the two-six code that AT&T assigns for Qwest-initiated ASRs. However, Qwest is not inventorying the AT&T two-six code. Qwest is assigning their own two-six code. This presents a major problem in a number of areas including maintenance. One of the first pieces of information asked by Qwest when AT&T reports a trouble is to provide the two-six code. AT&T provides the AT&T-assigned two-six code, but Qwest didn't inventory it so the Qwest maintenance group can't find the trunk group AT&T is reporting.

Here is the industry documentation from the ASOG for two-six code assignment:

53 TSC - Two Six Code

Identifies a code assigned to a trunk group or a CCS link

Set.

NOTE 1: The code set is unique to each established

trunk group or CCS Link Set and is provided to the

customer on the Firm Order Confirmation or Design and

Order Confirmation. The TSC entry may then be

populated by the customer when ordering changes,

additions or deletions to an existing trunk group or CCS

Link Set.

Clearly Qwest is not in compliance with inventorying the two-six code, as the ASOG specifically states the two-six code is provided to the customer on the FOC. In the case where Qwest initiates ASRs, Qwest is the customer and AT&T is the supplier. Consequently, Qwest should be inventorying the two-six code provided by AT&T to Qwest on the FOC.

Status History

Date Action Description
4/24/2002 CR Submitted  
4/25/2002 CR Acknowledged  
4/30/2002 Additional Information Status History from the Product & Process CR (PC120301-6) is located in the Project Meetings Tab. 
5/6/2002 Status Changed Status changed to 'Deferred', matching PnP CR, PC120301-6 
5/8/2002 Status Changed Status changed to 'Clarification' - To be discussed at the May CMP Meeting. 
5/16/2002 Discussed at Monthly CMP Meeting SCR120301-6x discussed at May Systems CMP Monthly meeting; please see Systems CMP Distribution Package May CMP - Attachment D 
5/23/2002 Communicator Issued Notice for Proposed Dates & Times: CMPR.05.23.02.F.01271.Mtg_Two-Six_Code 
5/29/2002 Communicator Issued Meeting Announcement mailout: CMPR.05.29.02.F.01273.Mtg_Two_Six_Code 
6/3/2002 General Meeting Held General meeting held with CLECs to discuss Two-Six Code; please see Project Meetings 
6/7/2002 Additional Information Two Six Code as a topic for discussion added as agenda item for CMP Re-design; item was on agenda but meeting adjourned before the agenda item was reached 
6/11/2002 CLEC Call Phone conversation with Qwest and AT&T (Kit Thomte, Michael Buck, Donna Osborne Miller, Sharon Van Meter); purpose of call was to coordinate schedules for setting up a conference call bewteen Qwest and AT&T 
6/20/2002 Discussed at Monthly CMP Meeting SCR120301-6X discussed at June Systems CMP Monthly meeting; please see Systems CMP Distribution Package June CMP -- Attachment I 
6/20/2002 Discussed at Monthly CMP Meeting SCR120301-6X discussed at June Systems CMP Monthly meeting; please see Systems CMP Distribution Package July CMP -- Attachment I 
7/18/2002 Discussed at Monthly CMP Meeting SCR120301-6X discussed at July Systems CMP Monthly meeting; please see Systems CMP Distribution Package July CMP -- Attachment I 

Project Meetings

July 18, 2002 CMP Meeting Discussion: Michael Buck/Qwest reviewed the history. Qwest & AT&T have been meeting weekly to discuss the solution associated with this CR. Kathy Stryczek/AT&T reviewed the trial underway in New Mexico to inventory the TSC. The trial appears to working well. Judy Schultz/Qwest said that a discussion was held at Re-design and this decision was made to handle this as a Change Management issue. Michael Buck/Qwest noted that this CR would be handled as a Product and Process CR Jonathan Spangler/AT&T accepts this as a Product/Process CR. Michael Buck/Qwest said that this will be updated as a Product/Process CR and the action item and Systems CR will be closed.

June 20, 2002 CMP Meeting Discussion: Michael Buck (Qwest) said this is a cross over from Product/Process. If there is more to discuss, that can certainly be done, but the CLECs and Qwest discussed it in the Product/Process meeting yesterday. Qwest believes that this is not a CMP issue, but is working with AT&T to resolve the issue. Sharon Van Meter (AT&T) indicated that there would be an ad-hoc redesign meeting. She indicated that AT&T doesn’t want to close this. She acknowledged that AT&T understands that Qwest doesn’t think that this is a CMP issue but that AT&T does. AT&T wanted to include the other CLECs in the discussion. Sharon reviewed this issue, and how it was initiated as a product/process CR. She indicated that at the time it was submitted, no one noted that it shouldn’t be a CMP issue. She added that until we can talk about this at re-design and can get resolution on whether or not this is a CMP issue, AT&T would like to leave this open. She indicated that this was brought up last Fall to their Service Management team and that team referred them to CMP. Process CMP didn’t state that this was not a CMP CR. And now Qwest is referring AT&T back to their Service Manager. The good news is that Mike and Kit are working to get this resolved. Michael Buck (Qwest) stated that Qwest is moving forward with both the issue of whether this is in the scope of CMP as well as helping AT&T with their issue. Once this is discussed in re-design Qwest will decide whether this should be a Systems or Product and Process CR. Sharon Van Meter (AT&T) said that she wasn’t sure if this belongs in product/process or systems. She added, Personally, I don’t care, as long as it stays open. Jeff Thompson (Qwest) mentioned that his understanding is that this is purely manual. Qwest sends the CLECs a fax. The CLECs respond with a fax. He stated that in his mind it’s very clear cut that it is a manual process. He noted that when he first read the CR, he understood that AT&T was getting the run around, but that he didn’t understand why this was a Systems CR. He noted that when the issue is resolved in re-design, if it stays in CMP it should be a Product/Process issue. Sharon Van Meter (AT&T) said that while AT&T currently has a manual process, it was mentioned on a call with Qwest yesterday that Qwest is looking at a systems change. This has happened a couple of times, the ‘run around’, and while Sharon is sure that Qwest is not meaning to do it, it certainly looks that way to the CLECs. The 3rd issue to be careful of in the future, as things are brought forward via CMP, is that they don’t get sent back to the Service Manager. Jeff Thompson (Qwest) & Michael Buck (Qwest) agreed that that was a fair enough comment.

Time/Date: 10:00 a,m. (MDT) / Monday June 3, 2002 Conference Call-In No.: 877 542-1728 pass code 7117699 CR No.: CLEC Change Request SCR120301-6X Clarification/Walk-thru Meeting

Attendees: Donna Osborne-Miller - AT&T Kathy Stryczek - AT&T Jeff Thompson - Qwest Michael Buck - Qwest Lynn Stecklein - Qwest

Meeting Agenda: Introduction of participants on the Conference Call was made. The purpose of the call was to determine if SCR12030106X should be handled outside the scope of CMP. Review of CR: Donna Osborne-Miller reviewed the description of change on this SCR. AT&T opened this CR to address the system changes that must be implemented to address AT&Ts request for Two-Six Code Inventory For Local Interconnection Trunk Groups Ordered By Qwest This was previously known as PC120301-6. When Qwest orders a local interconnection trunk group, AT&T assigns the two-six code and returns it to Qwest on the FOC. Qwest should be inventorying the two-six code that AT&T assigns for Qwest-initiated ASRs. However, Qwest is not inventorying the AT&T two-six code. Qwest is assigning their own two-six code. This presents a major problem in a number of areas including maintenance. One of the first pieces of information asked by Qwest when AT&T reports a trouble is to provide the two-six code. AT&T provides the AT&T-assigned two-six code, but Qwest didn't inventory it so the Qwest maintenance group can't find the trunk group AT&T is reporting. Clearly Qwest is not in compliance with inventorying the two-six code, as the ASOG specifically states the two-six code is provided to the customer on the FOC. In the case where Qwest initiates ASRs, Qwest is the customer and AT&T is the supplier. Consequently, Qwest should be inventorying the two-six code provided by AT&T to Qwest on the FOC. Jeff Thompson said that he needed to understand why AT&T brought this issue to CMP. Jeff said that in this case, Qwest is the Customer and AT&T is the Provider and he could not consider this scenario one that would be governed by CMP. Donna Osborne-Miller said that AT&T was told by their Qwest Service Manager and Account Manager to work this issue in CMP. The Service Manager is Pete Budner and the Account Manager, (Lydell Peterson. Kathy Stryczek said that they also work with Dixie Carlson in the Des Moines Center on their conversions. Jeff Thompson asked if this order activity was all in region or out of region. AT&T was not sure. Jeff asked if there was a problem on the flip side when AT&T orders from Qwest via Exact and the TSC is returned on the FOC. Donna Osborne- Miller said there was no issue on this scenario. Jeff said that this scenario (when Qwest orders from AT&T) would fall under the umbrella of CMP. Jeff Thompson proposed that this issue be handled as a business to business issue and to work offline and not in CMP. Donna Osborne-Miller said that she had a concern that this issue would not be handled in a timely manner and that this CR was in Product and Process for months and then sent to the Systems CMP. How fast is Qwest going to work this issue? Jeff Thompson said that he would get with the Service Manager and that we might work as a notice and go with a 30 day notification. Jeff said that Qwest would be contacting Pete Budner this week.. Michael Buck said that Qwest would like to close this CR in CMP as withdrawn. Donna Osborne-Miller said that she wants to discuss this issue with Judy Schultz before any decision is made re: the CR. She wants to see if this can be a re-design issue

================================

May 16, 2002 Systems CMP Meeting Discussion: Donna Osborne-Miller/AT&T reviewed request and advised that at last month's Product & Process CMP meeting it was determined that this needed to be a cross over CR due to impacts to Qwest downstream systems. Connie Winston/Qwest stated that for Systems, the CLECs usually come to Qwest via CMP and stated that there needs to be an off-line discussion as to why this request came thr CMP since it is Qwest who is the customer of the CLEC here. Donna Osborne-Miller stated that she is agreeable as this is backwards. Connie/Qwest stated that an off-line call will be set-up with AT&T. Terry Wicks/Allegiance asked if other CLECs would have the same situation? Connie Winston/Qwest responded that she didn't think that Qwest ordered LIS from any other CLEC but could check. Jonathan Spangler/AT&T stated that it might be a good idea to do a General Notification so Qwest doesn't risk missing anyone.where there could be an impact. This CR will be discussed at the June Systems CMP Meeting. CR Status to be updated to Evaluation.

================================

INFORMATION FROM PnP CMP CR PC120301-6:

STATUS HISTORY: 12/03/01 - CR Submitted by AT&T and acknowledged by Qwest 12/07/01 - Clarification call arranged for 12/10/01, rescheduled for 12/11/01 at AT&T's request 12/11/01 - Clarification call held with AT&T 12/12/01 - CMP Meeting, AT&T introduced their CR, status changed to Clarification 12/14/01 - Draft clarification meeting minutes issued to AT&T 01/16/02 - January CMP meeting. The CR was clarified with the CLEC community. Qwest presented various potential manual and system options. Qwest received feedback on potential solutions and will continue to evaluate scenarios for presentation at the February CMP meeting. Status changed to "Evaluation" 02/12/02 - Draft response sent to AT&T and entered into CMP Database 02/19/02 - E-mail from AT&T with some questions about Qwest's response 02/20/02 - February CMP meeting: Qwest response dated 02/12/02 presented to CLECs. Qwest will present expected time frame for system implementation at the March CMP meeting. CR Status changed to "Development" Meeting discussions will be set forth in the Product/Process Draft Meeting Minutes contained in the Product/Process CMP Meeting Distribution Package 03/20/02 02/22/02 - Formal response dated 02/12/02 issued to CLECs - Document Number: CMPR.02.22.02.F.01229.CRResponses 03/20/02 - March CMP Meeting: Status update provided to CLECs, CR status to remain in "Development." Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site 04/12/02 - Revised response dated 04/10/02 sent to AT&T 04/12/02 - Revised response dated 04/10/02 posted to the web 04/17/02 - April CMP Meeting: Qwest presented revised response dated 04/10/02. Qwest agreed to open a related systems CR. Status of this CR to be advised after discussions with Judy Schultz. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site 04/24/02 - Issued Systems CR to cmpcr@qwest.com on behalf of AT&T

PROJECT MEETINGS FROM PnP: 02/19/02 E-mail from AT&T with some questions about Qwest's response

Subject: RE: Qwest Response to Change Request PC120301-6 "Two-Six Code Inv entory for Local Interconnection Trunk Groups Ordered by Qwest" Date: Tue, 19 Feb 2002 17:20:24 -0600 From: "Stryczek, Kathleen K (Kathy), BNSVC" To: Michael Keegan CC: "Olsen, Linda Kae" , "Martin, Richard" , "Mead, Todd" , "Adkisson, Ann B, NCAM" , "Feinstein, Philip G (Phil), NNCER" , "Scherer, Esther A, NCAM" Michael, Thank you for your response to request PC120301-6 for Qwest to inventory the two-six code provided by AT&T on local interconnection trunk groups ordered by Qwest. If Qwest used the two-six code as the PON, would AT&T be able to report trouble tickets using the AT&T assigned two-six code? Also, would the Qwest maintenance group be able to locate a trunk group by searching for a PON which would have the two-six code embedded? If Qwest uses the AT&T two-six code only in the PON, but not in other systems, then I am concerned that Qwest may not be able to find the two-six code and associated trunk group when AT&T is reporting a trouble involving trunk groups ordered by Qwest. Kathy Stryczek AT&T 602-277-4527

Clarification Call, December 11, 2001, 11:00 am (MDT)

Attendees: Todd Mead, Qwest Linda Kae Olsen, Qwest Peggy Kilgus, Qwest Ann Adkinisson, AT&T Kathy Stryczek, AT&T Ester Shearer, AT&T

Reviewed description of Change Request.

Products impacted: Local Interconnection Service (LIS) Qwest need to have someone from the repair group who is involved in the management and use of the TIRKS system, involved in preparing the response to this CR. AT&T's expectation: AT&T would like Qwest to use the two-six code provided by AT&T when Qwest places an order for a local trunk group.

Action Plan: - Qwest will evaluate various options. This CR will be clarified with the CLEC Community at the January CMP Meeting. Qwest will provide a draft response for discussion at the February 2002 CMP meeting. - AT&T will provide Qwest with a contact in Ameritech to discuss ordering process and use of two-six codes. - Qwest to identify and involve the appropriate repair/TIRKS person to assist Linda in developing the draft response. An internal meeting will be held by next Wednesday (12/19/01)

CenturyLink Response

May 16, 2002 Systems CMP Meeting Discussion: There will be a meeting scheduled with the CLEC Community to discuss if this is a CR that should come thru CMP.

INFORMATION FROM PnP PC120301-6:

REVISED RESPONSE

April 10, 2002

Ms. Kathy Stryczek Manager AT&T

SUBJECT: Qwest’s Change Request Response - CR # PC120301-6 Two-Six Code Inventory for Local Interconnection Trunk Groups Ordered by Qwest

This letter is a follow-up response to AT&T Change Request PC120301-6, requesting Qwest inventory the two-six code that AT&T assigns for Qwest initiated ASRs.

Qwest’s written response dated February 12, 2002 informed the CLEC community that Qwest was willing to perform a detailed economic and technical investigation to evaluate the feasibility of implementing the system changes required to meet the intent of this CR.

Qwest has completed its evaluation and has concluded the cost of changing the myriad of downstream-related systems needed to effect this change is prohibitive. Qwest suggests deferral of this CR until the 2003 fiscal year funding review, planned for later this year.

Therefore Qwest regretfully informs AT&T that this CR cannot be processed this year.

Sincerely,

Susan Bliss Director Process Management Qwest

FORMAL RESPONSE

February 12, 2002

AT&T Ms. Kathy Stryczek Manager

SUBJECT: Qwest’s Change Request Response - CR PC120301-6 Two-Six Code Inventory for Local Interconnection Trunk Groups Ordered by Qwest

This letter is in response to AT&T Change Request PC120301-6, Two-Six Code Inventory For Local Interconnection Trunk Groups Ordered By Qwest. AT&T has requested that Qwest inventory the two-six code that AT&T assigns for Qwest initiated ASRs.

During the CLEC Community clarification meeting held January 16, 2002, AT&T confirmed their desire for Qwest to inventory the TSC provided on the FOC for the order. AT&T agreed that this TSC, along with the TCICs and ACTL information provided today, could be provided during the up-front planning meeting for new markets. Qwest could then use this code as the PON number as well as possibly make program modifications that would allow it to be used as the TSC (TGAC) in the processing and inventory systems used by Qwest (EXACT, IABS, TIRKS, WFA, TRDB, etc.)

Qwest is willing to pursue internal system changes to evaluate the feasibility (technical and economical) of implementing such changes. Qwest can not determine all of the systems that would be impacted, nor what the downstream effects on the process would be until the systems evaluations are performed.

If this approach is acceptable to AT&T, Qwest will initiate the required internal system changes and provide a status update at the March CMP meeting.

Sincerely,

Linda Kae Olsen Process Specialist - LIS Qwest

Archived System CR SCR111901-1 Detail

 
Title: Request for Qwest to separate daily usage files by separating category 01 and 010 from category 011.
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR111901-1 Completed
5/17/2002
-   Wholesale Billing Interfaces/ Switched Services
Originator: Osborne-Miller, Donna
Originator Company Name: AT&T
Owner: Zimmerman, Alan
Director:
CR PM: Esquibel-Reed, Peggy

Description Of Change

AT&T is requesting Qwest to separate daily usage files, separating Category 01 and 010 from category 011

Request for Qwest to separate daily usage files by separating category 01 and 010 from category 011. Categories 01 and 010 separate daily usage records for end users while category 011 tracks billing for other carriers. AT&T separates billing entities by these functions. AT&T believes that other carriers utilize this same process. AT&T believes would be more efficient if the daily usage files were separate in this manner.

Status History

Date Action Description
8/30/2001 CR Submitted CR PC090401-1 received from Donna Osborne-Miller of AT&T 
9/4/2001 Status Changed PC090401-1 Status changed to New - To be reviewed 
9/4/2001 Info Sent to CLEC Updated CR PC090401-1 sent to Donna Osborne-Miller of AT&T 
9/12/2001 Clarification Meeting Held PC090401-1 Clarification meeting held with AT&T. AT&T to get CLEC community acceptance 
9/21/2001 Record Update AT&T will not have opportunity to present PC090401-1 at community meeting until 10/15/01 
10/17/2001 Discussed at Monthly CMP Meeting CMP Meeting: SBC indicated that they were receiving separate billing records for daily usage. Alan Zimmerman, Qwest to draft reply for next CMP (November 14, 2001). No change to "Current Status." 
11/1/2001 Qwest Response Issued PC090401-1 Draft response issued 
11/7/2001 Qwest Response Issued PC090401-1 Draft response updated to indicate if approved this will need to become a system CR 
11/14/2001 Discussed at Monthly CMP Meeting CMP meeting it was agreed that this PC090401-1 request can be closed. A system CR will be opened by Qwest to notify Qwest IT regarding the request.. 
11/19/2001 CR Submitted New Systems CR created 
11/20/2001 Info Sent to CLEC AT&T was provide the Systems CR number via e-mail 
11/20/2001 Record Update At the December CMP meeting, Alan Zimmerman will ask CLEC's want to participate in the receiving of two separate files for categories 010 & 011. 
12/13/2001 Discussed at Monthly CMP Meeting Qwest indicated a notice will go out seeking CLEC desire to participate in CR 
12/20/2001 Communicator Issued Notice # CMPR.12.20.01.F.01206.DUF, Title: Notification of Request for Separate Usage Files sent out to CLEC Community regarding the process to request separate files.. 
1/17/2002 Discussed at Monthly CMP Meeting CR # SCR111901-1 discussed at January CMP meeting during 'CRs with Outstanding Action Items' (Attachment E of Distribution Package) 
2/25/2002 Additional Information Targeted Implementation Date is April 1, 2002. 
3/21/2002 Discussed at Monthly CMP Meeting SCR111901-1 discussed March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP - Attachment G 
4/19/2002 Status Changed Deployed April 19, 2002. Status changed from 'Development' to 'CLEC Test'. 
5/16/2002 Discussed at Monthly CMP Meeting SCR111901-1 discussed at May Systems CMP Monthly meeting; please see Systems CMP Distribution Package May CMP - Attachment F 

Project Meetings

May 16, 2002 Systems CMP Meeting Discussion: Carla Pardee/AT&T stated that is receiving separate files and having no problems, is ok to close.

May 6, 2002 Email from Process Specialist, Carl Sear: The only CLEC that responded was AT&T for their TCG, T02 files. There were no responses received from Allegiance, who does not have a Qwest presence for a DUF, Eshcelon, who asked for something other than what was made available, and MidCo, who Carl had pesonally spoken to twice but has not yet sent the technical file information needed to split the files.

03/21/02 - March CMP discussion: Alan Zimmerman/Qwest -provided a status update; he indicated that the Target deployment date is still April 1 st. Action Item is Closed.

12/13/01 - December CMP discussion: Alan Zimmerman advised for those who wish to participate in the receiving of separate files to send him an email. A general email will be sent announcing Alan's need for email response from those wishing to get separate files.

09/12/01 - Clarification meeting on PCCR 090401-1. In attendance Carla Dickinson Pardee and Troy Smith from ATT. Alan Zimmerman and Kit Thomte from Qwest.

Alan indicated that he was familiar with this subject. He believed it had been submitted once before but did not have the support of the other CLECs at that time. Alan indicated that he thought some of the CLECs might see the need for this now.

Alan stated the issue: In the current environment two usage files containing the same data are sent to two locations. ATT would like to have the file containing message types 01 and 10 split out on one file. The other file should contain message type 11, to be distributed separately.

Carla indicated she would take this CR to the next community meeting to propose this change to other CLECs.

CenturyLink Response

For Review By CLEC Community and Discussion at November CMP Meeting

November 6, 2001

This letter is in response to the CLEC Change Request Form #PC090401-1. This Change Request requests that the Daily Usage Feed (DUF) be split into two pieces—with local usage (generally Category 1 & 10 EMI records) on one file, and access usage (Category 11 records) on a separate file.

Today, both local usage and access usage is sent on a single DUF file for each CLEC. It is fairly straight-forward to separate this usage into two files. To do so requires some small programming changes, as well as some JCL and NDM/Connect: Direct changes for every CLEC that chooses to have their DUF split into two pieces. This would be a medium-sized effort. This CR will be moved to the Systems CMP process in order to prioritize this system work.

Qwest would implement this CR in such a way that those CLECs that wish to continue to receive their DUF file as one file (like today) would be able to continue with that implementation. Those that wish to receive two separate files would be able to do so, having those two files sent to two different destinations (assuming connections exist) or to the same destination as the CLEC desires.

Any CLEC who would like to have their DUF split in two as this CR requests may send an e-mail to me at azimmer@qwest.com to be included in the deployment of this functionality. If you have any questions, feel free to e-mail me or call me at the number below.

Sincerely,

Alan Zimmerman (303)896-8346

Archived System CR SCR100101-1 Detail

 
Title: Archive Loss and Completion Reports
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR100101-1 Completed
3/22/2002
-   Loss & Completion Report/ Unbundled Loop, UNE-P
Originator: Dickinson Pardee, Carla
Originator Company Name: AT&T
Owner: Winston, Connie
Director:
CR PM: Esquibel-Reed, Peggy

Description Of Change

Currently the loss and completion reports are not archived by Qwest. Once a CLEC accesses the report, it is no longer available from Qwest. CLECs have the ability to archive the reports once they are accessed, however, if the report is inappropriately accessed by an individual who is not aware of the CLEC archive process, the reports are no longer available from Qwest.

Status History

Date Action Description
10/1/2001 CR Submitted CR was received, and logged. This CR will be presented at the Oct. Systems CMP meeting by AT&T 
10/8/2001 Clarification Meeting Scheduled Qwest received email from Carla asking for meeting to be rescheduled due to an unexpected mandatory AT&T meeting. 
10/12/2001 Clarification Meeting Held Clarification meeting held (see minutes) 
10/18/2001 Discussed at Monthly CMP Meeting Presented and discussed at the October CMP Meeting (see minutes) 
10/29/2001 Draft Response Issued Draft response posted to the CMP database 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. SCR100101-1 ranked 14 
11/15/2001 Discussed at Monthly CMP Meeting Discussed at the November CMP Meeting. 
1/17/2002 Discussed at Monthly CMP Meeting CR # SCR100101-1 discussed during 10.0 Packaging Presentation 
1/17/2002 Record Update Removed all reference to IMA for this CR as it is a web interface and not part of IMA 
2/25/2002 Additional Information Targeted implementation date is 1st Quarter 2002 = March 15, 2002. 
2/27/2002 Communicator Issued SYST.02.21.02.F.02600.Ls_&_Cmpl_Rpt_Retntn mailed to CLEC community advising of February 28, 2002 effective date for Loss & Completion reports via the web. 
3/1/2002 Status Changed Status changed to CLEC Test. Implementation date was February 28, 2002. See Qwest Response section for details. 
3/21/2002 Discussed at Monthly CMP Meeting SCR100101-1 discussed March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP - Attachment E 
3/22/2002 Status Changed Status updated from 'CLEC Test' to 'Completed' 

Project Meetings

March 21, 2002 CMP Discussion: Connie Winston/Qwest indicated that the change request has been completed and that the archived reports are accessible on the web site. Bonnie Johnson/Eschelon asked if the archived ones could be kept somewhere else (other than the 1 st page of the service delivery gateway) because the user who does the download is having trouble determining which files have already been downloaded. She indicated that it is cumbersome. AT&T noted that they are very happy with it. Connie Winston/Qwest noted that a CR would have to be opened so that options could be explored and presented to make sure that all CLECs would be in agreement with any changes. Bonnie Johnson/Eschelon noted that if the change request as implemented is meeting the needs of the community, then there is no need to change it. CLEC community indicated that is was OK to close. Status changed to Completed.

11/15/01 November CMP Discussion: Qwest advised that this work can be done by the end of June 2002.

Alignment/Clarification Meeting 10:00 a.m. (MDT) / Friday 12th August 2001

Attendees: Carla Dickinson Pardee / AT&T Joseph J. Bradley / Qwest Peggy Esquibel-Reed / Qwest Merna Thane / Qwest

Once a report is accessed, it disappears. Qwest has previously advised that reports can be retrieved. AT&T is requesting an archival system available via the web. Requested is the current day’s data plus the data from the previous 30 days. No formatting changes are being requested for the reports. AT&T has advised that this request is not a high priority at this time. Interface - IMA Deliverables - Implement an archival system available via the web. Archived data to be available is the current day’s data plus the data from the previous 30 days.

--

10/18/01: - Discussed at the October CMP Meeting. Carla/AT&T advised that the request is for an archival system on the web. No archival process is being requested for NDM at this time. AT&T is requesting reports to be available on the web for 30-50 days, then can fall-off the web. Qwest IT advised that this request's level of effort would be medium.

CenturyLink Response

March 1, 2002 - This request was implemented on February 28, 2002. The Loss and Completion Reports are archived on the mainframe for 30 days. They are available via the Service Delivery Gateway (SDG), a web pickup method of transport. The format for this transport method can be either a report format or a fixed flat file format. A CLEC must obtain a userid and certificate to access the SDG site via Internet. The security at the site limits the CLEC to only their designated reports. The URL for the Service Delivery Gateway is https://sdgate.uswest.com

February 28, 2002 The Service Delivery Gateway (SDG) is a WEB pickup method of transport. The format for this transport method can be either a report format or a fixed flat file format. The CLEC must obtain a userid and certificate to access the SDG site via Internet. The security at the site limits the CLEC to only their designated reports.

DRAFT RESPONSE For Review by the CLEC Community and Discussion at November CMP Meeting October 29, 2001

Carla Dickinson Pardee Manager - LSAM A T & T

CC: Connie Winston John I. Gallegos Joseph J. Bradley Merna Thane

This letter is in response to your CLEC Change Request Form, number SCR100101-1, dated October 1, 2001, CR Title: Archive Loss and Completion Reports.

CR Description: Currently the loss and completion reports are not archived by Qwest. Once a CLEC accesses the report, it is no longer available from Qwest. CLECs have the ability to archive the reports once they are accessed, however, if the report is inappropriately accessed by an individual who is not aware of the CLEC archive process, the reports are no longer available from Qwest.

Additional clarification was received from Carla in the Clarification Meeting that was held on Friday, October 12th and at the October CMP Forum. AT&T is requesting an archival system available via the web. Requested is data to be available for 30-50 day’s on the web. No formatting changes are being requested for the reports. AT&T has advised that this request is not a high priority at this time.

Qwest Response: Based on the information noted above, this CR has been determined to have a medium level of effort.

Sincerely, John I. Gallegos Information Technologies Manager

Archived System CR SCR100101-2 Detail

 
Title: Flow through indicator on FOCs.
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR100101-2 Completed
7/18/2002
-   IMA Common/10 Unbundled Loop, UNE-P
Originator: Dickinson Pardee, Carla
Originator Company Name: AT&T
Owner: Winston, Connie
Director:
CR PM: Esquibel-Reed, Peggy

Description Of Change

Currently Qwest does not have a flow through indicator on Firm Order Completion notices. (FOCs). It would be helpful for CLECs to know whether an order flows through or falls out for manual handling.

Status History

Date Action Description
10/1/2001 Info Sent to CLEC Sent Updated CR to Donna Osborne-Miller, Tim Bessey and Lydell Peterson 
10/1/2001 CR Submitted CR was received, and logged. This CR will be presented at the Oct. Systems CMP meeting by AT&T 
10/8/2001 Clarification Meeting Scheduled Qwest received email from Carla asking for meeting to be rescheduled due to an unexpected mandatory AT&T meeting. 
10/12/2001 Clarification Meeting Held Clarification Meeting Held (see minutes) 
10/18/2001 Discussed at Monthly CMP Meeting Presented and discussed at the October CMP Meeting (see minutes) 
10/25/2001 Status Changed Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization 
10/29/2001 Draft Response Issued Draft response posted to CMP database 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. SCR100101-2 ranked 19 
11/15/2001 Discussed at Monthly CMP Meeting Discussed at November CMP Meeting. 
1/17/2002 Discussed at Monthly CMP Meeting CR # SCR100101-2 discussed during 10.0 Packaging Presentation 
1/17/2002 Status Changed CR # SCR100101-2 status updated to 'Packaged' for 10.0 
3/13/2002 Status Changed Status updated from 'Packaged' to 'Development 
3/21/2002 Discussed at Monthly CMP Meeting SCR100101-2 discussed at March Systems CMP Monthly meeting during IMA Release 10.0 Commitment Discussion (Attachment I) 
6/20/2002 Discussed at Monthly CMP Meeting SCR100101-2 discussed at June Systems CMP Monthly meeting; please see Systems CMP Distribution Package June CMP -- Attachment N 
6/20/2002 Discussed at Monthly CMP Meeting SCR100101-2 discussed at June Systems CMP Monthly meeting; please see Systems CMP Distribution Package July CMP -- Attachment G 
6/25/2002 Status Changed Status updated to CLEC Test based upon discussion at June Systems CMP Meeting and IMA 10.0 Deployment on June 17, 2002 
7/18/2002 Discussed at Monthly CMP Meeting SCR100101-2 discussed at July Systems CMP Monthly meeting; please see Systems CMP Distribution Package July CMP -- Attachment G 

Project Meetings

July 18, 2002 CMP Meeting Discussion: This CR was completed with the IMA 10.0 Release. No CMP participants disagreed with the proposal to update this CR to Completed.

11/15/01 November CMP Discussion: Connie clarified that the request was for did it flow through or was it flow through eligible. CLEC's advised request was for did it flow through. Connie will get the definition corrected. Connie & Jeff advised that due to the low ranking from the vote, this may not make 10.0 but would be back on the list for 11.0 or could be a spillover for a point release.

Alignment/Clarification Meeting 10:00 a.m. (MDT) / Friday 12th August 2001

Attendees: Carla Dickinson Pardee / AT&T Joseph J. Bradley / Qwest Peggy Esquibel-Reed / Qwest Melva Harris / Qwest Shon Higer / Qwest

AT&T requesting a yes/no indicator on flow through to identify if FOC was Flow Through eligible. Requesting only for original FOC, not for subsequent FOCs. Interfaces - IMA Deliverables - Provide a yes/no indicator on flow through to identify if an original FOC was flow through eligible.

10/18/01 - Discussed at the October CMP Meeting. AT&T is requesting a non-standard (per OBF) indicator to identify if FOC was Flow Through eligible. No questions from the CLEC community. Level of Effort is medium.

CenturyLink Response

Discussion at November CMP Meeting DRAFT RESPONSE October 29, 2001

Carla Dickinson Pardee Manager - LSAM A T & T

CC: Connie Winston John I Gallegos Joseph J. Bradley Shon Higer Melva Harris

This letter is in response to your CLEC Change Request Form, number SCR100101-2, dated October 1, 2001, CR Title: Flow Through Indicator on FOCs.

CR Description: Currently Qwest does not have a flow through indicator on Firm Order Completion notices (FOCs). It would be helpful for CLECs to know whether an order flows through or falls out for manual handling.

Additional clarification was received from Carla in the Clarification Meeting that was held on October 12, 2001. AT&T is requesting a yes/no indicator on flow through to identify if the FOC was flow through eligible. This request is only for the original FOC, not for subsequent FOCs.

Qwest Response: Based on the information from the Clarification meeting, the level of effort for this request is medium. This CR is an eligible voting candidate for Release 10.0.

Sincerely, John I. Gallegos Information Technologies Manager

Archived System CR 5396031 Detail

 
Title: Request Qwest to separate category daily usage files with the ability to send separate files to different locations.
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

5396031 Completed
11/30/2001
-   Wholesale Billing Interfaces/ Daily Usage File
Originator: Osborne-Miller, Donna
Originator Company Name: AT&T
Owner: Routh, Mark
Director:
CR PM: Routh, Mark

Description Of Change

Today Qwest combines all of it’s daily usage files and sends to one location on a single feed. Also, Qwest’s process does not allow CLECs to analyze separate products in their bills due to lack of UNE-P indicator, which is also required. Separate feeds for the different record types, along with UNE-P indicator is requested.

Status History

Date Action Description
2/15/2001 CR Submitted Received and recorded. Status set to New- To be validated. 
2/16/2001 Info Sent to CLEC Sent email to Donna Osborne-Miller and Lydell Peterson with updated CR. 
3/2/2001 LOE Issued The development effort (T-Shirt size) for this request is Large. This CR is eligible for industry prioritization and will be placed on the on-line voting site in March. 
3/2/2001 Status Changed Status changed to Reviewed - Under consideration. 
3/6/2001 Info Sent to CLEC Sent email to Donna Osborne-Miller, Lydell Peterson and Tim Bessey with updated CR. 
3/21/2001 Status Changed This CR was cancelled by Qwest due to the fact that this change would be CLEC specific development. 
3/28/2001 Info Sent to CLEC Sent email to Donna Osborne-Miller, Lydell Peterson and Tim Bessey with updated CR. 
4/18/2001 Status Changed Status changed to Reviewed - Baseline Candidate - Whole Billing Interface 
5/2/2001 Info Sent to CLEC Sent email to Donna Osborne-Miller, Lydell Peterson and Tim Bessey with updated CR. (Rank 3) 
12/13/2001 Status Changed Closed in the Systems CMP meeting by AT&T 

Project Meetings

CenturyLink Response

Archived System CR 5578858 Detail

 
Title: Request Qwest to deliver Verification report in Excel or Access format versus flat text file.
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

5578858 Completed
1/18/2002
-   Directory Listings/
Originator: Osborne-Miller, Donna
Originator Company Name: AT&T
Owner: Routh, Mark
Director:
CR PM: Routh, Mark

Description Of Change

Today Qwest provides AT&T the DL verification report as a word document. This document cannot be parsed. There is no way to move the document from the word format to a spreadsheet or database format. The file contains the directory listings for all of AT&T customers; it also does not distinguish between non-published and non-listed numbers. We request that this file be in a spreadsheet format and that it be broken down by residential, business, non-listed and non-published listings.

Status History

Date Action Description
6/6/2001 Record Update The T-Shirt size and options will be presented at the June CICMP Meeting. 
6/6/2001 CR Submitted Received and logged. Status set to New - To be validated" 
6/6/2001 Info Sent to CLEC Sent email to Donna Osborne-Miller, Lydell Peterson and Tim Bessey with updated CR 
1/2/2002 Status Changed Requested verification from Esther Sherer of AT&T that the report that they now get meets the needs of this request. 
1/17/2002 Discussed at Monthly CMP Meeting CR # 5578858 discussed at January CMP meeting during 'CRs to Consider for Closure' (Attachment D of Distribution Package) 
1/18/2002 Status Changed Status updated to 'Completed' per January Systems CMP meeting 

Project Meetings

CenturyLink Response

Work will be completed by October 1, 2001

Archived System CR 5580037 Detail

 
Title: Advance Notification uniformity to Co providers of changes in Qwest’s processes, to include OSS and process environments.
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

5580037 Completed
1/8/2002
-   Other/
Originator: Osborne-Miller, Donna
Originator Company Name: AT&T
Owner: Routh, Mark
Director:
CR PM: Routh, Mark

Description Of Change

On May 1st a communicator was sent to co-providers relative to a change to the FBDL PON valid values. This change was effective immediately. Failure to comply with the PON instructions IMMEDIATELY would result in cancellation of the order by the Listings Operations Center. AT&T requests at least a 60 day notice by Qwest to CLECS of any changes that are being introduced to the CLEC community, be it OSS or process driven changes.

Status History

Date Action Description
6/7/2001 Info Sent to CLEC Sent email to Donna Osborne-Miller, Lydell Peterson and Tim Bessey with updated CR 
6/7/2001 Record Update The T-Shirt size and options will be presented at the June CICMP Meeting. 
6/7/2001 CR Submitted Received and logged. Status set to "New - To be validated" 
6/8/2001 Status Changed Status changed to Completed - In Production 
6/10/2001 Info Sent to CLEC Sent email to Donna Osborne-Miller, Lydell Peterson and Tim Bessey with updated CR 

Project Meetings

CenturyLink Response

Archived System CR 5580968 Detail

 
Title: IMA EDI CR requiring that the CUS CODE always be returned on a CSR response(whether or not it is on the CSR Query.
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

5580968 Withdrawn
1/8/2002
-   IMA EDI/
Originator: Osborne-Miller, Donna
Originator Company Name: AT&T
Owner: Routh, Mark
Director:
CR PM: Routh, Mark

Description Of Change

The efficient flow-through of an LSR order is now requiring a 3 digit CUS CODE in addition to the 10- digit TN to fully complete the end user’s 13- digit AN. What if we do not know the customer code? If we send a CSR Query to get it, that information is not returned unless we included the CUS CODE on the Query. The business rules state that the customer code is only returned on the CSR Response if we send it on the CSR Query. What we need is when Qwest goes to the CSR to gather the other CSR type of information, that they also, always pick up the CUS Code and return it to the requester.

Status History

Date Action Description
Release Information IMA Release 
6/7/2001 Info Sent to CLEC Sent email to Donna Osborne-Miller, Lydell Peterson and Tim Bessey with updated CR 
6/7/2001 CR Submitted Received and logged. Status set to "New - To be validated" 
6/7/2001 Record Update The T-Shirt size and options will be presented at the June CICMP Meeting. 
6/8/2001 Status Changed Status changed to New - To be clarified 
6/10/2001 Info Sent to CLEC Sent email to Donna Osborne-Miller, Lydell Peterson and Tim Bessey with updated CR 
8/15/2001 Status Changed Canceled - CLEC 
12/18/2001 Record Update Changed status from 'Cancelled CLEC' to 'Withdrawn' for database cleanup 

Project Meetings

CenturyLink Response

Archived System CR SCR090601-1 Detail

 
Title: Request that UNE P orders to be billed on a CABS bill.
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR090601-1 Completed
1/27/2003
-   Wholesale Billing Interfaces/ Billing UNE-P
Originator: Osborne-Miller, Donna
Originator Company Name: AT&T
Owner: Thompson, Jeff
Director:
CR PM: Esquibel-Reed, Peggy

Description Of Change

Today all UNE-P orders are billed out of the CRIS billing system. AT&T can only receive CRIS bills via paper, which makes it extremely inefficient and difficult to use. In addition, the CRIS bill does not provide the level of detail required for auditing or for inventory, i.e. USOC, Circuit ID and CRS. The level of detail needed and electronic interface are available in the CABS billing system. Moreover, Qwest negotiated CABS billing in its

interconnection agreements. Therefore AT&T requests that UNE-P orders be billed on a CABS bill. Qwest is in the process of CABS formatting CSRs, however, AT&T needs the entire bill in the CABS format and not just the CSR.

Status History

Date Action Description
9/6/2001 CR Submitted CR was logged and status set to "Submitted". 
9/7/2001 Info Sent to CLEC Sent Updated CR to Donna Osborne-Miller, Tim Bessey and Lydell Peterson 
10/18/2001 Discussed at Monthly CMP Meeting CR presented by AT&T at the October CMP meeting and Qwest received some clarification on this request. 
11/1/2001 Clarification Meeting Held Clarification Meeting held. Action items for AT&T identified 
11/1/2001 Qwest Response Issued Draft response to CMP database 
11/1/2001 LOE Issued LOE is Extra Large 
11/5/2001 Info Received From CLEC Received AT&T's responses for clarification meeting action items. See meeting details. 
11/15/2001 Discussed at Monthly CMP Meeting Discussed at November Monthly Systems CMP meeting 
1/23/2002 Escalation Initiated AT&T initiated escalation SCR090601-1-E05; see project meetings for escalation text 
1/30/2002 Qwest Response Issued Response to Escalation SCR090601-1-E05 provided to originating and participating CLECs. Response can be viewed at http://www.qwest.com/wholesale/cmp/escalations.html and in the Qwest Response for this CR 
2/14/2002 Record Update Targeted deployment date is July 1, 2002. 
3/5/2002 CLEC Requested Info Had phone conversation with AT&T (Carla Dickinson Pardee); AT&T is seeking a meeting to clarify the approach on this CR; meeting date to be set by 3/8/02; required attendees include Jeff Thompson and Alan Zimmerman 
3/7/2002 Info Sent to CLEC AT&T requested meeting has been scheduled for March 15, 2002. Alan Zimmerman and Jeff Thompson invited. Email sent to Carla Pardee with meeting details. She will invite her billing SME Bob Hayes. 
3/15/2002 General Meeting Held Meeting requested by AT&T held. Please see Project Meetings for meeting notes. 
3/18/2002 Record Update Implementation date is June 6, 2002. 
3/21/2002 Discussed at Monthly CMP Meeting SCR090601-1 discussed March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP - Attachment G 
4/19/2002 Communicator Issued IABS Release 85 - Draft Technical Specifications: SYST.04.19.02.F.04033.IABS_R85_DftTechSpec 
5/16/2002 Communicator Issued CMP Systems: IABS Release 85 - Final Technical Specifications: SYST.05.16.02.F.04058.IABS_Final_TechSpec 
6/20/2002 Discussed at Monthly CMP Meeting SCR090601-1 discussed at June Systems CMP Monthly meeting; please see Systems CMP Distribution Package June CMP -- Attachment N 
6/20/2002 Discussed at Monthly CMP Meeting SCR090601-1 discussed at June Systems CMP Monthly meeting; please see Systems CMP Distribution Package July CMP -- Attachment G 
7/1/2002 Communicator Issued CMP-Systems-Final Notification for IABS Release 85. Deployed in Production July 1, 2002. 
7/8/2002 Status Changed Status updated to 'CLEC Test'. Deployed July 1, 2002. 
7/18/2002 Discussed at Monthly CMP Meeting SCR090601-1 discussed at July Systems CMP Monthly meeting; please see Systems CMP Distribution Package July CMP -- Attachment G 
8/9/2002 CLEC Provided Information See Project Meetings Section for email details. 
8/19/2002 CLEC Provided Information See Project Meetings Section for email details. 
8/20/2002 Info Requested from CLEC Carla Pardee will advise Peggy Esquibel-Reed of AT&T's availability for a meeting to discuss billing problems. 
8/20/2002 CLEC Provided Information Received AT&T's availability for meeting to discuss buNE-P billing problem. 
8/20/2002 Additional Information Meeting scheduled for Friday, August 23, 2002. 
8/22/2002 Discussed at Monthly CMP Meeting SCR090601-1 discussed at August Systems CMP Monthly meeting; please see Systems CMP Distribution Package August CMP -- Attachment G 
8/23/2002 General Meeting Held Meeting to discuss billing issue held, see Project Meetings Section for details. 
9/19/2002 Discussed at Monthly CMP Meeting SCR090601-1 discussed at September Systems CMP Monthly meeting; please see Systems CMP Distribution Package November CMP -- Attachment G 
10/14/2002 Additional Information Trouble Ticket 6060879 opened. 
10/17/2002 Discussed at Monthly CMP Meeting SCR090601-1 discussed at October Systems CMP Monthly meeting; please see Systems CMP Distribution Package October CMP -- Attachment G 
11/21/2002 Discussed at Monthly CMP Meeting SCR090601-1 discussed at November Systems CMP Monthly meeting; please see Systems CMP Distribution Package November CMP -- Attachment G 
12/19/2002 Discussed at Monthly CMP Meeting SCR090601-1 discussed at December Systems CMP Monthly meeting; please see Systems CMP Distribution Package December CMP -- Attachment G 
1/16/2003 Discussed at Monthly CMP Meeting SCR090601-1 discussed at January Systems CMP Monthly meeting; please see Systems CMP Distribution Package January CMP - Attachment G. 
1/27/2003 Status Changed Status Changed to Completed. Received Carla Pardee's (AT&T) okay to close this CR. 

Project Meetings

January 27,2003: Received voicemail from Carla Pardee/AT&T with okay to close AT&Ts SCR090601-1 UNE-P on CABS Bill. Carla stated that the CR would be re-opened, if needed.

- January 16, 2003 Systems CMP Meeting Discussion: Carla Pardee/AT&T stated that she needs to validate the January bill and will contact Peggy (Qwest) hopefully next week to close the CR. Connie Winston/Qwest stated that this CR would remain in CLEC Test for AT&T’s bill validation.

December 19, 2002 Systems CMP Meeting Discuaaion: Connie Winston/Qwest said that the trouble ticket associated with this CR just went in a Patch. Jonathan Spangler/AT&T will talk to Carla Pardee/AT&T offline to discuss closure. Connie Winston/Qwest said to advise Kit Thomte/Qwest if this CR can be closed.

November 21, 2002 Systems CMP Meeting Discussion: Carla Pardee-AT&T stated that the rounding fix appeared to be working. Connie Winston-Qwest agreed and stated that AT&T would validate with the December work and that the team hoped to close the CR in December.

October 17, 2002 Systems CMP Meeting Discussion: Michael Buck/Qwest stated that this has been discussed in previous meetings. Jeff Thompson/Qwest stated that the two issues are the rounding issues and the CSR mismatch. We are looking for fixing the rounding issue on November 14th and the CSR mismatch is targeted for December. We have a more robust fix for the rounding issue but requires a change to an interface. While we’ll be fixing the problem in the patch for November, we will open a CR for the more robust fix. Carla Pardee/AT&T stated that AT&T is also anxious to close this CR. The status of this CR remains CLEC Test.

- September Systems CMP Meeting Discussion: Jeff Thompson/Qwest stated that Qwest has delivered 3 month's of bills and there are a series of issues. Qwest continues to fix these and believe we are down to a rounding error and are working to fix that. Have no target date yet for that out of balance fix. Carla Pardee/AT&T agrees and stated that the paper bills are not balancing with the CSR. At the CLEC forum, Alan Zimmerman and Carl Sear also stated that the fix was in development. Carla stated that she appreciates all of Qwest's efforts and stated that we are getting close.

August 23, 2002 General Meeting Minutes; Attendee's: Carla Pardee/AT&T, Jerri Lancaster/AT&T, Peggy Esquibel-Reed/Qwest, Tim Bessey/Qwest, Catriona Dowling/Qwest, Fred Howard/Qwest, Diana Jensen/Qwest, Pat Smith/Qwest, Lon Jones/Qwest, Jami Larson/Qwest, Dennis Martinez/Qwest Carla Pardee/AT&T - has received transactions for 3 states, CO, AZ, & WA. There is a problem with being out of balance and matching to the CSR. It appears that the issue(s) are fixed for CO & AZ, WA is still out of balance. For the WA bill - the amount that AT&T is being asked to pay does not match the bill summary total. The total on the CSR also does not match the recurring dollars. Pat Smith/Qwest asked for the record id that was out of balance. Jerri Lancaster/AT&T advised it is the 1005xx records and will forward an email (to Peggy Esquibel-Reed/Qwest) that explains. Peggy Esquibel-Reed/Qwest asked for the amount that is out of balance. AT&T respoded that there is an out of balnce amount of 99 cents. Jerri Lancaster/AT&T asked if in the future, will more standard adjustment codes be used? Is currently seeing codes of X15 & X18. Jami Larson/Qwest advised that the codes are generic and is as much detail as can give. Jerri Lancaster/AT&T advised will run any additional problems through Carla Pardee. Carla Pardee/AT&T stated that if the problem is found to be just on the CSR detail, she would be willing to close this CR and open a new one, if necessary. AT&T asked if the data source was different for the state of WA. Qwest responded that the CRIS Systems are different for CO/AZ than for WA. Carla Pardee/AT&T stated that this generally has gone rather smoothly. Dennis Martinez/Qwest advised that Qwest will investigate, check with CRIS regarding the problem raised today, and will communicate information back to AT&T. Email received and copy provided to those on the call. Email details: The totals at the bill summary level are calculated incorrectly. There is an edit in CAB/BOS Vol 3A, 1005XX - page 6 that states: LP Total (10051300) + 0 MAC Tot (10051200) + 201,939.94 Debit Adj Tot (10051250) + 0 Tot OC&C (10051300) + 19,044.23 Tot Usg (10051300) + 21,841.76 Tot Taxes (10051300) + 30.70 Tot Sur (10051300) + 0 Tot Pay Plan (10051300) 0 Total Current Charges (10051300).

If you add the above fields together from their bill, you will get 242,856.63. They say the total current charges are 242,866.64 (from the 10051300), a difference of .99. This is why the bill is out of balance. When they correct this item, they will then need to look at their Tot Balance Due edit because it will not be correct. In regards to the statement that the CSR and MAC $ do not match, the reason they do not match is that the structure of the 'J' CSR is incorrect. We are dropping out 6079 (USOC) records with $ on them because they are using a left handed fid of HTG with no TN under the HTG before they end the group with a 401525 record. See record sequence number of 21350 on the bill and below. If you have further questions, I can be reached at 770-993-8644. Thanks, Yvonne Hopkins ABM Systems Support phone: 770-750-7820 pager: 1-888-858-7243 pin: 135037 email: yhopkins@att.com

--Original Message-- From: Lancaster, Geri L, NCAM Sent: Monday, August 19, 2002 11:06 AM To: Pardee, Carla D, NCAM Cc: Hopkins, Yvonne H, NCAM Subject: Washington UNE-P Mech Bill

Carla, We received the Washington UNE-P bill for 8/5/02. The bill is out of balance. I'll ask Yvonne to see if she can find out any further details. Bottom line, we still can't pay by the mechanized bill and they shouldn't be allowed to close the change request. FYI - the CSR total dollars do not match the recurring dollars either. This will not "fatal" a bill, but it is important that they match since the CSR is the supporting detail for the summarized recurring expense on the bill. I'll keep you posted. Thanks. Geri 770-750-8407

August 22, 2002 Systems CMP Meeting Discussion: Donna Osborne-Miller/AT&T - I believe there was still an issue in Washington around this and Peggy has a meeting scheduled for tomorrow. Peggy Esquibel-Reed/Qwest - yes, we have a meeting scheduled with IABS tomorrow to review the Washington bill and the out of balance issue. Confirmed that Tim Bessey (Qwest) and Dennis Martinez (Qwest) have been invited to the meeting with AT&T. Donna Osborne-Miller/AT&T - I would like to keep this open. Michael Buck/Qwest - this CR will remain in CLEC Test.

August 19, 2002 Email to Peggy Esquibel-Reed/Qwest from Carla Pardee/AT&T: I am sorry to report we still can't close this CR. I am waiting to hear back from our client about how they want to proceed. I am attaching an e-mail from our billing group to explain what the problem it. I imagine it is time to set up a meeting to see what we can do to make this work. Thanks. Carla Dickinson Pardee Manager - LSAM (303) 298-6101

August 9, 2002 Email from Carla Pardee: Peggy - just another update. I heard from Tim Bessey today that Jamie Larson had been working with Yvonne Hopkins and all of the issues in the letter have been resolved. Let's keep our fingers crossed. We will hopefully know by the Systems meeting. Carla Dickinson Pardee Manager - LSAM (303) 298-6101

August 7, 2002 Email from Jami Larson to Tim Bessey/AT&T Account Manager: Tim, All of the issues that Tim Boykin cites in his note have already been taken care of by IABS. I did advise Yvonne on 7/30 that the problems with the out of balance on taxes and usage, as well as the dates populated on the adjustment/oc&c BDT records would be corrected for the August bill periods.

August 7, 2002 Email from Carla pardee/AT&T to Scott Schipper/Qwest: Scott - Attached please find a letter from Tim Boykin discussing problems we are having with the first CABs bill AT&T obtained from Qwest for the month of July 2002. Please feel free to contact me and/or Tim if you have questions. Thank you. Carla Dickinson Pardee Manager - LSAM (303) 298-6101 LETTER: RE: Problems Associated with CABs Billing Dear Scott: In response to AT&T’s change request SCR090601-1, Qwest implemented CABS billing for AT&T’s UNE-P bills. AT&T received its first CABS bill during the month of July 2002. However, there are a number of problems associated with this first bill, and as a result, AT&T is not able to process the mechanized CABS bill. We would like to request your assistance to remedy these problems. Without going into great detail in this letter, the problems associated with this bill are two fold. First, the usage/incurred dates are invalid on the Adjustments and OC&C. The bills use a 'from date' and 'thru date' of 00010101 rather than actual usage dates. Secondly, the bills are out of balance. The supporting details do not sum to the total for several categories including taxes and usage. In addition, Qwest still forwards a paper bill - the CABS mechanized bill and the paper bill do not match. Yvonne Hopkins, AT&T, has been working with Qwest representative Jamie Larson to resolve these issues, however, to date, there has been no resolution. AT&T has been patiently working with paper bills for some time. AT&T was excited to finally obtain a mechanized CABS bill and is very disappointed that the bill is incorrect. Early next week, we would like to arrange a meeting with Qwest SMEs to discuss these problems and resolve all issues. Could you assist us in organizing your subject matter experts to close these issues? Qwest CMP managers are very anxious to close this CR, however, until these issues are resolved, AT&T is not able to close SCR090601-1. Thank you for your assistance in this regard. I look forward to hearing from you. Very truly yours, Timothy Boykin District Manager AT&T Local Services and Access Management Cc: Pam Delaittre, Pete Budner, Tim Bessey

August 6, 2002 Email from Carla Pardee/AT&T: Peggy - we can't process July's bill for a few reasons. We are sending a letter to Qwest outlining the issues tomorrow. I will copy you on that letter. For the time being, we do not feel comfortable closing it - unless you have a suggestion for following up with the problems we are having. Carla Dickinson Pardee Manager - LSAM (303) 298-6101

August 5, 2002: Email response from Carla Pardee/AT&T: I have a meeting with the billing people tomorrow. We are getting the bill, but still having some problems. I will e-mail you tomorrow right after our meeting. I would like to close this as much as you, believe me. Hopefully we can tomorrow. Thanks. Carla Dickinson Pardee Manager - LSAM (303) 298-6101

August 5, 2002 Sent email to Carla Pardee & Donna Osborne-Miller asking if has looked at the bill and are okay to close.

July 18, 2002 Tim Bessey email to Peggy Esquibel-Reed: Tim will keep Peggy and Jeff posted.

July 18, 2002 Peggy sent email to Tim Bessey asking him to keep Peggy informed as well.

July 18, 2002 Email response from Carla Pardee (AT&T): Peggy - thanks but we can't close it out. The bill was sent but the suffix record indicator's were wrong. They are supposed to send it again before 7/25/02. As soon as we get a bill through I will let you know and we can close it out. I have been working with our account rep - Tim Bessey. I asked Tim to keep Jeff Thompson in the loop on this as I know Jeff is really anxious to close it. Thanks. Carla Dickinson Pardee Manager - LSAM (303) 298-6101

July 18, 2002 Peggy Esquibel-Reed (Qwest) sent an email to Donna Osborne-Miller and Carla Pardee: SCR090601-1 deployed into production on July 1, 2002 and currently has a status of CLEC Test. At the July Systems CMP Meeting, during the discussion for the 'CRs To Consider For Closure' section, Qwest asked if this CR was okay to close. Carla stated that the bill would be reviewed the following day. Carla and the CLEC Community agreed that this could be an item that could be closed outside the CMP Meeting. So my question is ...... is this CR okay to close? If you are still validating, please let me know when you will have an answer. I appreciate it.

July 18, 2002 CMP Meeting Discussion: This CR will remain in CLEC Test. Qwest will work off-line with AT&T to close, with CLEC Community concurrence. AT&T wanted the opportunity to check the bill.

June 20, 2002 CMP Meeting Discussion: Jeff Thompson (Qwest) explained that this CR is on target for July 1st. Qwest has been working with AT&T to receive those BOSS bills. Carla Pardee (AT&T) indicated that the test files have been transmitted. Jeff Thompson (Qwest) indicated that Qwest hasn’t heard anything negative. Carla Pardee (AT&T) agreed with Jeff.

March 21, 2002 CMP Discussion: Carla Pardee/AT&T - AT&T is extremely disappointed with how this has been handled. AT&T escalated this in January. Qwest said this would be implemented in July. A meeting happened last Friday, and AT&T learned that this was only going in two states. AT&T is concerned that it is taking so long to be worked. AT&T is looking at having two billing systems. This is a huge impact and it affects all CLECs. Carla wants to know why it was decided to be put in only two states (that AT&T isn’t even in) Jeff Thompson/Qwest indicated that he felt there was a misunderstanding. Jeff acknowledged that there was some confusion around what was communicated in the meeting. Alan Zimmerman/Qwest confirmed that the change would be implemented for all 14 states. He indicated that it was just a matter of timing. Carla Pardee/AT&T - it was not made clear last Friday that all states would be implemented Jeff Thompson/Qwest- Qwest will gladly confirm the timing on the states that AT&T is most concerned about. Jeff asked Carla if Qwest knew of the states that AT&T was concerned about. Carla Pardee/AT&T AT&T will send the list of states to Qwest. Carla asked to be notified when the implementation plan for the 3 states has been confirmed. Ok to close this action item. Action Item is Closed.

March 15, 2002 Meeting - Carla Pardee, AT&T Bob Hayes, AT&T Peggy Esquibel-Reed, Qwest Fred Howard, Qwest Jami Larson, Qwest Diane Jensen, Qwest Alan Zimmerman, Qwest Carl Sear, Qwest

A document was provided to all participants of this meeting. Fred/Qwest advised that this is provided at a hi-level and is subject to change. The document’s information is as follows: BOS BILL INVOICE AND CSR OVERVIEW Qwest will format UNE P bill and CSR data into a CAB/BOS format. Qwest will follow TRG, CABS/BOS recommendations for implementation and population of the CABS/BOS records Production Implementation - 7/1/02 (OR, WA only) BOS Version @ production - Version 37 Qwest will provide a test file and Difference List, 30 days prior to the production installation (6/1/02) Data Population of Records Has Not Been Finalized. It is anticipated that this will be completed 4/22/02

Population of records is work in progress at this point and the records and data population of records is subject to change.

ANTICIPATED UNE BILL RECORDS Bill Pack Header (10-01-01-00, 01) Bill Face Heading (10-05-05-00) Balance Due Information (10-05-10) Detail of Current Charges-1 (10-05-12) Detail of Current Charges-2 (10-05-13) Bill Message Record (10-10-05) Detail of Payments (10-15-05) Detail of Payments-Total (10-15-90) Detail of Adjustments (10-20-05) Detail of Adjustments-Total (10-20-90) Detail of Balance Due (10-25-05) Detail of Balance Due-Total (10-25-90) OC&C Service Order/Transaction Identification (10-30-05) OC&C Service Order/Transaction Identification (10-30-05) OC&C Phrase Code Data (10-30-15) Detail of OC&C – Phrase Lines (10-30-16) OC&C USOC Data (10-30-20) OC&C USOC Description Data (10-30-21) OC&C Service Order/Transaction Net Effect (10-30-25) OC&C Total (10-30-90) Unbundled Transport Usage Detail (10-39-05) Unbundled Miscellaneous Usage Detail (10-39-20) Summary of Unbundled Usage by Jurisdiction (10-41-05) Total Summary of Unbundled Usage (10-41-15) Detail of Taxes (10-50-05) Detail of Taxes-Total (10-50-90) Detail of Surcharge (10-55-05) Detail of Surcharge-Total (10-55-90) Bill Pack Trailer (10-99-99)

ANTICIPATED UNE CSR RECORDS 40-01-01 (CSR Pack Header) 40-05-05 (CSR Account ID) 40-10-05 (CSR Bill Name & Address) 40-15-05 (CSR S&F FID) 40-15-10 (CSR USOC) 40-15-16 (CSR S&F USOC Tax Data) 40-15-20 (CSR S&f USOC Amounts) 40-15-21 (CSR S&f USOC Amounts Mileage) 40-15-24 (USOC Amounts - Testing) 40-15-25 (CSR S&F Subtotal) 40-15-25 (CSR S&F Total) 40-20-05 (CSR Remarks) 40-25-05 (CSR Last Activity) 40-25-17 (CSR Summary Unbundled Line Port Inventory) 40-25-30 (CSR Summary - Glossary) 40-99-99 (CSR Pack Trailer)

AT&T asked if this work will be expanded for all states. Qwest stated would look into that, understanding was for OR & MN. AT&T advised that needs for entities of TCG, TPM, LOA, ATX. AT&T asked if Qwest doing by IABS basis or by customer’s requesting UNE-P format? Qwest responded, by customer’s requesting UNE-P format. AT&T stated that other customer’s would want this. Qwest advised that there are 3 separate CRIS environments for UNE-P billing. Retail, Wholesale, and Retail. The 3 CRIS regions are Eastern CRIS for MN, IA, ND, SD, NE. Central CRIS for CO, AZ, WY, NM, ID, MT, UT. Western CRIS for OR, WA. AT&T questioned if for unbundled transport, would CABS BOS group all usage into a global jurisdiction or bill for each jurisdiction. Qwest responded at a global jurisdiction. AT&T responded "that’s good." AT&T requested that they be kept updated as changes will be made. AT&T stated that any changes need to be standard. Qwest stated that will know what the changes are by the end of April. Any upcoming questions from AT&T will be funneled through the CRPM, Peggy Esquibel-Reed.

March 18, 2002 Email from Qwest IT: The ability to produce BOS files for Bill and CSR will be included for all states and all UNE customers that have contracts specifying BOS format and request it of Qwest.

11/05/01 - Received AT&T's responses for clarification meeting action items:

1) Instead of CABS, would an EDI format work. The records could be formatted via ndm, stp or an internet protocol. ABM supports the industry standard CABS for UNE-P expense billing. ABM is not in the position to support any non-OBF compliant formats.

2) They want a definitive list of the items that we want a certain level of details on, such as USOCs, etc. The level of detail requested by ABM is equal to that which is outlined in the OBF guidelines specific to UNE-P billing.

3) I had told them that CABs was the industry standard. They didn't think so, where did we get that information? The Carrier Access Billing System (CABS) guidelines were developed to bring uniformity to access billing in the post divestiture environment. CABS is an industry accepted and industry supported media for billing of access and interconnection charges. Provisions for billing Unbundled Network Elements (UNE) were first included in CABS Version 31 which was implemented 3/1/1999. The CABS guidelines provide a uniform method for billing UNE charges. Compliance with CABS guidelines means AT&T receives the same billing elements, values and record layouts from all bill providers. No special company-specific programming is needed. Although the CABS guidelines are developed by the Technical Review Group (TRG) and owned and published by Telcordia, the guidelines are indirectly supported by the Ordering and Billing Forum (OBF) through referral of resolved issues to the TRG. OBF Billing Committee Issue 1287 - Billing for Unbundled Network Elements - was referred to the TRG for implementation in CABS. The OBF Billing Committee continues to address industry-wide UNE issues -- Issue 1548 Billing Verification Process In An Unbundled Environment. OBF provides forum to address industry-wide UNE issues.

4) They are in the process of putting the CSRs in one file; they need to know if it would work to have the CSRs in one file, and the fill file in CABS. ABMs preference would be within the same file but separate files will work as long as they are received in consecutive transmissions.

====================================

11/15/01 November CMP Discussion: Jeff Thompson advised that Qwest accepts the CR. This request will be very difficult to do. Mapping between EDI & BOSS is currently taking place. That effort will take 2 more weeks to complete. Qwest cannot yet commit to an implementation date. Is not an IMA candidate since this is a billing interface and not IMA. JAD sessions are taking place with the development team. A target date will be determined after the JAD sessions are completed.

Alignment/Clarification Meeting 1:30 p.m. (MST) / Thursday 1st November 2001 Request that UNE-P orders to be billed on a CABS bill

Attendees: Carla Dickinson Pardee / AT&T Fred Howard / Qwest Alan Zimmerman / Qwest Janey Antal / Qwest Peggy Esquibel-Reed / Qwest

Today all UNE-P orders are billed out of the CRIS billing system. AT&T can only receive CRIS bills via paper, which makes it extremely inefficient and difficult to use. In addition, the CRIS bill does not provide the level of detail required for auditing or for inventory, i.e. USOC, Circuit ID and CRS. The level of detail needed and electronic interface are available in the CABS billing system. Moreover, Qwest negotiated CABS billing in its interconnection agreements. Therefore AT&T requests that UNE-P orders be billed on a CABS bill. Qwest is in the process of CABS formatting CSRs, however, AT&T needs the entire bill in the CABS format and not just the CSR.

Wholesale Billing

AT&T requesting an electronic CABS formatted bill and CSR.

AT&T will provide answer’s to the following question’s from Qwest: 1. What is the level of detail being requested, if other than USOCs & circuit ID’s? 2. Would an EDI format be acceptable? 3. Would a separate bill and a separate CSR be acceptable? 4. Would a phased approach be acceptable?

==============

Escalation E-Mail Received 01/23/02

To: cdickinson@att.com cc:

Subject: AT&T CR#SCR090601-1 Development

Escalation Company: AT&T CR#: SCR090601-1 Status Code: Development

Qwest Action Requested: no action selected

= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = Description: Request that Qwest utilize CABS billing systems for UNE-P bills.

History of Item: SCR090601-1 was initially submitted on 9/6/01. It was declined without a clarification meeting on 9/18/01. The reason it was declined - it was explained that this CR was identical to a CR submitted by Rhythms in January 2001. However, AT&T's request was very different than how Qwest was developing the Rhythms request. After further discussion in the October CMP Systems meeting, Qwest indicated it would work on this CR but that it was tee shirt sized extra large, with no indication of when CABS billing would be implemented by Qwest.

Reason for Escalation / Dispute: The AT&T billing department is experiencing many problems with the billing system Qwest uses, i.e. CRIS. The level of detail is completely insufficient. Furthermore, CABS billing systems were negotiated in the 1997 interconnection agreements.

Business Need and Impact: AT&T does not have the level of detail needed to resolve outstanding billing disputes. Unsusual charges are appearing on the bill without the level of detail needed to determine what the charge is specifically. AT&T cannot electronically process CRIS bills, so using a paper bill is an extremely inefficient process for AT&T, requiring additional resources for billing purposes.

Desired CLEC Resolution: Qwest to implement CABS billing systems as soon as possible.

= = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = = =

Lead Submitter: Name: Carla Pardee Title: LSAM Manager

Joint Submitters:

CenturyLink Response

The CABS formatted CSR work which is being completed will provide the necessary detail required for auditing and inventory.

DRAFT RESPONSE For Review by the CLEC Community and Discussion at November CMP Meeting

November 1, 2001

Carla Dickinson Pardee LSAM Manager AT&T

CC: Donna Osborne-Miller, OSS LSAM, AT & T Fred Howard Janey Antal Alan Zimmerman Jon Ecklund This letter is in response to your CLEC Change Request Form, number SCR090601-1 dated September 6, 2001 - CR Title: Request that UNE-P orders be billed on a CABS bill.

CR Description: Today all UNE-P orders are billed out of the CRIS billing system. AT&T can only receive CRIS bills via paper, which makes it extremely inefficient and difficult to use. In addition, the CRIS bill does not provide the level of detail required for auditing or for inventory, i.e. USOC, Circuit ID and CRS. The level of detail needed and electronic interface are available in the CABS billing system. Moreover, Qwest negotiated CABS billing in its interconnection agreements. Therefore AT&T requests that UNE-P orders be billed on a CABS bill. Qwest is in the process of CABS formatting CSRs, however, AT&T needs the entire bill in the CABS format and not just the CSR.

Qwest Response: Based on the above noted information, the level of effort for this request is Extra Large.

Sincerely, Jon Ecklund Information Technologies Manager

====================

Qwest Escalation Response Issued

January 30, 2002

Carla Dickinson Pardee LSAM Manager AT&T

Dear Ms. Pardee:

This letter is in response to your formal escalation (SCR090601-1-E05) regarding UNE-P orders to be billed on a CABS bill, dated January 23, 2002.

Qwest has reviewed the formal escalation and is pleased to inform you that we will be able to meet AT&T’s request for providing UNE-P bills in a BOS billing format. This capability will become available in Qwest’s Western, Central and Eastern Regions beginning with the July bill cycle, July 1, 2002. Please contact me by telephone at (303) 896-7276 or by e-mail at jlthomp@qwest.com if you have any questions.

Sincerely,

Jeffery L. Thompson Director Business Solution Design

cc: Sara Padula POPP Communications Controller, Treasurer

Jeffrey Harnack OneStar Communications Director Network Optimization

Karen Clauson Eschelon Telecom Inc. Director of Interconnection

Dana Filip Qwest, Sr.Vice President – Customer Service

Dan Poole Qwest, Sr. Director of Legal Issues

Nancy Lubamersky Qwest, Sr. Director of Legal Issues

Archived System CR 5498567 Detail

 
Title: Facility Type Removal
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

5498567 Withdrawn
1/8/2002
-   IMA EDI/ Unbundled Loop
Originator: McReynolds, Maria
Originator Company Name: Covad
Owner: Routh, Mark
Director:
CR PM: Routh, Mark

Description Of Change

Covad would like the CFA Code removed as an ordering requirement. Although the CFA code is beneficial to Qwest (describes the type and size of cable), it really has no importance for the CLEC. In order to accurately specify CFA, we have to compare it with the information in IMA GUI. Unfortunately this information is not constant, and changes often without notice. This causes numerous rejections by EDI and makes for an incorrect database causing hours of needless reconciliation. Covad would like Qwest to re-evaluate the need for CFA information and consider removing it as an ordering requirement. See the following example, the facility type is designated in bold: ALT10 24-NL 189 CLSPCOMA CLSPCOMAHG7

Status History

Date Action Description
Release Information IMA Release 
4/3/2001 CR Submitted CR was received and recorded. Status was set to New- To be clarified. 
4/11/2001 Clarification Meeting Held Conf call was conducted to clarify this request. 
6/8/2001 Status Changed Status changed to "Canceled - Qwest" Orders can be processed without this Key information. 
6/10/2001 Info Sent to CLEC Sent email to Gregory Johnson and Susan Earley with updated CR. 
12/18/2001 Record Update Changed status from 'Cancelled CLEC' to 'Withdrawn' for database cleanup 

Project Meetings

CenturyLink Response

Archived System CR 5370845 Detail

 
Title: CALA Field Removal
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

5370845 Withdrawn
2/21/2001
-   IMA EDI/ Unbundled Loop
Originator: Wallace-Jones, Regina
Originator Company Name: Covad
Owner: Routh, Mark
Director:
CR PM: Routh, Mark

Description Of Change

Exact address matches for Qwest new loop orders are significantly lower than other ILECs with which we are in production (i.e. 38% compared to between 60% - 80% for other ILECs). This is primarily due to an additional "CALA" field required by Qwest pre-ordering system. The CALA field helps Qwest determine from which region a customer address originates (for example: Bellevue or Seattle in the state of Washington). Qwest does not provide a mapping table to help us deterministically figure out which addresses map to which regions, so in cases where multiple CALAs are returned, our Covad systems consider the address a "no match". Covad is requesting that either the CALA requirement be lifted for pre-order address validation or that Qwest provide an address mapping table to help us deterministically select the regions associated with our address submissions. This CR will help Covad and other co-providers scale operations more efficiently.

Status History

Date Action Description
Release Information IMA Release 
2/1/2001 CR Submitted CR received and status set to "New - To be validated" 
2/1/2001 Info Sent to CLEC Sent email to Regina Wallace-Jones and Mike Goebel with updated CR. 
2/1/2001 Status Changed Status changed to New - To be reviewed 
2/1/2001 Record Update T-Shirt size and options will be presented in the Feb. CICMP meeting. 
2/2/2001 Status Changed Status changed to Evaluated - To be reviewed. 
2/2/2001 Info Sent to CLEC Sent email to Regina Wallace-Jones and Mike Goebel with updated CR. 
2/7/2001 Status Changed Reviewed - Under Consideration 
2/7/2001 LOE Issued T-Shirt size NA and options provided. Not eligible for industry prioritization. 
2/8/2001 Info Sent to CLEC Sent email to Regina Wallace-Jones and Mike Goebel with updated CR. 
2/21/2001 Status Changed Status changed to Canceled - Co-Provider since the CALA field mapping will be provided by Qwest. 
2/27/2001 Info Sent to CLEC Sent email to Regina Wallace-Jones and Mike Goebel with updated CR. 
12/18/2001 Record Update Changed status from 'Cancelled CLEC' to 'Withdrawn' for database cleanup 

Project Meetings

CenturyLink Response

Archived System CR 5370997 Detail

 
Title: Disconnect Business Rule Change
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

5370997 Completed
3/21/2002
-   IMA Common/9 Unbundled Loop
Originator: Wallace-Jones, Regina
Originator Company Name: Covad
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

Covad would like the address requirement lifted from disconnect loop orders. Currently, approximately 25% of our disconnect orders receive system rejects for invalid address. Technically, only CFA and/or ILEC Circuit are required elements to successfully process a disconnect. Provided that a co-provider keeps accurate record of which ILEC Circuit has been assigned to a particular customer, there should be no need to re-validate a customer address. This change request is an effort on our part to minimize the number of system rejects that we are receiving in production. This problem has become particularly noticeable on orders which were originally placed in IMA EDI 4.2 and are now being disconnected in IMA EDI 5.0 (or greater).

Status History

Date Action Description
Release Information IMA Release 9.00 
2/1/2001 Record Update T-Shirt size and options will be presented in the Feb. CICMP meeting. 
2/1/2001 CR Submitted CR received and status set to -New - To be validated. 
2/1/2001 Info Sent to CLEC Sent email to Regina Wallace-Jones and Mike Goebel with updated CR. 
2/2/2001 Status Changed Status changed to Evaluated - To Be Reviewed. 
2/2/2001 Info Sent to CLEC Sent email to Regina Wallace-Jones and Mike Goebel with updated CR. 
2/7/2001 Status Changed Status changed to Reviewed - Under Consideration. 
2/7/2001 LOE Issued T-Shirt size Small and options provided. Eligible for industry prioritization. 
2/8/2001 Info Sent to CLEC Sent email to Regina Wallace-Jones and Mike Goebel with updated CR. 
3/21/2001 Info Sent to CLEC Sent email to Regina Wallace-Jones and Mike Goebel with updated CR. 
3/21/2001 Status Changed Status changed to Reviewed - Release Baseline Candidate for IMA Release 9.0. 
10/24/2001 Baseline Candidate Selection CLECs notified this CR was a selected CR Baseline Candidate. 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. 5370997 ranked 27 
2/25/2002 Status Changed 5370997 status updated to 'CLEC Test' based upon 2/25/02 implementation of IMA 9.0 
3/21/2002 Status Changed Reviewed in the 3/21/02 CMP meeting and Closed. 
3/21/2002 Discussed at Monthly CMP Meeting 5370997 discussed March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP - Attachment E 

Project Meetings

CenturyLink Response

Archived System CR 5372690 Detail

 
Title: TOS Code Removal for Req Type A Loop Ordering
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

5372690 Denied
4/18/2001
-   IMA EDI/ Unbundled Loop
Originator: Wallace-Jones, Regina
Originator Company Name: Covad
Owner: Routh, Mark
Director:
CR PM: Routh, Mark

Description Of Change

Covad would like the TOS Code removed as an ordering requirement. Although TOS is beneficial to Qwest (helps define billing and customer service), it really has no meaning for the CLEC. In order to accurately specify TOS, we must have access to the CSR, which means additional time and development. Covad would like Qwest to re-evaluate the need for TOS information and consider removing it as an ordering requirement. Information from Manuel Lozano ---- For the TOS field in LSOG 5. Qwest is not adhering to OBF guidelines. The field in LSOG 5 is Conditional for Activities N,C,T,V,W. Condition: Required when the ACT field is "N", "C", "T", "V" or "W" and the first position: of the REQTYP field is "E", "F" or "M" and the LTOS on the service specific form is not populated, otherwise optional. Basically, it is only required for Resale and UNE P/Port Services.

Status History

Date Action Description
Release Information IMA Release 
2/2/2001 Status Changed Status changed to New - To Be Reviewed. 
2/2/2001 Info Sent to CLEC Sent email to Regina Wallace-Jones and Mike Goebel with updated CR 
2/2/2001 CR Submitted Received and status set to New - To be validated. 
2/7/2001 LOE Issued T-Shirt size Large and options provided. Eligible for industry prioritization. 
2/7/2001 Status Changed Reviewed - Under Consideration 
2/8/2001 Info Sent to CLEC Sent email to Regina Wallace-Jones and Mike Goebel with updated CR 
4/2/2001 Record Update Description of changes was updated to include the information that Manuel Lozano provided. 
4/2/2001 Info Sent to CLEC Sent email to Regina Wallace-Jones and Mike Goebel with updated CR. 
4/18/2001 Status Changed CR was denied at the systems cmp meeting 

Project Meetings

CenturyLink Response

The TOS code is a required field per OBF Guidelines. To remove it would cause the loss of order integrity during the CSR processing.

Archived System CR 4868276 Detail

 
Title: Enhance Testing Environment
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

4868276 Completed
9/14/2001
-   IMA EDI/
Originator: Powers, Lynne
Originator Company Name: Eschelon
Owner: Routh, Mark
Director:
CR PM: Routh, Mark

Description Of Change

Eschelon requests the following enhancements to the Testing Process:1)Allow for more than one IP for testing purposes. 2)Move away from scheduling testing time periods for pre-ordering, allow CLECs to test pre-order scenarios during business hours. 3)Provide test data or test decks for Interoperability and Certification test scenarios. Create scenario library.

Status History

Date Action Description
Release Information IMA Release 
6/29/2000 Info Sent to CLEC Sent email to Lynne Powers with CR # and status. 
6/29/2000 CR Submitted Submitted 
6/29/2000 Status Changed New - To be industry evaluated 
7/19/2000 Status Changed Status changed to New - To be clarified. Kerrie Douglas to call with clarification for IP addresses and test data. 
7/20/2000 Info Received From CLEC Kerrie Douglas called. No change to IP addresses. Add clarifying words to test data description. 
7/20/2000 Status Changed Status changed to Evaluated - To be reviewed. 
7/28/2000 Info Sent to CLEC Sent email to Lynne Powers about status changes and form change to version 05. 
8/2/2000 Status Changed Reviewed - Under consideration 
8/16/2000 LOE Issued Received T-shirt size and option during industry team meeting. 
8/29/2000 Info Sent to CLEC Sent email to Lynne Powers with updated CR. 
10/18/2000 LOE Issued T-Shirt Size NA and Option provided in CICMP meeting. Not eligible for industry prioritization. 
11/8/2000 Info Sent to CLEC Sent email to Lynne Powers with updated CR 
11/15/2000 Status Changed Status Changed to Cancelled - Qwest 
12/1/2000 Info Sent to CLEC Sent email to Lynne Powers with updated 
2/1/2001 Info Sent to CLEC Sent email to Lynne Powers and Judy Rixe with updated CR 
3/1/2001 Status Changed Status changed to Reviewed - Release Baseline Candidate - IMA 8.0. The release has not been determined. 
10/18/2001 Discussed at Monthly CMP Meeting Discussed at CMP meeting agreed to close 
10/18/2002 Status Changed Status set to closed as a result of the SATE environment being implemeted. 

Project Meetings

CenturyLink Response

Archived System CR 5464735 Detail

 
Title: Eliminate delay due to error message indicating CFA in use, when it is not
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

5464735 Completed
9/19/2002
3000 - 5500  Process & Documentation/ Unbundled Loop
Originator: Powers, Lynne
Originator Company Name: Eschelon
Owner: Winston, Connie
Director:
CR PM: Esquibel-Reed, Peggy

Description Of Change

When CLEC submits a loop order to Qwest, the order is rejected for any reason, and CLEC re-submits the order, IMA responds with an error message indicating that the CFA is already in use. The CFA, however, is not in use, because the order was rejected (for reasons that may be unrelated to the CFA). At this time, CLEC then must call escalations to clear this, which results in a 2 to 3 day delay. Only after the issue is cleared up may the CLEC re-submit the order (and only then does the interval begin). Without this delay, the order could be corrected and re-submitted on the same day, which would not extend the interval. Qwest should change the system so that it allows the CLEC to use the CFA in this situation. Alternatively, if that is not possible, Qwest should allow CLEC to use the same request (the rejected request) with an increment (such as 1 or a) to avoid the delay that is currently associated with the escalation process and clearing the CFA.

Status History

Date Action Description
3/26/2001 CR Submitted Received and Logged. Status set to -New - To be validated. T-shirt size and options will be discussed, and the Industry Evaluation will be completed at the April 18th CICMP meeting 
3/26/2001 Info Sent to CLEC Sent e-mail with updated CR to Lynne Powers and Janet Houston. 
4/2/2001 Info Requested from CLEC Status changed to New - To be Clarified. Qwest needs examples of this error. 
4/2/2001 Info Sent to CLEC Sent e-mail with updated CR to Lynne Powers and Janet Houston 
10/25/2001 Info Sent to CLEC Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. 5464735 ranked 6 
11/16/2001 Clarification Meeting Held Clarification meeting held 
11/16/2001 Info Sent to CLEC Clarification meeting notes emailed 
11/26/2001 Info Requested from CLEC Qwest IT needs PON number or ticket number for help desk to find. Eschelon will try and locate information to narrow the search. 
11/27/2001 Info Received From CLEC Receved response from Eschelon: Will attempt to get PON's and ticket numbers if possible. Please check with the help desk as I am certain they have a record of this 
11/28/2001 Info Requested from CLEC Qwest asked Eschelon for the date that they submitted the trouble ticket to IMA help desk 
11/29/2001 Info Received From CLEC Response from Eschelon: there has not been anything really recent. Will attempt to get one 
11/29/2001 Info Requested from CLEC Sent email to Eschelon asking for an escalation. Qwest cannot recreate the error and without additional information, we cannot go forward 
11/30/2001 Info Received From CLEC E-mail received from Bonnie Johnson (Eschelon); see Project Meetings 
1/17/2002 Discussed at Monthly CMP Meeting CR # 5464735 discussed during 10.0 Packaging Presentation; status to be updated to "Withdrawn" if no CLECs provide examples of error by 1/25/02 
1/28/2002 Status Changed No additional error examples received; Status updated to "Withdrawn" as agreed to in January CMP Meeting (01/17/02) 
1/29/2002 Status Changed Status updated back to "Presented" based upon receipt of an e-mail from Eschelon with an error example 
2/1/2002 Info Requested from CLEC Sent email to Kathy Stichter asking for the LSR number of the request that was rejected due to the duplicate CFA in order to continue with the investigation. The LSR number is neede to determine what the issue is. 
2/3/2002 Info Received From CLEC Received email from Bonnie Johnson advising that they were unable to successfully send the request and there is no LSR number until Qwest accepts the LSR. Sent info to Qwest IT. 
2/4/2002 CLEC Provided Information Received examples from Allegiance. 
2/12/2002 Clarification Meeting Scheduled Meeting scheduled for 2/18, with Eschelon and Allegiance, to discuss investigation results. 
2/18/2002 Clarification Meeting Held See Project Meeting's for notes. 
2/21/2002 Discussed at Monthly CMP Meeting Action Item #1 for 5464735 closed at February Systems CMP Meeting 
4/18/2002 Discussed at Monthly CMP Meeting 5464735 discussed at April Systems CMP Monthly meeting; please see Systems CMP Distribution Package April CMP - Attachment G 
5/7/2002 Additional Information InfoBuddy issued by Russ Urevig. Issued 5/7/02. Title: Busy CFA Job Aid for Escalations/Call Centers/SDC's. MCC issued 5/14/02. Subject: Call Handling, Interconnect. Topic: Busy CFA InfoBuddy Job Aid. 
5/16/2002 Discussed at Monthly CMP Meeting 5464735 discussed at May Systems CMP Monthly meeting; please see Systems CMP Distribution Package May CMP - Attachment H 
9/6/2002 Status Changed Status changed to 'CLEC Test'. See Project Meetings Section for details. 
9/19/2002 Discussed at Monthly CMP Meeting 5464735 discussed at September Systems CMP Monthly meeting; please see Systems CMP Distribution Package September CMP -- Attachment G 

Project Meetings

Bonnie Johnson/Eschelon agreed to close CR at the September 19, 2002 Systems CMP Meeting.

September 4, 2002 Email from Bonnie Johnson/Eschelon: Hi Peggy, Thanks for your concern. I do not have a problem closing the CR. I have not been provided with any more examples here at Eschelon. Qwest and I suspected that some change was made at some point for something else that impacted this issue quite some time ago. Just surprised Qwest affiliated the two as they are completely separate issues. Thanks again!

-- September 3, 2002 Email to Bonnie Johnson/Eschelon: Bonnie -- Thank you for your willingness to close out your CR, 5464735, at the next CMP Meeting. Qwest certainly does not want you to agree to close it if you feel that the Eschelon CR has not been completed, in conjunction with another CR or not. I am a bit confused as to why Terry's CR does not impact yours. My understanding from the April Meeting was that the completion of Terry's CR would also meet the need of your CR. If that is not the case, are you willing to close the CR because you feel that it has been completed, just not with Terry's? Does Eschelon no longer need the request? Please clarify for me. Although I would love to have a completed CR, I do not want to close it until it is completed to your satisfaction.

- September 3, 2002 Email from Bonnie Johnson/Eschelon: Hi Peggy, Actually these are two totally different issues and the resolution to Terry's CR does not impact ours, however, I am willing to close our CR at the next CMP meeting.

September 3, 2002 Email sent to Bonnie Johnson/Eschelon: Hi Bonnie -- The CMP Systems CR 5464735 'Eliminate Delay Due To Error Message Indicating CFA In Use, When It Is Not' was being worked in conjunction with a Product and Process CMP CR, 5548229, submitted by Allegiance, as discussed in the April Systems CMP Meeting. The Allegiance CR (5548229) was discussed at the August 21st PnP Meeting and was updated to 'Completed' status. I have attached a copy of each of these CR's for your review. Due to the completion of the PnP CR 5548229, is Eschelon willing to close the CMP Systems CR 5464735? If you are not ready to close the Systems CR (5464735), can you please advise what additional information is needed by Eschelon in order to close your CR?

-- May 16, 2002 Systems CMP Meeting Discussion: Michael Buck/Qwest stated that status was provided yesterday at the Product and Process CMP meeting. The process regarding busy CFA will be communicated. This CR will be up for closure at the June CMP Meeting Received okay to close the Action Item. The CR remains open.

April 18, 2002 CMP Discussion: Peggy Esquibel-Reed/Qwest presented status: Russ Urevig/Qwest is working this CR in conjunction with a Product & Process CR, 5548229 Same Day Pair Change During Test & Turn-Up (Day of Cut). The documentation and communication are due to be completed by COB April 19,2002 and should close out both CR’s. There were no questions. This CR will be up for closure at the May CMP Meeting.

February 21, 2002 - Discussed at CMP: Russ Urevig will work with Chad Gerity to develop internal documentation for proper escalation steps and communicate to Qwest escalation desk personnel.

In response to the action items from 2-18 call: Reusing disconnected CFA on a new connect prior to IAD - When issuing a new connect, the busy CFA edit in IMA can be bypassed by populating the RPON field with the PON of the disconnect order, stating in the remarkls field 'pls reuse CFA,' and requesting manual assistance. It is the request for manual assitance that actually allows the LSR to be processed. This way the busy CFA edit is bypassed and the ISC representative has the opportunity to look at the LSR, acknowledge the association between the new connect and the disconnect, and allow it to be processed even though the CFA is not showing available.

Reusing CFA from a canceled LSR prior to system showing availability - The same process can be used when issuing a new connect LSR that follows the cancelation of an LSR with the same CFA. The new connect order wil be accepted if the RPON field is populated with the PON of the cancelled LSR, the Remarks field is populated with 'pls reuse CFA,' and requesting manual assistance field is selected.

February 18, 2002 Meeting to Discuss Investigation Results of Submitted Examples Attendees: Kathy Stichter, Bonnie Johnson/Eschelon. Terry Wicks/Allegiance. Chad Gerity, Russ Urevig, Ken Olson, Lynn Stecklein/Qwest The purpose of this meeting was to address 3 questions with Allegiance and Eschelon: Why wouldn’t IMA show the CFA’s available for re-use, how long does it take for Qwest’s systems to update after disconnect due date, and if this a manual process. Chad provided an overview of the process associated with TIRKS receiving the order from the SOP and when the design of the order begins: According to normal procedures, TIRKS receives service orders from the SOPS and begins the design of the circuit according the information provided on the order. This is appropriately called the design phase. Once the circuit is designed, the specifications are distributed to WFA-C where the actual physical wiring of the circuit occurs. Depending on how much of the design or the wiring of the circuit has been completed will determine the time in which it will again become available in the TIRKS system. When a request to cancel an order is received in TIRKS, the request will be distributed to the appropriate departments. A circuit will not show available until after TIRKS receives a 'Cancellation Complete' notice.

Typically, if TIRKS receives a cancellation during the design phase, the appropriate people cancel the design of the circuit in the system. Once the design is canceled and the 'Cancellation Complete' notice is received the CFA will show available. This generally takes one full business day. So if the CLEC does not cancel the LSR until the service orders have been distributed to TIRKS for design , then it will be one full business day before the CFA shows available again.

If TIRKS receives the cancellation request after the order has been distributed to WFA-C for wiring, the request to cancel must be distributed to WFA-C. The WFA-C personnel will then begin to 'un-wire' the CFA. Once WFA-C has completely taken out the wiring, a cancellation completion notification is sent to TIRKS. TIRKS then shows the CFA available. This process normally takes 5 business days after WFA-C receives the cancellation request. Therefore, if a CLEC issues a request to cancel an LSR after the physical wiring of the circuit has begun, it will be 5 business days before the CLEC can issue a new LSR requesting the CFA that was part of the formerly canceled LSR.

The processing of a disconnect follows a similar set of events. TIRKS receives a disconnect and posts an 'Inventory Availability Date,' (this is the date the CFA will be available to the CLEC again) which is 5 business days after the disconnect arrives in the TIRKS system. The request is then sent on to WFA-C. Upon receiving the disconnect, WFA-C will disable the circuit, but will not completely disconnect it. The reason for this is to make sure a cancellation of the disconnect is not received. TIRKS waits until the disconnect is posted complete and notifies WFA-C to completely disconnect the circuit. If the CLEC issues a new connect requesting CFA that is being disconnected on another order it will be rejected, unless the new connect is submitted 5 business days after the disconnect. The CLECs do have the option to issue a new connect at the same time the disconnect order is issued provided that:

1) The disconnect order is related to the new connect order. If this is done, then the CFA will be available for re-use.

2) A disconnect can be related to a new Connect by mentioning in the RPON field the new connect order number and by populating the Remarks field on the disconnect order with the comment "Re-use CFA".

3) The new connect order can not have the same due date as the disconnect order (If a CLEC issues a disconnect order on 01-01-2002 then the new connect should be dated on or after 01-02-2002).

IMA verified that in the case of the three disconnect PONs (708700-D4, 708700-D6, and 708700-D7) Allegiance did not populated the RPON and the Remarks field for CFA re-use. Therefore the new connect LSRs were rejected due to busy CFA.

Bonnie - Eschelon wanted to know when in the process does the order reach Tirks. Chad said the service order has been created.

Chad said that once a circuit is designed, the specs are sent to WFA-C where the actual wiring of the circuit occurs. Depending how much of the circuit is designed is the key as to when the CFA will again become available. A circuit will not show available until after TIRKS receives a 'Cancellation Complete' notice. If cancellation is received during design - CFA should be available in one business day If cancellation is received after the order has been distributed to WFA-C for wiring - CFA should be available in 5 days.

Terry - Allegiance brought up a concern regarding a Pseudo CLEC test (Exception 2079) It took 4 to 33 days for the CFA to show available. Russ will investigate test example and provide an answer to Peggy.

Bonnie - Eschelon wanted to know if they were using the wrong terminology associated with Disconnects. She also asked if there was a documented process. Chad indicated that the CLECs do have the option to issue a new connect at the same the disconnect order is issued. The disconnect needs to be related to the new connect by populating the RPON field and the remarks with re-use CFA.

Russ recommended that Qwest do a true-up and validate if this process is working the way it should be. Is the CFA really available. Russ and Chad will complete investigation and report findings to Peggy

Russ and Chad will provide an update in the Systems CMP meeting.

01/17/02 CMP Meeting Discussion: Jonathan Spangler/AT&T does not want this CR closed. He needs to check into. Jeff Thompson/Qwest responded that if examples can be provided by a week from Friday, Qwest can make a decision if the CR needs to go into Withdrawn status or goes into definition phase. Leilani Hines/WorldCom stated that the busy CFA project may have done something to fix this problem. Jeff Thompson/Qwest stated that there was no systems work done to fix this CR. The CR will be updated to 'Pending Withdrawal'. If Qwest gets examples by January 25, the CR will go into definition. If no examples are received by January 25, the CR status will be updated to 'Withdrawn'.

11-16-01 Alignment Meeting Notes Attendees: Attendees: Kathy Stichter/Eschelon, Bonnie Johnson/Eschelon, Kathy Rein/Qwest, J. J. Bradley/Qwest, Max Pitard/Qwest, Janet Carlson/Qwest, Gerald Mohatt/Qwest, Dallas Morris/Qwest, Chad Gerity/Qwest, Peggy Esquibel-Reed/Qwest, Monica Manning/Qwest, Russ Urevig/Qwest, Carrie Lousberg/Qwest Reviewed CR description and confirmed is an impact for IMA Common for Unbundled Loop only. CLEC Expectation: When a PON is submitted and the order is rejected for any reason, when the PON is re-submitted IMA responds with an error message that the CFA is in use. The CFA is not in use because the order was rejected. An escalation then needs to be called in to clear it. Eschelon is asking Qwest that if IMA rejects an order to allow the CFA to be unreserved in TIRKS so that the CLEC can resubmit under the same PON., or Qwest can look at the edits giving the CFA in use error to see if they can be modified.

======================

11-26-01 - E-mail sent to Eschelon requesting additional information:

1. What are the LSR and PON numbers of the orders that were rejected? 2. What are the LSR and PON numbers of the orders that were resubmitted with the same CFA? 3. We need a step by step recap of exactly what happened. Is there some type of incident or trouble ticket report that Eschelon had to complete that would give us this recap? If not, we need to get detailed steps of exactly what they did prior to, and immediately after receiving the error message. 4. We need numbers/statistics around how often this happens.

======================

11/30/01 E-Mail Received from Bonnie Johnson (Eschelon):

Email received from Bonnie Johnson (Eschelon): Eschelon's provisioner has indicated she had an order she had to cancel on 11/28. She then submitted another LSR using the same CFA on 11/29 and she did not receive an error. Is there a possibility that there has been something that happened in one of the point releases that would have corrected or changed this recently.

In addition, she did not save the escalation ticket data on those she had. I asked all provisioners to keep me informed on their experience with this. If you are unable to move forward we may have to wait until we can recreate the situation ourselves.

CenturyLink Response

DRAFT RESPONSE June 26, 2002

This letter is in response to your recent request regarding the Escalation process associated with busy CFA. A subsequent request was made to include information to the CLECs regarding how they should initiate an escalation for busy CFA.

Below is the information that is necessary to initiate an Escalation for busy CFA.

Busy Connecting Facility Assignment (CFA) is defined as; When validating the CFA the slot shows that it is currently in use by a circuit in the Trunk Integrated Record Keeping System (TIRKS). The busy CFA can be the result of several different reasons: normal activity, pending service order activity, pending Inventory Availability Date (IAD) issues, and canceled service orders that have not cleared in TIRKS. Should you receive an indicator that the CFA is currently in use, however you records indicate the CFA is NOT in use, an Escalation ticket may be opened.

Information that is required for an Escalation ticket will be for BUSY CFA problems.

1. TERM Z, TYPE LONG CLLI (ex.ALBONMNEHG1)

2. TERM A, TYPE SHORT TYPE CLLI (e.g., ALBQNMNE)

3. CABLE TYPE (e.g., alt01)

4. UNIT NUMBER (e.g., 086)

5. Was there a disconnect request submitted to free CFA location. (EX. Yes, a disconnect request was submitted and an FOC was received. The PON number for the isconnect was AAA121211-MA)

6. Was the Slot changed during installation? If so what was the old slot and what should the current slot be? (EX. Yes, we changed the CFA during test and turn-up the previous CFA was ALT01 slot 89 TCANAZMAHG1 and slot changed to slot 91. The PON number associated to this change was AAA121211-MA)

7. Was there any migration activity on this CFA? (EX. Yes, we should that a migration to another Provider on 06/17/2002)

8. Want type of request were you attempting when you encounter the busy CFA problem? (EX. We were attempting to request a new loop and utilize this CFA, or we were attempting a change activity against circuit 99.LXFU.000111.nw.)

9. Were there any change activity against the circuit, if so PON number for activities. (EX. Our records show a change activity should have taken place on 06/17/2002 from PON AAA121211-MA to free this CFA. Or our records indicate a disconnect request on 06/17/2002 on PON AAA121211-MA which should have freed the CFA.)

If you have any questions regarding this information please feel free to contact me.

Russ Urevig Senior Process Analyst

-

DRAFT RESPONSE For Review by the CLEC Community and Discussion at December CMP Meeting

November 26, 2001

Kathleen Stichter ILEC Relations Manager Eschelon Telecom Inc.

CC: Bonnie Johnson, Eschelon Chad Gerity, Qwest Russ Urevig, Qwest Carrie Lousberg, Qwest This letter is in response to your CLEC Change Request Form, number 5464735 dated March 26, 2001 - CR Title: Eliminate delay due to error message indicating CFA in use, when it is not.

CR Description: When CLEC submits a loop order to Qwest, the order is rejected for any reason, and CLEC re-submits the order, IMA responds with an error message indicating that the CFA is already in use. The CFA, however, is not in use, because the order was rejected (for reasons that may be unrelated to the CFA). At this time, CLEC then must call escalations to clear this, which results in a 2 to 3 day delay. Only after the issue is cleared up may the CLEC re-submit the order (and only then does the interval begin). Without this delay, the order could be corrected and re-submitted on the same day, which would not extend the interval. Qwest should change the system so that it allows the CLEC to use the CFA in this situation. Alternatively, if that is not possible, Qwest should allow CLEC to use the same request (the rejected request) with an increment (such as 1 or a) to avoid the delay that is currently associated with the escalation process and clearing the CFA.

Qwest Response: Based on the above noted information, the level of effort for this request is large. This CR was on the vote list for 10.0. A User Request was written on November 21, 2001.

Qwest needs additional information from Eschelon in order to continue and not jeopardize this CR for 10.0. Qwest is unable to recreate the error message that Eschelon is receiving. Information needed is: 1. What are the LSR and PON numbers of the orders that were rejected? 2. What are the LSR and PON numbers of the orders that were resubmitted with the same CFA? 3. We need a step by step recap of exactly what happened. Is there some type of incident or trouble ticket report that Eschelon had to complete that would give us this recap? If not, we need to get detailed steps of exactly what they did prior to, and immediately after receiving the error message. 4. We need numbers/statistics around how often this happens.

Sincerely, John Gallegos Information Technologies Manager

Archived System CR 5464798 Detail

 
Title: Eliminate requirement of location and department fields in IMA
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

5464798 Withdrawn
1/8/2002
-   IMA Common/ Centrex/Western Region
Originator: Powers, Lynne
Originator Company Name: Eschelon
Owner: Routh, Mark
Director:
CR PM: Routh, Mark

Description Of Change

CLEC asks Qwest to eliminate Qwest’s requirement that CLECs place complete the location and department fields in IMA-GUI (release 6.0). Orders are rejected when the LOCN or DEPT fields do not match Qwest records or if the fields are not completed. The only way to obtain the information for the fields is to pull a FULL Customer Service Record (CSR). This is extremely time consuming and inefficient. Only a certain amount of data downloads at one time, and then CLECs must sift through unneeded information to find the LOCN and DEPT information. Qwest has not provided a valid reason for requiring this information, and Eschelon is unaware of any benefit of requiring it. Because it is unneeded, Qwest should eliminate the requirement altogether.

Status History

Date Action Description
Release Information IMA Release 
3/26/2001 Info Sent to CLEC Sent e-mail with updated CR to Lynne Powers and Janet Houston. 
3/26/2001 CR Submitted Received and Logged. Status set to "New - To be validated" 
3/26/2001 Record Update T-shirt size and options will be discussed, and the Industry Evaluation will be completed at the April 18th CICMP meeting. 
4/2/2001 Info Sent to CLEC Sent e-mail with updated CR to Lynne Powers and Janet Houston. 
4/2/2001 Status Changed Validated - To be Industry Reviewed 
4/2/2001 Status Changed Declined - CR 5464965 will resolve this issue. 
4/18/2001 Status Changed This CR was canceled by Qwest at the April CICMP meeting 
4/18/2001 Discussed at Monthly CMP Meeting  
4/26/2001 Info Sent to CLEC Sent e-mail with updated CR to Lynne Powers and Janet Houston. 
12/18/2001 Record Update Changed status from 'Cancelled CLEC' to 'Withdrawn' for database cleanup 

Project Meetings

CenturyLink Response

Archived System CR 5464965 Detail

 
Title: Provide location and department information in partial CSR, if continue to require this information
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

5464965 Completed
7/18/2002
-   IMA Common/10 Centrex/Western Region
Originator: Powers, Lynne
Originator Company Name: Eschelon
Owner: Winston, Connie
Director:
CR PM: Stecklein, Lynn

Description Of Change

CLEC asks Qwest to eliminate Qwest’s requirement that CLECs place complete the location and department fields in IMA-GUI (release 6.0). Orders are rejected when the LOCN or DEPT fields do not match Qwest records or if the fields are not completed. The only way to obtain the information for the fields is to pull a FULL Customer Service Record (CSR). This is extremely time consuming and inefficient. Only a certain amount of data downloads at one time, and then CLECs must sift through unneeded information to find the LOCN and DEPT information. In a separate CR, Eschelon has asked that Qwest eliminate the requirement altogether. If Qwest does not do so, at a minimum, Qwest should provide the department and location information as part of the PARTIAL CSR.

Qwest Business Description:

Provide dept and location info in partial CSR to satisfy requirement. Orders rejected when LOCN or DEPT fields do not match Qwest's records or if fields are incomplete. Inefficient to pull FULL CSR to extract info.

Status History

Date Action Description
3/26/2001 CR Submitted Received and Logged. Status set to -New - To be validated" 
3/26/2001 Info Sent to CLEC Sent e-mail with updated CR to Lynne Powers and Janet Houston 
3/26/2001 Record Update T-shirt size and options will be discussed, and the Industry Evaluation will be completed at the April 18th CICMP meeting 
4/2/2001 Status Changed Status changed to Validated - To be industry reviewed. 
4/2/2001 LOE Issued T-Shirt size Large and options to be provided at the April CICMP meeting. 
4/18/2001 Discussed at Monthly CMP Meeting  
4/18/2001 Status Changed Status changed to "Reviewed - Under Consideration" 
10/25/2001 Status Changed Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization 
10/29/2001 Record Update J Gallegos to research the status of this CR. Work may already be completed under an internal CR. 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. 5464965 ranked 16 
11/17/2001 Record Update This change request was submitted 3/26/01. Work may be complete but a clarification meeting was still needed to confirm. 
11/17/2001 Clarification Meeting Held Clarification meeting was held 
1/8/2002 Status Changed Status changed to development 
1/17/2002 Discussed at Monthly CMP Meeting CR # 5464965 discussed during 10.0 Packaging Presentation 
1/17/2002 Status Changed CR # 5464965 status updated to 'Packaged' for 10.0 
3/13/2002 Status Changed Status updated from 'Packaged' to 'Development 
3/21/2002 Discussed at Monthly CMP Meeting 5464965 discussed at March Systems CMP Monthly meeting during IMA Release 10.0 Commitment Discussion (Attachment I) 
6/20/2002 Discussed at Monthly CMP Meeting 5464965 discussed at June Systems CMP Monthly meeting; please see Systems CMP Distribution Package June CMP -- Attachment N 
6/25/2002 Status Changed Status updated to CLEC Test based upon discussion at June Systems CMP Meeting and IMA 10.0 Deployment on June 17, 2002 
7/18/2002 Discussed at Monthly CMP Meeting 5464965 discussed at July Systems CMP Monthly meeting; please see Systems CMP Distribution Package July CMP -- Attachment G 
7/19/2002 Status Changed Status changed to Completed 

Project Meetings

11/17/01 - This change request was submitted 3/26/01. Work may be complete but a clarification meeting was still needed to confirm. 11/17/01 - Clarification meeting was held Attendees - Kathy Stichter, Bonnie Johnson, Monica Manning, Gerry Mohatt, J J Bradley, Lynn Stecklein Description - Provide location and department information in partial CSR, if continue to require this information. LSRs were being rejected in the Minneapolis Center for the Western Region only. An interim process was put in place not to reject the LSRs. The MN center reps were manually entering the Dept and Loc information for the CLEC until the system work could be done.

CenturyLink Response

DRAFT RESPONSE For Review by the CLEC Community and Discussion at December CMP Meeting

December 3, 2001

Kathy Stichter ILEC Relations Manager Eschelon

CC:John Gallegos Gerry Mohatt Monica Manning Michael Buck

This letter is in response to your CLEC Change Request Form, CR5464965 Provide Location and Department Information in Partial CSR

Description of Change: CLEC ask Qwest to eliminate Qwest’s requirement that CLECs place complete the location and department fields in IMA-GUI (release 6.0). Orders are rejected when the LOCN or DEPT fields do not match Qwest records or if the fields are not completed. The only way to obtain the information for the fields is to pull a Full Customer Service Record (CSR). This is extremely time consuming and inefficient. Only a certain amount of data downloads at one time, and then CLECs must sift through unneeded information to find the LOCN and DEPT information. In a separate CR, Eschelon has asked that Qwest eliminate the requirement altogether. If Qwest does not do so, at a minimum, Qwest should provide the department and location information as part of the Partial CSR.

Qwest Response: The clarification meeting to discuss this Change Request was held with Eschelon on November 19, 2001. From this meeting, the level of effort was determined to be Large. This Change Request was voted #16 as a result of the IMA 10.0 prioritization.

Sincerely,

John Gallegos Information Technologies Manager

Archived System CR 5578937 Detail

 
Title: Access to DSL pre qualification information
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

5578937 Completed
1/18/2002
-   Other/ DSL pre-Qulification Resale, Unbundled Loop, Other
Originator: Powers, Lynne
Originator Company Name: Eschelon
Owner: Gallegos, John
Director:
CR PM: Routh, Mark

Description Of Change

Please improve CLEC access to the DSL pre-qualification information to reduce the number of error messages and give CLEC at least the same access to the same information as Qwest receives. Often, when Eschelon uses Qwest’s IMA-GUI loop pre-qualification tool, the result is indeterminate. Instead of a yes or no response, Eschelon receives an error message. For example, the error message may indicate that the address and telephone number did not match. When Eschelon then calls Qwest, Qwest is able to run the request and receive a yes or no answer, even though Qwest is using the same address and telephone information used by Eschelon. In some cases, the customer already has DSL (and wants to upgrade speed, etc.). Even though the customer already has DSL, Eschelon cannot get pre-qualification information using IMA-GUI. But, when Eschelon calls Qwest, Qwest is able to retrieve the information using its internal systems. Eschelon has been working with Qwest to try to resolve this issue. Recently, Qwest has indicated that the issue may be addressed in Release 9.0, which will not occur until the end of the year. That is too long to wait. Also, no documentation has been provided as to what changes will be made during Release 9.0 and whether any changes will fully address the issue.

Call Karen Clausen at Eschelon to discuss the fix going I for Mega Bit (Qwest DSL) Loop Qual and make sure that it addresses Eschelon’s concerns

Status History

Date Action Description
6/6/2001 Info Sent to CLEC Sent email to Lynne Powers and Stephen Sheahan with updated CR 
6/6/2001 Record Update The T-Shirt size and options will be presented at the June CICMP Meeting. 
6/6/2001 CR Submitted Received and logged. Status set to New - To be validated" 
10/25/2001 Status Changed Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. 5578937 ranked 32 
1/2/2002 Status Changed Sent a note to Lynne Powers requesting verification that the requirements in this request have been completed and that they meet the needs of Eschelon. 
1/17/2002 Discussed at Monthly CMP Meeting CR # 5578937 discussed at January CMP meeting during 'CRs to Consider for Closure' (Attachment D of Distribution Package) 
1/18/2002 Status Changed Status updated to 'Completed' per discussion in January Systems CMP meeting 

Project Meetings

CenturyLink Response

Qwest (Lane Jones) presented an overview of the Loop Qualification tool in the November monthly Systems CMP meeting and updated the Loop Qualification documentation on the web to include EDI transactions.

Archived System CR 5522887 Detail

 
Title: More effective and accurate loss/completion reports
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

5522887 Completed
9/19/2002
2500 - 3750  Loss & Completion Report/ Loss & Completion Report Other
Originator: Powers, Lynne
Originator Company Name: Eschelon
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

CLECs need clear loss information, particularly with respect to resale customers. If loss information is not communicated effectively, two providers may bill one customer at the same time. To prevent such problems and ensure accuracy, Qwest should provide loss and completion information in a more organized, clear manner. Currently, Qwest includes all activity on a CLEC account that has outward action of a line or loop on a service order. For example, a migration from resale to loops appears as a loss, even though the customer has not changed providers. A loss should be limited to lines leaving the CLEC to go to another provider. The loss report should only reflect information of those customers that have changed to a different local service provider. The completion report should include order activity initiated by the CLEC, regardless of the activity type requested.

Status History

Date Action Description
4/27/2001 CR Submitted CR was received and recorded. Status was set to New - To be validated 
4/27/2001 Info Sent to CLEC Sent email to Lynne Powers and Janet Houston with updated CR. 
5/11/2001 LOE Issued T-Shirt Size Medium and Option provided in CICMP meeting. Eligible for industry prioritization. 
10/18/2001 Discussed at Monthly CMP Meeting Connie Winston presented Qwest's proposal at CMP 
10/19/2001 Record Update Meeting minutes from Actions # 327 included in this CR 
10/23/2001 Communicator Issued SRN102301 was issued (see Qwest response), requesting a Yes/No vote by 10/29/01 
10/29/2001 Status Changed Status changed to Development 
10/29/2001 Info Sent to CLEC Notice sent to CLECs, all 20 CLECs voted 'Yes' for the modification 
3/14/2002 Additional Information LOE was updated to extra large after additional requirements were established. 
3/21/2002 Discussed at Monthly CMP Meeting 5522887 discussed March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP - Attachment G 
4/29/2002 Communicator Issued Notification Number: SYST.04.29.02.F.04038.LossComptDrftTechSpc was distributed to the CLECs 
6/20/2002 Discussed at Monthly CMP Meeting 5522887 discussed at June Systems CMP Monthly meeting; please see Systems CMP Distribution Package June CMP -- Attachment N 
7/11/2002 Info Sent to CLEC Notification Number: SYST.07.11.02.F.04111.LossCompletionSysRel was sent to the CLECs 
7/11/2002 Status Changed Status set to CLEC Test 
7/18/2002 Discussed at Monthly CMP Meeting 5522887 discussed at July Systems CMP Monthly meeting; please see Systems CMP Distribution Package July CMP -- Attachment G 
8/22/2002 Discussed at Monthly CMP Meeting 5522887 discussed at August Systems CMP Monthly meeting; please see Systems CMP Distribution Package August CMP -- Attachment G 
8/23/2002 Info Sent to CLEC Notification Number: SYST.08.23.02.F.04151.LossTypeIndicator was sent to all CLECs 
9/19/2002 Discussed at Monthly CMP Meeting 5522887 discussed at September Systems CMP Monthly meeting; please see Systems CMP Distribution Package September CMP -- Attachment G 
9/19/2002 Status Changed Status set to completed per discussions in the September 02 Systems CMP meeting. 

Project Meetings

CLEC-Qwest Loss & Completion Report 2:00p.m. – 3:00p.m. Monday, October 1, 2001 Conference Call

INTRODUCTION The call was conducted in order to finalize the CLECs requirements for the Loss & Completion Report that Qwest provides to the CLECs

MEETING MINUTES The meeting began with introductions of the attendees. Mark Routh-Qwest welcomed the attendees and reviewed the Eschelon CR (CR#5522887)

Bonnie Johnson -Eschelon stated she thought the report had changed since August.

Anita Larson-Andres- Qwest confirmed that it had not changed since its inception.

Bonnie Johnson -Eschelon Confirmed that only the definition had changed. She asked if everything on the Loss Report was on the Completion Report?

Anita Larson-Andres- Qwest Stated that it should be.

Bonnie Johnson -Eschelon stated that she didn’t think that all the losses were on the Loss report. She stated that Eschelon only wants those losses to other CLECs/ILECS on the Loss report.

John Gallegos - Qwest stated that he had received the faxes that Bonnie Johnson had sent but that he needed more information.

Bonnie Johnson -Eschelon Stated that Echelon didn’t have any more information.

John Gallegos - Qwest indicated that the faxes he had received from Bonnie didn’t include the Name and Address information on the report. He added that the web site needed to be updated.

Kathy Stichter - Eschelon asked why they have two reports that are identical (the Loss and the Completion reports)

John Gallegos - Qwest indicated that there are differences in the reports.

Anita Larson-Andres- Qwest indicated the difference is that the Completion report contains the information about the Service Orders that completed to the impacted CLEC. The Loss report contains the loss information to the impacted CLEC. She sited some examples.

Kathy Stichter - Eschelon indicated that she wanted to see any loss to the CLEC on the Loss report.

Kathy Stichter & Bonnie Johnson -Eschelon indicated that they would send an updated Requirement Specification to Mark Routh. Kathy asked if there will be a process in place to provide PON when the PON is not on the report? – List of Attendees

First Last Company Attended Mark Routh Qwest In person John Gallegos Qwest In person Barbara Campbell Qwest In person Curt Anderson Qwest In person Nancy Walker Qwest In person Anita Larson-Andres Qwest Called in Theresa Hubis Qwest Called in Beth Foster Qwest Called in Joshua Nelson Qwest Called in Peter Budner Qwest Called in Kathy Stichter Eschelon Called in Bonnie Johnson Eschelon Called in Marcia Lees SBC Called in Sam Yeung KPMG Called in Scott Simon Premier Called in Joyce Davis Sprint Called in

CLEC-Qwest Loss & Completion Report 10:00p.m. – 11:00p.m. Friday, September 14, 2001 Conference Call

INTRODUCTION

The call was conducted in order to finalize the CLECs requirements for the Loss & Completion Report that Qwest provides to the CLECs

MEETING MINUTES

The meeting began with introductions of the attendees. Mark Routh-Qwest welcomed the attendees and Barbara Cambell – Qwest reviewed the Eschelon CR (CR#5522887)

Barbara Cambell- Qwest stated that the definition of the report has changed but it is still not accurate.

Lynne Powers –Eschelon stated that the definition of the Loss Report should be that a Loss is defined as a Loss to another CLEC. She read the definition of the Loss Report

Barbara Campbell – Qwest stated that Qwest will update the definition.

Curt Anderson – Qwest stated that the definition of the Loss Report as read by Lynne Powers was the second definition.

Barbara Campbell – Qwest stated that it was the definition.

Curt Anderson – Qwest stated that the Qwest Development team is looking at examples of the report that were submitted by Eschelon, but that they have not developed an answer yet.

Bonnie Johnson -Eschelon stated that they wasn’t to see only the losses per the definition prior to August 14th. Eschelon wants the Loss report to reflect only those losses to another CLEC/ILEC. Eschelon does not want to see order account activity that is generated by Eschelon to be included on the Loss report.

Mark Routh-Qwest asked the other participants on the call if they agreed with the Eschelon requirement for the Loss information. They all agreed that they would like to see the same information on the Loss report that Eschelon had requested.

It was requested the Qwest add the Product List to the Loss & Completion Report.

Curt Anderson – Qwest Committed to have the web site updated with the current products by Friday, October 5th.

Lynne Powers - Eschelon stated that she needs to know about the proposed changes in the report to see if it will fill their needs.

Curt Anderson – Qwest indicated that Qwest will only add new products, not change the report.

Bonnie Johnson-Eschelon indicated that they do get the Loss & Completion report for each product.

Curt Anderson – Qwest stated that he is working with the Documentation group to get the documents for the report updated.

Lynne Powers - Eschelon asked to have a Development representative available to discuss the issues. She stated, “In order to define the requirements, we need to understand the logic and flow of how that happens.”

Anita Larson-Andres – Qwest will provide the real definition of the Loss & Completion report and provide the Flow Chart of how the information gets on to the report.

There were no additional comments and Mark Routh ended the call. – List of Attendees

First Last Company Attended Mark Routh Qwest In-Person John Gallegos Qwest In-Person Barbara Campbell Qwest In-Person Curt Anderson Qwest In-Person Anita Larson-Andres Qwest Called in Lynne Powers Eschelon Called in Kathy Stichter Eschelon Called in Bonnie Johnson Eschelon Called in Marcia Lees SBC Called in Debbie Jewell ATG Called in Lori Nelson Midcontinent Called in Sharon Stettnichs Midcontinent Called in Ellen Neis Sprint Called in Mary Sagelski Premier Called in Oral Larson DSET Called in Susan Dever AT&T Called in Roy Harsila Comm South Called in Gloriann Lowinske New Access Called in Marcia New Access Called in Christy Hicks New Access Called in

Discussion from the September 19 CMP meeting:

Connie Winston/Qwest said this CR is one on which there were some questions around the ACT of D. Qwest did meet with Eschelon off line, and Qwest thought there could have been several issues on the loss and completion report. We did find one ‘people’ issue, we talked to that person. They simply input the incorrect PON and we’ve talked to them and that’s been cleared up. The other issues all result around ACT of D across different product types. Qwest defined that an ACT of D would be an external loss. From Eschelon’s perspective it appears that if they initiated the activity of D, it’s not an external loss to them. They would have thought that it would have had an internal indicator. AT&T was also interested in this discussion. Jonathan Spangler/AT&T — asked for clarification as to what came out of that discussion between Qwest and Eschelon regarding the ACT of D and if there were any conclusions that came out of that discussion. Bonnie Johnson/Eschelon said that the original CR was to have the loss report really truly identify losses, customers that have left Eschelon and have gone to another local service provider. This is really critical in UNE POTS and resale, because Eschelon is not notified via the LSR to release the number. So the loss report is the only report that Eschelon can depend on to be certain that we quit billing the customer. Our initial expectation was that this final step was taken to indicate internal vs. external. Last month, we determined that there is a different view of what was internal vs. external. It’s Eschelon's feeling that if we initiate a disconnect of any type, whether it is a partial disconnect or a full disconnect, whether it’s a C order, a D order, regardless of the order type, that we view that as internal because we initiated it. All we want to show up as external are those losses that we did not initiate. I think that we just need, at this point in time, to move forward and determine impacts to other CLECs, and whether it impacts everybody. AT&T seems to be the only other CLEC that uses the loss and completion reports. We don’t want to impact other CLEC’s process and how they use the report, so if there is agreement with other CLECs, I’ll submit a new CR to change the definition of internal and external. Jonathan Spangler/AT&T — and your request for changing that would define an actual internal loss meaning an order that was initiated by the CLEC just to change one of their customer features, or move orders. Bonnie Johnson/Eschelon — it would clearly state that external only applies when the customer is only actually changing local service providers via an LSR request from another carrier. Jonathan Spangler/AT&T — AT&T agrees with that definition. Can Qwest elaborate on what they define a loss as being, because AT&T has always assumed that that was the case. By definition, a loss would be that the CLEC was losing that customer and therefore be able to utilize the information that was on the loss report to be able to disconnect billing on that customer. Connie Winston/Qwest — from Qwest retail perspective a disconnect is considered a line loss. So it is considered a loss. So loss to revenue stream and things like that constitutes a loss. When this CR went into this definition, Qwest thought an ACT of D results in lost customers, lost revenue, so it’s a loss. The customer could have new connected with another CLEC, or they have gone to another state, things like that can happen, that’s where that definition came from. Bonnie’s explanation is also understandable, that’s why we discussed the new CR to change the definition. Jonathan Spangler/AT&T — I can understand the Qwest position too because essentially, except for in a move situation where the customer’s TNs aren’t really changing, if they are within the same switch, the account wouldn’t necessarily change. Connie Winston/Qwest — in all of the ones we’ve researched it has been a true ACT of D. Eschelon indicated that they haven’t had the “Move” situation, but they would look into that. Bonnie Johnson/Eschelon — for us, for Centrex plus account, if they're moving from one common block to another there will be one C to move and one C to add. There are occasions for Eschelon when a customer might be moving. The customer might change from resale to facility based. Eschelon uses the loss report to determine if it is appropriate to stop billing our customer. Eschelon wants to ensure that there aren’t other CLECs that are using these reports for a different purpose. Bonnie indicated that she would submit a new CR and then if there is anybody who would have an objection to that or uses these reports for a different reason, that that would come out when she submitted the CR. Jonathan Spangler/AT&T — I still think AT&T would be in favor of the CR that Bonnie is suggesting. Essentially AT&T is looking at that report as being a customer literally leaving AT&T. Liz Balvin/WorldCom — I think WorldCom is using it in the same manner as well. We’ll be sure to get with our folks when the new CR is initiated and see if there are any issues. But I believe we are using it as Eschelon has described. Mike Buck/Qwest stated that Qwest will be looking for a new CR and that this one will be updated to Completed knowing that there is a new CR is on the way. Bonnie Johnson/Eschelon — yes

CenturyLink Response

10/29/01 - Notice sent to CLECs: Qwest has received all of the votes on the proposed change to the Loss & Completion Report. There were a total of 20 CLECs that responded and all 20 of them voted Yes on the change. Therefore, Qwest is proceeding with the work to implement the modification to the Loss & Completion Report. I have been told that the work will take about 6 months. Qwest will provide you with all of the necessary documentation and notification related to this change as we progress with the development and implementation.

Mark Routh

Announcement Date: May 23, 2002 Effective Date: May 27, 2002 Notification Number: SYST.05.23.02.F.04074.LTypeFinalTechSpec Notification Category: Systems Notification Target Audience: CLECs, Resellers Subject: CMP – Systems Document in Review Loss and Completions – Loss Type Indicator, Final Technical Specifications Associated CR # or System Name and Number: CR 5522887 – Loss and Completions

On May 27, 2002, Qwest will post the Final Technical Specifications for Loss and Completions-Loss Type Indicator, targeted for implementation on July 11, 2002. These will be posted to the Qwest Wholesale Document Review site.

Summary of Change: This will allow CLEC to distinguish Telephone Number lines lost to other CLEC providers from those lines lost for other reasons. A loss type indicator will be added to the Loss Report. For each loss appearing on the Loss Report, the loss type indicator value will be either (I) internal or (E) external. An internal loss identifies a lost line that does not go to another CLEC provider. An external loss identifies a line lost to another CLEC provider.

Final Joint Test Plan: Qwest will deliver the Loss Report test file after 1:00 PM Central Time on June 11, 2002 to the CLEC community. Each CLEC will receive the test file in the same format, via the same transmission mode, as they do today.

Comment Response: There were no comments received during the CLEC Comment Cycle; therefore, Qwest Response to CLEC comments is not required.

If you have any questions on this subject, please submit comments though the following link: http://www.qwest.com/wholesale/cmp/comment.html.

Timeline:

Final Technical Specifications Loss Type Indicator-CLEC Final Tech Spec Requirements-V01.00 Available May 27, 2002 CLEC Testing Window Begins Available June 11, 2002 Targeted Production Date Available July 11, 2002

Sincerely,

Qwest

Note: In cases of conflict between the changes implemented through this notification and any CLEC interconnection agreement (whether based on the Qwest SGAT or not), the rates, terms and conditions of such interconnection agreement shall prevail as between Q west and the CLEC party.

Announcement Date: July 11, 2002 Effective Date: Immediately Notification Number: SYST.07.11.02.F.04111.LossCompletionSysRel Notification Category: Systems Notification Target Audience: CLECs, Resellers Subject: System Release Loss and Completions – Loss Type Indicator Associated CR # or System Name and Number: CR 5522887 – Loss and Completions

CMP CR5522887 has been released into production effective July 11, 2002.

Summary of Change: A loss type indicator will be added to the Loss Report that will allow customers to distinguish Telephone Number lines lost to other CLEC providers from those lines lost for other reasons. For each loss appearing on the Loss Report, the loss type indicator value will be either (I) internal or (E) external. An internal loss identifies a lost line that does not go to another CLEC provider. An external loss identifies a line lost to another CLEC provider.

Sincerely,

Qwest

Note: In cases of conflict between the changes implemented through this notification and any CLEC interconnection agreement (whether based on the Qwest SGAT or not), the rates, terms and conditions of such interconnection agreement shall prevail as between Q west and the CLEC party.

Archived System CR SCR073001-4 Detail

 
Title: Identification of CSR Customer Code
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR073001-4 Completed
3/22/2002
-   IMA GUI/9 IMA GUI All Products
Originator: Stichter, Kathy
Originator Company Name: Eschelon
Owner: Winston, Connie
Director:
CR PM: Stecklein, Lynn

Description Of Change

When a CLEC looks in IMA for a CSR (Customer Service Record) at times they find more than 1 live account with different cus codes for the same TN. There is no way for the CLEC to determine which live account to use when issuing the LSR. This causes the CLEC to issue the LSR on the incorrect account. Therefore, causing flow through issues and ultimately delays in service provisioning, which becomes customer affecting.

Qwest Business Description:

Multiple live accounts with different cus codes for the same TN can be listed in a CSR. Determine which live account to use when issuing the LSR in order to eliminate using an incorrect account, causing flow through issues and delaying provisioning.

Status History

Date Action Description
7/30/2001 Info Sent to CLEC Sent updated CR to Lynne Powers, Kathleen Stichter and Stephen Sheahan 
7/30/2001 CR Submitted Received and logged. Status set to New - To be validated 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. SCR073001-4 ranked 4 
11/15/2001 Clarification Meeting Held Clarification meeting held with Eschelon - See Project Meeting minutes. 
11/26/2001 Info Sent to CLEC Provided a summary of the efforts underway to address this request to Eschelon. 
11/29/2001 CLEC Provided Information Eschelon provided additional examples of Multiple CSR - Forwarded to Monica Manning for investigation. 
1/8/2002 CLEC Provided Information Received additional SCR cus code examples from K Stichter 
1/8/2002 Status Changed Development - 9.0 
1/17/2002 Discussed at Monthly CMP Meeting CR # SCR073001-4 discussed during 10.0 Packaging Presentation; this CR is slated for delivery as part of 9.0 
2/25/2002 Status Changed SCR073001-4 status updated to 'CLEC Test' based upon 2/25/02 implementation of IMA 9.0 
3/21/2002 Discussed at Monthly CMP Meeting SCR073001-4 discussed March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP - Attachment E 
3/22/2002 Status Changed Status updated from 'CLEC Test' to 'Completed' 

Project Meetings

11/15/01 Clarification Meeting Attendees: Kathy Stichter, Bonnie Johnson, Lynn Stecklein, Gerry Mohatt, Monica Manning, J J Bradley The purpose of this meeting was to determine if Eschelon agreed that this CR could be closed. Kathy and Bonnie felt that if Qwest could research existing UR's associated with this request and communicate the results of the findings we may be able to close. Following are the findings provided by Monica Manning. UR 2439 BOSS Status of Blank (deployed 10-13-01) - BOSS input files to IMA have been modified to provide an account status of "Final" when an account is disconnected, and an account status of "Blank" when an account is new with no current billing record. This allows IMA to filter out Final accounts.

UR 1433/CR 18889 CSR Match Rework (deployed 11-17-01) - IMA will not return CSRs with a 'FINAL' account status during Pre-Order Review. If all of the found accounts are in 'FINAL' status, an error message will be returned with 'No active account found'.

UR 1433/CR 25362 BPL eliminate CSRs in FINAL from Multi-Match response (deployed 7.0 timeframe) - Accounts with a Final status have been eliminated from a multi-match CSR response.

UR 2295/CR 28259 CSR Disconnect Flag (scheduled 9.0) - IMA GUI and EDI will be modified so that Co-Providers will know if a CSR in a 'LIVE' status is pending disconnection. An 'Account Descriptor ' field will be added to the IMA GUI next to the Line Status on Review Full or Partial CSR Response screens and CSR Multi Match screen. In addition, the 'Account Descriptor field will be added to the EDI CSR Response Administrative section and Listed Name and Address section of Multi Match section of the CSR mapping. The Account Descriptor field will provide an indicator of "DISC" for an account that is pending disconnection.

UR 2797 Edit for closing info on CSR (not targeted) - IMA will reject LSRs submitted for accounts that are pending disconnection. Dependent on UR 2295.

According to Change Request SCR073001-04, Eschelon wants to be able to determine which live account to use, when more than one live account with different cus codes for the same TN is returned for a Review CSR Query. With the work that has already been completed, Final accounts are not returned in the CSR Response. With the implementation of the CSR Disconnect Flag CR in 9.0, IMA will provide a "DISC" account descriptor for accounts that are pending disconnect. This will allow the CLECs to select the appropriate live account for LSR submission. Beyond 9.0, IMA will implement editing to reject LSRs with an account number that is pending disconnection. All of these changes will ensure that the CLEC selects the correct Account Number.

As long as the aforementioned work satisfies Eschelon, I think SCR073001-4 can be closed.

11/29/01 - Eschelon provided additional examples of multiple CSR's - forwarded to Monica Manning for investigation

CenturyLink Response

Following is a summary of the work being done to address the above request:

UR 2439 BOSS Status of Blank (deployed 10-13-01) - BOSS input files to IMA have been modified to provide an account status of "Final" when an account is disconnected, and an account status of "Blank" when an account is new with no current billing record. This allows IMA to filter out Final accounts.

UR 1433/CR 18889 CSR Match Rework (deployed 11-17-01) - IMA will not return CSRs with a 'FINAL' account status during Pre-Order Review. If all of the found accounts are in 'FINAL' status, an error message will be returned with 'No active account found'.

UR 1433/CR 25362 BPL eliminate CSRs in FINAL from Multi-Match response (deployed 7.0 timeframe) - Accounts with a Final status have been eliminated from a multi-match CSR response.

UR 2295/CR 28259 CSR Disconnect Flag (scheduled 9.0) - IMA GUI and EDI will be modified so that Co-Providers will know if a CSR in a 'LIVE' status is pending disconnection. An 'Account Descriptor ' field will be added to the IMA GUI next to the Line Status on Review Full or Partial CSR Response screens and CSR Multi Match screen. In addition, the 'Account Descriptor field will be added to the EDI CSR Response Administrative section and Listed Name and Address section of Multi Match section of the CSR mapping. The Account Descriptor field will provide an indicator of "DISC" for an account that is pending disconnection.

UR 2797 Edit for closing info on CSR (not targeted) - IMA will reject LSRs submitted for accounts that are pending disconnection. Dependent on UR 2295.

According to Change Request SCR073001-04, Eschelon wants to be able to determine which live account to use, when more than one live account with different cus codes for the same TN is returned for a Review CSR Query. With the work that has already been completed, Final accounts are not returned in the CSR Response. With the implementation of the CSR Disconnect Flag CR in 9.0, IMA will provide a "DISC" account descriptor for accounts that are pending disconnect. This will allow the CLECs to select the appropriate live account for LSR submission. Beyond 9.0, IMA will implement editing to reject LSRs with an account number that is pending disconnection. All of these changes will ensure that the CLEC selects the correct Account Number.

As long as the aforementioned work satisfies Eschelon, I think SCR073001-4 can be closed.

Archived System CR SCR073001-1 Detail

 
Title: IMA edits (7 10 digits) for Customer Forwarding Number (CFN) floats for features on Centrex lines
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR073001-1 Withdrawn
11/16/2001
-   IMA GUI/ Centrex/Western Region
Originator: Stichter, Kathy
Originator Company Name: Eschelon
Owner: Gallegos, John
Director:
CR PM: Esquibel-Reed, Peggy

Description Of Change

Eschelon requests a systems change to provide IMA edits for 7-10 digits for Customer Forwarding Number (CFN) floats for features on Centrex lines. IMA-GUI currently allows CLECs to use 10 digits, and the SOP edits to the correct number. But, for Centrex products, no edit occurs, and the CLEC provisioner must enter either 7 or 10 digits, as appropriate. Qwest should allow CLECs to use 10 digits on all orders, with Qwest’s system should edit the order if 7 is appropriate for Centrex products, as it does now for 1FB. Qwest’s centers have electronic, up-to-date access to this information and, therefore, CLECs should also have such access.

Status History

Date Action Description
7/30/2001 CR Submitted Received and logged. Status set to New - To be validated 
7/30/2001 Info Sent to CLEC Sent updated CR to Lynne Powers, Kathleen Stichter and Stephen Sheahan 
8/13/2001 LOE Issued T-Shirt Size of Medium and option will be provided at the 8/15/01 S-CMP meeting 
8/15/2001 Status Changed Status changed to Reviewed - Under consideration. This request was prioritized in the Aug 01 prioritization process. 
8/20/2001 Info Sent to CLEC Sent updated CR to Lynne Powers, Kathleen Stichter and Stephen Sheahan 
10/25/2001 Status Changed Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. SCR073001-1 ranked 17 
11/12/2001 Info Sent to CLEC Sent email to Kathy Stichter asking for availability this week for clarification meeting. 
11/12/2001 Clarification Meeting Scheduled Clarification meeting scheduled for November 16, 2001. 
11/16/2001 Status Changed Status is updated to Withdrawn; to be confirmed at December CMP meeting 
11/16/2001 Clarification Meeting Held Clarification meeting minutes emailed. 
12/13/2001 Discussed at Monthly CMP Meeting SCR073001-1 was discussed at the monthly systems CMP meeting (12/13/01) and there was no objection to the withdrawal of this CR 
12/13/2001 Status Changed CR Withdrawn by CLEC 
1/17/2002 Discussed at Monthly CMP Meeting CR # SCR073001-1 discussed during 10.0 Packaging Presentation 

Project Meetings

12/13/01 - December CMP discussion: CLEC's agreed that CR not needed. 11-16-01 Alignment Meeting Minutes Attendees: Kathy Stichter/Eschelon, Bonnie Johnson/Eschelon, Kathy Rein/Qwest, J. J. Bradley/Qwest, Max Pitard/Qwest, Janet Carlson/Qwest, Gerald Mohatt/Qwest, Dallas Morris/Qwest, Chad Gerity/Qwest, Peggy Esquibel-Reed/Qwest, Monica Manning/Qwest, Russ Urevig/Qwest, Carrie Lousberg/Qwest Reviewed CR description and confirmed is an IMA GUI request for Centrex. CLEC Expectation: Eschelon advised that a manual process has been implemented since this CR was submitted. Eschelon is happy with the manual process and no longer needs this CR. Eschelon requested that this CR remain open until discussed at the December CMP meeting. Email from Kathy Stichter received 11-16: In reference to the above CR. If no other CLEC wants this and/or any other CLEC does not want this, Eschelon will agree to close this CR at the December CMP meeting because the manual process Qwest implemented is working for Eschelon. See also MCC Subject: Centrex 21; Centrex Plus; Centron. Topic: Call Forward Number Format. Dated: August 22, 2001.

CenturyLink Response

DRAFT RESPONSE - For Review by the CLEC Community and Discussion at December CMP Meeting

November 26, 2001

Kathleen Stichter ILEC Relations Manager Eschelon Telecom Inc.

CC: Bonnie Johnson, Eschelon Dallas Morris, Qwest Kathy Rein, Qwest Carrie Lousberg, Qwest This letter is in response to your CLEC Change Request Form, number SCR073001-1 dated July 30, 2001 - CR Title: IMA edits (7-10 digits) for Customer Forwarding Number (CFN) floats for features on Centrex lines.

CR Description: Eschelon requests a systems change to provide IMA edits for 7-10 digits for Customer Forwarding Number (CFN) floats for features on Centrex lines. IMA-GUI currently allows CLECs to use 10 digits, and the SOP edits to the correct number. But, for Centrex products, no edit occurs, and the CLEC provisioner must enter either 7 or 10 digits, as appropriate. Qwest should allow CLECs to use 10 digits on all orders, with Qwest’s system should edit the order if 7 is appropriate for Centrex products, as it does now for 1FB. Qwest’s centers have electronic, up-to-date access to this information and, therefore, CLECs should also have such access.

Qwest Response: This request was on the candidate vote list for the 10.0 Release. Eschelon has since advised that they are no longer in need of this CR due to an edit that was installed in the 7.01 Release and the establishment of a manual process that is working for Eschelon. Eschelon is in agreement to close this CR at the December CMP meeting if there are no other CLECs interested in this request. Currently, there is no sponsor for this CR. If a sponsor is obtained at the December meeting, this CR will be targeted for a later Release.

Sincerely, John Gallegos Information Technologies Manager

Archived System CR SCR073001-2 Detail

 
Title: Complete service order detail on FOCs for Resale & UNE P
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR073001-2 Withdrawn
9/14/2001
-   IMA GUI/
Originator: Stichter, Kathy
Originator Company Name: Eschelon
Owner: Routh, Mark
Director:
CR PM: Routh, Mark

Description Of Change

When a CLEC sends an LSR with detail, such as feature changes, the CLEC receives a FOC with order number and due date, but no detail regarding what was ordered. If the CLEC received complete service order detail, the CLEC could identify discrepancies between the FOC and the LSR. For example, a clerical error could have occurred that changes the information ordered. Because such detail is not on the FOC, these issues are not discovered until the time of cut. Therefore, the problem becomes a customer affecting issue when it could have been avoided altogether.

Previously, McLeod made a similar request in CR#5466535. That CR, however, does not appear on the last CICMP log. If that CR remains active, Eschelon does not object to consolidating this CR with that one.

Status History

Date Action Description
Release Information IMA Release 
12/18/2001 Record Update Changed status from 'Cancelled CLEC' to 'Withdrawn' for database cleanup 

Project Meetings

CLEC-Qwest FOC S&E Section meeting 2:00p.m. – 3:00p.m. Friday, September 28, 2001 Conference Call

INTRODUCTION

The call was conducted in order to clarify the CLECs requirements for the S&E Section on the FOC that Qwest provides to the CLECs

ATTACHMENTS

Attachment A – List of Attendees

MEETING MINUTES

The meeting began with introductions of the attendees. Mark Routh-Qwest welcomed the attendees and stated the meeting was intended to confirm the CLEC’s requirements for the information to be returned on the S&E section of the Firm Order Completion (FOC).

Barbara Campbell – Qwest asked if everyone had a copy of the documentation that was distributed for the meeting.

Barbara Campbell – Qwest read through the Eschelon Change Request. Then she reviewed the sample FOC that was sent to the CLECs

Barbara Campbell – Qwest asked if the sample met the CLECs requirements.

The CLECs all agreed that it did.

Barbara Campbell – Qwest asked if the CLECs would agree to receiving the FOC’s outside of the normal response time due to more information being created.

The CLECs said yes.

The CLECs asked if certain information would be on the FOC.

Barbara Campbell – Qwest said that the S & E section on the FOC would be the same information that they would be getting on their completions notices.

The CLECs asked if they would get another FOC if the information changed.

Barbara Campbell – Qwest said that the FOC process was not changing, just the addition of the S & E section to the FOC, so if they were getting FOCs now when data changed, they would continue to receive them. She asked if this change would be for all products.

The CLECs said yes.

The CLECs asked when this would be implemented.

John Gallegos - Qwest indicated that it could not be done prior release 10.0 (pending the CLEC prioritization of this CR)

RESULTS OF THE DISCUSSION

The CLECs agreed to having the same information on the FOC as they are currently getting on completions notifications.

The CLECs agreed to a possible longer response time for the FOC since more data would be provided.

The CLECs agreed that it would be for all products.

The change would go in to the IMA release 10.0

Attachment A – List of Attendees

First Last Company Attended Mark Routh Qwest In-Person John Gallegos Qwest In-Person Barbara Campbell Qwest In-Person Curt Anderson Qwest In-Person Lynne Powers Eschelon Called in Bonnie Johnson Eschelon Called in Jan Stafford AT&T Called in H Fluker AT&T Called in Esther Scherer AT&T Called in T Dwayne AT&T Called in Terry Bahner AT&T Called in Jonathan Spangler AT&T Called in Rose Ann Brown AT&T Called in Kelly Morris ELI Called in Lorna Megasi ELI Called in Lori Nelson Midcontinent Called in Scott Simon Premier Called in Lana Messenger Freetel Called in Bob Carias NightFire Called in

CenturyLink Response

Archived System CR SCR073001-3 Detail

 
Title: CEMR Repair process for multiple lines on single report
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR073001-3 Completed
10/9/2001
-   CEMR/
Originator: Stichter, Kathy
Originator Company Name: Eschelon
Owner: Routh, Mark
Director:
CR PM: Routh, Mark

Description Of Change

In CR# 5579345 (a process CR), Eschelon previously asked Qwest to develop a consistent repair process for receiving information about multiple lines for a single customer on a single report, without the use of facsimiles. In some instances, when Eschelon calls Qwest about a repair issue for a multiple-line account, Qwest will require Eschelon to call regarding the main line and then send information regarding the subsequent lines by facsimile. This is time consuming and inefficient for both parties. In other cases, the Qwest representative will take the information over the telephone for all of the lines. The latter approach is more efficient. In any case, a consistent approach is needed so that Eschelon may adequately train its employees in the proper procedure.

In addition to changing the process (per that CR) for calls, Qwest should also modify CEMR to allow CLECs to enter multiple lines (i.e., the number of lines needing repair for the same customer location) on a single request in CEMR.

Status History

Date Action Description
7/30/2001 CR Submitted Received and logged. Status set to New - To be validated 
7/30/2001 Info Sent to CLEC Sent updated CR to Lynne Powers, Kathleen Stichter and Stephen Sheahan 
8/13/2001 LOE Issued T-Shirt Size of Large and option will be provided at the 8/15/01 S-CMP meeting 
8/15/2001 Status Changed Status changed to Reviewed - Under consideration. This request was prioritized in the Aug 01 prioritization process. 
8/20/2001 Info Sent to CLEC Sent updated CR to Lynne Powers, Kathleen Stichter and Stephen Sheahan 

Project Meetings

CenturyLink Response

9/4/01 Mark Routh sent a response to Kathy Sticter stating that CEMR did allow multiple lines (non-design services) in trouble to be reported on the same CEMR ticket.

10/09/01 Mark Routh sent a response to Kathy Sticter stating that POTS circuits (non-design services) are potentially all bundled on one circuit and therefore can be addressed together in one repair ticket. However, an Unbundled Loop (design services) involves taking a current loop and breaking the logical TN and physical equipment and assigning the loop to the CLEC, and tying it to a special frame. Because it is provisioned and identified as a separate entity it can not be grouped together with other Unbundled Loops on a repair ticket.

Archived System CR SCR073001-5 Detail

 
Title: Complete service order detail on FOCs
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR073001-5 Withdrawn
8/15/2001
-   IMA Common/
Originator: Stichter, Kathy
Originator Company Name: Eschelon
Owner: Routh, Mark
Director:
CR PM: Routh, Mark

Description Of Change

When a CLEC sends an LSR with detail, such as feature changes, the CLEC receives a FOC with information requested on the LSR, but no detail regarding what was typed. If the CLEC received complete service order detail, the CLEC could identify discrepancies between the FOC and what was actually typed on the service order. For example, a clerical error could have occurred that changes the information ordered. Because such detail is not on the FOC, these issues are not discovered until the time of cut. Therefore, the problem becomes a customer affecting issue when it could have been avoided altogether.

Status History

Date Action Description
Release Information IMA Release 
12/18/2001 Record Update Changed status from 'Cancelled CLEC' to 'Withdrawn' for database cleanup 

Project Meetings

CLEC-Qwest FOC S&E Section meeting 2:00p.m. – 3:00p.m. Friday, September 28, 2001 Conference Call

INTRODUCTION

The call was conducted in order to clarify the CLECs requirements for the S&E Section on the FOC that Qwest provides to the CLECs

ATTACHMENTS

Attachment A – List of Attendees

MEETING MINUTES

The meeting began with introductions of the attendees. Mark Routh-Qwest welcomed the attendees and stated the meeting was intended to confirm the CLEC’s requirements for the information to be returned on the S&E section of the Firm Order Completion (FOC).

Barbara Campbell – Qwest asked if everyone had a copy of the documentation that was distributed for the meeting.

Barbara Campbell – Qwest read through the Eschelon Change Request. Then she reviewed the sample FOC that was sent to the CLECs

Barbara Campbell – Qwest asked if the sample met the CLECs requirements.

The CLECs all agreed that it did.

Barbara Campbell – Qwest asked if the CLECs would agree to receiving the FOC’s outside of the normal response time due to more information being created.

The CLECs said yes.

The CLECs asked if certain information would be on the FOC.

Barbara Campbell – Qwest said that the S & E section on the FOC would be the same information that they would be getting on their completions notices.

The CLECs asked if they would get another FOC if the information changed.

Barbara Campbell – Qwest said that the FOC process was not changing, just the addition of the S & E section to the FOC, so if they were getting FOCs now when data changed, they would continue to receive them. She asked if this change would be for all products.

The CLECs said yes.

The CLECs asked when this would be implemented.

John Gallegos - Qwest indicated that it could not be done prior release 10.0 (pending the CLEC prioritization of this CR)

RESULTS OF THE DISCUSSION

The CLECs agreed to having the same information on the FOC as they are currently getting on completions notifications.

The CLECs agreed to a possible longer response time for the FOC since more data would be provided.

The CLECs agreed that it would be for all products.

The change would go in to the IMA release 10.0

Attachment A – List of Attendees

First Last Company Attended Mark Routh Qwest In-Person John Gallegos Qwest In-Person Barbara Campbell Qwest In-Person Curt Anderson Qwest In-Person Lynne Powers Eschelon Called in Bonnie Johnson Eschelon Called in Jan Stafford AT&T Called in H Fluker AT&T Called in Esther Scherer AT&T Called in T Dwayne AT&T Called in Terry Bahner AT&T Called in Jonathan Spangler AT&T Called in Rose Ann Brown AT&T Called in Kelly Morris ELI Called in Lorna Megasi ELI Called in Lori Nelson Midcontinent Called in Scott Simon Premier Called in Lana Messenger Freetel Called in Bob Carias NightFire Called in

CenturyLink Response

Archived System CR SCR100201-1 Detail

 
Title: Provide ‘true’ flow through for UNE P Resale LSRs
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR100201-1 Completed
4/22/2002
-   Process & Documentation/ UNE-P Resale
Originator: Stichter, Kathy
Originator Company Name: Eschelon
Owner: Winston, Connie
Director:
CR PM: Stecklein, Lynn

Description Of Change

Currently Qwest identifies UNE-P Resale products as eligible for flow through, however it has been Eschelon’s experience that the partial service order creation does not include service order detail (including but not limited to CFA, USOCs, etc.)

Eschelon continues to provide examples of service order errors that Qwest has made when service orders have not been issued by Qwest SDCs as requested on our LSRs. Qwest’s SDCs use the feature called Cutting and Pasting. CFA information is often incorrect on a service order because augments to our co-locations have different naming conventions. For resale and UNE-P, features including but not limited to CFN (Call Forwarding Number) and PIC (Primary Inter-exchange Carrier) are often omitted completely or essential information pertaining to these features is omitted leaving our end user customer without the functionality requested on our LSR. Since there is no ability to proactively identify Qwest service orders prior to DD (detail available on Service Order Completion only) the customer has been negatively impacted by the time the error is detected. Eschelon asks Qwest to provide TRUE flow through for LSRs submitted.

Status History

Date Action Description
10/2/2001 Info Sent to CLEC Sent updated CR to Kathy Stichter and Stephen Sheahan 
10/18/2001 Discussed at Monthly CMP Meeting CR discussed in CMP meeting - Eschelon did not feel a clarification meeting was necessary. L. Stecklein cancelled the clarification meeting scheduled on 10/22/01. 
10/25/2001 Status Changed Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization 
10/30/2001 Info Received From CLEC Sent e-mail to K Stichter to determine when the examples would be sent to Connie Winston on the Flow Through issue. 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. SCR100201-1 ranked 21 
11/5/2001 Info Received From CLEC Received spreadsheet from B Johnson at Eschelon with examples of flow through errors. Forwarded information to John Gallegos and team for investigation. 
11/8/2001 Record Update After research of flow through errors a clarification meeting will be scheduled with Eschelon to discuss findings. 
11/15/2001 Discussed at Monthly CMP Meeting Discussed in the Nov CMP meeting. The flow through errors are being researched by Mark Coyne's team to determine the type of errors. 
12/5/2001 Record Update The flow through errors examples sent by Eschelon are still being researched. 
1/17/2002 Discussed at Monthly CMP Meeting CR # SCR100201-1 discussed during 10.0 Packaging Presentation 
1/17/2002 Status Changed Status updated to 'In Definition' based upon 10.0 Packaging discussion from CMP meeting 
1/31/2002 Clarification Meeting Held A meeting was held to discuss spreadsheet of errors with Eschelon and to discuss the intent of this CR. 
2/4/2002 Info Requested from CLEC Meeting minutes sent to Eschelon and confirmation requested. 
2/5/2002 Info Received From CLEC Confirmation received from B Johnson re: content of meeting minutes 
2/7/2002 Record Update Qwest researching questions received from Eschelon re: flow through and will provide response; CR updated to reflect that this CR seeks to provide documentation not a system change; status updated to Evaluation 
3/19/2002 Qwest Response Issued Qwest response sent to Eschelon 
3/19/2002 CLEC Requested Info Bonnie forwarded question for investigation re: UNE-P - forwarded to Process for answer. 
3/25/2002 Info Sent to CLEC Response sent to B Johnson re: flow through 
4/2/2002 Info Requested from CLEC Contacted B Johnson to determine if Qwest has answered all questions associated with this CR. Bonnie said that she wanted to check a couple of things and would report at the next CMP meeting. 
4/8/2002 Status Changed Status changed to pending closure 
4/18/2002 Discussed at Monthly CMP Meeting SCR100201-1 discussed at April Systems CMP Monthly meeting; please see Systems CMP Distribution Package April CMP - Attachment E 
4/18/2002 Status Changed Status updated from 'CLEC Test' to 'Completed' per agreement at April Systems CMP Meeting 
4/18/2002 Status Changed Status changed to completed 

Project Meetings

4/18/02 CMP Systems Meeting Bonnie Johnson/Eschelon stated that this was completed.

10/18/01 CMP meeting. The definition of Flow Through = When the order goes through the Service Order Processor error free without human intervention. Eschelon and Allegiance brought up examples associated with the CFA and Circuit ID's that are missing or not the same as on the LSR that was submitted. C. Winston and T. Jacobs will take the lead on this issue. L. Powers will send examples to Qwest (T. Jacobs) of LSRs that are not true Flow Through. Qwest will research and determine what the problem is. L. Powers will also meet with Ken Olson to review a report that shows per CLEC why some orders do not Flow Through.

###

11/01/01 Per Kathy Sticher, examples of Flow Through are now being sent to Kathy Rein in the Mim Center. Susie Wells to contact B. Johnson to forward examples to L. Stecklein.

###

To: "Mark T Coyne" cc:"Connie D Winston" , Michael Buck/Mass/USWEST/US@USWEST

Subject:RE: SCR100201-1 Provide "True" Flow Through for UNE-P Resale LSRs

Mark, Here is the response from Bonnie Johnson re: confirmation of what we discussed on our call. Thanks!

- Forwarded by Lynn Stecklein/GROUPWARE/USWEST/US on 02/05/2002 08:27 AM To:Lynn Stecklein , klsticher@eschelon.com, "Johnson, Bonnie J." cc:krolson@qwest.com

Subject:RE: SCR100201-1 Provide "True" Flow Through for UNE-P Resale LSRs

Hi Lynn, You have captured this correctly to my recollection.

Thanks,

Bonnie

--Original Message-- From:Lynn Stecklein [SMTP:lsteckl@qwest.com] Sent:Monday, February 04, 2002 1:38 PM To:klsticher@eschelon.com; bjjohnson@eschelon.com Cc:krolson@qwest.com Subject:SCR100201-1 Provide "True" Flow Through for UNE-P Resale LSRs

Bonnie and Kathy, I want to thank you again for taking the time to clarify SCR100201 with Ken Olson and myself. We both feel that our discussion clarified the intent of this change request.

I am sending this e-mail to summarize the details of our call on February 2. I would appreciate confirmation that I have captured what we discussed accurately and also what we agreed upon going forward.

In November, Eschelon forwarded a spreadsheet of flow through errors for Qwest to research. These errors were supposed to be examples associated with SCR100201-1. Qwest completed this investigation and determined that these examples were not associated with this change request. Eschelon confirmed today that the spreadsheet was not meant to be associated withthis change request. These errors were associated with flow through issues on 1FB, CCMS services. There is a separate effort underway to address these errors.

In SCR100201-1, Eschelon clarified that they were looking for Qwest to provide the definition of "true flow" . In addition, Eschelon would also like Qwest to address the following:

What is the definition of flow through? When is the Manual Handling Indicator used? Is a partial service order created when the Manual Handling indicator is used? What causes the LSR to drop from FTS flow through? If it drops,what portion of the service order is created? Qwest will also provide an updated matrix of LSR's eligible for Flow Through that include exceptions.

Qwest agreed to provide a response to address these questions.Please let me know as soon as possible if we have captured our discussion accurately.

Thanks,

Lynn Stecklein Ken Olson

CenturyLink Response

3/19/02 Bonnie forwarded the following questions - Is UNE-P pots true flow through if the order is sent correctly. That means no SDC touches the order for any reason. You have it listed on the eligible chart. Send to Process for investigation.

o:bjjohnson@eschelon.com, klstichter@eschelon.com cc:krolson@qwest.com, Shon Higer/COMPLEX/USWEST/US@USWEST, Michael Buck/Mass/USWEST/US@USWEST

Subject: SCR100201-1 Flow Through Response

On January 31, 2002, Eschelon and Qwest held a conference call to discuss SCR100201-1. Eschelon clarified that the purpose of this change request was to further understand the order flow through process. Eschelon requested that Qwest provide additional information on the following items in order to bring this change request to closure.

What is the definition of flow through?

Any flow through eligible LSR that is processed mechanically, and service orders issued in the SOP without any manual intervention, can be considered as "true" flow through.

When is the Manual Handling Indicator used?

There are some complex scenarios within the boundaries of the flow through eligible matrix that must be manually handled. These more complex scenarios are generally identified by function or type of activity and are product specific. Service managers can answer questions about when it is appropriate to mark a LSR for manual handling.

Is a partial service order created when the Manual Handling indicator is used? What is created on the partial service order?

When manual handling is requested, no portion of a service order is created mechanically so it is important to limit the use of the manual indicator to those appropriate situations.

What causes the LSR to drop from FTS flow through? If it drops, what portion of the service order is created?

The service order error conditions may be caused by LSR input errors or Qwest processing issues associated with service order creation. Qwest automatically creates as much of the service order as possible for ALL products that are listed as exceptions on the attached exception table.

Qwest will also provide an updated matrix of LSR's eligible for Flow Through that include exceptions.

See Attached documents

Once you have had an opportunity to review the above information, let me know if you have any questions. I will schedule a follow up meeting if necessary.

Archived System CR 14886 Detail

 
Title: 5 6 2004 REVISED TITLE: Qwest Should Apply Interval Edits in IMA and IMA Flow Through Based on the CLECs ICA Intervals and Not the Qwest Service Interval Guide (SIG). (Orig Title: Pre order Transaction: Due Date availability & standard Intervals)
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

14886 Denied
10/13/2004
-   Other/ Any product where the interval is different in the SIG vs. the ICA’s
Originator: Stichter, Kathy
Originator Company Name: Eschelon
Owner: Winston, Connie
Director:
CR PM: Esquibel-Reed, Peggy

Description Of Change

5/6/2004 - REVISED DESCRIPTION OF CHANGE:

A CLEC should be allowed to submit a request for service using the interval that has been negotiated and is in the CLECs ICA. A CLEC has a contractual right to the intervals it has in its ICA. However, when the CLEC sends a request for service, and the interval the CLEC has negotiated in the CLECs ICA is different from the interval in the Qwest SIG, Qwest changes the CLECs requested due date to the interval in the Qwest SIG. For example, Eschelon has a contractual right to an interval in its ICA for a particular product in some states. That interval is shorter than the interval in the Qwest SIG. Qwest forces Eschelon to use different process when submitting a request for those orders so Eschelon can get the interval that it has a right to in its contract. This process includes marking the LSR for manual handling and actually calling the Qwest center Manager who handles this product to advise Qwest that Eschelon has sent an order with the interval in Eschelon's ICA. Eschelon has a right to the intervals in its ICA and should have to use a different process to get that interval. If Eschelon fails to follow the Qwest imposed process, Qwest changes the due date in Eschelon's ICA to the due date in Qwest's SIG, and uses the CFLAG/PIA field to tell Eschelon it changed the due date it requested. In addition, because this product is flow through eligible, Eschelon's requests are subject to Qwest service order typing errors when the order may have flowed through Qwest's systems because Eschelon has to set the LSR to manual handling. Qwest should change IMA to reflect intervals that a CLEC has in its ICA and not the Qwest SIG.

---------------------------------------------------------------------------------------

ORIGINAL 9/28/2001 CR DESCRIPTION:

Standard intervals should be mechanized in CLEC electronic interfaces based on standard interval guide (SIG).

Status History

Date Action Description
9/28/2001 CR Submitted CR transferred from legacy database to CMP database 
9/28/2001 Clarification Meeting Held CR was clarified with John Gallegos 
10/18/2001 Discussed at Monthly CMP Meeting Presented at Oct CMP meeting 
10/25/2001 Status Changed Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. 14886 ranked 36 
1/17/2002 Status Changed CR # 14886 status updated to 'Presented; CR was not packaged as part of 10.0 and is eligible for ranking in 11.0' 
1/31/2002 Status Changed Status updated from "Presented" to "Pending Withdrawl;" access to the Service Interval Guide is provided via the Qwest website at http://www.qwest.com/wholesale/guides/sig/index.html 
2/13/2002 Record Update LOE updated from Medium to Extra Large 
2/21/2002 Additional Information Qwest submitted this request for Withdrawl in the Feb CMP meeting and Eschelon asked to be the new sponsor of this CR. 
2/21/2002 Discussed at Monthly CMP Meeting 14886 discussed during 'Review of 11.0 Prioritization Eligible CRs' portion of February Systems CMP Monthly meeting; please see Attachment I of February Systems CMP Distribution Package 
2/21/2002 Discussed at Monthly CMP Meeting 14886 discussed during 'CRs to consider for Closure' portion of February Systems CMP Monthly meeting; please see Attachment E of February Systems CMP Distribution Package 
2/22/2002 Status Changed As a result of Eschelon picking this up, the status was changed to Presented. It is eligible for prioritization for IMA 11.0 
3/1/2002 Release Ranking Ranking for Release 11.0 following the February 2002 Systems CMP Meeting. 14886 ranked number 15 
4/1/2002 Release Ranking Ranking for SATE following the March 2002 Systems CMP Meeting. 14886 ranked number 13 
6/7/2002 Status Changed 14886 status updated to 'Pending Prioritization' based upon outcome of IMA 11.0 Packaging Selection vote 
7/18/2002 Discussed at Monthly CMP Meeting 14886 discussed at July Systems CMP Monthly meeting; please see Systems CMP Distribution Package July CMP -- Attachment P 
7/26/2002 Release Ranking Ranking for Release 12.0 following the July 2002 Systems CMP Meeting. 14886 ranked number 38 
10/30/2002 Status Changed 14886 status updated to 'Pending Prioritization' based upon outcome of release 12.0 packaging effort 
12/19/2002 Discussed at Monthly CMP Meeting 14886 discussed at December Systems CMP Monthly meeting; please see Systems CMP Distribution Package December CMP -- Attachment O 
12/31/2002 Release Ranking Ranked #25 for IMA 13.0 Release 
1/23/2003 Release Ranking Ranked #21 for IMA 13.0 after exception request SCR011303-02EX 
3/13/2003 Status Changed Status changed to Pending Prioritization after Packaging of IMA 13.0 
3/20/2003 Discussed at Monthly CMP Meeting 14886 discussed at March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP. 
4/7/2003 Release Ranking 14.0 Prioritization- Ranked #24 out of 53 
4/17/2003 Discussed at Monthly CMP Meeting 14886 discussed at April Systems CMP Monthly meeting; please see April Systems CMP Distribution Package, Attachment N. 
4/28/2003 Release Ranking Rank changed due to Late Adders- Ranked #26 
5/30/2003 Release Ranking Rank changed due to Late Adders- Ranked #27 
7/9/2003 Status Changed Status changed to pending prioritization with release of I MA 14.0 Packaging. 
8/21/2003 Discussed at Monthly CMP Meeting Discussed at the August Systems CMP Monthly Meeting; please see August Systems CMP Distribution Package, Attachment P 
9/2/2003 Release Ranking 15.0 Prioritization- Ranked #42 out of 57 
9/29/2003 Release Ranking 15.0 Revised Prioritization, due to Late Adder - Ranked #43 out of 58 
11/5/2003 Status Changed Status changed to pending prioritization 
1/22/2004 Discussed at Monthly CMP Meeting Discussed at the January Systems CMP Monthly Meeting; please see January Systems CMP Distribution Package, Attachment P 
2/4/2004 Release Ranking 16.0 Prioritization- Ranked #38 out of 50 
2/19/2004 Discussed at Monthly CMP Meeting Discussed at the February Systems CMP Monthly Meeting; please see the February Systems CMP Distribution Package, Attachments H & J 
3/1/2004 Release Ranking IMA 16.0 Revised Prioritization, Late Adder Ranking - #39 out of 51 
3/17/2004 Qwest CR Review Meeting Discussed in association with AI021904-03 Review of Open Systems CMP CRs. 
3/18/2004 Discussed at Monthly CMP Meeting Discussed at the March Systems CMP Monthly Meeting; please see March Systems CMP Distribution Package, Attachment H 
4/9/2004 Info Requested from CLEC Email Sent to Eschelon Requesting CR Revision, As Mentioned in March 17, 2004 Meeting. 
4/9/2004 Info Received From CLEC Email Received from Eschelon Advising the CR Revision is Pending. 
4/22/2004 Discussed at Monthly CMP Meeting Discussed at the April Systems CMP Monthly Meeting; please see April Systems CMP Distribution Package, Attachment I 
5/6/2004 Record Update CR Revision of Title and Description Received from Eschelon 
5/6/2004 Status Changed Ststaus Changed from to Evaluation due to CR Revision 
5/11/2004 Qwest CR Review Meeting Clarification Call Scheduled due to CR Revision 
6/17/2004 Discussed at Monthly CMP Meeting Discussed at the June Systems CMP Monthly Meeting; please see June Systems CMP Distribution Package, Attachment I 
7/22/2004 Discussed at Monthly CMP Meeting Discussed at the July Systems CMP Monthly Meeting; please see July Systems CMP Distribution Package, Attachment I 
8/18/2004 Discussed at Monthly CMP Meeting Discussed at the August Systems CMP Monthly Meeting; please see August Systems CMP Distribution Package, Attachment I 
9/16/2004 Discussed at Monthly CMP Meeting Discussed at the September Systems CMP Monthly Meeting; please see the September Systems CMP Distribution Package, Attachment I 
10/13/2004 Qwest CR Review Meeting Status Changed due to Denial. 
10/20/2004 Discussed at Monthly CMP Meeting Discussed at the October Systems CMP Monthly Meeting; please see the October Systems CMP Distribution Package, Attachment G 

Project Meetings

October 20, 2004 Systems CMP Meeting Discussion: Jill Martain/Qwest stated that this CR is denied due to cost, it is economically not feasible, and has discussed this with Bonnie (Johnson/Eschelon). Jill stated that the current process is for the CLEC to set to manual and the process will change in that if you have a contractual date which is shorter than the SIG, you will set to manual handling and put a remark on the order. Jill noted that it would be a Level 3 Notice. Bonnie Johnson/Eschelon thanked Qwest. [Comment Received from Eschelon: Bonnie Johnson/Eschelon thanked Qwest for the change in process so it is easier to submit the LSR.] The CR is closed in Denied Status.

-- September 16, 2004 Systems CMP Meeting Discussion: Jill Martain/Qwest stated that we are still exploring alternatives and that she will contact Bonnie Johnson/Eschelon to discuss further.

- August 18, 2004 Systems CMP Meeting Discussion: Jill Martain/Qwest stated that this is still being evaluated and that Qwest is looking into the contractual obligations around the 2-day standard interval. Jill noted that Qwest may ask for ad-hoc calls with the CLECs. Jill stated that a status would be provided in September.

July 22, 2004 Systems CMP Meeting Discussion: Connie Winston/Qwest stated that this is being reviewed and the LOE is pending. Jill Martain/Qwest stated that this CR is ‘Other’, not IMA, so it will not be included in the prioritization. This Action Item remains open for status.

-- June 17, 2004 Systems CMP Meeting Discussion: Connie Winston/Qwest stated that this CR remains in Evaluation, Qwest research continues. This Action Item remains open.

-- May 13, 2004 Clarification Meeting CR# 14886 (5-6-2004 REVISED TITLE) Qwest Should Apply Interval Edits in IMA and IMA Flow Through Based on the CLECs ICA Intervals and Not the Qwest SIG

Introduction of Attendees: Bonnie Johnson-Eschelon, John Gallegos-Qwest, Curt Anderson-Qwest, Nicole James-Qwest, Cynthia Gomez-Qwest, Jim Recker-Qwest, Peggy Esquibel-Reed-Qwest

Review Requested (Description of) Change: Peggy Esquibel-Reed-Qwest reviewed the revised CR Title and description:

5/6/2004 - REVISED DESCRIPTION OF CHANGE: A CLEC should be allowed to submit a request for service using the interval that has been negotiated and is in the CLECs ICA. A CLEC has a contractual right to the intervals it has in its ICA. However, when the CLEC sends a request for service, and the interval the CLEC has negotiated in the CLECs ICA is different from the interval in the Qwest SIG, Qwest changes the CLECs requested due date to the interval in the Qwest SIG. For example, Eschelon has a contractual right to an interval in its ICA for a particular product in some states. That interval is shorter than the interval in the Qwest SIG. Qwest forces Eschelon to use different process when submitting a request for those orders so Eschelon can get the interval that it has a right to in its contract. This process includes marking the LSR for manual handling and actually calling the Qwest center Manager who handles this product to advise Qwest that Eschelon has sent an order with the interval in Eschelon's ICA. Eschelon has a right to the intervals in its ICA and should have to use a different process to get that interval. If Eschelon fails to follow the Qwest imposed process, Qwest changes the due date in Eschelon's ICA to the due date in Qwest's SIG, and uses the CFLAG/PIA field to tell Eschelon it changed the due date it requested. In addition, because this product is flow through eligible, Eschelon's requests are subject to Qwest service order typing errors when the order may have flowed through Qwest's systems because Eschelon has to set the LSR to manual handling. Qwest should change IMA to reflect intervals that a CLEC has in its ICA and not the Qwest SIG.

Additional Discussion: Bonnie Johnson-Eschelon stated that Qwest response to the revision was that it would be a new CR. Bonnie stated that it is not a different CR. Bonnie stated that Eschelon realizes that in the 5.01 Release, Qwest was implementing a change to put edits in IMA based on the Service Interval Guide. Bonnie Johnson-Eschelon stated that the challenge for the CLECs is on service orders. Bonnie stated that Qwest flows through its systems and also manually types orders. Bonnie stated that Eschelon is forced to use a different process and noted that it is very manually intensive stated that they should not have to. Bonnie Johnson-Eschelon stated that this request is for any product where the interval is different in the SIG vs. the ICA’s. Bonnie stated that the contract always rules. Cynthia Gomez-Qwest asked Eschelon for examples. Bonnie Johnson-Eschelon stated that for example; the Eschelon contract has a 2-day interval for UBL in the states of CO, OR, & MN. Bonnie stated that when they submit a service order with a 2-day interval, the process is manually intensive. Bonnie stated that this causes them to only use it occasionally. Bonnie stated that the loops are then removed from the flow through process and they have to call the Duluth Center Manager and give them information so that the order can be worked. Cynthia Gomez-Qwest asked if there were more examples and asked for a complete list. Bonnie Johnson-Eschelon stated that some say that standard intervals do not apply. Bonnie stated that all CLECs have negotiated some time, different intervals for different products. Bonnie stated that the first driver is always the ICA, then the SIG, if no standard interval. Bonnie Johnson-Eschelon stated that she needs this change in IMA and in back-end systems. Bonnie Johnson-Eschelon stated that if the manual process is not used, Qwest applies the standard interval and sends a PIA to the CLECs indicating that the standard interval was used. John Gallegos-Qwest asked for the average percentage of orders that fall into this category. Bonnie Johnson-Eschelon stated that all Eschelon orders in CO, OR, & MN. John Gallegos-Qwest asked if this varies by stated and CLEC. Bonnie Johnson-Eschelon responded yes. John Gallegos-Qwest asked if Eschelon had a percentage. Bonnie Johnson-Eschelon stated that they do business in 10 Qwest states and 50% of UBL orders fall-out. (10 Qwest States are AZ, CO, ID, MN, ND, NM, OR, UT, WA, WY) There were no additional questions or comments.

Confirmed Impacted Interfaces: Peggy Esquibel-Reed-Qwest confirmed that this request is for IMA EDI & GUI

Confirmed Impacted Products: Peggy Esquibel-Reed-Qwest asked for the specific product(s) that this Change Request is for. Bonnie Johnson-Eschelon stated that the CR is for UBL 2 & 4-wire

Establish Action Plan & Resolution Time Frame: Peggy Esquibel-Reed-Qwest stated that Qwest will review the revised request and provide a status at the June Systems CMP Meeting. Bonnie Johnson-Eschelon stated okay.

- May 11, 2004 Email Sent to Eschelon: Hi Bonnie, This email is to confirm the Clarification Call details for your CR 14886. They are: DATE: Thursday, May 13, 2004 TIME: 9:00 a.m. MT / 10:00 a.m. CT CALL IN #: 1-877-564-8688, 8571927 Thanks, Peggy Esquibel-Reed Qwest CMP CRPM-Systems

May 10, 2004 Email Sent to Eschelon: Bonnie, I have revised the CR and attached a copy for your records. I am in the process of scheduling the Clarification Call. I have also created an Action Item on the CR to communicate the Revision to the CLEC Community and for Qwest to provide a Status. Peggy Esquibel-Reed Qwest CMP CRPM -- Systems

- May 6, 2004 Email Received from Eschelon: Peggy, It is not a completely different request than the first. To the contrary, I have E-mails Qwest sent to Lynne Powers stating Qwest would not make the change it did to IMA and Qwest did make the change. Eschelon should not have had to submit a CR to correct something Qwest said it would not do. Qwest said the edits it put in place with the SIG would not have the impact to our intervals and it did. Karen Clauson was involved. I would be happy to include Karen if need be.

Please schedule the clarification call without delay. Bonnie J. Johnson Director Carrier Relations Eschelon Telecom, Inc.

- May 6, 2004 Email Sent to Eschelon: Hi Bonnie, In reviewing the revision to 14886, this seems to be a completely different request from the original request. Due to the difference, we would ask that Eschelon submit a new CR for the Interval Edits based on the CLECs ICA Intervals and withdraw the CR of 14886. If you feel that it should be a revision, please send me an email and help me understand why it is a revision and not a separate request. Thank you, Peggy Esquibel-Reed Qwest CMP CRPM - Systems

May 4, 2004 Email Received from Eschelon: Peggy, Revised Title: Qwest should apply interval edits in IMA and IMA flow through based on the CLECs ICA intervals and not the Qwest service interval guide (SIG).

Revised Description of Change: A CLEC should be allowed to submit a request for service using the interval that has been negotiated and is in the CLECs ICA. A CLEC has a contractual right to the intervals it has in its ICA. However, when the CLEC sends a request for service, and the interval the CLEC has negotiated in the CLECs ICA is different from the interval in the Qwest SIG, Qwest changes the CLECs requested due date to the interval in the Qwest SIG. For example, Eschelon has a contractual right to an interval in its ICA for a particular product in some states. That interval is shorter than the interval in the Qwest SIG. Qwest forces Eschelon to use different process when submitting a request for those orders so Eschelon can get the interval that it has a right to in its contract. This process includes marking the LSR for manual handling and actually calling the Qwest center Manager who handles this product to advise Qwest that Eschelon has sent an order with the interval in Eschelon's ICA. Eschelon has a right to the intervals in its ICA and should have to use a different process to get that interval. If Eschelon fails to follow the Qwest imposed process, Qwest changes the due date in Eschelon's ICA to the due date in Qwest's SIG, and uses the CFLAG/PIA field to tell Eschelon it changed the due date it requested. In addition, because this product is flow through eligible, Eschelon's requests are subject to Qwest service order typing errors when the order may have flowed through Qwest's systems because Eschelon has to set the LSR to manual handling. Qwest should change IMA to reflect intervals that a CLEC has in its ICA and not the Qwest SIG.

Bonnie J. Johnson Director Carrier Relations Eschelon Telecom, Inc.

-- April 22, 2004 Systems CMP Meeting Discussion: Bonnie Johnson/Eschelon stated that Eschelon is still looking to see what the intent and business need is for this request. Connie Winston/Qwest stated that it is because with the implementation in a back-end system that does not accommodate for contract differences with the Service Interval Guide. Bonnie Johnson/Eschelon stated that they are battling with those situations. This Action Item remains Open.

April 16, 2004 Email Received from Eschelon: Peggy, I have not forgotten you. I am researching within Eschelon the purpose and what the need and intent of the CR was. I should have a response to you next week. Have a great weekend!! Bonnie J. Johnson Director Carrier Relations Eschelon Telecom, Inc.

-- April 9, 2004 Email Received from Eschelon: Hi Peggy, I am still checking with a couple of folks here at Eschelon to determine what the needs are to revise the CR. I should have some response for you soon. Thanks, Bonnie J. Johnson Director Carrier Relations Eschelon Telecom, Inc.

- April 9, 2004 Email Sent to Eschelon, Bonnie Johnson & Kathy Stichter: Hi Bonnie and Kathy, RE: 14886 Pre-order Transaction: Due Date availability & standard Intervals This email is a follow-up to the discussion that took place for this Systems CMP CR 14886, at the March 17th Review of Open Systems CMP CRs. During that meeting, Eschelon stated that a revision to the CR would be made and that another Clarification Meeting would be helpful. Do you have the revision ready to provide to me at Peggy.Esquibel-Reed@qwest.com ? Once the revision has been received, I will schedule the Clarification call. In the email that contains the revised CR, if you would also provide me with several options for that Clarification Call, I would greatly appreciate it. I have attached a current copy of the referenced CR. Thanks much, Peggy Esquibel-reed Qwest CMP CRPM - Systems

- March 17, 2004 Review of CR’s (AI021904-03 Review of Open Systems CMP CRs: March 18, 2004 Systems CMP Meeting Discussion: Bonnie Johnson/Eschelon stated that the intent of this request was to put edits in place that based on the Standard Interval Guide, has something to prevent from asking for a specific due date. Bonnie stated that the question is do you see a value in this. Bonnie stated that this CR does have a large LOE and that is probably one of the reasons why it has been ranked low in the prioritizations. John Berard/Covad asked if this request was only for IMA GUI. Bonnie Johnson/Eschelon stated that it is for IMA Common. Bonnie Johnson/Eschelon stated that the value needs to be evaluated and asked that the LOE be re-evaluated to see if it could possibly be lower due to other functionality that has been previously deployed. Bonnie Johnson/Eschelon stated that there appears to be some interest in this request. John Gallegos/Qwest stated that Qwest could re-evaluate the LOE but he needs more clarity and understanding of the request. Bonnie Johnson/Eschelon stated that she would revise the CR to add more detail of the request. John Gallegos/Qwest stated that once he reviews the revision, he would advise if an additional Clarification Call is needed. Phyllis Burt/AT&T asked Bonnie for clarification of the request. Bonnie Johnson/Eschelon stated that Eschelon is requesting an edit, in IMA, to enforce the asking of the correct interval. Bonnie stated that she was advised that they need to input the standard interval, then they need to request an expedite of the due date. Bonnie stated that she received a notice that indicated that the interval for Centrex was going to be less. John Gallegos/Qwest asked Eschelon to also please verify the Product scope for this request. Bonnie Johnson/Eschelon stated that she would confirm if it should be for All Products. Bonnie Johnson/Eschelon stated that another Clarification Call would be a good idea. Peggy Esquibel-Reed/Qwest stated that once the CR revision has been received, an additional Clarification Call would be scheduled. There were no additional questions or comments on this CR. This CR will be revised and re-evaluated.

February 19, 2004 Systems CMP Meeting Discussion Excerpt (Attachments H & J): Judy Schultz/Qwest stated that she wanted to provide an update to the funding approval process that was discussed in the January CMP Systems Meeting. Judy referred everyone to Attachment J in the Distribution Package. She stated that all CRs are being re-evaluated and must be approved. Judy said that CRs could not be scheduled without approval. Judy stated that the CRs with an impact to the IMA interface would follow the existing prioritization process. Judy noted that the funding for IMA 15.0 and IMA 16.0 has been approved, as well as funding to begin work on IMA 17.0.

January Systems CMP Meeting Discussion: There were no comments or questions for this CR.

-- 8/21/03 CMP Systems Meeting Kim Isaacs/Eschelon stated that she would like an IMA edit. Liz Balvin/MCI stated that this CR was a nice to have. Connie Winston/Qwest stated that an edit would require a new CR be submitted.

March 20, 2003 Systems CMP Meeting Discussion Regarding IMA 14.0 Prioritization: Bonnie Johnson/Eschelon stated that this is not a high priority for Eschelon.

December 19, 2002 Systems CMP Meeting Discussion: Kit Thomte/Qwest reviewed the prioritization process as defined in the CMP document. She noted that December 30th, 2002 is the due date for submitted votes. Judy Schultz/Qwest noted that the due date would be included in the instructions in the notification that goes out with the ballot. Kit Thomte/Qwest reviewed the sample prioritization form. Connie Winston/Qwest said that when you send in a LSR this would do a validation against a standard due date. Qwest initiated this CR for pre-order and withdrew the CR. Eschelon picked it up. Liz Balvin/WorldCom stated that this is a nice to have and it sounds like you want to know ahead of time that you are going to request the right due date. Our folks know what the intervals are for whatever products they support. Bonnie Johnson/Eschelon said she thinks it’s a nice to have.

CenturyLink Response

Qwest Response

October 13, 2004

Kathy Stichter Bonnie Johnson Eschelon

This letter is in response to CLEC Change Request number 14886 - Qwest Should Apply Interval Edits in IMA and IMA Flow-Through Based on the CLECs ICA Intervals and Not the Qwest Service Interval Guide (SIG).

CR Description: 5/6/2004 - REVISED DESCRIPTION OF CHANGE: A CLEC should be allowed to submit a request for service using the interval that has been negotiated and is in the CLECs ICA. A CLEC has a contractual right to the intervals it has in its ICA. However, when the CLEC sends a request for service, and the interval the CLEC has negotiated in the CLECs ICA is different from the interval in the Qwest SIG, Qwest changes the CLECs requested due date to the interval in the Qwest SIG. For example, Eschelon has a contractual right to an interval in its ICA for a particular product in some states. That interval is shorter than the interval in the Qwest SIG. Qwest forces Eschelon to use different process when submitting a request for those orders so Eschelon can get the interval that it has a right to in its contract. This process includes marking the LSR for manual handling and actually calling the Qwest center Manager who handles this product to advise Qwest that Eschelon has sent an order with the interval in Eschelon's ICA. Eschelon has a right to the intervals in its ICA and should have to use a different process to get that interval. If Eschelon fails to follow the Qwest imposed process, Qwest changes the due date in Eschelon's ICA to the due date in Qwest's SIG, and uses the CFLAG/PIA field to tell Eschelon it changed the due date it requested. In addition, because this product is flow through eligible, Eschelon's requests are subject to Qwest service order typing errors when the order may have flowed through Qwest's systems because Eschelon has to set the LSR to manual handling. Qwest should change IMA to reflect intervals that a CLEC has in its ICA and not the Qwest SIG.

ORIGINAL 9/28/2001 CR DESCRIPTION: Standard intervals should be mechanized in CLEC electronic interfaces based on the standard interval guide (SIG).

History: A clarification meeting, due to the CR revision, was held on May 13, 2004 with Eschelon and Qwest representation. At this meeting, it was determined that the request was specifically for the states of Colorado, Oregon, and Minnesota and that there are variations based on each individual Interconnection Agreement, State, and by each CLEC.

Qwest Response Qwest is meeting the CLECs intervals based upon our contractual agreements. At times, manual handling is the most efficient way to meet our requirements and this would be one of those cases. We have determined that this requested change is economically not feasible as it would require system costs and significant investigation. The estimated costs to implement this CR are $74,520.

Additionally, Qwest understands that Eschelon is the only CLEC calling Qwest to have the 2-day due date honored and the Eschelon call can be discontinued. Going forward, Eschelon only has to mark the LSR for manual handling and Qwest will clarify the due date process in the PCAT.

Sincerely,

Qwest

Archived System CR SCR100501-1 Detail

 
Title: Update documentation in order to provide the explanation of the data found in the Raw Loop Data Query.
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR100501-1 Completed
12/13/2001
-   Process & Documentation/ RLDQ UNE
Originator: Stichter, Kathy
Originator Company Name: Eschelon
Owner: Jones, Lane
Director:
CR PM: Stecklein, Lynn

Description Of Change

This is a request by Eschelon to provide some documentation that describes/defines the data contained in the Raw Loop Data Query.

Status History

Date Action Description
8/30/2001 Clarification Meeting Held Conducted a call with Eschelon to understand the requirements. 
9/5/2001 Clarification Meeting Scheduled Meeting scheduled with Eschelon to discuss this issue. Jeff Thompson (Qwest) to be on the call. 
9/5/2001 Clarification Meeting Held Results of call indicated that no comprehensive Qwest documentation is readily available to address data field definitions. Mark Routh to investigate the possibility of establishing a "Raw Loop Data Query" Mailbox for inquiries from the CLECs. 
9/6/2001 Info Sent to CLEC Mark Routh sent message for Kathy Stichter concerning the technical resource that might be available to Eschelon for access to this industry standard data. 
9/12/2001 Info Received From CLEC Kathy Stichter will contact Jerry Boeke to find out if Eschelon has a Technical Vendor that can provide the information for them. 
9/19/2001 Discussed at Monthly CMP Meeting Jeff Thompson agreed that Qwest will update the Documentation to describe the data that is contained in the fields on the RLD tool. 
10/5/2001 Info Sent to CLEC Qwest provided the references to the updated IMA Users Guide and "I Charts" . 
10/5/2001 CR Submitted SCR100501-1 was opened to work this issue. 
10/9/2001 Info Received From CLEC Eschelon indicated that this wasn't enough information for them to understand the data that is contained in the fields within the Raw Loop Data Query tool. 
10/23/2001 Record Update The following Action Items will be incorporated into this CR: 328, 352, and 354. 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. SCR100501-1 ranked 20 
11/29/2001 Discussed at Monthly CMP Meeting RLDQ tool was presented in the Nov CMP meeting; see meeting notes 
11/29/2001 Status Changed This item will be put in CLEC Test status 
12/13/2001 Discussed at Monthly CMP Meeting At the monthly systems CMP meeting (12/13/01) the CLEC community agreed that this CR is closed. 
1/17/2002 Discussed at Monthly CMP Meeting CR # SCR100501-1 discussed during 10.0 Packaging Presentation; CLECs reconfirmed that CR is closed 

Project Meetings

11/29/01 - The RLDQ tool was presented in the Nov CMP meeting. Lynn Powers asked specifically about H88. Lane pointed out it exists on pg 19 of the users guide. A person intepreting this data would need to have a network background to interpret this data. All acronyms are industry standard acronyms. Karen asked if there is a key that they can use. Lane noted that there is not key in existence at this time. Jeff noted that these are standard enfineering terms. The job aide was written for people who use the RLDQ through IMA. Lane noted that the wire center piece will be added in the next week or two and will be on the Wholesale website in the next few weeks. This item will be put in CLEC Test status.

11/18/01 - Action Item was discussed in Oct CMP meeting. K. Stichter, Eschelon, Advised that the RLD references provided to them on 10/05 did not provide them with enough information about the data in the fields. Eschelon is looking for a 'cheat sheet' and/or additional information related to the Loop information makeup (i.e. Pair Gain System, etc). J. Thompson advised that the RLD Guide/Tool was just distributed and would like to hold a joint review of the Document/Guide to determine if modifications are necessary to fit the need. The review will be done at the Nov CMP meeting. A handout will be provided for the review that will include examples. K Stichter will also e-mail examples from Eschelon repair.

10/10/01 - A meeting was held with Kathy Stichter and Stephen Sheahan to determine if the information met Eschelon's expectations. Per Kathy, Eschelon needs additional information associated with the loop information makeup (i.e. Pair Gain System etc.). Qwest to determine if this type of information can be provided.

09/05/01 - .Meeting scheduled with Eschelon to discuss this issue. Jeff Thompson (Qwest) to be on the call. Results of call indicated that no comprehensive Qwest documentation is readily available to address data field definitions. Mark Routh to investigate the possibility of establishing a "Raw Loop Data Query" Mailbox for inquiries from the CLECs.

8/30/01 - Conducted a call with Eschelon to understand the requirements. Qwest will set up an e-mail box to receive and respond to any

07/31/01 -: From: Walberg, Loren Sent: Tuesday, July 31, 2001 5:23 PM To: Stichter, Kathleen L. Cc: Clauson, Karen L.; Powers, F. Lynne Subject: RE: RLD Tool Questions and response

There may be a misunderstanding with regard to the request on the last bulleted item listed and contrary to Steve Sheahan's referral to the RLD data dictionary this morning....(I had already reviewed that .pdf file and did not find it useful) What I am looking for is further explanation, not of the data fields that are produced by the RLD tool, rather an explanation of the data that could potentially populate those fields. For example, I have attached an RLD example for our employee Rick Lewis. See attachment.

One field, is called "F1MAKEUPDESC" I understand that field to be a description of the F1 facilities make-up. However the data in that field is: "26NL 0.100kf 24NL 11.707kf 26NL 0.675kf 24NL 0.340kf "

I interpret this data to be 26 gauge non-loaded at 0.100 kilo feet, 24 gauge non-loaded at 11.707 kilo feet, 26 gauge non-loaded at 0.675 kilo feet and 24 gauge non-loaded at 0.340 kilo feet. I think this is a pretty good guess. However there are other fields where I cannot guess at the meaning of the abbreviations and acronyms in the field to make use of the data. For example: Field name: "F1LOADCOILTYPE" Field data: "H88"

What is H88?

Also, does it make a difference that I am not accessing RLD Tool through IMA, but rather through my digital certificate?

CenturyLink Response

11/29/01 - The RLDQ tool was presented in the Nov CMP meeting. Lynn Powers asked specifically about H88. Lane pointed out it exists on pg 19 of the users guide. A person intepreting this data would need to have a network background to interpret this data. All acronyms are industry standard acronyms. Karen asked if there is a key that they can use. Lane noted that there is not key in existence at this time. Jeff noted that these are standard enfineering terms. The job aide was written for people who use the RLDQ through IMA. Lane noted that the wire center piece will be added in the next week or two and will be on the Wholesale website in the next few weeks. This item will be put in CLEC Test status.

Archived System CR SCR112101-2 Detail

 
Title: Eschelon is requesting Qwest to investigate options for modifying the WFA (Work Force Administrator) system to address multiple credits for curcuit outages per trouble report.
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR112101-2 Denied
3/15/2002
-   Other/ Unbundled loop, UNE-P, Resale
Originator: Powers, Lynne
Originator Company Name: Eschelon
Owner: Thompson, Jeff
Director:
CR PM: Stecklein, Lynn

Description Of Change

Qwest currently uses the WFA system for all trouble reporting. It was designed to only handle a single circuit per trouble report. Consequently, credits for circuit outages are limited to a single circuit per trouble report. The CLEC may request individual tickets to ensure credit, as appropriate, for each affected curcuit. Automation of this process within WFA is requested Additional detail regarding this request can be found in Product & Process CR #5579345.

Status History

Date Action Description
11/28/2001 Record Update Contacted Cheryl McMahon to determine Business Process Representative for clarification meeting. 
11/28/2001 Info Sent to CLEC Contacted Eschelon to schedule clarification and also sent a copy of the CR to K Stichter. 
12/3/2001 Clarification Meeting Held Clarification meeting was held. See meeting minutes in project meetings. 
1/17/2002 Discussed at Monthly CMP Meeting CR # SCR112101-2 discussed at January CMP meeting during 'CRs with Outstanding Action Items' (Attachment E of Distribution Package) 
2/7/2002 Record Update Received verbal high level OOM from Telecordia -Qwest requested OOM in writing. 
2/7/2002 Status Changed Status changed to Evaluation 
2/14/2002 Info Requested from CLEC Contact CLEC to request Clarification Call availbility 
2/21/2002 Discussed at Monthly CMP Meeting SCR112101-2 and remaining action items discussed at February Systems CMP Meeting; Qwest (Jeff Thompson) indicated that level of effort provided by Telecordia was very high; CLECs requested a formal response to CR 
3/15/2002 Status Changed Status updated from 'Evaluation' to 'Denied' -- please see Qwest response 
3/21/2002 Discussed at Monthly CMP Meeting SCR112101-2 discussed March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP - Attachment E; denial of CR presented for discussion at March Systems CMP Monthly meeting; no dissent by attendees 

Project Meetings

3/21/02 CMP Systems meeting Mike Buck/Qwest - As Qwest indicated during discussion of this CR last month, the effort for this CR is large and Qwesst is denying the request. The official response is included in the response section of the change request.

12/3/01 - Clarification Meeting

Attendees: Kathy Stichter, Darlene Barber, Lynn Stecklein Adhoc meetings held with Cheryl Mcmahon and Bud Witte

The purpose of this meeting was to clarify the above request. Eschelon is requesting Qwest to investigate option for modifying the WFA system to address multiple credits for circuit outages per trouble report. Darlene Barber had not questions regarding the request. She did confirm that WFA is a Telecordia system. Also WFA cannot read the narritive. WFA can only give credit on 1 circuit not multiple circuits. This request is related to a Product and Process CR5579345. The Qwest response confirmed that multiple trouble reports will be accepted on a single repair ticket if all 3 of the following criteria was met: Same exact trouble on each line, same end user location and same customer name for end user. However, Qwest uses WFA for all trouble reporting. It was designed to only handle a single circuit per trouble report. Credits for circuit outages are limited to a signal circuit per trouble report. Kathy also advised this request was for designed services.

CenturyLink Response

The clarification meeting was held on 12/03/01 and the LOE has been determined to be large.

=========================================

March 15, 2002 Qwest Response

The email below constitutes a deny response for CMP request SCR112101-2 to have WFA-C capable of having multiple circuit troubles entered on a single ticket with all circuits as candidates for credit.

Qwest has obtained vendor estimates to have multiple circuits be applied against a single trouble ticket. This effort was estimated at $1-10M by Telcordia. At this time, Qwest does not intend to proceed with this effort for a mechanized solution, but wishes to re-emphasis that three options exist to accomplish the same goal.

There are three options available to the CLEC if the CLEC trouble includes multiple circuits. The options are as follows:

1) The RSA will put multiple circuits on a single ticket at the CLEC's request. This is dependent on the number of circuits allowed on a single ticket and must apply to the same customer at the same location reporting the same trouble. It should be noted that the CLEC must stay on the line while the ticket is created. Only the lead circuit will be a candidate for a credit. To obtain credit on each circuit the CLEC must contact their account representative.

2) The RSA will issue a separate ticket per trouble, at the CLEC's request, and each circuit is a candidate for credit.

3) The RSA may create a primary ticket, at the CLEC's request, and fax in the remaining circuits. The RSA will create a separate ticket for each circuit and each circuit will be a candidate for credit.

Jon Ecklund

Archived System CR SCR091302-01 Detail

 
Title: IMA flow through for Centrex 21 orders
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR091302-01 Completed
9/18/2003
2550 - 4250  IMA Common/13 All Centrex 21
Originator: Stichter, Kathy
Originator Company Name: Eschelon
Owner: Winston, Connie
Director:
CR PM:

Description Of Change

Eschelon asks Qwest to implement an IMA change to allow flow through of all Centrex 21 orders under all product lines. Manual handling of orders is expensive and is causing errors. Errors on orders affect customers' service up to and including full service outages.

Status History

Date Action Description
1/1/1900 Communicator Issued  
9/13/2002 CR Submitted  
9/13/2002 CR Acknowledged  
9/23/2002 Clarification Meeting Scheduled Meeting is scheduled for 9/25/02 at 12:30 - 1:30 Mountain 
9/24/2002 Additional Information WorldCom asked to delay the Clarification meeting in order to combine it with the clarification meeting for SCR092002-01 
10/3/2002 Clarification Meeting Held Clarification was held with WorldCom. See Meeting Minutes in Project Meeting section. 
10/3/2002 Status Changed Status set to Clarification 
10/14/2002 Additional Information Received email from Liz Balvin, concurring with description & expected deliverable change. 
10/17/2002 Discussed at Monthly CMP Meeting SCR091302-01 discussed at October Systems CMP Monthly meeting; please see Systems CMP Distribution Package October CMP -- Attachment B 
11/21/2002 Discussed at Monthly CMP Meeting SCR091302-01 discussed at November Systems CMP Monthly meeting; please see Systems CMP Distribution Package November CMP -- Attachment I 
12/19/2002 Discussed at Monthly CMP Meeting SCR091302-01 discussed at December Systems CMP Monthly meeting; please see Systems CMP Distribution Package December CMP -- Attachment O 
12/31/2002 Release Ranking Ranked #15 for IMA 13.0 Release 
1/23/2003 Release Ranking Ranked #8 for IMA 13.0 after exception request SCR011303-02EX 
3/13/2003 Release Ranking Packaged for IMA 13.0 Release 
3/20/2003 Discussed at Monthly CMP Meeting SCR091302-01 discussed at March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP - Attachment N.. 
4/17/2003 Discussed at Monthly CMP Meeting SCR091302-01 discussed at April Systems CMP Monthly meeting; please see April Systems CMP Distribution Package, Attachment P. 
7/9/2003 Status Changed Status changed to Development with Commitment of 14.0 on April 22, 2003 
7/17/2003 Discussed at Monthly CMP Meeting Discussed at July Systems CMP Monthly Meeting; please see July Systems CMP Distribution Package -- Attachment L 
8/4/2003 Status Changed Status Changed to CLEC Test Due To 8/4/03 Deployment. 
8/21/2003 Discussed at Monthly CMP Meeting Discussed at August CMP Monthly Meeting - See August Systems CMP Distribution Package - Attachment G 
9/18/2003 Discussed at Monthly CMP Meeting Discussed at the September Systems CMP Monthly Meeting; please see September Systems CMP Distribution Package, Attachment G. 
10/16/2003 Discussed at Monthly CMP Meeting Discussed at the October Systems CMP Monthly Meeting; please see October Systems CMP Distribution Package, Attachment G 
11/20/2003 Discussed at Monthly CMP Meeting Discussed at the November Systems CMP Monthly Meeting; please see November Systems CMP Distribution Package, Attachment G 
12/17/2003 Discussed at Monthly CMP Meeting Discussed at the December Systems CMP Monthly Meeting; please see December Systems CMP Distribution Package, Attachment G. 
12/16/2008 CR Submitted CR Submitted 
12/16/2008 CR Acknowledged CR Acknowledged 
12/17/2008 Discussed at Monthly CMP Meeting Discussed in the December Systems CMP Meeting - See Attachment F in the Distribution Package 
12/17/2008 Status Changed Status changed to Presented 
12/31/2008 Communicator Issued SYST.12.31.08.F.05938.CTG_IntrfceNewApplmpPl 
1/21/2009 Communicator Issued SYST.01.21.09.F.05987.CTG_NewApp_Imp_Plan_Resp 
4/6/2009 Status Changed Status changed to Deferred 
4/7/2009 Communicator Issued SYST.04.07.09.F.06245.CTG_NewApp_On_Hold 
11/10/2010 Status Changed Status changed from Deferred to Development (As of 11/10/10 REVISED Name change and reestablish implementation timeline)  
11/17/2010 Discussed at Monthly CMP Meeting Discussed at the November Systems CMP Meeting - See Attachment I and L in the Distribution Package 
12/15/2010 Discussed at Monthly CMP Meeting Discussed at the December Systems CMP Meeting - See Attachment M in the Distribution Package 
12/17/2010 Communicator Issued See notice number SYST.MEDI.12.17.10.F.08642.MTG_IntrfceNewApptoApp 
1/6/2011 Communicator Issued See notice number CMPR.MEET.01.06.11.F.08716.ChgDateMTG_Prelim_ImpRevw 
1/13/2011 Communicator Issued See notice number SYST.MEDI.01.13.11.F.08738.RespCommnts_MTG_Intrfce 
1/19/2011 Discussed at Monthly CMP Meeting Discussed at Monthy CMP Meeting 
1/20/2011 Communicator Issued See notice number SYST.MEDI.01.20.11.F.08765.AddlCmmntsCycleMTG_Intrfc 
2/9/2011 Communicator Issued See notice number SYST.MEDI.02.09.11.F.08824.DelaydRespCommtsMTG_Rel1 
2/16/2011 Discussed at Monthly CMP Meeting Discussed at the February Systems CMP Meeting - See Attachment N in the Distribution Package 
3/7/2011 Record Update 03/07/11 REVISION Description update to remove wording indicating MTG is a replacement.  
3/10/2011 Communicator Issued See Notice number SYST.MEDI.03.10.11.F.08921.Resp_Addl_Commnts_MTG 
3/16/2011 Discussed at Monthly CMP Meeting Discussed at the March System CMP Meeting - See Attachment D in the Distribution Package 
3/18/2011 Info Received From CLEC Integra Reply to Qwest response to CLEC comments on notification SYST.MEDI.03.10.11.F.08921.Resp_Addl_Commnts_MTG. See System Document Review Archive for initial notice SYST.MEDI.01.20.11.F.08765.AddlCmmntsCycleMTG_Intrfc available at http://www.qwest.com/wholesale/cmp/review_archivesystemjan11.html where Integra Reply is posted. 
4/20/2011 Discussed at Monthly CMP Meeting Discussed at the April System CMP Meeting - See Attachment I in the Distribution Package 
5/18/2011 Discussed at Monthly CMP Meeting Discussed at the May System CMP Meeting - See Attachment I in the Distribution Package 
5/20/2011 Communicator Issued See notice number SYST.MEDI.05.20.11.F.09159.Followup_Resp_Commnts_MTG 
5/20/2011 Communicator Issued See notice number CMPR.MEET.05.20.11.F.09163.MTG_MultipleAdHocMeetings 
5/23/2011 Info Received From CLEC Info rec'd from Integra assocated with notification SYST.MEDI.05.20.11.F.09159.Followup_Resp_Commnts_MTG and MTG matrix 
5/26/2011 Info Received From CLEC Info rec'd from Integra assocated with notification SYST.MEDI.05.20.11.F.09159.Followup_Resp_Commnts_MTG and MTG matrix 
5/27/2011 Info Sent to CLEC Info sent to CLECs - related to notification SYST.MEDI.05.20.11.F.09159.Followup_Resp_Commnts_MTG and MTG matrix 
6/1/2011 Info Received From CLEC Info rec'd from Integra assocated with notification SYST.MEDI.05.20.11.F.09159.Followup_Resp_Commnts_MTG and MTG matrix 
6/7/2011 Info Received From CLEC Info rec'd from Integra assocated with Ad hoc meeting on 6/8/11 and QPortal functionality 
6/8/2011 General Meeting Held Ad Hoc meeting held - technical review. 
6/9/2011 Info Received From CLEC Info rec'd from Integra assocated with Ad hoc meeting held on 6/8/11 
6/10/2011 Communicator Issued See Notice number CMPR.MEET.06.10.11.F.09219.MTG_AdHocMtgsCancelled 
6/14/2011 CLEC Requested Info Info rec'd from Integra - Requst for OSS materials for the CMP meeting 
6/14/2011 Info Sent to CLEC Reply sent ot CLECs that included MTG Timeline and Timeline posted to Wholesale calendar 
6/14/2011 Info Received From CLEC Info received from Integra and PAETEC - See Wholesale calendar for June CMP meeting for content 
6/15/2011 Discussed at Monthly CMP Meeting Discussed at the June System CMP Meeting - See Attachment I in the Distribution Package 
6/17/2011 Record Update 06/17/11 REVISION Description update received from originator to show the CEMR application will be the GUI 
6/30/2011 Communicator Issued See Notice number SYST.MEDI.06.30.11.F.09283.Followup_Resp_Commnts_MTG 
7/20/2011 Discussed at Monthly CMP Meeting Discussed at the July System CMP Meeting - See Attachment I in the Distribution Package 
8/5/2011 Communicator Issued See notice number SYST.MEDI.08.05.11.F.09382.MTG1.0_Drft_Tech_Specs 
8/10/2011 Communicator Issued See Notice number CMPR.MEET.08.10.11.F.09384.MTG_Addl_WalkthruOpprtnty 
8/17/2011 Discussed at Monthly CMP Meeting Discussed at the August System CMP Meeting - See Attachment I and N in the Distribution Package 
8/17/2011 General Meeting Held Additional MTG Technical Walkthrough conducted following CMP monthly meeting. See Wholesale calendar for walkthrough information  
8/24/2011 General Meeting Held MTG Technical Walkthrough conducted - See Wholesale calendar for walkthrough information  
8/26/2011 Communicator Issued See Notice number SYST.MEDI.08.26.11.F.09440.MTG1.0_DrftTechSpecsCORR 
9/2/2011 Communicator Issued See notice number SYST.MEDI.09.02.11.F.09452.MTG1.0_FinalTechSpecs 
9/21/2011 Discussed at Monthly CMP Meeting Discussed at the September System CMP Meeting - See Attachment I in the Distribution Package 
10/19/2011 Discussed at Monthly CMP Meeting Discussed at the October System CMP Meeting 
11/14/2011 Communicator Issued See notice number SYST.CEMR.11.14.11.F.09687.CEMR_Rel_Feb2012DraftDocs 
11/16/2011 Discussed at Monthly CMP Meeting Discussed at the November System CMP Meeting - See Attachment I in the Distribution Package 
11/21/2011 Communicator Issued See notice number SYST.CEMR.11.21.11.F.09707.CEMR_Feb2012_Fnl_RelNotes 
11/23/2011 Communicator Issued See notice number SYST.MEDI.11.23.11.F.09720.MTG_R1_FinalNoticeREVISED 
12/14/2011 Discussed at Monthly CMP Meeting Discussed at the December System CMP Meeting - See Attachment N in the Distribution Package 
1/12/2012 Communicator Issued See notice number WEBS.ANNC.01.12.12.F.09837.Update_OSS_Webpages_MTG 
1/13/2012 Communicator Issued See notice number SYST.MEDI.01.13.12.F.09842.MTG_R1_ImplemntationGuide 
1/13/2012 Communicator Issued See notice number SYST.CEMR.01.13.12.F.09843.CEMR_MTG_OnlineHelp 
1/18/2012 Discussed at Monthly CMP Meeting Discussed at the January System CMP Meeting - See Attachment N in the Product/Process Distribution Package and Attachment K of the Systems Distribution Package 
2/1/2012 Communicator Issued See notice number SYST.OTHR.02.01.12.F.09918.OSS_HrsAvailabilityUpdate 
2/13/2012 Status Changed Status changed to CLEC Test 
2/15/2012 Discussed at Monthly CMP Meeting Discussed at the February System CMP Meeting - See Attachments I and N of the Systems Distribution Package 
2/15/2012 Communicator Issued See SYST.CEMR.02.13.12.F.09919.MTG_CEMR-MTGDeplymt_Doc  
3/21/2012 Discussed at Monthly CMP Meeting Discussed at the March System CMP Meeting - See Attachment G in the Distribution Package 
4/18/2012 Discussed at Monthly CMP Meeting Discussed at April Sys CMP Meeting – See Attachment G in the Distribution package 
5/16/2012 Discussed at Monthly CMP Meeting Discussed at May Sys CMP Meeting – See Attachment G in the Distribution package 
6/20/2012 Discussed at Monthly CMP Meeting Discussed at June Sys CMP Meeting – See Attachment G in the Distribution package 
7/18/2012 Discussed at Monthly CMP Meeting Discussed at July Sys CMP Meeting – See Attachment G in the Distribution package 
8/10/2012 Communicator Issued See notice number SYST.MEDI.07.31.12.F.10350.MTG_CEMR-MTG_Available_MN  
8/15/2012 Discussed at Monthly CMP Meeting Discussed at AugustSys CMP Meeting – See Attachment G in the Distribution package 
9/19/2012 Discussed at Monthly CMP Meeting Discussed at the September Systems CMP Meeting - See Attachment G of the Distribution package. 
10/17/2012 Discussed at Monthly CMP Meeting Discussed at the October Systems CMP Meeting - See Attachment G in the Distribution Package 
11/14/2012 Discussed at Monthly CMP Meeting Discussed at the November Systems CMP Meeting - See Attachment G in the Distribution Package 
12/12/2012 Discussed at Monthly CMP Meeting Discussed at the December Systems CMP Meeting - See Attachment G in the Distribution Package 
1/16/2013 Discussed at Monthly CMP Meeting Discussed at the January Systems CMP Meeting - See Attachment G in the Distribution Package 
2/20/2013 Discussed at Monthly CMP Meeting Discussed at the February Systems CMP Meeting - See Attachment G in the Distribution Package. 
3/20/2013 Status Changed Status Changed to Completed. 
3/20/2013 Discussed at Monthly CMP Meeting Discussed at the March Systems CMP Meeting - See Attachment G in the Distribution Package. 

Project Meetings

9/18/03 CMP Systems Meeting Connie Winston/Qwest stated we have analyzed Centrex 21 orders and found a 60 to 65% flow through rate. Connie said that there are two changes pending in October and November that will improve flow through. Bonnie Johnson/Eschelon stated that she would like to leave this open for another month to determine if there is improvement. Bonnie also asked what Qwest’s expectation for success was. Connie Winston/Qwest stated that Qwest strives to keep at the benchmark and we pro-actively pursue to increase that benchmark to the 90’s. Connie Winston/Qwest stated that this request is working as requested and suggested that we close the CR and open an action item. Bonnie Johnson/Eschelon agreed that the CR can be closed and an action item open. Kim Isaacs/Eschelon said that there is trouble ticket open associated with the PSON being stripped and haven’t received an update. Connie Winston/Qwest said that the ticket number is 231038 and is associated with #19 in the package (SCR093002-04). Bonnie Johnson/Eschelon asked if the ticket was only associated with Centrex orders. Kim Isaacs/Eschelon said yes. Connie Winston/Qwest said that the trouble ticket is associated with another CR. Bonnie Johnson/Eschelon said that this CR could be closed.

8/21/03 CMP Systems Meeting Bonnie Johnson/Eschelon said that she was not sure if Eschelon can measure this and asked if Qwest had done any analysis to determine how many of these orders flow through untouched. Connie Winston/Qwest said that analysis has been done and some patches have been done. Connie stated that she does not have the percentages. Bonnie Johnson/Eschelon asked if Qwest could provide the data next month. Connie Winston/Qwest stated that we will provide the information in the September meeting.

7/18/02 Systems CMP Meeting Bonnie Johnson/Eschelon stated that Eschelon wants Centrex 21 to flow through. 12/17/01 Clarification Meeting Minutes: Attendees were Kathy Stichter / Eschelon, Shon Higer / Qwest, Susie Wells / Qwest, Peggy Esquibel-Reed for Lynn Stecklein / Qwest Reviewed CR description. Request is for Centrex 21, all products. CLEC Expectation is for Qwest to allow flow through of all Centrex 21 products, in both EDI & GUI. No other needed resources were identified. No dependent Change Requests identified.

January Systems Meeting 1/17/02 SCR120301-1 IMA Flow Through for Centrex 21 Orders Originated by Eschelon Bonnie Johnson/Eschelon reviewed the description of the CR, wants flowthrough rather than manually typed. Lynn Stecklein/Qwest stated that the LOE was Extra Large. Karen Clauson/Eschelon questioned what the factors were to determine the Extra Large level of effort. Jeff Thompson/Qwest responded that was determined due to the draft definition being consistent with the size of candidates. Effects multiple systems and sub-systems. Impacts are major changes to IMA and FTS. To gather data for Centrex 21 order, need to go to sub-system(s) to gather that data. Need to mechanize a human beings effort to flowthrough a Centrex 21 order. Karen Clauson/Eschelon asked what the number of hours is and what was looked at to determine the size. Jeff Thompson/Qwest responded that this is what Qwest would have to do. Hourly estimates are determined after Business and system requirements are completed. Mike Buck/Qwest stated that the status for this CR is now Presented and is ready for February IMA prioritization.

CenturyLink Response

Eschelon asks Qwest to implement an IMA change to allow flow through of all Centrex 21 orders under all product lines. The level of effort is 2550 to 4250 hours.

Archived System CR SCR102901-1 Detail

 
Title: Qwest to develop and distribute a monthly report of all tickets entered into CEMR by Eschelon.
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR102901-1 Completed
6/20/2002
200 - 750  CEMR/ Resale (non design) UNE Loop (design)
Originator: Stichter, Kathy
Originator Company Name: Eschelon
Owner: Busetti, Dan
Director:
CR PM: Stecklein, Lynn

Description Of Change

Eschelon asks Qwest to develop and distribute an accurate monthly report of all tickets entered into CEMR by Eschelon. The report needs to breakdown the number of tickets entered each month by category. One for resale (non-design) and one for UNE loop (design).

Status History

Date Action Description
 
11/1/2001 Info Received From CLEC Requested K Stichter to provide availability for clarification call. 
11/6/2001 Info Received From CLEC Contacted K Stichter availability for clarification call. 
11/7/2001 CLEC Provided Information K Stichter provided availability. 
11/8/2001 Clarification Meeting Held -Clarification call was held 11/8/01 3:00 pm 
11/15/2001 Discussed at Monthly CMP Meeting CR presented in the Nov CMP meeting 
11/15/2001 Action Item Created A presentation will be made in the Dec meeting to talk through what repair reports are available (Action Item #378) 
11/26/2001 Communicator Issued I Haskins provided a revision to the Qwest Response to reflect the change from monthly to weekly. 
12/13/2001 Status Changed  
12/13/2001 Discussed at Monthly CMP Meeting Discussion centered on how other CLECs can "get" the report. 
1/8/2002 UR Issued UR issued by Cheryl Mcmahon - UR# will be provided when available 
1/8/2002 UR Issued UR2985 issued 
1/17/2002 Discussed at Monthly CMP Meeting CR # SCR102901-1 discussed at January CMP meeting during 'CRs with Outstanding Action Items' (Attachment E of Distribution Package) 
1/22/2002 Info Received From CLEC Kathy Stichter provided e-mail address on 1/17/02. The weekly CEMR reports will be sent to qwest.repair.reports@eschelon.com. 
1/22/2002 Discussed at Monthly CMP Meeting CR discussed in Jan CMP meeting 
2/2/2002 Communicator Issued Notice # SYST.02.01.02.F.02560.CEMR_Release_Sched released indicating that scheduled March CEMR release has been removed. Next CEMR release is scheduled for May 5. 
2/21/2002 Discussed at Monthly CMP Meeting Qwest (Michael Buck) provided status update on CR; target implementation date for CR has been changed; reference Notice # SYST.02.01.02.F.02560.CEMR_Release_Sched 
3/13/2002 Info Received From CLEC Eschelon requested additional information on the CEMR -TN, CKT ID, & Date. Dan Busetti will investigate. 
3/13/2002 CLEC Provided Information Dan Busetti provided a sample report that included the info Eschelon requested. CKT ID, date and status. 
3/19/2002 Info Requested from CLEC Response requested re: answer on sample CEMR report from Eschelon by COB 3/20/02 
5/7/2002 Status Changed Deployed 5/5/02 Status changed to CLEC test 
5/16/2002 Discussed at Monthly CMP Meeting SCR102901-1 discussed at May Systems CMP monthly meeting See Systems CMP Distribution Package May CMP Attachment F 
5/23/2002 Info Received From CLEC Report provided to Eschelon on 5/19/02 
6/20/2002 Discussed at Monthly CMP Meeting SCR102901-1 discussed at June Systems CMP Monthly meeting; please see Systems CMP Distribution Package June CMP -- Attachment G 
6/21/2002 Status Changed Status changed to completed 

Project Meetings

-- Original Message -- Subject: RE: Test message from Qwest EBTA Date: Wed, 22 May 2002 09:38:26 -0500 From: "Stichter, Kathleen L." To: dbusett@qwest.com

Dan, I received your test message. We did get a report on 5/19/02 dated 5/12 through 5/18/02. It was the first one we received. Thanks Kathy Stichter ILEC Relations Manager Eschelon Telecom, Inc 612-436-6022 klstichter@eschelon.com

> --Original Message-- > From: Dan Busetti [SMTP:dbusett@qwest.com] > Sent: Wednesday, May 22, 2002 9:08 AM > To: qwest.repair.reports@eschelon.com > Subject: Test message from Qwest EBTA > > This is a test message to confirm successful transmission. > Please reply when you receive this message. > thanks, > Dan Busetti << File: Card for Dan Busetti >>

5/16/02 CMP Systems Meeting Kathy Stichter/Eschelon said that she would like to leave this CR open because she has not seen a report yet. Bonnie Johnson/Eschelon asked if there had been reports generated and they are just not getting them or have there not been any generated reports as yet? Michael Buck/Qwest said that this CR will remain in CLEC test until June CMP meeting. Kathy Stichter/Eschelon provided email that the reports are to be sent to. (qwest.repair.reports@eschelon.com.)

4/18/02 CMP Systems Meeting Dan Busetti/Qwest reviewed CR. There were no questions.

11/8/01 Clarification Meeting

Kathy Stichter , Eschelon Lynn Stecklein, Qwest Cheryl McMahon Qwest Karrie Waldner Qwest Irene Haskins Qwest

The purpose of the call was to clarify SCR102901-1 dated 10/29/01with Eschelon. Review of Response Description of Change: Eschelon asks Qwest to develop and distribute an accurate monthly report of all tickets enteres into CEMR by Eschelon. The report needs to breakdown the number of tickets entered each month by category. One for resale (non-design) and one for UNE Loop (design). K Stichter advised that the report needs to include just the count of tickets and no other detail. The report would breakdown the count by design and non design and would be requested monthly. Qwest asked Eschelon what type of format would be required. K Stichter said that an e-mail with the counts would work.

January CMP meeting 1/17/02 SCR102901-1 Qwest to develop and distribute a monthly report of all tickets entered into CEMR by Eschelon AI Number 3 Determine method for CLECs to receive new CEMR report: Dan Busetti/Qwest discussed CLEC’s contacting their service manager’s to request the report. The targeted implementation date is March 31, 2002. The CEMR User Guide will also be updated so that they can see that this report will be available. The CEMR User Guide will also state that they need to contact the service manager. Reports will be on a weekly basis. Kathy Stichter/Eschelon asked if as of March 31st, they are to contact their Service Manager for the report? Michael Buck/Qwest responded that Eschelon just needs to provide their email address to Lynn Stecklein. All other CLECs will need to contact their service manager’s. Michael Buck/Qwest advised that the status for this Action Item will be Closed.

Subject: FW: [Fwd: 02/27/02 weekly report for AYD] Date: Wed, 6 Mar 2002 17:29:11 -0600 From: "Stichter, Kathleen L." To: dbusett@qwest.com CC: "Walberg, Loren"

Dan, I met with our repair director today. What he would like to see at a minimum is each submitted ticket itemized by date, with the TN or CKT ID: Date TN or CKT ID His wish list would be to add to the trouble type for each submitted ticket along with columns showing if a DPO was authorized and if Testing was authorized: Date TN or CKT ID Trouble Report Type DPO Authorized Testing Authorized 3/5/02 612-436-6022 NDT, open outnono 3/5/02XXX-XXX-XXXXXXXXXnono ETC Let me know what you think. Thanks

Kathy Stichter ILEC Relations Manager Eschelon Telecom, Inc 612-436-6022 klstichter@eschelon.com

Kathy, Is this more like you needed? thanks, Dan

-- Original Message -- Subject: 03/12/02 weekly report for AYD Date: Tue, 12 Mar 2002 15:31:30 -0700 (MST) From: Matt Hoepfinger

03/12/02 WEEKLY REPORT FOR AYD

There have been 54 successful LMOS create request(s) through CEMR for AYD.

Successful LMOS creates for AYD:

Date CircuitId Status -- -- - 03-08-2002 2067259740 closedOut 03-08-2002 7637671326 closedOut 03-08-2002 2539220334 closedOut 03-10-2002 4808384221 closedOut 03-11-2002 7634330618 closedOut 03-11-2002 6514303385 closedOut 03-11-2002 4257479655 closedOut 03-11-2002 6517628133 closedOut 03-11-2002 7634344772 closedOut 03-11-2002 8012544440 closedOut 03-11-2002 3037336706 closedOut 03-11-2002 4809667198 closedOut 03-11-2002 2534721300 closedOut 03-11-2002 2063650686 closedOut 03-11-2002 6022763466 closedOut 03-11-2002 2067633599 closedOut 03-11-2002 8012808150 closedOut 03-11-2002 4803257944 closedOut 03-11-2002 7637121116 closedOut 03-11-2002 2538404400 closedOut 03-11-2002 7208551948 closedOut 03-11-2002 2538336075 closedOut 03-11-2002 3032868432 closedOut 03-11-2002 4254017188 closedOut 03-11-2002 3032888729 closedOut 03-11-2002 2537350192 closedOut 03-11-2002 3033700919 closedOut 03-11-2002 5203278886 closedOut 03-11-2002 2067831350 closedOut 03-11-2002 3032359773 closedOut 03-12-2002 8014872087 pendingDispatch 03-12-2002 3034412418 closedOut 03-12-2002 3032820808 closedOut 03-12-2002 8019736234 closedOut 03-12-2002 2538338007 closedOut 03-12-2002 5415672335 closedOut 03-12-2002 2538473880 closedOut 03-12-2002 9283439504 closedOut 03-12-2002 8013710901 closedOut 03-12-2002 6514394319 closedOut 03-12-2002 6517027628 dispatchedOut 03-12-2002 4254512453 dispatchedOut 03-12-2002 2062566429 closedOut 03-12-2002 5202926745 closedOut 03-12-2002 9524490896 pendingDispatch 03-12-2002 5032264429 pendingDispatch 03-12-2002 4256379387 pendingDispatch 03-12-2002 2538542770 screening 03-12-2002 2534721300 dispatchedIn 03-12-2002 3039042021 closedOut 03-12-2002 9522499313 pendingDispatch 03-12-2002 2533337848 screening 03-12-2002 2533331736 screening 03-12-2002 8013995840 screening

There have been 0 successful WFA create request(s) through CEMR for AYD.

Successful WFA creates for AYD:

Date CircuitId Status -- -- - Requested response by COB 3/20/02.

CenturyLink Response

-- Original Message -- Subject: RE: Test message from Qwest EBTA Date: Wed, 22 May 2002 09:38:26 -0500 From: "Stichter, Kathleen L." To: dbusett@qwest.com

Dan, I received your test message. We did get a report on 5/19/02 dated 5/12 through 5/18/02. It was the first one we received. Thanks Kathy Stichter ILEC Relations Manager Eschelon Telecom, Inc 612-436-6022 klstichter@eschelon.com

> --Original Message-- > From: Dan Busetti [SMTP:dbusett@qwest.com] > Sent: Wednesday, May 22, 2002 9:08 AM > To: qwest.repair.reports@eschelon.com > Subject: Test message from Qwest EBTA > > This is a test message to confirm successful transmission. > Please reply when you receive this message. > thanks, > Dan Busetti << File: Card for Dan Busetti >>

5/16/02 CMP Systems Meeting Kathy Stichter/Eschelon said that she would like to leave this CR open because she has not seen a report yet. Bonnie Johnson/Eschelon asked if there had been reports generated and they are just not getting them or have there not been any generated reports yet? Michael Buck/Qwest said this this CR will remain in CLEC test until the June CMP meeting. Kathy Stichter/Eschelon provided email that the reports are to be sent to (qwest.repair.reports@eschelon.com)

4/18/02 - Dan Busetti/Qwest reviewed this CR at the April Systems CMP meeting. The level of effort is 200-750 hours and the targeted implementation is 5/5/02.

For Review by the CLEC Community and Discussion at November CMP Meeting

November 26, 2001

Kathleen Stichter Eschelon

CC: Connie Winston John I. Gallegos Joseph J. Bradley Merna Thane

This letter is in response to your CLEC Change Request Form, number SCR102901-1, dated October 29, 2001, CR Title: Qwest to Develop and Distribute a Monthly Report of all Tickets Entered into CEMR by Eschelon. Per the CMP meeting on November 15, 2001, the requirement for monthly reports has been changed to weekly reports.

CR Description: Eschelon asks Qwest to develop and distribute an accurate weekly report of all tickets entered into CEMR by Eschelon. The report needs to breakdown the number of tickets entered in each week by category. One for resale (non-design) and one for UNE loop (design).

High Level Requirements: R1:Qwest shall develop a weekly report listing all trouble tickets entered into CEMR by Eschelon. R2:The weekly report shall contain only the Eschelon tickets for the week and no other data such as date tickets were created, status, etc. R3:The weekly report shall provide a count of the number of tickets entered into CEMR by Eschelon and be categorized by Resale: Non-Design UNE-Loop: Design R4: The weekly report shall be identified with the week and year. R5: The weekly report shall be distributed to Eschelon via email. R6: The weekly report shall be provided in a standard business application (e.g., Microsoft WORD, Excel, etc.). Qwest Response: Based on the information noted above, this CR has been determined to have a small level of effort. As discussed in the monthly CMP meeting on November 15, 2001, the CEMR system archives ticket information for a week. Qwest proposed that the report be provided on a weekly basis. Eschelon replied that weekly reports would be acceptable. The implementation date for this change request is to be determined.

Sincerely, Jon Ecklund Information Technologies Manager

Archived System CR SCR100401-1X Detail

 
Title: Allow for Coordinated Hot Cuts on CLEC UBL to CLEC Resale (Cross over CR PC100401 1)
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR100401-1X Closed
12/19/2002
1275 - 2150  IMA Common/ All Products
Originator: Stichter, Kathy
Originator Company Name: Eschelon
Owner: Thompson, Jeff
Director:
CR PM: Stecklein, Lynn

Description Of Change

Currently Qwest only offers Coordinated Hot Cuts on the unbundled product. Qwest should offer the option for coordination when a customer is converting from a facility based CLEC to CLEC Resale when new facilities are required. This would be handled with a Completion Call. This type of request would come through IMA and require the development of a new USOC. Qwest's offering to this request will include an LNP Completion call to be placed by the outside field technician when new facilities are used. Once the Qwest work is finished, the Resale/UNE Provider can then proceed to dispatch to the premise as needed.

Status History

Date Action Description
4/24/2002 Additional Information See Project Meetings notes for the Product/Process status history records. 
4/24/2002 CR Submitted  
4/25/2002 CR Acknowledged Acknowledgement sent to Kathy Stichter at Eschelon 
4/25/2002 Clarification Meeting Scheduled Meeting is scheduled for 4/26/02 at 3:00 p.m. (MT) 
4/26/2002 Clarification Meeting Held See meeting minutes in the Project Meeting notes. 
5/16/2002 Discussed at Monthly CMP Meeting Status changed to Presented as a result of the discussion at the May Systems CMP meeting. 
5/23/2002 Status Changed Status updated from 'Presented' to 'Pending Prioritization'; 'Pending Prioritization' is a new status as agreed to in CMP Re-Design 
7/18/2002 Discussed at Monthly CMP Meeting SCR100401-1X discussed at July Systems CMP Monthly meeting; please see Systems CMP Distribution Package July CMP -- Attachment P 
7/26/2002 Status Changed Status set to Prioritized as a result of the release prioritization for IMA 12.0 
7/26/2002 Release Ranking Ranking for Release 12.0 following the July 2002 Systems CMP Meeting. SCR100401-1X ranked number 57 (tie) 
10/30/2002 Status Changed SCR100401-1X status updated to 'Pending Prioritization' based upon outcome of release 12.0 packaging effort 
12/19/2002 Discussed at Monthly CMP Meeting SCR100401-1X discussed at December Systems CMP Monthly meeting; please see Systems CMP Distribution Package December CMP -- Attachment I 

Project Meetings

12/19/02 CMP Systems Meeting Kit Thomte/Qwest we’ve had a couple of discussions over the last few days on the CR. Bonnie Johnson/Eschelon thought this CR had been denied and wanted Qwest to provide a status in this meeting. What we’ve agreed to do, Bonnie would still like some changes outlined here, we would like to close the existing systems CR, resurrect the original Product/Process CR, deny it, then create a sub-CR under the Product/Process CR with an MN suffix so that the things that Bonnie wanted would be addressed in the sub CR Judy Schultz/Qwest- noted that Section 5.7 of the CMP Document states that if there is a systems change request with a manual process available, then a parent-child relationship would be created. The reason we went that route is that Bonnie Johnson/Eschelon felt that the original request was a deny and did not want to start with a new date. Bonnie Johnson/Eschelon stated that when this CR was originally opened, we were optimistic that it would happen, and it was crossed over to Systems to add a USOC. The systems CR does not apply any more. She also stated that it was very important to me because I asked for a specific product. Qwest stated that they are unable to fulfill that request so the CR has to be denied. They have some solutions that will alleviate some of the pain, so part of what I asked for can be provided. Jonathan Spangler/AT&T asked Bonnie Johnson/Eschelon if they are asking Qwest to do a coordinated hot cut. Bonnie Johnson/Eschelon noted from unbundled to resale or UNE-P. Jonathan Spangler/AT&T asked how is that different from what we’re building with Joan Wells/Qwest now. Bonnie Johnson/Eschelon said that is just with port-in. Jonathan Spangler/AT&T asked if we have clarification that the loop that the CLEC is using is a Qwest loop - Qwest is not going to reuse the facility. Bonnie Johnson/Eschelon said that the problem is you have the potential of a customer working at two switches. Judy Schultz/Qwest said that when we open this MN CR, we’ll bring that it forward to the next meeting and make sure we have all the right people on the telephone from Product and Process. Jonathan Spangler/AT&T stated that the CLEC to UNE-P CLEC discussion (with Joan Wells) might help to see how we handle those orders.

Clarification call was held on 4/26/02 with Eschelon.

Attendees were:

Kathy Stichter - Eschelon Bonnie Johnson - Eschelon Mark Routh - Qwest Systems CRPM Jerry Mohatt - Qwest IT Project Manager J.J Bradley - Qwest Business SME

Mark opened the meeting and indicated that the intent was to make sure that Eschelon was aware of the fact that this CR had been moved over from the Product & Process CMP and was now being tracked as a systems issue. He mentioned that this CR would impact IMA and would be eligible for prioritization in IMA 12.0. Bonnie clarified that there are two processes; reuse of facilities and new facilities. This CR was to address new facilities. She stated that Qwest retail is creating a new product for Coordinated Hot Cuts that are being moved from the CLECs back to Qwest switch. She wanted to insure that when the product is created for the Retail business, it is also available to the retail business at the same time. Mark mentioned that a new USOC for this product will be created and that there is an action item open to insure that the new product will be made available to the wholesale market when it available to retail.

Product/Process Status History record

10/02/01 - CR received from Eschelon 10/04/01 - CR status changed to Submitted 10/04/01 - CR Updated and sent to Eschelon. 11/05/01 - Clarification Mtg Held with Eschelon. 11/12/01 - Had additional questions for Eschelon which were emailed to Kathy Stichter at Eschelon. 11/12/01 - Need to schedule another meeting with Eschelon. New questions have come up after further investigation. Left message for Kathy S. to call me to schedule. 11/14/01 - CMP Meeting - Eschelon presented the CR. It was determined that UBL with LNP needed to be added and that there should be another clarification meeting 11/19/01 - Received answers back from Eschelon, however Kathy S. is on vacation from 11/19-11/23 and I haven't yet heard back from her to be able to schedule nessessary meeting with her. 11/29/01 - Conducted additional clarification meeting with Eschelon. 11/29/01 - Eschelon provided clarification e-mail. 12/03/01 - Clarification Meeting Minutes issued to Eschelon. 12/12/01 - CMP Meeting - Qwest advised of the coordination effort required in addition to its LNP Managed Cut product and expressed concern in coordination with 3rd party CLEC. Eschelon advised they were only interested in Qwest internal coordination. Qwest to investigate whether the Network coordinated process could be used in-lieu-of developing a new product. Qwest to develop its response. 01/08/02 - Issued Qwest's Draft Response dated January 4, 2002 to Eschelon and posted to dBase. 01/16/02 - CMP Meeting - Qwest presented its draft response. Qwest advised that it would like to present another solution based on partnering with retail. CR will remain in Presented status and Qwest will address the issues from the CMP meeting. 01/31/02 - Received questions from Eschelon to be addressed in Qwest's response. 02/12/02 - Issued Qwest's Revised Draft Response dated 2/7/02 to Eschelon. 02/20/02 - CMP Meeting - Qwest presented its revised response. It was agreed that the CR could be moved to Development. Meeting discussions will be set forth in the Product/Process Draft Meeting Minutes contained in the Product/Process CMP Meeting Distribution Package 03/20/02. 02/22/02 - Qwest's formal response dated 2/7/02 issued to CLEC Community. 03/13/02 - Issued Development status update and answers to Eschelon's questions from the 2/20/02 CMP Meeting. Posted update in the CMP dBase under Qwest Response. 03/20/02 - CMP Meeting - Qwest provided a status update on the process development and responded to Eschelon's questions from February's CMP Meeting. The CR will remain in Development status. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site. 04/17/02 - CMP Meeting - Qwest provided a status updated and indicated that a Systems CR would need to be created to complete the process development. Meeting discussions will be set forth in the Product/Process Meeting Minutes to be posted on the CMP Web site. It was agreed to issue a Systems CR. 04/24/02 - Issued Systems CR to cmpcr@qwest.com on behalf of Eschelon.

CenturyLink Response

Qwest will create a new USOC for Coordinated Hot Cuts on New Facilities. They will make the necessary changes to the IMA interfaces and all necessary back end systems when this candidate is prioritized in a future IMA Release. Qwest will insure that the new product that results from this change will be available to the wholesale markets at the same time that it is made available to the retail markets.

Archived System CR SCR083001-1 Detail

 
Title: NPI (Number Port Indicator) field utilization for LSR request routing.
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR083001-1 Completed
5/16/2002
-   IMA GUI/9
Originator: Stichter, Kathy
Originator Company Name: Eschelon
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

Utilize NPI field for order distribution. Currently the CLEC populates the field with data that identifies port in and port within information. The NPI field is not a recognized field for Qwest LSOG5. Qwest’s system routes the orders based on REQTYP. Within the REQTYP requests can contain port in or port within service and need to be routed to the Qwest Center that handles that type of service request. Significant service affecting problems, up to and including customers out of service for several days, arise on the due date as a result of these types of orders not be routed to the correct Qwest service center for processing. Update Qwest systems to identify port in and port within using the NPI to ensure these orders are routed to the correct Qwest processing center.

Status History

Date Action Description
8/30/2001 CR Submitted CR Submitted 
10/1/2001 Related Change Request Process PCCR100101-1 submitted. This CR requests process changes relating to this systems CR 
10/19/2001 Record Update Response to Systems Action # 345 incorporated into this CR 
10/25/2001 Status Changed Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. SCR083001-1 ranked 31 
1/17/2002 Status Changed CR # SCR083001-1 status updated to 'Presented; CR was not packaged as part of 10.0 and is eligible for ranking in 11.0' 
1/31/2002 Status Changed Status updated from "Presented" to "Development"; during review of 11.0 Rank eligible list it was determined that SCR083001-1 (UR2656) is in development for release 9.01 (internal CR32804) 
1/31/2002 Release Information IMA Release 9.01 
3/25/2002 Status Changed Status updated from 'Development' to 'CLEC Test' 
4/18/2002 Discussed at Monthly CMP Meeting SCR083001-1 discussed at April Systems CMP Monthly meeting; please see Systems CMP Distribution Package April CMP -- Attachment E; Eschelon wants to leave this in CLEC Test until May Systems CMP meeting to ensure the routing function is working properly 
4/18/2002 Additional Information Eschelon requested that this CR remain in CLEC Test for one more month so they can confirm that the routing is working properly. 
5/16/2002 Status Changed Status changed to completed as a result of the discussion at the May Systems CMP meeting. 

Project Meetings

CenturyLink Response

Draft Response to Process PCCR100101-1 "Use NPI (Number Port Indicator) field on LSR for requests for orders requiring Port In and Port Within"

October 30, 2001 Draft Response

Ms. Kathleen Stichter Eschelon Telecom

This letter is in response to Change Request Form, PCCR100101-1 – Use NPI (Number Port Indicator) field on LSR for requests for orders requiring Port In and Port Within.

Description of Change: “Currently the CLEC populates the NPI field with data that identifies Port In and Port Within information. The NPI field is not a recognized field for Qwest LSOG5. Qwest’s system routes the orders based on the REQTYP. Within the REQTYP requests can contain Port In and Port Within service. For requests that require Port In and Port Within, Qwest uses the remarks section of the LSR and the CLEC must also populate the Manual IND field with a Y. This process puts the onus on the CLEC and not Qwest to ensure Qwest routes the order to the correct center. These requests require special handling. If the orders are not written correctly significant service affecting problems, up to and including customers out of service for several days, arise on the due date. Eschelon asks that Qwest start using the NPI field to recognize that a request is for number porting.”

Definitions of Port Activity associated with this request include: ? Port In activity includes all service requests in which the end user is currently being served by another Network Service Provider and the end user does not currently reside in a Qwest switch. Qwest has received a Local Service Request to Port the end user into the Qwest switch. Current Wholesale activity includes Port In to Qwest Resell Services. ? Port Within (Location Portability) is the ability of end users to retain the same telephone number when moving from one service location, to another area that is served by different central offices within the same Rate Center and in some locations, within NPA and municipal boundaries. The end user is currently being served by Qwest as the network Service Provider and resides in a Qwest switch.

On the OBF LSOG 5 Resale form there is a field called the NPI field. (ref 11) Actually, this is a Qwest recognized field, but currently there are no edits in place involving this field. Current accepted entries for the NPI field that will be utilized are: C=Port In Working TN D=Port In Reserved TN Z=Port Within When this field is populated, then the Manual IND field should be set to “Y” and the remark should be populated with a positive entry. Qwest has issued a system change request to begin utilizing this field for proper routing of Port in and Port Within orders to the correct Interconnect Center work queues. Scheduled implementation will be in a future IMA release. It is believed that with implementation of this change, orders will be automatically routed to the correct Interconnect Center for processing. This should help to expedite the Port In/Port Within order received process and ensure that the correct Center doing the provisioning will have access to the order sooner. Once verification of the completion time is known, notification will be sent via the CMP Process or CLEC notification. Qwest would like to close this CR and work issues related to future implementation through SCR083001-1, which relates directly to the system implementation of the NPI field.

Sincerely, Joan Wells LNP Process Manager

Archived System CR SCR122801-1 Detail

 
Title: Scrub Number Assignment DB
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR122801-1 Completed
4/18/2002
-   Other/ All
Originator: Stichter, Kathy
Originator Company Name: Eschelon
Owner: Winston, Connie
Director:
CR PM: Stecklein, Lynn

Description Of Change

Eschelon is experiencing trouble when pulling numbers from IMA. IMA will show a number as available when in fact the number is working. Qwest is rejecting LSRs stating that the numbers given are already in use. Orders sit in AO status and it may not be identified until the DD that the number is already in use. Then Qwest finds that it can not DPO so a customer DD is missed. Also Eschelon expends unnecessary time and energy to investigate and re-submit rejected LSRs. Eschelon asks Qwest to scrub the number assignment database for all available TNs to ensure they are non-working numbers.

Status History

Date Action Description
12/28/2001 CR Submitted CR received by Qwest 
12/31/2001 Info Sent to CLEC Reciept of CR Acknowledged to originator 
1/9/2002 Clarification Meeting held Clarification meeting held 1/9/02 
1/9/2002 Draft Response Issued Response Issued 
1/17/2002 Discussed at Monthly CMP Meeting CR # SCR122801-1 'Presented' at January CMP meeting 
1/21/2002 Status Changed Status changed to CLEC test 
1/29/2002 Info Received From CLEC Feedback on CR received via e-mail from Eschelon (Kathy Stichter) 
2/5/2002 Info Requested from CLEC Investigation complete on 303 456-4571 Need additional information from Eschelon. Still investigating 801 373-2035. 
2/6/2002 Info Received From CLEC Kathy Stichter provided additional info on TN 303 456-4571. Forwarded to C Hunt for investigation. 
2/7/2002 Info Received From CLEC Kathy Stichter provided 2 more examples of TN's that were changed. Forwarded to C Hunt for investigation. 
2/21/2002 Discussed at Monthly CMP Meeting SCR122801-1 discussed during 'CRs to consider for Closure' portion of February Systems CMP Monthly meeting; please see Attachment E of February Systems CMP Distribution Package 
3/21/2002 Discussed at Monthly CMP Meeting SCR122801-1 discussed March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP - Attachment E; CLECs requested to leave CR in CLEC Test for one additional month; closure of CR expected in April Systems CMP Meeting 
4/18/2002 Discussed at Monthly CMP Meeting SCR122801-1 discussed at April Systems CMP Monthly meeting; please see Systems CMP Distribution Package April CMP - Attachment E 
4/18/2002 Status Changed Status updated from 'CLEC Test' to 'Completed' as agreed to in the April Systems CMP Meeting 
4/23/2002 Status Changed Status changed to completed 

Project Meetings

4/18/02 CMP Systems Meeting - Bonnie Johnson/Eschelon stated that this was Completed.

3/21/02 - Connie Winston/Qwest discussed in the CMP Systems Meeting. Connie noted that we examined the examples and think the gap has been closed. The situation was only happening in one center and one person using the old process. That person has been trained and the problem has been resolved. Connie thanked Bonnie for the examples because it was difficult to find the problem internally because of the systems were behaving appropriately. Bonnie Johnson/Eschelon asked to have this left open for 1 more month to make sure they have a clean month (no errors). Status to remain CLEC Test and CR to be reviewed in the April Systems meeting.

2/21/02 CMP Systems Meeting Connie Winston/Qwest reviewed the status of this. Bonnie Johnson/Eschelon stated that they have provided examples that need to be investigated before they will close this CR. Connie Winston/Qwest said that Qwest continues to research the examples from February 6 and will re-look at the January examples. This CR will remain in CLEC test.

The clarification meeting was held on 1/9/02 In Attendance: Kathy Stichter (Eschelon), Gerry Mohatt (IT Manager), Monica Manning (Process Specialist) Eschelon is experiencing trouble when pulling numbers from IMA. IMA will show a number as available when in fact the number is working. Qwest is rejecting LSRs stating that the numbers given are already in use. Qwest asked what products this request was associated with. K Stichter was not sure but indicated that the request was associated with the Pre-Order Functionality. Qwest advised that UR2801 implemented on 1/8/02 should address and resolve the problem that Eschelon has raised in this change request. UR2801 will build a telephone number reservation system that will interface with all systems where a telephone number can be reserved. This system will identify a reserved telephone number and feed the reservation information to all systems trying to process a new service order. Eschelon recommended that Qwest provide a response with the information associated with UR2801 and discuss in the next CMP meeting. 1/27/02 - Connie Winston provided an overview of UR2801 ( Duplicate TN) in the January CMP meeting. This UR should resolve the change being requested in this CR. Eschelon will provide feedback if they encounter any issues.

January CMP meeting 1/17/02 SCR122801-1 Scrub Number Assignment DB Originated by Eschelon Status moved to CLEC Test. Bonnie Johnson/Eschelon presented Change Request. Bonnie stated that this is an ongoing problem and Qwest has stated that telephone numbers are assigned that are already in use. This causes problems if not caught in time, particularly with dispatch. CR is asking that Qwest go back and check all telephone number’s to make sure they are not in use. These number’s have been in use, sometimes for years. Bonnie Johnson/Eschelon wants more information, she wasn’t able to make the clarification call. Connie Winston/Qwest stated that Qwest identified the problem previously and had been discussing internally. UR2801 was issued and implemented which should resolve the problem that Eschelon raised in this Change Request. Change was not an IMA change. CLECs and Qwest need to monitor to determine if we can close this CR in the February CMP meeting. Bonnie Johnson/Eschelon stated that this was great and would monitor. If after January 8th, has any examples, will forward them on. John Gallegos/Qwest stated that focus should be on any examples on or after January 15th as that was the date where the implemented fix was solidified. Connie Winston/Qwest stated that would report next month for closure. Bonnie Johnson/Eschelon stated that CLEC Test is appropriate.

CenturyLink Response

2/21/02 CMP Systems Meeting Connie Winston/Qwest reviewed the status of this. Bonnie Johnson/Eschelon stated that they have provided examples that need to be investigated before they will close this CR. Connie Winston/Qwest said that Qwest continues to research the examples from February 6 and will re-look at the January examples. This CR will remain in CLEC test.

1/9/02 -Eschelon is experiencing trouble when pulling numbers from IMA. IMA will show a number as available when in fact the number is working. Qwest is rejecting LSRs stating that the numbers given are already in use.

Qwest advised that UR2801 implemented on 1/8/02 should address and resolve the problem that Eschelon raised in this change request. UR2801(Duplicate TN Solution) will build a telephone number reservation system that will interface with all systems where a telephone number can be reserved. This system will identify a reserved telephone number and feed the reservation information to all systems trying to process a new service order. The system will perform several validations on the TN including validations to ensure that the TN is not working. These validations will eliminate the rejection of LSRs back to the CLEC stating that the number given is already in use. Eschelon has agreed to present this change request in the January CMP meeting and Qwest will discuss UR2801 as the potential fix to this request.

2/5/02 - Stichter, Kathleen L." cc: "Cassandra Hunt" , "Irene M Haskins"

Subject: Re: SCR122801-1 TN's Available in IMA and then Changed on order

Kathy, Qwest has completed the investigation on the query below. All documentation indicates that 303 456-4571 was provisioned on the service order as requested by Eschelon. The FOC also indicates that 303 456-4571 was assigned. Does Eschelon have other documentation that would help us understand why 303 940-1310 is in question? The LSR ID is 3799634 and the PON is CO144162DSLL. Thanks!

To: lsteckl@qwest.com cc: "Johnson, Bonnie J."

Subject: SCR122801-1 TN's Available in IMA and then Changed on order

Lynn, Here is another example. Thanks

Kathy Stichter ILEC Relations Manager 612-436-6022 klstichter@eschelon.com

--Original Message-- From:Chaplina, Irina B. Sent:Wednesday, January 30, 2002 4:10 PM To:Johnson, Bonnie J. Subject: RE: TN's Available in IMA and then Changed on order

Yes, this is another one. PON: CO144162DSLL LSRID: 3799634 N72888563 - order N FOC's TN: 303-456-4571 But Qwest put wrong TN 303-940-1310 on order on the time of completing. And they did not send new FOC and did not call me.

Following are the findings on the four TNs for Eschelon that were provisioned incorrectly (303-456-4571; 303-367-4876; 602-252-1947; and 801-373-5409).

We researched the transactions in every system in the LSR flow for these numbers. On three of the TNs (303-456-4571; 303-367-4876; and 602-252-1947) we used a process of elimination to determine that the requests were processed correctly until the SOP. At that point, it seems that the SOP found the TNs to be working, and so assigned a "duplicate TN error" to the service orders. This error caused the orders to fall out to the center, where service representatives assigned new TNs to the orders. Because we are unable to access historical data in the SOP, we cannot identify why the SOP identified the requested TNs as working when all other systems in the flow recognized that they were available. Therefore, the only solution at this point would be a manual workaround in which the centers research every order with a "duplicate TN error" to make sure that the error is valid. We can't recommend or discourage this approach without getting a feel for what percentage of service orders fall out due to this error, but we are trying to get that information as well.

The fourth TN, 801-373-5409, seems to be an anomaly. This number belongs to Integra and has for some some time. It seems that at the point when Eschelon was attempting to reserve it, Qwest was processing a records only order against the TN which included an OZCID. This field seems to have caused TNRES to identify the TN as available. Additionally, SWITCH and LFACS identify the number as nonworking even today. We are continuing to research this TN, and will keep you informed.

Archived System CR SCR101001-1 Detail

 
Title: CEMR confirmation that Qwest received ticket and CEMR notification of a failure when a ticket does not get to a Qwest person to work.
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR101001-1 Completed
5/17/2002
750 - 3000  CEMR/ All
Originator: Stichter, Kathy
Originator Company Name: Eschelon
Owner: Busetti, Dan
Director:
CR PM: Esquibel-Reed, Peggy

Description Of Change

At this time CEMR gives confirmation, that the ticket was entered into CEMR, on every ticket submitted. CEMR does not give a confirmation that Qwest received the ticket and is working the ticket. When we enter a ticket in CEMR it is fair to assume, unless otherwise indicated, that Qwest has received our ticket and is working to correct the trouble. There are times when we call for status on a ticket and Qwest tells us that no ticket was entered. CEMR never sends a notice of a failure when the ticket Eschelon enters does not get to a Qwest person to work. This delays the resolution of the trouble for our end user customers because we then have to enter another ticket and we have now lost up to a day in getting the end user customer’s trouble cleared when we legitimately assumed the trouble was already cleared. Eschelon asks that Qwest send confirmation when a ticket gets to a Qwest person to work and also to send a notification if the ticket failed and did not get to a Qwest person to work.

Status History

Date Action Description
10/10/2001 Info Sent to CLEC Updated CR was sent to Kathy Stichter and Stephen Sheahan 
10/10/2001 CR Submitted CR was received and logged 
10/18/2001 Discussed at Monthly CMP Meeting Discussed at CMP meeting 
10/19/2001 Clarification Meeting Held Alignment/Clarification meeting held (see meeting minutes) 
10/29/2001 Draft Response Issued Draft response posted to CMP database 
11/15/2001 Discussed at Monthly CMP Meeting Discussed at the November Systems CMP Meeting. 
12/13/2001 Discussed at Monthly CMP Meeting Discussed at the December Systems CMP Meeting 
12/13/2001 Status Changed Status updated to "Development" 
1/17/2002 Discussed at Monthly CMP Meeting SCR101001-1 discussed at January Monthly CMP Meeting; requirements clarified 
2/2/2002 Communicator Issued Notice # SYST.02.01.02.F.02560.CEMR_Release_Sched released indicating that scheduled March CEMR release has been removed. Next CEMR release is scheduled for May 5. 
2/21/2002 Discussed at Monthly CMP Meeting Qwest (Michael Buck) provided status update on CR; target implementation date for CR has been changed; reference Notice # SYST.02.01.02.F.02560.CEMR_Release_Sched 
4/2/2002 CLEC Requested Info Eschelon asking what the email subject line would include. Needs only TN or CKT ID and TR Status. And asks if Imp. Date is May 5? 
4/2/2002 Info Sent to CLEC Qwest provided Eschelon with example: Subject: Trouble Tkt Status: Cleared; referMtceCenter; 24/fdda/111111/ms. Also advised of targeted May 5th implementation date. See also SYST.04.04.02.F.04010.CEMR_Rel_1.03.06 
5/6/2002 Status Changed Deployed May 5, 2002: Status changed to CLEC Test. 
5/16/2002 Discussed at Monthly CMP Meeting SCR101001-1 discussed at May Systems CMP Monthly meeting; please see Systems CMP Distribution Package May CMP - Attachment F 

Project Meetings

May 16, 2002 Systems CMP Discussion: Michael Buck/Qwest stated that the CEMR Release was deployed on 5/5/02 and asked for closure of this CR. CLECs okayed to close

April 18, 2002 CMP Discussion: Dan Busetti/Qwest reviewed CR and stated that is improving the subject line on email statuses. Bonnie Johnson/Eschelon said 'We thank you for that'

February 21, 2002 CMP Discussion: Michael Buck/Qwest stated that this CR was targeted for the March Release and that a notice was mailed out stating that there is no longer a March Release. This is now targeted for the May Release. (Notice # SYST.02.01.02.F.02560.CEMRReleaseSched)

01/17/02 CMP Meeting Discussion: Michael Buck/Qwest directed those on the phone to the Interactive report. Karen Clauson/Eschelon stated is upset due to item not being in package. Michael Buck/Qwest explained that the submitting CLEC’s request to withdraw this CR did not come until after the package had been printed. Also, the apparent CLEC desire to withdraw the CR was contrary to Qwest’s understanding. Therefore, Qwest felt that this CR should be addressed as a walk on rather than losing over 6 weeks waiting until the February meeting. Bonnie Johnson/Eschelon stated that in the past Qwest has indicated that to provide failure notification, Qwest would need to program CEMR down to the keystroke level. However, what is really needed is to get email notification to be more specific in the subject line, i.e. TN or circuit ID, transaction type, ticket number, brief status. Kathy Stichter/Eschelon agreed that this would satisfy their needs. Michael Buck/Qwest stated the CR will remain in Development status but will not close. The requirement as stated in the CR needs to be updated to reflect the new understanding. Dan Busetti/Qwest advised that the Date of trouble to be in the body of the email, not in the subject line. One status would be failure. Eschelon asked Why can’t you sort the email by status. Dan/Qwest advised that failure would not be the only reason to use email. Keep CR. Targeted for March 31.

12/13/01 - December CMP discussion: Irene Haskins reviewed the response. 99% of the trouble tickets get to the back end systems within 3 minutes. Failure notification is technically feasible, the LOE is large. Dan B. reviewed why this effort would be large: Dan noted that if you go to the transaction history screen it will show the failure. Currently nothing available for immediate notification of failure. The information is available under the maintenance or the transaction screen. The error will show up in less then 3 minutes (generally less than one minute). Dan noted that they realize that the users are getting overwhelmed with email (dozen per ticket). He suggested it would be helpful to get feedback from users on which emails they want to receive. Qwest did not want to edit what was and what was not sent out via email. Eschelon is to see if they can give feedback around what emails are necessary & not necessary.

=====================

12/6/01 - Response to SCR101001-1 Questions Arising in the November CMP Meeting: Corrections are in order regarding two statements made by Qwest in the November CMP meeting. In that meeting a statement was made indicating that it could take up to several hours for a trouble ticket to reach the backend systems. Statistical data shows that 99% of trouble ticket attempts via CEMR are successful with a response time of less than 3 minutes.

The second statement that needs to be corrected regards failure notification. In the November meeting a statement was made that notification of a failure is currently provided via an email notice. Qwest does not currently provide failure notification of trouble ticket attempts entered into CEMR via an email message. Regarding questions from the last meeting: Due to System limitations, it is not possible to provide an immediate trouble ticket number and status on trouble tickets entered into CEMR. This information is provided via email. In response to the request to provide failure notification, while this is technically possible, the tee-shirt estimate for this functionality is LARGE.

==========================

11/15/01 - November CMP discussion: The next CEMR Release date is March 3, 2002. Notification that ticket is received is a screen scraper function and would result in an impact to system response time, 5-25 minute wait for the response. Eschelon requests immediate response. Jeff Thompson advised that this is a restriction of the system, cannot get immediate response. Eschelon asked for at least a trouble ticket back and a notification of a failure. Jeff advised that notification of a failure is currently provided via an email notice. Open issues remain for this CR: - Jeff Thompson or Irene Haskins will investigate what happens when a trouble ticket doesn't get to the back end system for hours? - The current email notification is not sufficient. EXAMPLE: Eschelon submits 100 trouble tickets. Eschelon receives 98 emails from Qwest. Eschelon then has to investigate all 98 emails to determine which 2 out of the 100 failed. Eschelon requesting a failure notification with information such as failure due to a system failure or if is a transaction failure. Jeff advised that agreements would need to be reached between CLEC(s) and Qwest on how many re-tries would be done before a failure notification is sent. A meeting will take place to discuss.

=====================

Alignment/Clarification Meeting 1:30 p.m. (MDT) / Friday 19th October 2001

SCR101001-1 CEMR Confirmation That Qwest Received Ticket and CEMR Notification of a Failure When A Ticket Does Not Get To A Qwest Person To Work Attendees: Kathy Stitcher / Eschelon Chris Frederiksen / Eschelon Michael Potter / Eschelon Peggy Esquibel-Reed / Qwest Irene Haskins / Qwest Cheryl McMahon / Qwest Ann Danielsen / Qwest Kerri Waldner / Qwest JoAnn DeLaCruz / Qwest Ken Olson / Qwest

Eschelon does use the email notification option but is unable to match the notification email to the reported trouble. Requesting 1 system, CEMR, for reporting trouble and receiving notification. Requesting immediate notification via CEMR that the ticket either failed or that it was successfully created. Requesting to receive an immediate response of the ticket number on a CEMR screen when submits a ticket in CEMR, in lieu of an email. Requesting connection from the Transaction Screen for immediate response of the ticket number. Request is for Design and non-design tickets. Eschelon may accept a slower response time, depending on the length of time and CLEC community concurrence.

===========================

CenturyLink Response

For Review by the CLEC Community and Discussion at November CMP Meeting DRAFT RESPONSE October 29, 2001

Kathleen Stichter ILEC Relations Manager Eschelon Telecom Inc.

CC: Jon Ecklund Irene Haskins Cheryl McMahon Dan Busetti This letter is in response to your CLEC Change Request Form, number SCR101001-1 dated October 10, 2001 – CR Title: CEMR confirmation that Qwest received ticket and CEMR notification of a failure when a ticket does not get to a Qwest person to work.

CR Description: At this time CEMR gives confirmation, that the ticket was entered into CEMR, on every ticket submitted. CEMR does not give a confirmation that Qwest received the ticket and is working the ticket. When we enter a ticket in CEMR it is fair to assume, unless otherwise indicated, that Qwest has received our ticket and is working to correct the trouble. There are times when we call for status on a ticket and Qwest tells us that no ticket was entered. CEMR never sends a notice of a failure when the ticket Eschelon enters does not get to a Qwest person to work. This delays the resolution of the trouble for our end user customers because we then have to enter another ticket and we have now lost up to a day in getting the end user customer’s trouble cleared when we legitimately assumed the trouble was already cleared. Eschelon asks that Qwest send confirmation when a ticket gets to a Qwest person to work and also to send a notification if the ticket failed and did not get to a Qwest person to work.

Additional information was received from Eschelon at the Clarification meeting that was held on October 19, 2001. * Eschelon does use the email notification option but is unable to match the notification email to the reported trouble. * Requesting 1 system, CEMR, for reporting trouble and receiving notification * Requesting immediate notification via CEMR that the ticket either failed or that it was successfully created. * Requesting to receive an immediate response of the ticket number on a CEMR screen when submits a ticket in CEMR, in lieu of an email. * Requesting connection from the Transaction Screen for immediate response of the ticket number. * Request is for both Design and non-design tickets. * Eschelon advised that a slower response time might be acceptable, depending on the length of time and concurrence from the CLEC community.

Qwest Response: Based on the above noted information, the level of effort for this request is medium. Sincerely, Jon Ecklund Information Technologies Manager

==========================

01/02/02 - UR issued and has a targeted implementation date of March 31, 2002. UR requirements are: 1) Qwest shall provide the CLECs with an e-mail notification on trouble tickets entered via CEMR. 2) The e-mail notification shall provide sufficient information (i.e., date of trouble request, time of trouble request, TN or circuit identification, description of trouble, etc.) to allow the CLEC to identify the trouble request. Note: This information should be comparable to what is provided for successful tickets. 3) The e-mail notification of failed trouble tickets shall be provided for both POTS and design services.

Archived System CR SCR101901-1 Detail

 
Title: Allow customers to move and change local service providers at the same time. (This CR is to add the use of the EUMI field. SCR013102 09 adds a value for EUMI)
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR101901-1 Completed
12/19/2002
5500 - 8000  IMA Common/11 Centrex Resale, UNE-P
Originator: Stichter, Kathy
Originator Company Name: Eschelon
Owner: Winston, Connie
Director:
CR PM: Esquibel-Reed, Peggy

Description Of Change

The current Qwest process states that when a customer moves and wants to change local service providers they must first convert to the new local service provider with a subsequent move order or move with their current local service provider and subsequently convert to the new local service provider. This causes delays in a customer’s choice to change local service providers. It also forces the customer and/or CLEC to pay processing and installation charges for both a conversion and a move. In addition if the Qwest service order does not post to the CRIS system for the move or conversion in a timely manner, this can cause customer impacting issues due to the fact that the Qwest service order may not be processed accurately. Change Qwest process to allow an end user to select the local service provider of their choice when they move to their new location.

Status History

Date Action Description
9/17/2001 Clarification Meeting Held Clarification meeting held for PC083001-1 
9/26/2001 Draft Response Issued Draft response sent 
10/19/2001 Related Change Request Systems CR created from PC083001-1. 
10/25/2001 Status Changed Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization 
11/7/2001 Record Update Revised response received from Harriett Berry. 
1/21/2002 Record Update Status changed to presented. 
2/13/2002 Record Update LOE updated from Medium to Extra Large 
2/21/2002 Discussed at Monthly CMP Meeting SCR101901-1 discussed during 'Review of 11.0 Prioritization Eligible CRs' portion of February Systems CMP Monthly meeting; please see Attachment I of February Systems CMP Distribution Package 
3/1/2002 Release Ranking Ranking for Release 11.0 following the February 2002 Systems CMP Meeting. SCR101901-1 ranked number 3 
3/1/2002 Status Changed Status updated to 'Prioritized' from 'Presented' 
4/1/2002 Release Ranking Ranking for SATE following the March 2002 Systems CMP Meeting. SCR101901-1 ranked number 06 
6/7/2002 Status Changed SCR101901-1 status updated to 'Packaged' for IMA 11.0 based upon outcome of Packaging Selection vote 
6/7/2002 Status Changed SCR101901-1 status updated to 'Packaged' for SATE release associated with IMA 11.0 based upon outcome of Packaging Selection vote 
8/5/2002 Status Changed Status changed from 'Packaged' to 'Development', targeted implementation date is 11/18/02. 
8/22/2002 Discussed at Monthly CMP Meeting SCR101901-1 discussed at August Systems CMP Monthly meeting; please see Systems CMP Distribution Package August CMP -- Attachment R 
11/18/2002 Record Update Deployed November 18, 2002 
11/21/2002 Discussed at Monthly CMP Meeting SCR101901-1 discussed at November Systems CMP Monthly meeting; please see Systems CMP Distribution Package November CMP -- Attachment L 
12/19/2002 Discussed at Monthly CMP Meeting SCR101901-1 discussed at December Systems CMP Monthly meeting; please see Systems CMP Distribution Package December CMP -- Attachment G 

Project Meetings

December 19, 2002 Systems CMP Meeting This CR was completed with 11.0 and is ok to close.

August Systems CMP Meeting Discussion: Attachment R = Change Requests Committed for IMA Release 11.0 Connie Winston/Qwest - we have one small issue requiring the Sup 2 (SCR013002-8 Flowthrough on Sup 2 Category Due Date) to be a spillover for 11.1. She explained why this will be a spillover into the point release. She noted that resale and UNE sup 2 due date change orders will flow through. The unbundled loop will drop out to the Center and will be updated by the Center until 11.1. Donna Osborne-Miller/AT&T - that’s line item #4 in the Attachment? Connie Winston/Qwest - yes. Michael Buck/Qwest - stated that the NOTE at the bottom of the page needs to be changed from 'In Definition' to 'Packaged'. Liz Balvin/WorldCom - asked how the 11.0 PO2 CR is different than the one in 12.0. Connie Winston/Qwest - they are just different edits. The edits are noted on each of the 2 CRs. Liz Balvin/WorldCom - with 12.0, would you say that any of the hours devoted to this would lower the 8,000 hours? Are you looking at that when you do the design? Connie Winston/Qwest - we always look at that, but the edits are different so I could expect a reduction in the LOEs. As we get further in design, we do update the LOE. Attachment R = Change Requests Committed for SATE Release 11.0 Connie Winston/Qwest - SATE has the same spillover candidate for 11.1, SCR013002-8 Sup 2. Michael Buck/Qwest - noted that items 3, 5, and 7 are SATE specific candidates. The others are IMA with SATE impacts. Wendy Green/Qwest - noted that the SATE side has a shorter list because of the GUI only impacting CRs going into IMA having no impact to SATE. Michael Buck/Qwest - any other questions in the room or on the bridge? None.

February 21, 2002 CMP Discussion: Bonnie Johnson/Eschelon stated that the manual interim process has been implemented. This CR has an Extra Large level of effort and is an eligible candidate for the 11.0 vote.

Clarification Meeting - 09/17/01 Attendees Bonnie Johnson - Eschelon Harriettt Berry - Qwest Russ Urevig - Qwest Susie Wells - Qwest Peter Wirth - Qwest

Qwest representatives representing -Resale-- (Mallory Paxton) and -UNE-P- (to be determined) were not available for the meeting. Harriett Berry, Qwest will identify and include missing representatives for further activities regarding the subject CR.

Review Requested (Description of) Change Concurrence was received from both Eschelon and Qwest parties. Questions were raised by Russ Urevig, Qwest regarding applicability to -Resale- markets. Eschelon provided clarifications. Harriett Berry (Qwest) will review CR will representatives not in attendance.

Harriett Berry, Qwest confirmed selected -Products Impacted,- as appropriate for the CR.

Harriett Berry, Qwest identified the following Qwest personnel to assist in providing a response to Eschelon: - Qwest CLEC Migration Team

Eschelon is expecting a response from Qwest identifying: (1) current procedures used to meet the needs of the CR (and any required modifications, as feasible); (2) identification of any factors (i.e., regulatory, etc.) that may preclude procedure modifications to meet the CR -Description of Change-; and (3) approximate time table for procedural changes, as applicable.

Eschelon did not identify any dependent CRs associated with the subject CR.

Action Plan: Qwest will internally discuss CR with all supporting SME staff to determine time frame for response to Eschelon. Discussions to occur on 24 September 2001 (afternoon).

CenturyLink Response

Qwest Wholesale Product Marketing

DRAFT RESPONSE For Review by CLEC Community and Discussion at November 2001 CMP Meeting

November 7, 2001

Kathy Stichter ILEC Relations Manager Eschelon Telecom Inc.

This letter is in response to the following CLEC Change Request Forms #PCCR083001-1 and pertains to allowing customers to move and change Local Service Providers at the same time.

Qwest has evaluated the subject Change Request (CR) and has determined the following:

1) Eschelon is correct in their assessment of the Qwest service order procedure for customers that physically change address and desire a new local service carrier for Centrex, Resale and UNE-P products. The current process does require two service orders to accomplish an end user move and migration.

2) We propose combining the two step process so that only one order is issued to concurrently change both customer address and Local Service Provider. The Local Service Request (LSR) would be issued with Activity Type V (for conversion) with the EUMI (End User Move Indicator) populated with Y. If Qwest can secure agreement from the CLEC community, the manual process may be put in place as soon as December 1, 2001.

3) Since Qwest does not currently utilize the EUMI field, an Interconnect Mediated Access (IMA) System software upgrade will be required to implement this field. Qwest has initiated an internal change for the IMA System software upgrade. This change will be managed under the CMP Systems Change Request SCR101901-1.

4) Qwest will implement the following manual interim process which will be in effect until SCR101901-1 is implemented:

? The CLEC will submit a single LSR for service orders to “change the end user’s provider and move at the same time.” That LSR will need to show ACT of V (for conversion as specified), Manual Indicator of Y, and then remarks regarding the end use move (new address, etc.) must be provided.

5) This process has been designed specifically for the following: ? CLEC migration with simultaneous end user move with same telephone number and same product, and no addition of new lines ? CLEC migration with simultaneous end user move with same telephone number, product change (but within same product family), and no addition of new lines

Note that this new process is in addition to existing processes for porting in and conversion (product conversions, moves, etc.).

Should you have any questions regarding this response please contact Peter Wirth, CR Project Manager at (303) 294-1642. He can coordinate any follow-up meetings, if necessary, to discuss this response.

Sincerely,

Harriett Berry Qwest CLEC Migration Team

MIGRATION/END USER MOVE INTERIM MANUAL PROCESS

Issue one LSR to migrate and move the end user

ACT Type = V Manual Indicator = Y Remarks = Include end user move information including new address

Archived System CR 5556774 Detail

 
Title: Requesting Qwest to Re cap LML on Directory Listings.
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

5556774 Withdrawn
11/12/2001
-   IMA EDI/ Pre-Order Centrex
Originator: Sprague, Michelle
Originator Company Name: McLeodUSA
Owner: Gallegos, John
Director:
CR PM: Esquibel-Reed, Peggy

Description Of Change

Request that Qwest re-cap LML so that the CLEC’s are not required to recap Directory Listings. McLeod is currently having to send Centrex order types in order to avoid the massive development behind having to support the development of us re-capping. Please see Annelyn Aficial regarding this issue, she can provide details. This is a high priority issue for McLeod due the volume it effects.

Status History

Date Action Description
5/18/2001 CR Submitted CR Submitted 
10/18/2001 Discussed at Monthly CMP Meeting Presented at Oct CMP meeting 
10/25/2001 Status Changed Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. 5556774 ranked 12 
11/12/2001 Status Changed Status is updated to Cancelled CLEC 
11/12/2001 Info Received From CLEC Received email from Michelle Sprague at McLeodUSA stating that code changes have been made, CR can be canceled. 
11/12/2001 Record Update The CLEC's have voted this fairly high in the 10.00 prioritization. The CLECs will be asked at the November CMP meeting if one of them would like to sponsor this. If not, This CR will be canceled. 
12/18/2001 Record Update Changed status from 'Cancelled CLEC' to 'Withdrawn' for database cleanup 
1/17/2002 Discussed at Monthly CMP Meeting CR # 5556774 discussed during 10.0 Packaging Presentation 

Project Meetings

CenturyLink Response

Archived System CR SCR092801-1 Detail

 
Title: Release Addendum deadline date and Addendum submission requirements
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR092801-1 Completed
7/18/2002
-   Process & Documentation/10 N/A
Originator: Sprague, Michelle
Originator Company Name: McLeodUSA
Owner: Henry, Karen
Director:
CR PM: Esquibel-Reed, Peggy

Description Of Change

McLeodUSA has two change requests in regards to release addendum’s. McLeodUSA is requesting a deadline date to be initiated for the submission of addendum’s pertaining to a IMA/EDI release. To our knowledge there is not currently a deadline date associated with addendum’s. We would request that all addendum’s be submitted by Qwest, within 30-days of the Disclosure document being published. McLeod would also like to put a requirement in place that would require that each addendum be reviewed and discussed with Qwest and the CLEC, to ensure that the CLEC’s will not be impacted with development changes (on the EDI side). If it is found that their will need to be changes to development for the CLEC to support the addendum, then the CLEC would have the right not to support the addendum until the following release. McLeodUSA has been faced with numerous last minute development changes, due to addendum’s being issued very close to our EDI release implementation dates.

Status History

Date Action Description
9/28/2001 CR Submitted CR was received in the System process and logged. 
10/8/2001 Clarification Meeting Held Clarification meeting held with McLeodUSA (see minutes) 
10/18/2001 Discussed at Monthly CMP Meeting Discussed at the October CMP Meeting. This is a systems documentation issue, no system change is needed so is not a candidate for 10.0. No questions from the CLEC community. Level of Effort is not applicable. 
10/29/2001 Draft Response Issued Draft response posted to CMP database 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. SCR092801-1 ranked 15 
11/15/2001 Discussed at Monthly CMP Meeting Discussed at the November CMP Meeting; discussion to continue on this item through redesign; see November CMP meeting minutes; CR Status updated to On Hold pending outcome of discussion in Redesign 
12/1/2001 Status Changed Status changed to "On Hold" pending Re-Design resolution 
1/17/2002 Discussed at Monthly CMP Meeting CR # SCR092801-1 discussed during 10.0 Packaging Presentation 
1/17/2002 Status Changed CR # SCR092801-1 status updated to 'Packaged' for 10.0 
3/13/2002 Status Changed Status updated from 'Packaged' to 'Development' 
3/21/2002 Discussed at Monthly CMP Meeting SCR092801-1 discussed at March Systems CMP Monthly meeting during IMA Release 10.0 Commitment Discussion (Attachment I) 
6/20/2002 Discussed at Monthly CMP Meeting SCR092801-1 discussed at June Systems CMP Monthly meeting; please see Systems CMP Distribution Package June CMP -- Attachment N 
6/20/2002 Discussed at Monthly CMP Meeting SCR092801-1 discussed at June Systems CMP Monthly meeting; please see Systems CMP Distribution Package July CMP -- Attachment G 
6/25/2002 Status Changed Status updated to CLEC Test based upon discussion at June Systems CMP Meeting and IMA 10.0 Deployment on June 17, 2002 
7/18/2002 Discussed at Monthly CMP Meeting SCR092801-1 discussed at July Systems CMP Monthly meeting; please see Systems CMP Distribution Package July CMP -- Attachment G 

Project Meetings

July 18, 2002 CMP Meeting Discussion: This CR was completed with the IMA 10.0 Release. No CMP participants disagreed with the proposal to update this CR to Completed.

11/15/01 November CMP Discussion: Jeff Thompson would like the proposed process agreed to at the the re-design meeting. Eschelon advised that McLeod does not participate in re-design. McLeod will be invited along with EDI vendors to the December or January re-design meeting. Eschelon asked if the proposal agrees with McLeod's request. Jeff advised that no it does not. McLeod does not want any addendums and addendums are necessary for corrections. NightFire wants an analysis of previous addendums. Jeff advised that he would provide addendum examples to use in the discussion, an analysis is too big of a job.

Alignment/Clarification Meeting

10:00 a.m. (MDT) / Monday 8th October 2001 SC092801-1 Release Addendum Deadline Date and Addendum Submission Requirements

Attendees Peggy Esquibel-Reed / Qwest Michelle Sprague / McLeod USA Joseph J. Bradley / Qwest Annelyn Aficial / Qwest Beth Foster / Qwest Dianne Friend / Qwest Tracy Gilford / Qwest Gerald Mohatt / Qwest Lynn Stecklein / Qwest

10-08-01: Received clarification from Michelle Sprague, there are not two change requests, this request is a two-fold request. Part 1) McLeod would like a deadline established for addendum’s. Part 2) McLeod would like 30 days to review the ‘draft addendum’ for EDI associated changes. If code changes are involved, the CLEC would like the right to have the change moved to another release. Michelle advised that there has been some instances where addendum’s have impacted CLEC’s due to code changes and not enough notice was given to the CLEC’s to make any system changes. One example when impacted was the 8.0 release involving a manual indicator. Qwest advised that a draft developer worksheet does go out a few months prior to a release, but is not a full disclosure document. Qwest advised that a process for addendum’s may exist and will research. Confirm Interfaces & Products Impacted: IMA / EDI

CenturyLink Response

For Review by the CLEC Community and Discussion at November CMP Meeting DRAFT RESPONSE

October 29, 2001

Michelle Sprague ILEC Relations Manager McLeodUSA

CC: Jeffery Thompson Teresa Jacobs Joseph J. Bradley Beth King

C This letter is in response to your CLEC Change Request Form, number SCR092801-1, dated September 28, 2001, CR Title: Release Addendum Deadline Date and Addendum Submission Requirements

CR Description: McLeod USA has two change requests in regards to release addendum’s. McLeod USA is requesting a deadline date to be initiated for the submission of addendum’s pertaining to an IMA/EDI release. To McLeod’s knowledge there is not currently a deadline date associated with addendum’s. McLeod would request that all addendum’s be submitted by Qwest, within 30-days of the Disclosure document being published. McLeod would also like to put a requirement in place that would require that each addendum be reviewed and discussed with Qwest and the CLEC, to ensure that the CLEC’s will not be impacted with development changes (on the EDI side). If it is found that their will need to be changes to development for the CLEC to support the addendum, then the CLEC would have the right not to support the addendum until the following release. McLeodUSA has been faced with numerous last minute development changes, due to addendum’s being issued very close to our EDI release implementation dates.

Additional clarification was received from Michelle in the Clarification Meeting that was held on Monday, October 8th and at the October CMP Forum. There are not two change requests; this request is a two-fold request. Part 1) McLeod would like a deadline established for addendum’s. Part 2) McLeod would like 30 days to review the ‘draft addendum’ for EDI associated changes. If code changes are involved, the CLEC would like the right to have the change moved to another release. Michelle advised that there has been some instances where addendum’s have impacted CLEC’s due to code changes and not enough notice was given to the CLEC’s to make any system changes. One example when impacted was the 8.0 release involving a manual indicator. Qwest advised that a draft developer worksheet does go out a few months prior to a release, but is not a full disclosure document. Qwest advised that a process for addendum’s may exist and will research.

Qwest Response: An addendum to the IMA EDI Disclosure Document is required anytime any content of the disclosure document changes. The addendum will always include a change summary that will explain each change by chapter or appendix, location (ie. business description or field on developer worksheet), action taken (add, delete, change), and a concise summary of the change. Additionally, each chapter on the web page includes the date of update next to it's title. Following is a high level overview of the current disclosure, release and addendum process: * Draft Developer Worksheets -- 45 days prior to a release the draft Developer Worksheets are made available to the CLEC’s. * Final Disclosure - 5 weeks prior to a release the Final Disclosure documents, including I charts and developer worksheets are made available to the CLECs. * Release Day - On release day only those CLECs using the IMA GUI are required to cut over to the new release. * 1st Addendum - 2 weeks after the release the 1st addendum is sent to the CLECs. * Subsequent Addendum’s - Subsequent addendum’s are sent to the CLECs after the release as needed. There is no current process and timeline. * EDI CLECs - 6 months after the release those CLECs using EDI are required to cut over to the new release. CLECs are not required to support all new releases.

Following is a high level overview of the proposed disclosure, release and addendum process. * Draft Disclosure -- 73 days prior to release the CLECs receive full draft disclosure. * Walk through & Review Disclosure - 68 days prior to release the CLECs and Qwest walk through and review the draft disclosure documents. * CLECs have a designated period of time to identify issues and discuss them with Qwest. Where appropriate Qwest will make changes to the release and the disclosure documents. * Final Disclosure Documents will be made available to the CLECs prior to the 5-week mark that is used in the current process. * SATE Test Environment -- 30 days prior to the release the CLECs will be given the opportunity to test interfaces in SATE environment. * Addendum’s - The 1st addendum will be published 2 weeks after the release. Subsequent addendum’s will be published as needed.

Based on the information noted above, this CR would require changes to systems documentation. This request will not result in a system change, therefore a level of effort is not appropriate and this request is not eligible for a systems release. This issue is also being addressed in the re-design meetings.

Sincerely, Karen Henry Information Technologies Sr. Director

Archived System CR SCR091201-1 Detail

 
Title: New indicator on the Service Activity File (SOACTVTY.DET )
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR091201-1 Completed
9/19/2001
-   Wholesale Billing Interfaces/ Billmate GUI
Originator: Sprague, Michelle
Originator Company Name: McLeodUSA
Owner: Routh, Mark
Director:
CR PM: Routh, Mark

Description Of Change

Requesting a new indicator on the Service Activity File (SOACTVTY.DET this new file replaced the previous OCC files), to break out the nonrecurring and fractional charges. The old OCC files did break out nonrecurring and fractional charges, therefore it’s replacement (Service Activity File) should offer the same breakdown. Currently McLeod is being forced to page through 15,000 page bills, to determine the breakout. This manual workaround can not be a long term solution.

Status History

Date Action Description
9/12/2001 Info Sent to CLEC Sent updated CR to Michelle Sprague and Rosemarie Ferris 
9/12/2001 CR Submitted Received and logged the CR. Status set to Submitted 

Project Meetings

CenturyLink Response

Archived System CR 5425855 Detail

 
Title: Convert As Is for Directory Listings.
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

5425855 Withdrawn
1/8/2002
-   IMA Common/ Centrex/Western Region
Originator: Sprague, Michelle
Originator Company Name: McLeodUSA
Owner: Routh, Mark
Director:
CR PM: Routh, Mark

Description Of Change

Would like ability to select the LACT field=Z (convert as is) for Directory listings. This is an option in the I-Charts for the EDI disclosure Version 5, but is not being supported.

Status History

Date Action Description
Release Information IMA Release 
3/30/2000 Info Sent to CLEC 1 Sent email to Michelle Sprague and Rosemarie Ferris with updated CR. 
3/5/2001 CR Submitted CR was received and logged with a status of New - To be validated. 
3/5/2001 Info Sent to CLEC Sent email to Michelle 
3/30/2001 Status Changed Status changed to Canceled - Qwest. This is due to the way Main listings are handled for Centrex accounts. 
3/30/2001 Status Changed T-Shirt size given of Declined - Centrex processing requirements do not support this functionality. 
12/18/2001 Record Update Changed status from 'Cancelled CLEC' to 'Withdrawn' for database cleanup 

Project Meetings

CenturyLink Response

Archived System CR 5466535 Detail

 
Title: More detailed FOC
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

5466535 Withdrawn
1/17/2002
-   IMA EDI/10 Resale 1FB,Centrex
Originator: Mohrfeld, Christine
Originator Company Name: McLeodUSA
Owner: Gallegos, John
Director:
CR PM: Routh, Mark

Description Of Change

We would like to receive a more detailed FOC on all resale orders to include the following: 1) USOCs, 2) FIDs, 3) How the hunting sequence is set up once the Qwest order is typed, listing the numbers in the order of the hunt sequence. 4) When applicable, what is the call forwarding number on the order? 3) LPIC and PIC. 4) Verify if a voice mailbox exists on the order. McLeod has experienced a huge number of Qwest typist errors. When Qwest receives an order from McLeod, Qwest has the ability to reject the order based on errors. McLeod wants the capability to ensure our order has been typed the way we wrote it. This would be possible through a more detailed FOC.

Status History

Date Action Description
3/26/2001 Record Update T-shirt size and options will be discussed, and the Industry Evaluation will be completed at the April 18th CICMP meeting. 
3/26/2001 Info Sent to CLEC Sent e-mail with updated CR to Christine Morfield and Rosemarie Ferris. 
3/26/2001 CR Submitted Received and Logged. Status set to -New - To be validated 
4/18/2001 LOE Issued T-Shirt size Large and options provided at the April CICMP meeting. 
4/18/2001 Status Changed Status changed to Reviewed - Under consideration 
4/18/2001 Discussed at Monthly CMP Meeting  
4/26/2001 Info Sent to CLEC Sent e-mail with updated CR to Christine Morfield and Rosemarie Ferris. 
9/28/2001 Baseline Candidate Selection CLEC meeting (see minutes) 
10/25/2001 Status Changed Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. 5466535 ranked 23 
11/9/2001 Record Update Meeting minutes from Actions # 325 included in this CR 
1/17/2002 Discussed at Monthly CMP Meeting CR # 5466535 discussed during 10.0 Packaging Presentation; CLECs agreed that CR should be withdrawn because it is a duplicate of CR25497 
1/17/2002 Status Changed Status updated to 'Withdrawn' because this CR is a duplicate of CR25497 

Project Meetings

CLEC-Qwest FOC S&E Section meeting 2:00p.m. – 3:00p.m. Friday, September 28, 2001 Conference Call

INTRODUCTION

The call was conducted in order to clarify the CLECs requirements for the S&E Section on the FOC that Qwest provides to the CLECs

ATTACHMENTS

Attachment A – List of Attendees

MEETING MINUTES

The meeting began with introductions of the attendees. Mark Routh-Qwest welcomed the attendees and stated the meeting was intended to confirm the CLEC’s requirements for the information to be returned on the S&E section of the Firm Order Completion (FOC).

Barbara Campbell – Qwest asked if everyone had a copy of the documentation that was distributed for the meeting.

Barbara Campbell – Qwest read through the Eschelon Change Request. Then she reviewed the sample FOC that was sent to the CLECs

Barbara Campbell – Qwest asked if the sample met the CLECs requirements.

The CLECs all agreed that it did.

Barbara Campbell – Qwest asked if the CLECs would agree to receiving the FOC’s outside of the normal response time due to more information being created.

The CLECs said yes.

The CLECs asked if certain information would be on the FOC.

Barbara Campbell – Qwest said that the S & E section on the FOC would be the same information that they would be getting on their completions notices.

The CLECs asked if they would get another FOC if the information changed.

Barbara Campbell – Qwest said that the FOC process was not changing, just the addition of the S & E section to the FOC, so if they were getting FOCs now when data changed, they would continue to receive them. She asked if this change would be for all products.

The CLECs said yes.

The CLECs asked when this would be implemented.

John Gallegos - Qwest indicated that it could not be done prior release 10.0 (pending the CLEC prioritization of this CR)

RESULTS OF THE DISCUSSION

The CLECs agreed to having the same information on the FOC as they are currently getting on completions notifications.

The CLECs agreed to a possible longer response time for the FOC since more data would be provided.

The CLECs agreed that it would be for all products.

The change would go in to the IMA release 10.0

Attachment A – List of Attendees

First Last Company Attended Mark Routh Qwest In-Person John Gallegos Qwest In-Person Barbara Campbell Qwest In-Person Curt Anderson Qwest In-Person Lynne Powers Eschelon Called in Bonnie Johnson Eschelon Called in Jan Stafford AT&T Called in H Fluker AT&T Called in Esther Scherer AT&T Called in T Dwayne AT&T Called in Terry Bahner AT&T Called in Jonathan Spangler AT&T Called in Rose Ann Brown AT&T Called in Kelly Morris ELI Called in Lorna Megasi ELI Called in Lori Nelson Midcontinent Called in Scott Simon Premier Called in Lana Messenger Freetel Called in Bob Carias NightFire Called in

CenturyLink Response

Archived System CR 4433500 Detail

 
Title: DSS Order Functionality to IMA GUI
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

4433500 Completed
10/18/2001
-   IMA GUI/8
Originator: Lawson, Mary
Originator Company Name: McLeodUSA
Owner: Routh, Mark
Director:
CR PM: Routh, Mark

Description Of Change

Improve IMA GUI functionality to allow for submission of LSR orders for DSS services.

Status History

Date Action Description
Release Information IMA Release 8.00 

Project Meetings

CenturyLink Response

Archived System CR 5371938 Detail

 
Title: Incorrect Address on Exact Match AVR Response
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

5371938 Withdrawn
2/21/2001
-   IMA EDI/ Unbundled Loop
Originator: Pedersen, Kate
Originator Company Name: Northpoint
Owner: Routh, Mark
Director:
CR PM: Routh, Mark

Description Of Change

It appears that when an address returns only one AVR response, this returns from Qwest as an ‘Exact Match’ even if the address differs by city, state, and zip code.

Status History

Date Action Description
Release Information IMA Release 
2/1/2001 Info Sent to CLEC Sent email to Kate Pedersen and Tom Lawson with updated CR. 
2/1/2001 Record Update T-Shirt size and options to be presented in Feb CICMP meeting. 
2/1/2001 CR Submitted T-Shirt size and options to be presented in Feb CICMP meeting. 
2/2/2001 Info Sent to CLEC Sent email to Kate Pedersen and Tom Lawson with updated CR. 
2/2/2001 Status Changed Status changed to Evaluated - To Be Reviewed. 
2/7/2001 Status Changed Reviewed - Under Consideration 
2/8/2001 Info Sent to CLEC Sent email to Kate Pedersen and Tom Lawson with updated CR. 
2/8/2001 LOE Issued T-Shirt size NA and options provided. Not eligible for industry prioritization. 
2/21/2001 Status Changed Status changed to Cancelled -Qwest due to the fact that Qwest will provide a CALA Field Map that will remedy this problem. 
2/27/2001 Info Sent to CLEC Sent email to Kate Pedersen and Tom Lawson with updated CR. 
12/18/2001 Record Update Changed status from 'Cancelled CLEC' to 'Withdrawn' for database cleanup 

Project Meetings

CenturyLink Response

Archived System CR 5370693 Detail

 
Title: More descriptive IMA Error Message for “Busy CFA”
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

5370693 Completed
3/21/2002
-   IMA Common/9 Unbundled Loop
Originator: Pedersen, Kate
Originator Company Name: Northpoint
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

We would like the "Busy CFA" error message to be more descriptive allowing us to know right away what is wrong. Is it formatted wrong or in use? And if in use, where?

Status History

Date Action Description
Release Information IMA Release 9.00 
2/1/2001 Info Sent to CLEC Sent email to Kate Pedersen and Tom Lawson with updated CR. 
2/1/2001 Record Update T-Shirt size and options to be presented in Feb CICMP meeting. 
2/1/2001 CR Submitted Received CR and assigned status of New - To be validated 
2/2/2001 Status Changed Status changed to Evaluated - To be reviewed. 
2/2/2001 Info Sent to CLEC Sent email to Kate Pedersen and Tom Lawson with updated CR. 
2/7/2001 Info Sent to CLEC Sent email to Kate Pedersen and Tom Lawson with updated CR. 
2/7/2001 LOE Issued T-Shirt Size Small (option A) or Extra Large (Option B) and option description provided. CR is eligible for industry prioritization. 
2/7/2001 Status Changed Status changed to Reviewed - Under consideration. 
3/21/2001 Status Changed Status changed to Reviewed - Release Baseline Candidate for IMA 9.0 
3/29/2001 Info Sent to CLEC Sent email to Kate Pedersen and Tom Lawson with updated CR. 
10/24/2001 Baseline Candidate Selection CLECs notified this CR was a selected CR Baseline Candidate. 
2/25/2002 Status Changed 5370693 status updated to 'CLEC Test' based upon 2/25/02 implementation of IMA 9.0 
3/21/2002 Status Changed Reviewed in the 3/21/02 CMP meeting and Closed. 
3/21/2002 Discussed at Monthly CMP Meeting 5370693 discussed March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP - Attachment E 

Project Meetings

CenturyLink Response

Archived System CR 26636 Detail

 
Title: Shared Loop Enhancements
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

26636 Completed
9/17/2004
1950 - 3250  IMA Common/15 Shared Loop
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Esquibel-Reed, Peggy

Description Of Change

This project stemmed out of the work done for the Shared Distribution Loop (SDL) long-term solution. Several of the functionalities that were identified for the SDL product also needed to be applied to the Shared Loop product.

* Provide full follow-through for Shared Loop orders that have LNA=N

* Provide the ability to recap meet points from the Pre-Order query in IMA to the LSR.

* Allow conversion from Qwest DSL to Shared Loop to be an LNA=V

* Allow conditioning to be requested after Shared Loop service has been established

Status History

Date Action Description
9/28/2001 CR Submitted CR transferred from legacy database to CMP database 
9/28/2001 Clarification Meeting Held Clarified CR with John Gallegos. 
10/18/2001 Discussed at Monthly CMP Meeting Presented at Oct CMP meeting 
10/25/2001 Status Changed Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. 26636 ranked 49 
1/17/2002 Status Changed CR # 26636 status updated to 'Presented; CR was not packaged as part of 10.0 and is eligible for ranking in 11.0' 
2/21/2002 Discussed at Monthly CMP Meeting Eligible for the IMA 11.0 Prioritization. 
2/21/2002 Discussed at Monthly CMP Meeting 26636 discussed during 'Review of 11.0 Prioritization Eligible CRs' portion of February Systems CMP Monthly meeting; please see Attachment I of February Systems CMP Distribution Package 
3/1/2002 Release Ranking Ranking for Release 11.0 following the February 2002 Systems CMP Meeting. 26636 ranked number 16 
3/1/2002 Status Changed Status updated to 'Prioritized' from 'Presented' 
4/1/2002 Release Ranking Ranking for SATE following the March 2002 Systems CMP Meeting. 26636 ranked number 14 
6/7/2002 Status Changed 26636 status updated to 'Pending Prioritization' based upon outcome of IMA 11.0 Packaging Selection vote 
7/18/2002 Discussed at Monthly CMP Meeting 26636 discussed at July Systems CMP Monthly meeting; please see Systems CMP Distribution Package July CMP -- Attachment P 
7/26/2002 Status Changed Status set to Prioritized as a result of the release prioritization for IMA 12.0 
7/26/2002 Release Ranking Ranking for Release 12.0 following the July 2002 Systems CMP Meeting. 26636 ranked number 28 
10/30/2002 Status Changed 26636 status updated to 'Pending Prioritization' based upon outcome of release 12.0 packaging effort 
12/19/2002 Discussed at Monthly CMP Meeting 26636 discussed at December Systems CMP Monthly meeting; please see Systems CMP Distribution Package December CMP -- Attachment O 
12/31/2002 Release Ranking Ranked #29 for IMA 13.0 Relase 
1/23/2003 Release Ranking Ranked #27 for IMA 13.0 after exception request SCR011303-02EX 
3/13/2003 Status Changed Status changed to Pending Prioritization after Packaging of IMA 13.0 
4/7/2003 Release Ranking 14.0 Prioritization- Ranked #27 out of 53 
4/28/2003 Release Ranking Rank changed due to Late Adders- Ranked #29 
5/30/2003 Release Ranking Rank changed due to Late Adders- Ranked #30 
7/9/2003 Status Changed Status changed to pending prioritization with release of I MA 14.0 Packaging. 
8/21/2003 Discussed at Monthly CMP Meeting Discussed at the August Systems CMP Monthly Meeting; please see August Systems CMP Distribution Package, Attachment P 
9/2/2003 Related Change Request 15.0 Prioritization- Ranked #11 out of 57 
9/29/2003 Release Ranking 15.0 Revised Prioritization, due to Late Adder - Ranked #12 out of 58 
11/20/2003 Status Changed Status changed to Packaged 
11/20/2003 Discussed at Monthly CMP Meeting Discussed at November Monthly CMP Meeting - See Attachment O 
2/17/2004 Qwest CR Review Meeting IMA 15.0 Hi-Level Walk Thru Held 
2/19/2004 Discussed at Monthly CMP Meeting Discussed at the February Systems CMP Monthly Meeting; please see the February Systems CMP Distribution Package, Attachments H & J 
3/18/2004 Discussed at Monthly CMP Meeting Discussed at the March Systems CMP Monthly Meeting; please see March Systems CMP Distribution Package, Attachment K 
4/19/2004 Status Changed Status Changed to CLEC Test due to the Deployment of the IMA 15.0 Release 
4/22/2004 Discussed at Monthly CMP Meeting Discussed at the April Systems CMP Monthly Meeting; please see April Systems CMP Distribution Package, Attachment G 
5/20/2004 Discussed at Monthly CMP Meeting Discussed at the MaySystems CMP Monthly Meeting; please see May Systems CMP Distribution Package, Attachment G 
6/17/2004 Discussed at Monthly CMP Meeting Discussed at the June Systems CMP Monthly Meeting; please see June Systems CMP Distribution Package, Attachment G 
7/22/2004 Discussed at Monthly CMP Meeting Discussed at the July Systems CMP Monthly Meeting; please see July Systems CMP Distribution Package, Attachment G 
8/18/2004 Discussed at Monthly CMP Meeting Discussed at the August Systems CMP Monthly Meeting; please see August Systems CMP Distribution Package, Attachment G 
9/16/2004 Discussed at Monthly CMP Meeting Discussed at the September Systems CMP Monthly Meeting; please see the September Systems CMP Distribution Package, Attachment G 

Project Meetings

September 16, 2004 Systems CMP Meeting Discussion: Connie Winston/Qwest stated that this CR was completed in the 15.0 release. The CLEC Community agreed that this CR could be closed.

- August 18, 2004 Systems CMP Meeting Discussion: Connie Winston/Qwest stated that this CR was implemented in 15.0 and would remain in CLEC Test.

July 22, 2004 Systems CMP Meeting Discussion: Connie Winston/Qwest stated that this was implemented in 15.0 and would remain in CLEC Test.

June 17, 2004 Systems CMP Meeting Discussion: Connie Winston/Qwest stated this CR will remain in CLEC Test for another month per the request of Donna Osborne-Miller/AT&T.

5/20/04 Systems CMP Meeting Connie Winston/Qwest stated that the majority of the CRs in Attachment G were deployed in 15.0. Connie said that we usually like to wait for the 1st EDI customer to certify a new release. Bonnie Johnson/Eschelon said that when the submitting CLEC of a CR has not moved to the release and another CLEC performs the test, they may not understand the submitting CLECs intent or their system may be different. Bonnie said that she initiated a CR to establish a new status and Qwest voted no. 6/1/04 - Revision to Minutes from Eschelon. Bonnie said that we need to define in the CMP Document, a new status that fits the situation when a CR has not been tested in a release. Randy Owen/Qwest said that we might look at something between CLEC Test and Completed. Cheryl Peterson/AT&T said that we might use CLEC Test One and Two. Bonnie Johnson/Eschelon said that we could use ‘Pending Test’ or ‘CLEC Hold’. Connie Winston/Qwest stated that we would create an action item to research the possibility of establishing a new Status Code.

This CR will remain in CLEC Test.

- April 22, 2004 Systems CMP Meeting Discussion: Connie Winston/Qwest stated that this CR just deployed with the IMA 15.0 Release and will remain open for another month. There were no questions or comments. This CR remains in CLEC Test.

March 18, 2004 Systems CMP Meeting Discussion: Connie Winston/Qwest stated that this CR is deploying on April 19, 2004, in the IMA 15.0 Release. There were no questions or comments.

February 19, 2004 Systems CMP Meeting Discussion Excerpt (Attachments H & J): Judy Schultz/Qwest stated that she wanted to provide an update to the funding approval process that was discussed in the January CMP Systems Meeting. Judy referred everyone to Attachment J in the Distribution Package. She stated that all CRs are being re-evaluated and must be approved. Judy said that CRs could not be scheduled without approval. Judy stated that the CRs with an impact to the IMA interface would follow the existing prioritization process. Judy noted that the funding for IMA 15.0 and IMA 16.0 has been approved, as well as funding to begin work on IMA 17.0.

MEETING MINUTES-February 17, 2004 Hi-Level Walk Through of IMA 15.0 Committed CR's

Attendees: Anne Robberson-Process Analyst (Qwest), Curt Anderson- IT Systems Analyst (Qwest), Diane Burt-Systems Analyst (AT&T), Donna Osborne-Miller - Carrier Relations Manager (AT&T), Dusti Bastian-Process Analyst (Qwest), Ellen McArthur-Process Analyst (Qwest), Hank Martinez-IT Systems Analyst (Qwest), James McCluskey-ILEC Manager (Accenture), John Daugherty-Product Management (AT&T), John Gallegos-IT Manager (Qwest), Kathy Miller-Process Manager (Qwest), Kim Isaacs-ILEC Relations Process Analyst (Eschelon), Kyle Kirves-IT Analyst (Qwest), Linda Miles-Process Manager (Qwest), Lori Langston-Process Manager (Qwest), Marie Acceno-Systems Analyst (AT&T), Nancy Denny-IT Analyst (Qwest), Nicole James-IT Analyst (Qwest), Pat Bratetic-Process Manager (Qwest), Phyllis Burt-Systems Analyst (AT&T), Randy Owen-IT Manager (Qwest), Shon Higer-Process Analyst (Qwest), Shonna Pasionek-IT Analyst (Qwest), Stephanie Prull-EDI Business Analyst (Eschelon), Susie Wells-Product/Process Analyst (Qwest) Meeting Facilitator: Nancy Denny (Qwest)

Purpose: High-level walk-through of the CRs that are committed in the IMA 15.0 Release.

Supporting Documents: Qwest Notification: SYST.02.13.04.F.01366.IMAEDI15.0Cand&DocWkth Documentation containing 15.0 Candidate Summaries: February 17, 2004, attached to notification CRs can be found in the Qwest Wholesale Change Request Interactive Report located at: http://www.qwest.com/wholesale/cmp/changerequest.html

Functional Overview: CLEC’s using the IMA GUI currently must manually enter meet point data obtained from a Pre-Order Meet Point Query into their LSR. Enhancements introduced by this request allow user’s to perform a Pre-Order Meet Point Query and have the response information pre-populated in the POTSSPLIT field on Loop Service form. The information that will be pre-populated will be only validated Meet Point information that was returned from the Pre-Order Query. In addition, users will be able to paste/edit the pre-populated meet point data on the Loop Service form if they chose to do so.

Form Impacts: LS (Loop Service) Note: The LS form POTSSPLIT field length will increase from 24 to 38

Products: Shared Loop

Activities: N/A

Meeting Discussion: Linda Miles presented the overview based on the documentation published with the agenda.

There were no questions.

- August 21, 2003 Systems CMP Meeting Discussion: No comment.

CenturyLink Response

Archived System CR 20408 Detail

 
Title: De averaging
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

20408 Completed
4/18/2002
-   IMA Common/ All Products
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

Create a means of rating Wholesale products based on zone location..

Status History

Date Action Description
Release Information IMA Release 
10/23/2001 CR Submitted CR transferred from legacy database to CMP database 
11/6/2001 Record Update Originally slated for 9.00 Release, but moved to coincide with 04/13/02 CRIS Release 
4/10/2002 Status Changed Status upated from 'Development' to 'CLEC Test'. This CR will be reviewed for closure in the April CMP meeting. 
4/18/2002 Discussed at Monthly CMP Meeting 20408 discussed at April Systems CMP Monthly meeting; please see Systems CMP Distribution Package April CMP -- Attachment E 
4/18/2002 Status Changed Status updated from 'CLEC Test' to 'Completed' 

Project Meetings

CenturyLink Response

Originally slated for 9.00 Release, but moved to coincide with 04/13/02 CRIS Release

Archived System CR 26633 Detail

 
Title: UBL Ocn ACT=N UNE Remand Docket 96 98
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

26633 Completed
10/22/2001
-   IMA Common/8
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Gallegos, John
Director:
CR PM: Routh, Mark

Description Of Change

Prior to the 6.0 release of IMA, Co-Providers were able to submit their LSR requests to do regular Local Number Port Out anytime, any day of the week, including Saturday, Sunday and Holidays, utilizing the IMA Flow-Through ordering process.

Status History

Date Action Description
Release Information IMA Release 8.00 
8/1/2001 CR Submitted CR was received from Qwest 
8/1/2001 CR Acknowledged Sent an acknowledgment to John Gallegos of Qwest 
8/15/2001 Discussed at Monthly CMP Meeting CR was presented by Qwest and discussed at the August CMP meeting.This CR has been selected for IMA Release 8.0 
10/22/2001 Status Changed CR was completed in IMA 8.0 

Project Meetings

CenturyLink Response

This project was completed in IMA Release 8.0

Archived System CR 31562 Detail

 
Title: Add LSOG LR Form Functionality
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

31562 Withdrawn
11/15/2001
-   IMA Common/ All Products
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

Change existing Qwest functionality for jeopardy, reject and FOC/LRSC notices to the LR form in LSOG6. The functionality allows most CLEC notifications to be processed using one form (the OBF LR form). Implementing this functionality requires: - replacing current forms with the LR form or map existing Qwest forms to the LR form.

Status History

Date Action Description
Release Information IMA Release 
10/25/2001 CR Submitted CR was received from Qwest 
10/25/2001 CR Acknowledged Notified Qwest that the CR had been received and logged 
11/15/2001 Discussed at Monthly CMP Meeting CR was presented by Qwest at the Nov. CMP meeting 
2/5/2002 Status Changed CR31562 is withdrawn due to duplication with SCR013102-1; both CR's seek the exact same change. 

Project Meetings

CenturyLink Response

Archived System CR 26637 Detail

 
Title: INTRABUILDING CABLE
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

26637 Completed
10/5/2001
-   IMA Common/8
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Gallegos, John
Director:
CR PM: Routh, Mark

Description Of Change

This user request is to support the new Sub-Loop product Intrabuilding Cable. There are 7 new USOCs and new NC/NCI’s for this product.

Status History

Date Action Description
Release Information IMA Release 8.01 
9/7/2001 Record Update This is the Short Term Solution and was completed 

Project Meetings

CenturyLink Response

Archived System CR 30208 Detail

 
Title: SASN Edit for Flow Through
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

30208 Withdrawn
2/21/2002
200 - 750  IMA Common/ All products
Originator: Higer, Shon
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

The address validation routine requires that if the AHN (assigned house number) is populated then the SASN (street name) must begin with the @ symbol. A new edit in IMA should require that the @ symbol be entered as the first character in SASN when AHN.

An address validation failure will cause a LSR to drop out for manual handling. The requested IMA edits improve Qwest’s ability to validate the end user address, locate the correct CSR, and process the request via flow through.

This enhancment was identified during review of LSR fall-out.

The following approximate monthly volume of address validation failures will be corrected by the requested validation improvements. This same volume of conversion LSRs will be eligible for flow through and a more timely FOC:

POTS Resale: 150

LNP: 120

UNE-P: 10

Unbundled Loop: 15

A new edit in IMA will require a "@" symbol as the first character in the SASN (Street Name) field followed by a valid street name any time AHN (Assigned House Number) is populated. If AHN is populated and SASN does not contain "@" as the first character along with a valid street name the LSR will be rejected

Another edit will stipulate that a "@" symbol should never be allowed as the only entry in SASN. If "@" is entered in SASN and a valid street name does not follow it the LSR will be rejected.

Two relational edits will enforce the following new rules in IMA:

1. Route cannot be populated if SANO is populated. If both Route and SANO are populated, the LSR will be rejected.

2. Route is required when BOX is populated. If BOX is populated and Route is not, the LSR will be rejected.

An existing condition for the AHN field will be enforced as an edit in IMA. The existing condition is: AHN required for unnumbered addresses (SANO (Field11) is not populated for unnumbered addresses), otherwise not applicable.

An existing condition for the SANO field will be enforced as an edit in IMA. The existing condition is: SANO required for numbered addresses, otherwise, not applicable.

Status History

Date Action Description
Release Information IMA Release 
9/26/2001 CR Submitted CR submitted 
10/18/2001 Discussed at Monthly CMP Meeting CR Presented at October Monthly Systems CMP Meeting 
11/15/2001 Discussed at Monthly CMP Meeting CR discussed at monthly systems CMP Meeting 
1/31/2002 Record Update Change Request updated to improve the description of desired change 
2/13/2002 Record Update LOE updated from Medium to Small 
2/21/2002 Status Changed CR was withdrawn by Qwest at the Feb CMP meeting 
2/21/2002 Discussed at Monthly CMP Meeting 30208 discussed during 'CRs to consider for Closure' portion of February Systems CMP Monthly meeting; please see Attachment E of February Systems CMP Distribution Package 

Project Meetings

CenturyLink Response

Archived System CR 30157 Detail

 
Title: IBA PO 6 & 7 Transmission Date and Timestamps IBA Measures
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

30157 Completed
12/31/2001
-   IMA Common/8
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Gallegos, John
Director:
CR PM: Routh, Mark

Description Of Change

To get the actual transmission dates and timestamps for the EDI/IMA work and billing completions.

Status History

Date Action Description
Release Information IMA Release 8.01 
12/15/2001 Record Update This CR was completed in a 8.01 patch 

Project Meetings

CenturyLink Response

12/15/01 - This CR was completed in a 8.01 patch

Archived System CR 23569 Detail

 
Title: UNE Unbundled ATM Switch Interface Port
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

23569 Completed
10/8/2001
-   IMA Common/
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Gallegos, John
Director:
CR PM: Routh, Mark

Description Of Change

Implement the product Unbundled Packet ATM Switch Interface Port.

Status History

Date Action Description
Release Information IMA Release 
10/8/2001 Status Changed Close per email from Gerald Mohatt, CR was completed in a IMA patch 

Project Meetings

CenturyLink Response

Archived System CR 23932 Detail

 
Title: UPS Virtual Customer Channel (New Product)
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

23932 Completed
10/8/2001
-   IMA Common/
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Gallegos, John
Director:
CR PM: Routh, Mark

Description Of Change

Implement the product Unbundled Packet Switch Virtual Customer Channel. This product is a result of the FCC Remand and is part of Wholesale’s Unbundled Packet Switching offering.

Status History

Date Action Description
Release Information IMA Release 
10/8/2001 Status Changed Close per email from Gerald Mohatt, CR was completed in a IMA patch 

Project Meetings

CenturyLink Response

Archived System CR 30819 Detail

 
Title: Loop Splitting
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

30819 Withdrawn
1/17/2002
-   IMA Common/ UBL
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Gallegos, John
Director:
CR PM: Routh, Mark

Description Of Change

Shared Loop is defined as making available the opportunity for a Data Local Exchange Carrier (DLEC) to offer qualified advanced data services (ADSL) on an existing Qwest end user’s analog voice grade service. The end user service considered candidates for Shared Loop are simple Business/Residential customers, either flat rate or measured (e.g. 1FR,1FB & 1MR)

In the central office, a loop carrying ADSL traffic is split by a device called a POTS Splitter. One end is connected to an ADSL modem for access to the internet; the other end is connected to the switch for voice communication. The DLEC will use the data portion of the loop while Qwest will maintain the voice portion of the loop.

The following forms will be used between Qwest and the Co-Provider for Shared Loop ordering purposes:

* LSR - Local Service Request

* EU - End User

* LS –Loop Service Request

* LSNP – Loop Service With Number Portability Request

Status History

Date Action Description
9/28/2001 CR Submitted CR transferred from legacy database to CMP database 
10/18/2001 Discussed at Monthly CMP Meeting Presented at Oct CMP meeting 
10/25/2001 Status Changed Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. 30819 ranked 46 
11/12/2001 Status Changed CR was withdrawn by Qwest Product Manager 

Project Meetings

CenturyLink Response

Archived System CR 29629 Detail

 
Title: Allow service order number beginning with .A. on FOC
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

29629 Completed
10/26/2001
-   IMA Common/8 All Products
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Gallegos, John
Director:
CR PM: Routh, Mark

Description Of Change

Service order numbers that begin with an “A” are currently not allowed in IMA on FOC. A placeholder SO number is used and the actual SOP SO number is entered in Remarks. Auto completion will not be performed on LSRs that have placeholder SO numbers. This change will allow the A Order types to auto complete. The A Order type is used only in the Eastern region after a “Disconnect” to transfer calls to another number.

Status History

Date Action Description
Release Information IMA Release 8.01 
9/28/2001 CR Submitted CR transferred from legacy database to CMP database 
10/18/2001 Discussed at Monthly CMP Meeting Presented at Oct CMP meeting 
10/25/2001 Status Changed Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization 
10/26/2001 Status Changed Completed in a 8.0 patch 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. 29629 ranked 26 

Project Meetings

CenturyLink Response

Completed in a 8.0 patch

Archived System CR 25381 Detail

 
Title: Implement edit to reject requests for conversion from Remote Call Forward for UBL
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

25381 Completed
7/18/2002
-   IMA Common/10 IMA UBL
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

Implement the edit to automatically reject request in IMA for conversion from a Remote Call Forwarding (also referred to as a Market Expansion Line) to an UBL or UBL with Number Port. This CR is related to the Electronic Flow-through Performance Indicator Definition (PIDs PO2A and B) and the LSR Rejection Notice Interval PID (PO3). Colorado Docket 01I-041T. PID definitions can be found at http://www.nrri.ohio-

state.edu/oss/master/perform/perform.htm.

The benefit to CLECs is that errors are caught much earlier in the process and reduces the likelyhood that the CLEC customer will be impacted.

When a CLEC sends in an LSR requesting a conversion from a Remote Call Forwarding to an unbundled loop it is erroring in the Qwest Service Order Processor, which impacts the PO2 measurement. A conversion from an RCF to an Unbundleld Loop is not applicable since there are no facilities on the RCF and the LSR is later rejected. This request will reject the LSR upfront. The CLEC can then submit the LSR for a new loop with portability and use the RCF as the ported number and an LSR for the disconnect order on the RCF account. This applies to Unbundled Loop and Unbundled Loop with number port, REQ TYPE = A and B; ACT=V, Z. A remote Call Forwardiong or Market Expansion Line has the below classes of service, based on the state. The USOC and Class of Service are the same. Only One RCF is billed to an account but it may have multiple paths (or additional lines that use the same TN). The table below defines the States, Service and USOC associated with this CR.

STATES SERVICE USOC

AZ, ID-S

MT, NM,

UT, WY

Local RCFVH

Toll RCFVT

WATS RCFWT

Remote Call

Forwarding (Res) RCFRH

Toll (Res) RCFRT

Add'l path RCA

CO

Local RCFVF

Toll RCFVT

WATS RCFWT

Add'l path RCA

IA, MN,

NE, ND,

SD

Local RCFVF

Interstate/WATS outside of state RCFVE

Intrastate/WATS inside of state RCFVS

International/Canada RCFVN

Remote Call Forwarding(Res) RCFRF

Toll Interstate (Res) RCFRE

Toll International (Res) RCFRN

Toll Intrastate (Res) RCFRS

Add'l path RCA

Malheur, OR

Toll RCFVT

Add’l path RCA

ID-N,

OR,WA

Local RD5

Remote Call

Forwarding(Res) RD6

LD-Intrastate RCFVS

LD-Interstate RCFVE

WATS-Intrastate RCFWS

WATS-Interstate RCFWE

International/Canada RCFVN

Add'l path RCA

Status History

Date Action Description
10/18/2001 CR Submitted CR transferred from legacy database to CMP database 
10/18/2001 Discussed at Monthly CMP Meeting Presented at Oct CMP meeting, status changed to development 
10/18/2001 Clarification Meeting Held Clarified CR at the Monthly CMP meeting. 
10/25/2001 Qwest Response Issued Qwest response included with CLEC prioritization request 
10/31/2001 Release Ranking Ranking for Release 10.0; 25381 is "Above the Line" 
1/17/2002 Discussed at Monthly CMP Meeting CR # 25381 discussed during 10.0 Packaging Presentation 
1/17/2002 Status Changed CR # 25381 status updated to 'Packaged' for 10.0 
3/13/2002 Status Changed Status updated from 'Packaged' to 'Development 
3/21/2002 Discussed at Monthly CMP Meeting 25381 discussed at March Systems CMP Monthly meeting during IMA Release 10.0 Commitment Discussion (Attachment I) 
6/20/2002 Discussed at Monthly CMP Meeting 25381 discussed at June Systems CMP Monthly meeting; please see Systems CMP Distribution Package June CMP -- Attachment N 
6/25/2002 Status Changed Status set to CLEC Test 
7/18/2002 Discussed at Monthly CMP Meeting 25381 discussed at July Systems CMP Monthly meeting; please see Systems CMP Distribution Package July CMP -- Attachment G 
7/18/2002 Status Changed Status updated to Completed 

Project Meetings

CenturyLink Response

Qwest is concerned that there is no CR Type that clearly encompasses these CRs. Qwest believes these CRs are most closely aligned with the Regulatory Change CR type. Qwest proposes to address this concern during the next Redesign Working Session.

Archived System CR 27029 Detail

 
Title: Expand current UBL products to include OC3, OC12, OC48 and OC192 facility types.
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

27029 Withdrawn
10/18/2001
-   IMA Common/ UBL
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

Expand current UBL product to include OC3, OC12, OC48 and OC192 facility types. Will allow Co-Provider variations to DS0, DS1, DS3 facility types currently offered for UBL with or without LNP. Implementation will meet Federal UNE Remand mandate, Docket 96-98.

Status History

Date Action Description
Release Information IMA Release 
9/28/2001 CR Submitted CR transferred from legacy database to CMP database 
10/18/2001 Discussed at Monthly CMP Meeting Presented at Oct CMP meeting, status changed to Presented 
10/18/2001 Baseline Candidate Selection Selected for IMA release 10.0 as a regulatory candidate 
12/13/2001 Status Changed Removed from the IMA 10.0 list due to resource limitations. 
1/31/2002 Status Changed Status updated to "Withdrawn"; this CR is duplicate of CR 5206704; research performed by Gerry Mohatt in discussion with Cheryl Gillilon; remaining work to be performed by UR2032 as part of 5206704 will complete the work requested within CR 5206704 

Project Meetings

CenturyLink Response

This is a Regulatory CR for IMA Release 10.0

Archived System CR 30212 Detail

 
Title: Add New UNE P PAL to IMA
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

30212 Withdrawn
9/19/2002
3125 - 5225  IMA Common/ UNE-P PAL
Originator: Graham, Gloria
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

UNE-P PAL is a new UNE-P product providing the equivalent functionality of the Qwest Basic Public Access Lines (PAL) product and breaking it down into its unbundled elements for billing purposes. A Basic PAL line is a ‘dumb’ line to which the customer connects a ‘smart’ pay telephone. The smart pay telephone contains a microprocessor that is programmed to provide coin control signaling, including coin collection and coin return.

Qwest Retail and Resold PAL Service is provided for use by Independent Payphone Providers (IPPs), Payphone Service Providers (PSPs), and COCOT (Customer Owned Coin Operated Telephone) customers, allowing them to place their own coin or coinless public pay telephone instruments on the PAL line. The UNE-P PAL product makes this similar PAL functionality available to UNE-P CLEC customers.

Currently several UNE-P CLEC customers are required to manually create and submit several hundred UNE-P PAL requests each week. Manual creation and submission of requests is more labor intensive for these UNE-P CLEC customers and may allow for a greater number of errors to exist in the request, resulting in more rejects and re-work of the requests. Adding the UNE-P PAL product into IMA will allow for the mechanized creation and submission of these requests. Mechanized IMA processing is currently available for the Retail and Resold PAL products and adding this new UNE-P product into IMA will allow ordering parity for the entire line of Qwest PAL products.

CLECs may order new UNE-P PAL combinations or convert preexisting Qwest Retail or Resold PAL services to UNE-P PAL.

UNE-P PAL consists of the following unbundled network elements:

* 2-Wire Voice Grade Analog Loop

* Analog Line Side Port Switch

* Shared Transport

Status History

Date Action Description
9/28/2001 CR Submitted CR transferred from legacy database to CMP database 
9/28/2001 Clarification Meeting Held Clarified this CR with Gloria Graham. 
10/18/2001 Discussed at Monthly CMP Meeting Presented at Oct CMP meeting 
10/25/2001 Status Changed Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. 30212 ranked 42 
1/17/2002 Status Changed CR # 30212 status updated to 'Presented; CR was not packaged as part of 10.0 and is eligible for ranking in 11.0' 
2/13/2002 Record Update LOE updated from Medium to Large 
2/21/2002 Discussed at Monthly CMP Meeting Eligible for the IMA 11.0 Prioritization. 
2/21/2002 Discussed at Monthly CMP Meeting 30212 discussed during 'Review of 11.0 Prioritization Eligible CRs' portion of February Systems CMP Monthly meeting; please see Attachment I of February Systems CMP Distribution Package 
3/1/2002 Release Ranking Ranking for Release 11.0 following the February 2002 Systems CMP Meeting. 30212 ranked number 28 
3/1/2002 Status Changed Status updated to 'Prioritized' from 'Presented' 
4/1/2002 Release Ranking Ranking for SATE following the March 2002 Systems CMP Meeting. 30212 ranked number 28 
6/7/2002 Status Changed 30212 status updated to 'Pending Prioritization' based upon outcome of IMA 11.0 Packaging Selection vote 
7/26/2002 Release Ranking Ranking for Release 12.0 following the July 2002 Systems CMP Meeting. 30212 ranked number 53 
8/27/2002 Status Changed Status set to Pending Withdrawl due to the fact that a new CLEC initiated CR (SCR082202-01) was originated. 
9/19/2002 Discussed at Monthly CMP Meeting 30212 discussed at September Systems CMP Monthly meeting; please see Systems CMP Distribution Package September CMP -- Attachment G 
9/19/2002 Status Changed Status updated to Withdrawn 

Project Meetings

CenturyLink Response

Archived System CR 30827 Detail

 
Title: Flowthrough of Retail Orders
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

30827 Withdrawn
2/14/2002
3000 - 5500  IMA Common/ Products
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

Currently no Retail REQTYP in IMA, so Retail orders are issued as Resale and flagged for manual handling. Add REQTYP DB to IMA to be valid with ACT D. and all non-Resale TOS codes, and with ACT C and Megabit TOS codes only.

Status History

Date Action Description
9/28/2001 CR Submitted CR transferred from legacy database to CMP database 
10/18/2001 Discussed at Monthly CMP Meeting Presented at Oct CMP meeting 
10/25/2001 Status Changed Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. 30827 ranked 45 
1/17/2002 Status Changed CR # 30827 status updated to 'Presented; CR was not packaged as part of 10.0 and is eligible for ranking in 11.0' 
2/13/2002 Record Update LOE updated from Medium to Large 
2/14/2002 Status Changed Status updated from Presented to Pending Withdrawal; submitter no longer wishes to pursue CR 
2/21/2002 Status Changed CR was withdrawn by Qwest at the Feb CMP meeting 
2/21/2002 Discussed at Monthly CMP Meeting 30827 discussed during 'CRs to consider for Closure' portion of February Systems CMP Monthly meeting; please see Attachment E of February Systems CMP Distribution Package 

Project Meetings

CenturyLink Response

Archived System CR 28183 Detail

 
Title: Flowthrough Validate Customer Address Location Area.
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

28183 Completed
12/20/2001
-   IMA Common/8
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Gallegos, John
Director:
CR PM: Routh, Mark

Description Of Change

Customer Address Location Area (CALA) should be edited for validity on EDI LSRs. Entering SAGA or other unknown values rather than a valid CALA results in requests dropping to manual eliminating opportunity for flow through. Edit will restrict field entry to valid CALA. Colorado QPAP Docket 01I-041T.

Status History

Date Action Description
Release Information IMA Release 8.02 
10/18/2001 Discussed at Monthly CMP Meeting Presented at Oct CMP meeting, status changed to development 
10/25/2001 Qwest Response Issued Qwest response included with CLEC prioritization request 
11/9/2001 Record Update CR scheduled for production in 12/08/01 patch 
12/20/2001 Status Changed In production according to Gerry Mohatt e-mail 

Project Meetings

CenturyLink Response

Archived System CR 32093 Detail

 
Title: Business Rules Updates
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

32093 Withdrawn
2/14/2002
3000 - 5500  IMA Common/ POTS Resale
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

Some business rules for POTS Resale need updating to allow correct orders for Switched Private Line Services such as Foreign Exchange Service and Foreign Central Office Service. Expected outcome is to allow successful order of Switched Private Line Services via IMA. Currently these services are ordered through the IIS process. These products will be added to IMA. The TOS field will be used to direct the request to manual handling.

Status History

Date Action Description
9/28/2001 CR Submitted CR transferred from legacy database to CMP database 
10/18/2001 Discussed at Monthly CMP Meeting Presented at Oct CMP meeting 
10/25/2001 Status Changed Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. 32093 ranked 40 
1/17/2002 Status Changed CR # 32093 status updated to 'Presented; CR was not packaged as part of 10.0 and is eligible for ranking in 11.0' 
2/13/2002 Record Update LOE updated from Medium to Large 
2/14/2002 Status Changed Status updated from Presented to Pending Withdrawal; submitter no longer wishes to pursue CR 
2/21/2002 Status Changed CR was withdrawn by Qwest at the Feb CMP meeting 
2/21/2002 Discussed at Monthly CMP Meeting 32093 discussed during 'CRs to consider for Closure' portion of February Systems CMP Monthly meeting; please see Attachment E of February Systems CMP Distribution Package 

Project Meetings

CenturyLink Response

Archived System CR 25379 Detail

 
Title: Enhancement to accept and format orders for LSR requests with ACT=T for Unbundled Loop.
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

25379 Completed
7/18/2002
-   IMA Common/10 IMA UBL
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

Implements flowthrough for LSR requests with ACT=T (transfer) for Unbundled Loop and Unbundled Loop with number port. This CR is related to the Electronic Flow-through Performance Indicator Definition (PIDs PO2A and B). Colorado Docket 01I-041T. PID definitions can be found at http://www.nrri.ohio-state.edu/oss/master/perform/perform.htm

The benefit to CLECs is that errors are caught earlier in the process and reduces the likelyhood that the CLEC customer will be impacted.

Qwest systems will create correctly formatted service orders for UBL requests with an ACT=T that will be accepted by the Service Order Processing systems. As part of this solution, IMA needs to validate that the CFA and NC codes submitted on the LSR have not changed from the CFA and NC codes currently on the end user CSR.

However, the Co-Provider has the option of populating either the CFA on the LS form or the APOT on the LSR form. When the APOT is filled out, there is nothing of similar format on the CSR to validate against, so the LSR must be dropped to manual handling.

Included in Scope

1. Unbundled Loop requests with Reqtype =AB and ACT=T are in scope.

2. Unbundled Loop NC codes of LX--, LX-N, LXR- are currently in scope.

Status History

Date Action Description
10/18/2001 CR Submitted CR transferred from legacy database to CMP database 
10/18/2001 Clarification Meeting Held CR was clarified at the monthly CMP meeting. 
10/18/2001 Discussed at Monthly CMP Meeting Presented at Oct CMP meeting, status changed to development 
10/25/2001 Qwest Response Issued Qwest response included with CLEC prioritization request 
10/31/2001 Release Ranking Ranking for Release 10.0; 25379 is "Above the Line" 
1/17/2002 Status Changed CR # 25379 status updated to 'Packaged' for 10.0 
1/17/2002 Discussed at Monthly CMP Meeting CR # 25379 discussed during 10.0 Packaging Presentation 
3/13/2002 Status Changed Status updated from 'Packaged' to 'Development 
3/21/2002 Discussed at Monthly CMP Meeting 25379 discussed at March Systems CMP Monthly meeting during IMA Release 10.0 Commitment Discussion (Attachment I) 
6/20/2002 Discussed at Monthly CMP Meeting 25379 discussed at June Systems CMP Monthly meeting; please see Systems CMP Distribution Package June CMP -- Attachment N 
6/25/2002 Status Changed Status set to CLEC Test 
7/18/2002 Discussed at Monthly CMP Meeting 25379 discussed at July Systems CMP Monthly meeting; please see Systems CMP Distribution Package July CMP -- Attachment G 
7/18/2002 Status Changed Status updated to Completed 

Project Meetings

CenturyLink Response

Qwest is concerned that there is no CR Type that clearly encompasses these CRs. Qwest believes these CRs are most closely aligned with the Regulatory Change CR type. Qwest proposes to address this concern during the next Redesign Working Session.

Archived System CR 30822 Detail

 
Title: EEL IMA Business Rules Updates
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

30822 Withdrawn
2/14/2002
200 - 750  IMA Common/ UNE-P ISDN PRI, UNE-P ISDN Facility, UNE-P ISDN Trunk, UNE-P DSS Facility, and UNE-P DSS Trunk.
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

Some business rules for EEL/UNE Combination in IMA should reflect the ordering of EEL service and the product definition. Discrepancies between the business rules in IMA and the product definition will then be corrected.

Status History

Date Action Description
9/28/2001 CR Submitted CR transferred from legacy database to CMP database 
10/18/2001 Discussed at Monthly CMP Meeting Presented at Oct CMP meeting 
10/25/2001 Status Changed Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. 30822 ranked 35 
1/17/2002 Status Changed CR # 30822 status updated to 'Presented; CR was not packaged as part of 10.0 and is eligible for ranking in 11.0' 
2/13/2002 Record Update LOE updated from Medium to Small 
2/14/2002 Status Changed Status updated from Presented to Pending Withdrawal; submitter no longer wishes to pursue CR 
2/21/2002 CLEC Requested Info Bonnie Johnson wanted additional information on this candidate. 
2/21/2002 Discussed at Monthly CMP Meeting 30822 discussed during 'CRs to consider for Closure' portion of February Systems CMP Monthly meeting; please see Attachment E of February Systems CMP Distribution Package 
2/26/2002 Additional Information Mark Routh sent the information to Bonnie Johnson. 
3/11/2002 Status Changed Eschelon responded that will not be sponsoring this CR. Therefore, this CR is Withdrawn and Closed 

Project Meetings

CenturyLink Response

Archived System CR 30623 Detail

 
Title: On time jeopardy notification improvements.
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

30623 Completed
7/18/2002
5500 - 8000  IMA Common/10 IMA All Products
Originator: Thompson, Jeff
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

Implements additional automated jeopardy notifications, to a total of 45 types of jeopardy conditions. This CR is related to the Jeopardy Notice Interval and Timely Jeopardy Notices Performance Indicator Definition (PIDs PO8 and PO9). Colorado Docket 01I-041T. PID definitions can be found at http://www.nrri.ohio-state.edu/oss/master/perform/perform.htm.

The current Jeopardy Notice process is manually intensive.

Problem: The current process for sending Jepardy Notices and then calculating the timeliness of Jeopardy Notices is manually intensive. personnel in the Interconnect Service Center (ISC), manually send a notice using FAX, email or online IMA functionality. Then, the ISC will manually record the fact that the notice was sent in a database to be used by the algorithm that calculates the P08/P09 measures.

Resulting Business Need:

Automate the creation of Jepardy Notices, the sending of Jeopardy Notices, and the recording of statistics about when the Jeopardy Notice was sent. This goal can be achieved with some enhancements to the existing IMA architecture. The existing architecture allows Network systems to be interrogated to determine the Jeopardys on wholesale service orders. Jeopardys are then recorded and make available to IMA. Today, IMA does not create a Jeopardy Notice or set the LSR status to Jeopardy. However, if an the ISC manually uses online IMA functionality to send a Jeopardy Notice to the CLEC, then the IMA LSR status is set to Jeopardy. The new business requirement will ask that IMA automatically do what it does today in response to a person in the ISC using the online IMA Jepardy screen: set the IMA LSR status to Jeopardy, send a Jeopardy Notice to the CLEC, and record the Jeopardy information. The Jeopardy data will then be available to produce the data for PIDs P08 and P09 .

LSRs that are Faxed to Qwest do not reside in IMA.

Problem: The only requests that are in IMA are requests that originated in IMA. Consequently, requests that do not originate in IMA (such as requests that come in via FAX or IIS) cannot have their Jeopardy Notices automatically sent by IMA.

Resulting Business Need:

Create a mechanism to alert personnel in the ISC when a Jeopardy is detected on a non-IMA request. Allow ISC to manually record the date/time when they manually send the Jeopardy notice. The ISC will still have to manually FAX the Jeopardy Notice for LSRs that do not originate in IMA.

Not all Jeopardys should result in Jeopardy Notices.

Problem: IMA systems currently detect all jeopardies that are in the Network systems for wholesale service orders. Some of these jeopardies are ‘internal’ and should not result in Jeopardy Notices being sent to the CLECs.

Resulting Business Need: Qwest systems will filter out internal Jeopardys.

Project Objectives

a) Automate the generation of Jeopardy Notices for IMA-originated LSRs.

b) Create an automated mechanism to alert personnel in the ISC when Jeopardys exist on non-IMA LSRs.

c) Allow manual entry into Qwest systems to indicate when a Jeopardy Notice is sent. This functionality will be used for LSRs that do not originate in IMA.

d) Filter out the ‘internal’ Jeopartys so that they are not recorded in IMA.

Status History

Date Action Description
10/18/2001 CR Submitted CR was submitted at the October Monthly CMP Meeting by Qwest. 
10/18/2001 Discussed at Monthly CMP Meeting CR was presented at the October CMP Meeting. 
10/18/2001 Clarification Meeting Held CR was clarified by Jeff Thompson at the October Monthly meeting 
10/31/2001 Release Ranking Ranking for Release 10.0; 30623 is "Above the Line" 
1/17/2002 Discussed at Monthly CMP Meeting CR # 30623 discussed during 10.0 Packaging Presentation 
1/17/2002 Status Changed CR # 30623 status updated to 'Packaged' for 10.0 
3/13/2002 Status Changed Status updated from 'Packaged' to 'Development' 
3/21/2002 Discussed at Monthly CMP Meeting 30623 discussed at March Systems CMP Monthly meeting during IMA Release 10.0 Commitment Discussion (Attachment I) 
4/18/2002 Discussed at Monthly CMP Meeting 30623 discussed at April Systems CMP Monthly meeting; please see Systems CMP Distribution Package April CMP - Walk On 
6/20/2002 Discussed at Monthly CMP Meeting 30623 discussed at June Systems CMP Monthly meeting; please see Systems CMP Distribution Package June CMP -- Attachment N 
6/25/2002 Status Changed Status set to CLEC Test 
7/18/2002 Discussed at Monthly CMP Meeting 30623 discussed at July Systems CMP Monthly meeting; please see Systems CMP Distribution Package July CMP -- Attachment G 
7/18/2002 Status Changed Status updated to Completed 

Project Meetings

CenturyLink Response

Qwest is concerned that there is no CR Type that clearly encompasses these CRs. Qwest believes these CRs are most closely aligned with the Regulatory Change CR type. Qwest proposes to address this concern during the next Redesign Working Session.

Archived System CR 25497 Detail

 
Title: Provide Pending Service Order S&E to CLECs [Include summary USOC(s) in FOC]
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

25497 Completed
9/19/2002
5500 - 8000  IMA Common/10 All Products
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

Providers are requesting a summary of the order by USOC to be included with the FOC so that errors can be identified and corrected before the order completes.

Status History

Date Action Description
9/26/2001 CR Submitted CR transferred from legacy database to CMP database 
9/26/2001 Clarification Meeting Held CR was clarified with John Gallegos 
10/18/2001 Discussed at Monthly CMP Meeting Presented at Oct CMP meeting 
10/25/2001 Status Changed Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. 25497 ranked 3 
1/3/2002 Record Update Related UR# updated from UR1950 to UR2849 
1/17/2002 Discussed at Monthly CMP Meeting CR # 25497 discussed during 10.0 Packaging Presentation; definition work continues on CR; CR is targetted for 10.0 but may become a 10.01 spillover CR 
1/17/2002 Status Changed Status updated to 'In Definition' based upon 10.0 Packaging discussion from CMP meeting; this candidate might be part of a 10.01 release; related CRs (5079096, 5466535) were withdrawn with CLEC agreement as duplicates of CR 25497 
3/21/2002 Discussed at Monthly CMP Meeting 25497 discussed at March Systems CMP Monthly meeting during IMA Release 10.0 Commitment Discussion (Attachment I) 
5/13/2002 Status Changed Candidate is now in Development and scheduled to be implemented on 8/19/02 
7/18/2002 Discussed at Monthly CMP Meeting 25497 discussed at July Systems CMP Monthly meeting; please see Systems CMP Distribution Package July CMP -- Attachment L 
7/19/2002 Communicator Issued Notification Number: SYST.07.19.02.F.04117.IMADraftRelDoc10.01 
7/26/2002 Info Sent to CLEC Notification Number:SYST.07.26.02.F.04125.IMAFinalReleaseNotes for IMA 10.01 sent to CLECs 
8/22/2002 Discussed at Monthly CMP Meeting 25497 discussed at August Systems CMP Monthly meeting; please see Systems CMP Distribution Package August CMP -- Attachment L 
8/22/2002 Status Changed Status changed to CLEC Test in the Aug. Systems CMP meeting. 
9/19/2002 Discussed at Monthly CMP Meeting 25497 discussed at September Systems CMP Monthly meeting; please see Systems CMP Distribution Package September CMP -- Attachment G 
9/19/2002 Status Changed Status updated to Completed 

Project Meetings

9/19/02 CMP Systems Meeting Connie Winston/Qwest indicated that this was deployed as part of IMA 10.1 and has been in CLEC Test. Bonnie Johnson/Eschelon said that. Eschelon looks at every PSON to review the Service Order that was issued by Qwest, identifying any errors vs. what was sent This allows us to identify customer impacting errors prior to the due date so we can stop the train wreck before it happens. It’s very useful, and we track all the data and open up an escalation ticket to get the service order corrected. Connie Winston/Qwest said that Qwest believes this is ready for closure Bonnie Johnson/Eschelon said that as we do go through this process, and have any problems, we are looking at a couple of things like on those service orders where the hunting is at the bottom of the service order that possibly is cut off and sometimes the PSON isn’t available. Would we bring those issues to Jean Novak/Qwest? Connie Winston/Qwest said yes, because before this candidate was implemented, we had some parsing problems on the service order completion record that we were sending out in the Central Region. When you brought that issue in through service management we actually had an opportunity to review it. Sometimes when we run into parsing problems, everything looks perfect until you get to the bottom of one particular order. It did some strange thing to our code that we hadn’t expected and it allows us to trouble shoot and if it needs to be turned into a trouble ticket then we’ll open one. A question was asked whether you have to sign up for the new functionality. Connie Winston/Qwest said that yes, via your User Profile. Liz Balvin/WorldCom asked if this is available through both GUI & EDI Connie Winston/Qwest said yes. It follows your user profile. Mike Buck/Qwest asked if there were any objections on the phone or on the bridge to updating the status of this CR to “Completed.” There was no objection. The status will be updated to “Completed.”

Dicussion from the September 19 CMP meeting:

Connie Winston/Qwest indicated that this was deployed as part of IMA 10.1 and has been in CLEC Test. Bonnie Johnson/Eschelon said that. Eschelon looks at every PSON to review the Service Order that was issued by Qwest, identifying any errors vs. what was sent This allows us to identify customer impacting errors prior to the due date so we can stop the train wreck before it happens. It’s very useful, and we track all the data and open up an escalation ticket to get the service order corrected. Connie Winston/Qwest said that Qwest believes this is ready for closure Bonnie Johnson/Eschelon said that as we do go through this process, and have any problems, we are looking at a couple of things like on those service orders where the hunting is at the bottom of the service order that possibly is cut off and sometimes the PSON isn’t available. Would we bring those issues to Jean Novak/Qwest? Connie Winston/Qwest said yes, because before this candidate was implemented, we had some parsing problems on the service order completion record that we were sending out in the Central Region. When you brought that issue in through service management we actually had an opportunity to review it. Sometimes when we run into parsing problems, everything looks perfect until you get to the bottom of one particular order. It did some strange thing to our code that we hadn’t expected and it allows us to trouble shoot and if it needs to be turned into a trouble ticket then we’ll open one. A question was asked whether you have to sign up for the new functionality. Connie Winston/Qwest said that yes, via your User Profile. Liz Balvin/WorldCom asked if this is available through both GUI & EDI Connie Winston/Qwest said yes. It follows your user profile. Mike Buck/Qwest asked if there were any objections on the phone or on the bridge to updating the status of this CR to “Completed.” There was no objection. The status will be updated to “Completed.”

CenturyLink Response

Archived System CR 25001 Detail

 
Title: Update FOM LSR Status to match CRM Status
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

25001 Completed
7/18/2002
750 - 3000  IMA Common/10 All Products
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

When CRM receives a jeopardy notification from WFA the LSR Status is updated in CRM but not in IMA. When order and request statuses are updated in CRM, Service Order and LSR statuses in IMA need to be updated to match.

Status History

Date Action Description
9/26/2001 CR Submitted CR transferred from legacy database to CMP database 
9/26/2001 Clarification Meeting Held Clarified the CR with John Gallegos 
10/18/2001 Discussed at Monthly CMP Meeting Presented at Oct CMP meeting. 
10/25/2001 Status Changed Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization. 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. 25001 ranked 11 
1/17/2002 Discussed at Monthly CMP Meeting CR # 25001 discussed during 10.0 Packaging Presentation 
1/17/2002 Status Changed CR # 25001 status updated to 'Packaged' for 10.0 
3/13/2002 Status Changed Status updated from 'Packaged' to 'Development' 
3/21/2002 Discussed at Monthly CMP Meeting 25001 discussed at March Systems CMP Monthly meeting during IMA Release 10.0 Commitment Discussion (Attachment I) 
6/20/2002 Discussed at Monthly CMP Meeting 25001 discussed at June Systems CMP Monthly meeting; please see Systems CMP Distribution Package June CMP -- Attachment N 
6/25/2002 Status Changed Status set to CLEC Test 
7/18/2002 Discussed at Monthly CMP Meeting 25001 discussed at July Systems CMP Monthly meeting; please see Systems CMP Distribution Package July CMP -- Attachment G 
7/18/2002 Status Changed Status updated to Completed 

Project Meetings

CenturyLink Response

Archived System CR 26047 Detail

 
Title: Enhancement for Loop Qual Tool Loop Qual Reservation System
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

26047 Completed
7/18/2002
-   IMA Common/10 DSL
Originator: Baros, Fred
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

Loop Qual Reservation System enhancement that would allow a telephone

number and email address to be entered. The system would re-qualify the

telephone number for Megabit services automatically, send an email when

TN qualifies for service.

Status History

Date Action Description
9/26/2001 CR Submitted CR transferred from legacy database to CMP database 
9/26/2001 Clarification Meeting Held Clarified the CR with Fred Baros. 
10/18/2001 Discussed at Monthly CMP Meeting Presented at Oct CMP meeting 
10/25/2001 Status Changed Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. 26047 ranked 10 
1/17/2002 Discussed at Monthly CMP Meeting CR # 26047 discussed during 10.0 Packaging Presentation 
1/17/2002 Status Changed CR # 26047 status updated to 'Packaged' for 10.0 
3/13/2002 Status Changed Status updated from 'Packaged' to 'Development 
3/21/2002 Discussed at Monthly CMP Meeting 26047 discussed at March Systems CMP Monthly meeting during IMA Release 10.0 Commitment Discussion (Attachment I) 
6/20/2002 Discussed at Monthly CMP Meeting 26047 discussed at June Systems CMP Monthly meeting; please see Systems CMP Distribution Package June CMP -- Attachment N 
6/25/2002 Status Changed Status set to CLEC Test 
7/18/2002 Discussed at Monthly CMP Meeting 26047 discussed at July Systems CMP Monthly meeting; please see Systems CMP Distribution Package July CMP -- Attachment G 
7/18/2002 Status Changed Status updated to Completed 

Project Meetings

CenturyLink Response

Archived System CR 25591 Detail

 
Title: Flowthrough validate LPIC LSR Entries
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

25591 Withdrawn
2/21/2002
750 - 3000  IMA Common/ see details
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

An edit to validate PIC and LPIC values would eliminate errors in various OSS's and reduce provisioning time.

Provisioning errors and service order errors occur when invalid PIC/LPIC values are submitted on a LSR that flows through. By validating PIC and LPIC values in IMA only valid values would be used on flow through service orders, which would increase flow through and the percentage of automatic FOCs.

This enhancement was identified during a review of flow through errors.

This requested change would affect both IMA EDI and IMA GUI

IMA currently edits the PIC and LPIC values to verify that they are numeric (codes with less than 4 numeric are padded with zeros), "NONE", or "DFLT". IMA is not validating that the PIC or LPIC represent valid long distance carriers for specific central offices (long distance carrier participation is at the LATA level).

The project objective is to edit the PIC and LPIC fields to ensure that they contain valid data values for the central office and to replace invalid data values with valid values, to reduce the number of PIC and LPIC errors, and the number of orders dropped to manual. The edits that exist in IMA today are not sufficient and as a result a significant number of orders are dropping to manual due to PIC and LPIC errors. This requires time and resources during the provisioning process to research invalid PIC and LPIC values. Provisioning, FOC interval, and flow through are adversely affected.

The following products are in scope:

- CENTREX Plus

- Centron

- Centrex 21

- UNE-P Centrex

- UNE-P Centrex 21

- Analog Line Side Port

- Digital Line Side Port

- Unbundled Analog DID/PBX Trunk Port

- Unbundled DS1 DID/PBX Trunk

- Pots Resale

- PAL - Co-Providers

- PAL - PSPs

- BRI ISDN Resale

-PBX

- Designed Trunks Resale

- Megabit

- UNE-P POTS

- PRI ISDN Resale Trunks

- UNE-P ISDN BRI

- UNE-P PRI ISDN Trunk

- UNE-P PBX Designed Trunk

- UNE-P DSS Trunk

Status History

Date Action Description
9/28/2001 CR Submitted CR transferred from legacy database to CMP database 
10/18/2001 Discussed at Monthly CMP Meeting Presented at Oct CMP meeting 
10/25/2001 Status Changed Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. 25591 ranked 43 
1/17/2002 Status Changed CR # 25591 status updated to 'Presented; CR was not packaged as part of 10.0 and is eligible for ranking in 11.0' 
1/31/2002 Record Update Description of change updated to provide more details on requested change 
2/14/2002 Status Changed Status updated from Presented to Pending Withdrawal 
2/21/2002 Status Changed CR was withdrawn by Qwest at the Feb CMP meeting. 
2/21/2002 Discussed at Monthly CMP Meeting 25591 discussed during 'CRs to consider for Closure' portion of February Systems CMP Monthly meeting; please see Attachment E of February Systems CMP Distribution Package 

Project Meetings

CenturyLink Response

Archived System CR 28186 Detail

 
Title: Telephone Number Reservation Prohibit Multiple Selections of 9 Telephone Numbers
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

28186 Withdrawn
1/17/2002
750 - 3000  IMA Common/ All products that use TN
Originator: Baros, Fred
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

TN Reservation functionality in Pre Order system allows CLEC to make multiple selections of 9 telephone numbers from which to choose a number. The TN Reservation functionality should be modified to prevent this, so that available TNs in a CO are not depleted.

Status History

Date Action Description
9/28/2001 CR Submitted CR transferred from legacy database to CMP database 
10/18/2001 Discussed at Monthly CMP Meeting Presented at Oct CMP meeting 
10/25/2001 Status Changed Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. 28186 ranked 41 
1/17/2002 Status Changed Status updated to "Pending Withdrawal;" submitter of this request sought to cancel UR in early January; status updated in order to take CR to February CMP meeting 
2/21/2002 Status Changed CR was withdrawn by Qwest at the Feb CMP meeting 
2/21/2002 Discussed at Monthly CMP Meeting 28186 discussed during 'CRs to consider for Closure' portion of February Systems CMP Monthly meeting; please see Attachment E of February Systems CMP Distribution Package 

Project Meetings

CenturyLink Response

Archived System CR 23943 Detail

 
Title: Shared Distribution Loop Long Term
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

23943 Withdrawn
3/19/2002
3000 - 5500  IMA Common/ SDL
Originator: Sumner, Steve
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

Shared Distribution Loop is defined as making available the opportunity for the CLEC to offer ADSL qualified advanced data services simultaneously with an existing end user’s analog voice grade service provided by Qwest on the distribution loop. The CLEC will use the data portion of the loop while Qwest will maintain the voice portion of the loop. The voice circuit is originating at the Qwest Central Office and terminates at the Network Interface at the customer location. The data originates at the CLECs DSLAM located at their established form of Remote Collocation and terminates at the Network Interface at the customer location.

One of the system functionalities used for all of the Shared Products is the new process of ordering line conditioning after the service has already been established. Ideally, the need for line conditioning would be detected during the Pre-Order Raw Loop Data query, where the CLEC can see if there are bridge taps or load coils that need to be removed. However, there is a possibility that the service order was completed erroneously, indicating that the service is provisioned when in fact it is inoperative, since the testing proved that the line needs conditioning. The CLEC needs a mechanism whereby they can order line conditioning on an existing service.

Status History

Date Action Description
9/28/2001 CR Submitted CR transferred from legacy database to CMP database 
10/18/2001 Discussed at Monthly CMP Meeting Presented at Oct CMP meeting 
10/25/2001 Status Changed Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. 23943 ranked 48 
1/17/2002 Status Changed CR # 23943 status updated to 'Presented; CR was not packaged as part of 10.0 and is eligible for ranking in 11.0' 
1/31/2002 Status Changed Status updated to "Pending Withdrawal" from "Presented"; submitter sought to cancel the UR in November; status updated in order to take CR to February CMP meeting 
2/13/2002 Record Update LOE updated from Medium to Large 
2/21/2002 Discussed at Monthly CMP Meeting 23943 discussed during 'CRs to consider for Closure' portion of February Systems CMP Monthly meeting; please see Attachment E of February Systems CMP Distribution Package; AT&T indicated that they might want to sponsor this CR 
3/19/2002 Status Changed AT&T has decided not to sponsor this CR. As a result, it is closed. 

Project Meetings

CenturyLink Response

Archived System CR 27065 Detail

 
Title: Shared Loop/One Service Order
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

27065 Completed
10/5/2001
-   IMA Common/
Originator: Rea, Ervin
Originator Company Name: Qwest Corporation
Owner: Routh, Mark
Director:
CR PM: Routh, Mark

Description Of Change

Develop service order that can be issued to provision and bill for Shared Loop service rather than issuing two orders. "C" order on end user account to provision and an "N" order for billing. Could extend to other types of "shared" facility arrangements

Status History

Date Action Description
Release Information IMA Release 
10/5/2001 Status Changed Completed per Gerald Mohatts e-mail 

Project Meetings

CenturyLink Response

Archived System CR 25505 Detail

 
Title: Line Splitting for UNE P accounts
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

25505 Withdrawn
3/19/2002
3000 - 5500  IMA Common/ UNE-P
Originator: Sumner, Steve
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

Accept LSR for line sharing on a UNE-P account, class of service UHR. Accept LSR issued by the provider of UNE-P that contains splitting information regarding the DLEC. Accept the LSR with information for central office based and remote line sharing. Enhance loss and completion report for Line Splitting goes to CLEC (owner of UNE-P). Allow line sharing USOCs to appear on the UNE-P (class of service UHR) account to provision and bill. NC/NCI codes for Line Splitting are requested and will be provided at a later date. Conditioning is allowed on Line Splitting, the TRAK fid will be used. Basic installation is the only installation option available for Line splitting

Status History

Date Action Description
9/28/2001 CR Submitted CR transferred from legacy database to CMP database 
10/18/2001 Discussed at Monthly CMP Meeting Presented at Oct CMP meeting 
10/25/2001 Status Changed Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. 25505 ranked 47 
1/17/2002 Status Changed CR # 25505 status updated to 'Presented; CR was not packaged as part of 10.0 and is eligible for ranking in 11.0' 
1/31/2002 Status Changed Status updated to "Pending Withdrawal" from "Presented"; submitter sought to cancel the UR in November; status updated in order to take CR to February CMP meeting 
2/13/2002 Record Update LOE updated from Medium from Large 
2/21/2002 Discussed at Monthly CMP Meeting 25505 discussed during 'CRs to consider for Closure' portion of February Systems CMP Monthly meeting; please see Attachment E of February Systems CMP Distribution Package; AT&T indicated that they might want to sponsor this CR 
3/19/2002 Status Changed AT&T has decided not to sponsor this CR. As a result, it is closed. 

Project Meetings

CenturyLink Response

Archived System CR 26642 Detail

 
Title: IMA EDI Co Provider Security Table
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

26642 Completed
10/5/2001
-   IMA Common/8
Originator: Sumner, Steve
Originator Company Name: Qwest Corporation
Owner: Gallegos, John
Director:
CR PM: Routh, Mark

Description Of Change

Provide online mechanism to update trading partner transaction confirmation. Updates done today require changes directly to the database.

Status History

Date Action Description
Release Information IMA Release 8.00 
10/5/2001 Status Changed Closed 

Project Meetings

CenturyLink Response

Archived System CR 27751 Detail

 
Title: Intrabuilding Cable.
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

27751 Withdrawn
2/21/2002
3000 - 5500  IMA Common/ Intrabuilding Cable
Originator: Sumner, Steve
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

An Intra-Building Cable (IBC) is a 2 wire or 4 wire facility that extends from a building terminal or other accessible terminal that services one Multi-Tenant Environment (MTE) building on a property to the end-user’s network interface device (NID).

A CLEC obtains access to the IBC at an established MTE-POI arrangement. The MTE-POI product allows the CLEC to cross-connect at the building terminal for Multi-Tenant Environment Buildings.

The following forms will be used between Qwest and the Co-Provider for ordering IBC:

* LSR - Local Service Request

* EU - End User Information

* LS – Loop Service Request

Status History

Date Action Description
9/28/2001 CR Submitted CR transferred from legacy database to CMP database 
10/18/2001 Discussed at Monthly CMP Meeting Presented at Oct CMP meeting 
10/25/2001 Status Changed Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. 27751 ranked 33 
1/17/2002 Status Changed CR # 27751 status updated to 'Presented; CR was not packaged as part of 10.0 and is eligible for ranking in 11.0' 
2/13/2002 Record Update LOE updated from Medium to Large 
2/14/2002 Status Changed Status updated from Presented to Pending Withdrawal; submitter no longer wishes to pursue CR 
2/21/2002 Discussed at Monthly CMP Meeting 27751 discussed during 'CRs to consider for Closure' portion of February Systems CMP Monthly meeting; please see Attachment E of February Systems CMP Distribution Package; AT&T indicated that they might want to sponsor this CR 
3/8/2002 Status Changed This CR was presented for withdrawal by Qwest at the Feb 2002 Systems CMP meeting. Subsequently, AT&T asked to delay the withdrawal until they checked to see if they wanted to sponsor it. AT&T has decided not to sponsor this CR. 

Project Meetings

CenturyLink Response

Archived System CR 25800 Detail

 
Title: Add New Auto Push Statuses
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

25800 Withdrawn
2/21/2002
750 - 3000  IMA Common/ All Products
Originator: Sumner, Steve
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

Auto Push two existing IMA statuses: ‘Submitted’ and ‘Partial’. Display the new auto-push statuses in SOSI consistently with what is auto-pushed.

Status History

Date Action Description
9/28/2001 CR Submitted CR transferred from legacy database to CMP database 
10/18/2001 Discussed at Monthly CMP Meeting Presented at Oct CMP meeting 
10/25/2001 Status Changed Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. 25800 ranked 39 
1/17/2002 Status Changed CR # 25800 status updated to 'Presented; CR was not packaged as part of 10.0 and is eligible for ranking in 11.0' 
2/5/2002 Status Changed Status updated from "Presented" to "Pending Withdrawal" at the request of submitting company 
2/21/2002 Status Changed Withdrawn by Qwest at the Feb CMP meeting. 
2/21/2002 Discussed at Monthly CMP Meeting 25800 discussed during 'CRs to consider for Closure' portion of February Systems CMP Monthly meeting; please see Attachment E of February Systems CMP Distribution Package 

Project Meetings

CenturyLink Response

Archived System CR 24640 Detail

 
Title: Resale Form should be required for DID In Only Trunk
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

24640 Completed
10/8/2001
-   IMA Common/
Originator: Sumner, Steve
Originator Company Name: Qwest Corporation
Owner: Gallegos, John
Director:
CR PM: Routh, Mark

Description Of Change

For DID In Only Trunk orders, a resale form should be required. A workaround has been published to the Co-Provider community to allow the Co-Providers to provide the information that would be on the resale form in remarks. The release notification published to the Co-Providers is attached.

Status History

Date Action Description
Release Information IMA Release 
10/8/2001 Record Update CR was completed per Gerald Mohatt's e-mail 

Project Meetings

CenturyLink Response

It has been determined that this work is no longer required.

Archived System CR 24758 Detail

 
Title: Redundant EDI auto push transactions
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

24758 Completed
7/18/2002
750 - 3000  IMA Common/10 All Products
Originator: Sumner, Steve
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

Check for additional redundant EDI auto-push transactions

Status History

Date Action Description
9/28/2001 CR Submitted CR transferred from legacy database to CMP database 
9/28/2001 Clarification Meeting Held Clarified the CR with Steve Sumner. 
10/18/2001 Discussed at Monthly CMP Meeting Presented at Oct CMP meeting 
10/25/2001 Status Changed Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. 24758 ranked 24 
1/17/2002 Discussed at Monthly CMP Meeting CR # 24758 discussed during 10.0 Packaging Presentation 
1/17/2002 Status Changed CR # 24758 status updated to 'Packaged' for 10.0 
3/13/2002 Status Changed Status updated from 'Packaged' to 'Development' 
3/21/2002 Discussed at Monthly CMP Meeting 24758 discussed at March Systems CMP Monthly meeting during IMA Release 10.0 Commitment Discussion (Attachment I) 
6/20/2002 Discussed at Monthly CMP Meeting 24758 discussed at June Systems CMP Monthly meeting; please see Systems CMP Distribution Package June CMP -- Attachment N 
6/25/2002 Status Changed Status set to CLEC Test 
7/18/2002 Discussed at Monthly CMP Meeting 24758 discussed at July Systems CMP Monthly meeting; please see Systems CMP Distribution Package July CMP -- Attachment G 
7/18/2002 Status Changed Status updated to Completed 

Project Meetings

CenturyLink Response

Archived System CR 26639 Detail

 
Title: Clarify usage of the DSPCH and the SCA fields on the LSR
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

26639 Completed
7/18/2002
-   IMA Common/10 UBL Product
Originator: Sumner, Steve
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

Clarify usage of the DSPCH and the SCA fields on the LSR. UBL DSPCH/SCA fields ACT=N, V, C, T, Z

Status History

Date Action Description
9/28/2001 CR Submitted CR transferred from legacy database to CMP database 
9/28/2001 Clarification Meeting Held Clarified this CR with Steve Sumner. 
10/18/2001 Discussed at Monthly CMP Meeting Presented at Oct CMP meeting 
10/25/2001 Status Changed Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. 26639 ranked 18 
1/17/2002 Discussed at Monthly CMP Meeting CR # 26639 discussed during 10.0 Packaging Presentation 
1/17/2002 Status Changed CR # 26639 status updated to 'Packaged' for 10.0 
3/13/2002 Status Changed Status updated from 'Packaged' to 'Development 
3/21/2002 Discussed at Monthly CMP Meeting 26639 discussed at March Systems CMP Monthly meeting during IMA Release 10.0 Commitment Discussion (Attachment I) 
6/20/2002 Discussed at Monthly CMP Meeting 26639 discussed at June Systems CMP Monthly meeting; please see Systems CMP Distribution Package June CMP -- Attachment N 
6/25/2002 Status Changed Status set to CLEC Test 
7/18/2002 Discussed at Monthly CMP Meeting 26639 discussed at July Systems CMP Monthly meeting; please see Systems CMP Distribution Package July CMP -- Attachment G 
7/18/2002 Status Changed Status updated to Completed 

Project Meetings

CenturyLink Response

Archived System CR 25145 Detail

 
Title: Auto Route Centrex to 1FB requests specific queue
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

25145 Completed
11/3/2001
-   IMA Common/8
Originator: Sumner, Steve
Originator Company Name: Qwest Corporation
Owner: Routh, Mark
Director:
CR PM: Routh, Mark

Description Of Change

McLeod and Eschelon are converting a number of their Centrex customers to 1FB. During that conversion, there are a number of failures happening that put the customer out of service. To resolve these outages, these requests (Centrex to 1FB) will be specifically identified and placed into a specific queue.

Status History

Date Action Description
11/3/2001 Release Information IMA Release 8.00 

Project Meetings

CenturyLink Response

Archived System CR 24652 Detail

 
Title: Unbundled DID/PBX Trunk Port Facility move from LS to PS
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

24652 Withdrawn
9/19/2002
1875 - 3150  IMA Common/ Unbundled PID/PBX Trunk Port
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

The Unbundled DID/PBX Trunk Port product is currently setup to use the IMA Loop Services (LS) form when it should be using the Port Services (PS) form

Status History

Date Action Description
9/28/2001 CR Submitted CR transferred from legacy database to CMP database 
9/28/2001 Clarification Meeting Held Clarified this CR with John Gallegos. 
10/18/2001 Discussed at Monthly CMP Meeting Presented at Oct CMP meeting 
10/25/2001 Status Changed Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. 24652 ranked 22 
1/17/2002 Discussed at Monthly CMP Meeting CR # 24652 discussed during 10.0 Packaging Presentation 
1/17/2002 Record Update LOE changed from Medium to Large 
1/17/2002 Status Changed Status changed to 'Presented' -- CR was not packaged into 10.0 and is eligible for ranking for 11.0 
2/13/2002 LOE Issued LOE changed from Large back to Medium 
2/21/2002 Discussed at Monthly CMP Meeting Eligible for the IMA 11.0 Prioritization 
2/21/2002 Discussed at Monthly CMP Meeting 24652 discussed during 'Review of 11.0 Prioritization Eligible CRs' portion of February Systems CMP Monthly meeting; please see Attachment I of February Systems CMP Distribution Package 
3/1/2002 Release Ranking Ranking for Release 11.0 following the February 2002 Systems CMP Meeting. 24652 ranked number 37 
3/1/2002 Status Changed Status updated to 'Prioritized' from 'Presented' 
6/7/2002 Status Changed 24652 status updated to 'Pending Prioritization' based upon outcome of IMA 11.0 Packaging Selection vote 
7/18/2002 Discussed at Monthly CMP Meeting 24652 discussed at July Systems CMP Monthly meeting; please see Systems CMP Distribution Package July CMP -- Attachment P 
7/26/2002 Release Ranking Ranking for Release 12.0 following the July 2002 Systems CMP Meeting. 24652 ranked number 55 
9/4/2002 Status Changed Status set to Pending Witdrawal per email from John Gallegos and Mark Early. 
9/19/2002 Discussed at Monthly CMP Meeting 24652 discussed at September Systems CMP Monthly meeting; please see Systems CMP Distribution Package September CMP -- Attachment G 
9/19/2002 Status Changed Status changed to withdrawn 

Project Meetings

CenturyLink Response

Archived System CR 27756 Detail

 
Title: Cancellation Remarks
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

27756 Withdrawn
2/21/2002
200 - 750  IMA Common/ All Products
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

Qwest Business Description: A special remark shall be entered on each flow through service order associated with a cancellation supplemental LSR.

Status History

Date Action Description
9/28/2001 CR Submitted CR transferred from legacy database to CMP database 
10/18/2001 Discussed at Monthly CMP Meeting Presented at Oct CMP meeting 
10/25/2001 Status Changed Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. 27756 ranked 9 
1/8/2002 Record Update CR initiator seeks to have CR considered for future release; to be discussed at CMP meeting 
1/17/2002 Discussed at Monthly CMP Meeting CR # 27756 discussed during 10.0 Packaging Presentation; Qwest to send e-mail to voting members of CMP describing why Qwest seeks to remove this CR from 10.0 
1/17/2002 Status Changed Status updated to 'Presented' at request of originator 
2/14/2002 Status Changed Status updated from Presented to Pending Withdrawal; submitter no longer wishes to pursue CR 
2/21/2002 Status Changed CR was withdrawn by Qwest at the Feb CMP meeting 
2/21/2002 Discussed at Monthly CMP Meeting 27756 discussed during 'CRs to consider for Closure' portion of February Systems CMP Monthly meeting; please see Attachment E of February Systems CMP Distribution Package 

Project Meetings

CenturyLink Response

DRAFT RESPONSE For Review By CLEC Community and Discussion at November CMP Meeting

11-9-01

Kathy Stichter ILEC Relations Manager Eschelon

CC: Deb Heckart Kate Spry Deni Toye Steve Hilleary Fred Aesquivel Joan Wells Russ Urevig Barry Orrel

This letter is in response to your CLEC Change Request Form, number PCCR092801-1 dated 9-28-01 – CR Title: Improve Cut-Over Process

The situation identified advises that when a customer moves from Qwest to a CLEC on UNE services, there are times when Qwest does not remove the customer’s telephone numbers from the Qwest switch at the appropriate time. This causes incoming calls to the CLEC customer to fail.

Eschelon has asked that Qwest add a step to its process at the time of test and turn-up of the CLEC loop acceptance. The request is to have Qwest technicians make a call from the Donor Switch to the customer’s numbers that were ported to ensure that they were removed from the Qwest switch.

Eschelon provide Qwest research indicates that this LSR request received from Eschelon was for a straight LNP order, not for UNE service.

The LSR requested disconnect of 3 numbers, the porting and disconnect of 651-735-4000 and the change of the BTN. When the Market Unit Service Deliver Coordinator (SDC) wrote the orders, the SDC failed to issue the order with the porting and disconnect of 651-735-4000. Thus the request was not sent to down stream systems to be worked. All work that was on the Qwest issued order was completed according to process by Network. SDC processes have been reviewed to ensure that these types of errors are addressed.

The requested PCCR was directed at UNE type orders. The example provided by Eschelon does not reflect this issue. UNE orders with LNP do have processes in place that ensures orders are ported prior to completing with the CLEC. Qwest processes do have steps in place to ensure that the line translations are completed in the Switch prior to advising the CLEC that the work has been completed.

Therefore, Qwest does not feel that a change to the current process is necessary at this time based on the results of the research. If the order was issued correctly, all work would have been completed accurately. Implementation of the proposed change would not have ensured this line was ported.

If Eschelon has examples of UNE services with LNP that illustrate problems related to the specific change request, please provide them and Qwest will review.

Straight (i.e., non-UNE related) LNP disconnect issues are being addressed in PCCR 5582099.

Sincerely,

Diane Diebel Director Process Management

Archived System CR 28138 Detail

 
Title: Create IMA edit to validate Area Codes.
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

28138 Completed
10/19/2001
-   IMA Common/8
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Gallegos, John
Director:
CR PM: Routh, Mark

Description Of Change

This enhancement will create an up-front edit in IMA to validate Area Codes. IMA cannot accept incorrect or invalid Area codes.

Status History

Date Action Description
Release Information IMA Release 8.00 
10/19/2001 Status Changed Completed 10/19/01 

Project Meetings

CenturyLink Response

Archived System CR 28288 Detail

 
Title: LNP IMA Ability to change Order Status, Completed to Pending
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

28288 Completed
10/8/2001
-   IMA Common/
Originator: Sumner, Steve
Originator Company Name: Qwest Corporation
Owner: Gallegos, John
Director:
CR PM: Routh, Mark

Description Of Change

Upon completion of this request it is expected that SDC's processing LSR's could go into the IMA system and change a completed order status back to a pending status. This will allow sups to flow through from the Co-Provider on the original PON, when Qwest has completed a Port Order prior to confirming that actual activation has occurred at the NPAC.

Status History

Date Action Description
Release Information IMA Release 
10/8/2001 Status Changed Close per email from Gerald Mohatt, CR was completed in a IMA patch 

Project Meetings

CenturyLink Response

Archived System CR 25091 Detail

 
Title: DSL Flowthrough
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

25091 Completed
8/21/2003
2450 - 4075  IMA Common/13 DSL
Originator: Sumner, Steve
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Stecklein, Lynn

Description Of Change

Long term Flowthrough. The actual conversion from CAP based to DMT based networks was implemented April 4, 2001. Existing CAP based Qwest DSL will be supported until 2003. Qwest DSL Select will be replaced with Qwest DSL 256. Qwest DSL 256 will offer some of the same features as Qwest DSL Select but it will be DMT based as opposed to CAP based. Qwest DSL 256 provide customers with dedicated service but at a slower downstream speed; 256 Kbps and will not be offered in DA Hotels/RT’s. The available Qwest DSL services are: Qwest DSL 256, Qwest DSL Deluxe, Qwest DSL Pro Deluxe, Qwest DSL Pro 640, Qwest DSL Pro 1M, Qwest DSL Pro 4M and Qwest DSL Pro 7M. Currently, DMT and CAP based Qwest DSL service requests are processed by the ISC. To achieve POTS flow for DMT based requests, ISP/IHOST information needs to be auto-validated. ISP validation will allow for full flow through. CAP based orders will continue with a design flow for allowable changes; contract interval changes, ISP/IHOST changes and feature changes. Also, as of 6/14/01 CAP based Qwest DSL services will not be offered but will be maintained until 2003.

Status History

Date Action Description
9/26/2001 CR Submitted CR transferred from legacy database to CMP database 
9/26/2001 Clarification Meeting Held CR was clarified with Steve Sumner 
10/18/2001 Discussed at Monthly CMP Meeting Presented at Oct CMP meeting 
10/25/2001 Status Changed Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. 25091 ranked 13 
1/17/2002 Discussed at Monthly CMP Meeting CR # 25091 discussed during 10.0 Packaging Presentation 
1/17/2002 Record Update LOE changed from Medium to Large 
1/17/2002 Status Changed Status changed to 'Presented' -- CR was not packaged into 10.0 and is eligible for ranking for 11.0 
2/21/2002 Discussed at Monthly CMP Meeting Eligible for the IMA 11.0 Prioritization. 
2/21/2002 Discussed at Monthly CMP Meeting 25091 discussed during 'Review of 11.0 Prioritization Eligible CRs' portion of February Systems CMP Monthly meeting; please see Attachment I of February Systems CMP Distribution Package 
3/1/2002 Release Ranking Ranking for Release 11.0 following the February 2002 Systems CMP Meeting. 25091 ranked number 26 
3/1/2002 Status Changed Status updated to 'Prioritized' from 'Presented' 
6/7/2002 Status Changed 25091 status updated to 'Pending Prioritization' based upon outcome of IMA 11.0 Packaging Selection vote 
7/18/2002 Discussed at Monthly CMP Meeting 25091 discussed at July Systems CMP Monthly meeting; please see Systems CMP Distribution Package July CMP -- Attachment P 
7/26/2002 Status Changed Status set to Prioritized as a result of the release prioritization for IMA 12.0 
7/26/2002 Release Ranking Ranking for Release 12.0 following the July 2002 Systems CMP Meeting. 25091 ranked number 27 
10/30/2002 Status Changed 25091 status updated to 'Pending Prioritization' based upon outcome of release 12.0 packaging effort 
12/19/2002 Discussed at Monthly CMP Meeting 25091 discussed at December Systems CMP Monthly meeting; please see Systems CMP Distribution Package December CMP -- Attachment O 
12/31/2002 Release Ranking Ranked #5 for IMA 13.0 Release 
1/23/2003 Release Ranking Ranked #4 for IMA 13.0 after exception request SCR011303-02EX 
3/13/2003 Release Ranking Packaged for IMA 13.0 Release 
7/9/2003 Status Changed Status changed to Development with Commitment of 14.0 on April 22, 2003 
8/4/2003 Status Changed Status Changed to CLEC Test Due To 8/4/03 Deployment. 
8/22/2003 Status Changed Status changed to completed 
8/22/2003 Discussed at Monthly CMP Meeting Discussed at August CMP Monthly Meeting - See August Systems CMP Distribution Package - Attachment G 

Project Meetings

8/21/03 CMP Systems Meeting Connie Winston/Qwest stated Qwest would like to close this request. Kim Isaacs/Eschelon said that Eschelon was having a problem with DSL orders on one LSR on POTs and Centrex orders with an ACT of T. Connie Winston/Qwest asked if examples could be provided. Kim Isaacs/Eschelon stated that they have no examples because they could not submit the orders. Connie Winston/Qwest said that those issues could be addressed with the N&T Loop Qual CR. She noted that we will keep these notes under the N&T loop qual CR and this CR will be closed.

CenturyLink Response

Archived System CR 23313 Detail

 
Title: Pre Order DD: Dispatch Indicator for LSNP ( Old CR # 14886) / 25892
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

23313 Withdrawn
10/8/2001
-   IMA Common/
Originator: Sumner, Steve
Originator Company Name: Qwest Corporation
Owner: Gallegos, John
Director:
CR PM: Routh, Mark

Description Of Change

In the Pre-Order Due Date Query being implemented in IMA 8.0, the following message needs to be added onto the standard message returned to the Co-Provider along with the interval from SIBS when a Co-Provider requests an analog Unbundled Loop: " A 3-day interval may be applied if the loop qualifies for Quick Loop". Display the Quickloop disclaimer for Analog Unbundled Loop orders only when the request is for 24 lines or less.

Status History

Date Action Description
Release Information IMA Release 
10/8/2001 Related Change Request Close per email from Gerald Mohatt (Combined with CR 14886) 
10/8/2001 Status Changed Close per email from Gerald Mohatt (Combined with CR 14886) 

Project Meetings

CenturyLink Response

Archived System CR SCR092601-1 Detail

 
Title: Change edits applied to notification(s) allowed after an FOC is sent.
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR092601-1 Completed
7/18/2002
-   IMA Common/10 All Products
Originator: Martain, Jill
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Stecklein, Lynn

Description Of Change

Allow a jeopardy notification after a FOC instead of a non-fatal error after a FOC.

Status History

Date Action Description
9/26/2001 CR Submitted CR submitted 
10/11/2001 Discussed at Monthly CMP Meeting Clarification meeting held 
10/18/2001 Discussed at Monthly CMP Meeting Presented in October meeting (see meeting minutes) 
10/25/2001 Info Sent to CLEC Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. SCR092601-1 ranked 2 
11/5/2001 Qwest Response Issued Draft response posted to CMP database 
11/15/2001 Discussed at Monthly CMP Meeting CR discussed in the Nov CMP meeting.(See CMP meeting minutes) 
11/28/2001 Record Update See action item 370 - Jill will provide the changes to the rough draft to CR# SCR092601-1(Change edits applied to notification(s) allowed after an FOC is sent). 
11/28/2001 Clarification Meeting Held see meeting notes 
12/12/2001 Action Item Created AT&T is concerned about the time frame for Qwest to issue a Jeopardy notification to CLECs, specifically for LNP and Broadband. Qwest to take an action to advise what the interval is before this interim process is implemented. 
12/18/2001 Info Sent to CLEC Response to action #2 sent to AT&T 
12/19/2001 CLEC Provided Information For details of AT&T response to action # 2, see meeting minutes. 
1/17/2002 Discussed at Monthly CMP Meeting CR # SCR092601-1 discussed during 10.0 Packaging Presentation 
1/17/2002 Status Changed CR # SCR092601-1 status updated to 'Packaged' for 10.0 
3/13/2002 Status Changed Status updated from 'Packaged' to 'Development' 
3/21/2002 Discussed at Monthly CMP Meeting SCR092601-1 discussed at March Systems CMP Monthly meeting during IMA Release 10.0 Commitment Discussion (Attachment I) 
6/20/2002 Discussed at Monthly CMP Meeting SCR092601-1 discussed at June Systems CMP Monthly meeting; please see Systems CMP Distribution Package June CMP -- Attachment N 
6/20/2002 Discussed at Monthly CMP Meeting SCR092601-1 discussed at June Systems CMP Monthly meeting; please see Systems CMP Distribution Package July CMP -- Attachment G 
6/25/2002 Status Changed Status updated to CLEC Test based upon discussion at June Systems CMP Meeting and IMA 10.0 Deployment on June 17, 2002 
7/18/2002 Discussed at Monthly CMP Meeting SCR092601-1 discussed at July Systems CMP Monthly meeting; please see Systems CMP Distribution Package July CMP -- Attachment G 
7/18/2002 Status Changed Status changed to completed 

Project Meetings

10/11/01 -- Clarification meeting

Participants included Denise Martinez, J.J. Bradley, Jerry Mohatt, Beth Foster, Lynn Stecklein. Further discussion and research is necessary within the Process Specialist organization. A follow-up meeting will be scheduled.

=============

10/18/01 October CMP Meeting

During Oct CMP meeting held on 10/18/01 CLECs voted for a jeopardy notice after FOC instead of the nonfatal error after FOC.

=============

11/15/01 - CR discussed in the Nov CMP meeting. Action Item 370 was created - Jill will provide process options by Nov 30.

=============

11/28/01 - Qwest Internal Clarification Meeting

A meeting was held to discuss the following 2 CR's. In attendance Jill Martain, Joan Wells, Todd Mead, Michael Buck, Lynn Stecklein The latest status is Discussed at Systems CMP meeting. There are interim process solutions available for SCR092601-1. Qwest will discuss potential interim process at the December CMP P&P meeting. CR 5582295 should be closed on agreement from CLEC community. SCR092601-1 - Lynn will maintain this CR. It has been prioritized high by the CLECs for 10.0 and will be in development for June Release. We need to maintain this in the systems CMP meeting and report on progress as it progresses through CMP process.

===============

December P&P CMP Meeting 12/12/01

Qwest reviewed the proposed manual process for the Systems CR (SCR092601-1) and explained that this process would apply to all products. AT&T is concerned about the time frame for Qwest to issue a Jeopardy notification to CLECs, specifically for LNP and Broadband. Qwest to take an action to advise what the interval is before this interim process is implemented. The details of the Systems CR will be reviewed in tomorrow's Systems CMP Meeting. Based upon resolution of the timeframes with AT&T, the CLEC participants agreed that Qwest could move forward with the manual process with an effective target date of 2/1/02.

================

12/19/01; Letter received from AT&T

December 19, 2001

Todd Mead CMP Manager Qwest Communications 1801 California Street Denver, Colorado 80202

RE: E-mail titled SCR092601-1 – Time Interval

Dear Todd:

AT&T does not believe the proposed three-day interval to monitor AT&T Broadband’s LNP LSRS for Qwest jeopardy notices satisfies Broadband’s needs nor CR5582295 sent to Qwest June 6th, 2001.

AT&T believes Qwest should not fatal reject nor send a jeopardy notice after the FOC for a product which has a three-day service interval. AT&T understands that Qwest has reduced many circumstances requiring a jeopardy notice by implementing and improving their OSS front-end edits. If there are isolated cases where a jeopardy notice must be sent after the FOC, AT&T expects this notice to be sent no later than four hours after the FOC. This jeopardy notice should be followed up with a call from the Qwest typist who issued the notification.

AT&T Broadband has established internal processes which rely on a reliable FOC. Qwest’s three-day proposal places a burden on AT&T and creates a situation where the end customer resides in both switches causing a degradation of service and a double billing issue.

AT&T cannot agree to go forward with the proposed implementation of SCR092601-1 in February as agreed upon in the December CMP meeting.

Sincerely,

Terry Bahner Supervisor AT&T Local Services Access Management Western Region

Cc: Tim Boykin Sharon Van Meter Donna Osborne-Miller

CenturyLink Response

Draft Response for Discussion at December CMP Meeting

Qwest draft process documentation for procedures.

Upon Qwest identifying the Fatal or Non-Fatal error condition after a FOC, the Service Delivery Coordinator will:

1. Issue a jeopardy notification to the CLEC via IMA EDI, fax, or email stating the reason for the jeopardy condition and the action necessary to correct the error. The reason will be a C05 for design requests and SX for non-designed requests. The associated jeopardy description will state: Error or Reject Condition Identified After the FOC Was Sent to the CLEC.

2. For the first week, place a courtesy call to the CLECs that are currently receiving a call on the non-fatal error to advise them that a jeopardy notice has been issued.

3. Follow-up the LSR in 4-hours to see if a supplement has been received to correct the error condition. If a supplement has not been received, the service order(s) will be canceled (the LSR remains in a jeopardy status).

4. The LSRs will then be followed up in 30-business days to validate if the jeopardy condition has been satisfied. If the LSR remains in a jeopardy status after 30-days, the LSR will be rejected back to the CLEC.

Once a supplement has been received, the LSR will be placed back into the provisioning process and the jeopardy condition satisfied. The original Due Date may or may not be changed, depending on the error condition and the interval in which the supplement was received.

NOTE: SCR92601-1 has been scheduled for 10.0 to enforce not allowing a Non-Fatal Error Notice after a FOC. This process can be manually implemented prior to 10.0 if the CLECs desire the change in process prior to system enforcement.

Draft Response Update for November 15, 2001 CMP Meeting

In regards to the discussion at the last CMP meeting, Qwest agreed to investigate what would be required to be able to implement the CLEC request to receive a jeopardy notice when a CLEC error is detected after FOC issuance instead of the non-fatal error that is currently sent.

Qwest has reviewed process and system impacts across all products and has determined that:

1. One issue that was not discussed at the last meeting was driving closure to the jeopardy notice. Since Qwest will be issuing a jeopardy notice, the 4-hour requirement for resolution before rejection is removed. A timeline for resolution is still required. Qwest is proposing that if the CLEC jeopardy condition is not resolved within 30 calendar days that the LSR is rejected. 2. Internal system changes are needed; however, the opportunity to move forward with process changes in advance of system changes does exist. Qwest could implement the process change manually, without the system changes that would prevent a non-fatal error message from being sent after the FOC. With this approach, the chance for human error exists, especially when the process change is first implemented. Qwest can monitor the process change for compliance and reinforce it through reports, but the ultimate results are realized when the system changes are made. Therefore, in order to use this approach, CLECs must recognize that Qwest would be using process changes to transition from non-fatal error messages to jeopardy notices. The transition would be complete with the implementation of the necessary system changes.

Based on the above information, Qwest cannot determine an actual implementation date at this time. Because of the proposed process changes mentioned above, this Change Request will also be discussed in the Product and Process Meeting scheduled on December 12, 2001.

Archived System CR 32095 Detail

 
Title: Remove CONVIND Field
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

32095 Withdrawn
1/17/2002
-   IMA Common/ All Products
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Gallegos, John
Director:
CR PM: Routh, Mark

Description Of Change

The CONVIND field is a Qwest specific field that is not used for flow through processing any longer. The system counts lines and determines full or partial conversion based on whether the number of lines on the request match the number of lines on the account. CONVIND should be removed from IMA to avoid continued CLEC and ISC/IWSC confusion over use of the field.

Status History

Date Action Description
9/28/2001 CR Submitted CR transferred from legacy database to CMP database 
10/18/2001 Discussed at Monthly CMP Meeting Presented at Oct CMP meeting 
10/25/2001 Status Changed Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. 32095 ranked 29 
1/17/2002 Status Changed Withdrawn by Qwest due to low business value. 

Project Meetings

CenturyLink Response

Archived System CR 30831 Detail

 
Title: FCC Mandated Number Pooling
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

30831 Completed
7/18/2002
-   IMA Common/10 IMA LNP
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

This CR provides for the update of IMA to match the 9.3 release of Facility Check or whichever newest release is available. In order for IMA to implement the Number Pooling functionality that the 9.3 release of Facility Check will provide. IMA must be able to continue to interface to Facility Check.

FCC Docket CC99-200 per K. Rein. Page 70 para. 156

Section D. Implementation Issues

1. National Framework

156. We believe based on the readiness of thousand block number pooling standards and technical requirements, that thousands-block number pooling can be implemented on a national level within nine months of the selection a national thousands-block number Pooling Administrator. In the interim, we will continue to make individual delegations of authority to states seeking to implement thousands-block number pooling trials, subject to the parameters we set forth in our previous orders delegating additional numbering authority to state commissions to the extent that they are consistent with our national pooling framework set forth in this Report and Order. Although the ultimate goal, to maximize the optimization of the resource, is to implement pools in as many rate centers as possible, we are constrained from implementing pooling everywhere because it is dependent on LNP capability. Therefore, when we begin to implement pooling at the national level, we will initially concentrate our implementation efforts in those areas in which all or most carriers are LNP-capable—i.e., the top 100 MSAs and in areas where pooling trials have begun. Once thousands-block pooling is implemented in an area, LNP-capable carriers will only receive numbers in blocks of one thousand for all purposes, including the establishment of an initial footprint as well as for growth needs. Consistent with the Thousand Block Pooling Guidelines, carriers will be required to donate all unused or lightly-used blocks (i.e., with ten percent or less contamination) to initially stock the pool. Carriers that participate in pooling will not be required to meet utilization thresholds to obtain growth codes initially. We may, however, revisit the question of whether all carriers should be subject to meeting a utilization threshold to obtain growth codes if we find that such thresholds significantly increase numbering use efficiency.

Status History

Date Action Description
10/18/2001 CR Submitted CR transferred from legacy database to CMP database 
10/18/2001 Discussed at Monthly CMP Meeting Presented at Oct CMP meeting, status changed to development. 
10/18/2001 Clarification Meeting Held CR was clarified at the October CMP meeting. 
10/31/2001 Release Ranking Ranking for Release 10.0; 30623 is "Above the Line" 
1/17/2002 Discussed at Monthly CMP Meeting CR # 30831 discussed during 10.0 Packaging Presentation 
1/17/2002 Status Changed CR # 30831 status updated to 'Packaged' for 10.0 
3/13/2002 Status Changed Status updated from 'Packaged' to 'Development 
3/21/2002 Discussed at Monthly CMP Meeting 30831 discussed at March Systems CMP Monthly meeting during IMA Release 10.0 Commitment Discussion (Attachment I) 
6/20/2002 Discussed at Monthly CMP Meeting 30831 discussed at June Systems CMP Monthly meeting; please see Systems CMP Distribution Package June CMP -- Attachment N 
6/25/2002 Status Changed Status set to CLEC Test 
7/18/2002 Discussed at Monthly CMP Meeting 30831 discussed at July Systems CMP Monthly meeting; please see Systems CMP Distribution Package July CMP -- Attachment G 
7/18/2002 Status Changed Status updated to Completed 

Project Meetings

CenturyLink Response

Qwest has donated pools of numbers in 8 states, including 134 blocks in Colorado. The first time Qwest received blocks for production was 12/01, when we received 2 blocks in Utah. We are not currently scheduled to receive any blocks in Colorado, but as soon as Qwest does, the IMA system must be prepared to run the Pre Order Query using the new 7 digit key as required by the new FCC Ruling.

Qwest has already automated the donate / receive process. The Colorado trial prework (freezing blocks, decontamination) started in the April/May timeframe this year. The offical block donation date was 6/1/01.

Changes are underway, to Qwest legacy systems, to support the ordering/provisioning flow. These changes will be transparent to IMA, and use the full 10 digit TN (present on the order) to determine how to route and provision the order. Other changes, that are not transparent to IMA, are to the pre-order queries that use TN (e.g. facility availability query). Until IMA can use the new interface, and pass all 10 digits of the TN, queries based on TN will begin to return errored conditions, for numbers that are in blocks Qwest has received from another carrier. This is due to the fact that in the existing interface, the query uses only the NPA-NXX of the number. Since Qwest has not received any blocks to date, there has been no impact to IMA. This is now changing.

Archived System CR 31321 Detail

 
Title: Accept Cancel Status
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

31321 Completed
11/5/2001
-   IMA Common/ All Products
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Gallegos, John
Director:
CR PM: Routh, Mark

Description Of Change

Today the system does not pick-up the Cancel status on a service order canceled by one of the SOPs. Due to completions issues need IMA to pick-up and display the Cancel status.

Status History

Date Action Description
9/28/2001 CR Submitted CR transferred from legacy database to CMP database 
10/18/2001 Discussed at Monthly CMP Meeting Presented at Oct CMP meeting 
10/25/2001 Status Changed Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. 31321 ranked 8 
11/5/2001 Status Changed Process updates have been completed 
1/17/2002 Discussed at Monthly CMP Meeting CR # 31321 discussed during 10.0 Packaging Presentation; this CR completed via methods and procedures 

Project Meetings

CenturyLink Response

the correction to this problem involves the reinforcement of existing manual practices. Targeted implementation was 11/5/01.

Archived System CR 28287 Detail

 
Title: UBL ECCKT field GUI Only.
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

28287 Completed
10/18/2001
-   IMA GUI/8
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Gallegos, John
Director:
CR PM: Routh, Mark

Description Of Change

Provide an edit in IMA to ensure that CLEC provides the last two characters of the CLS in the ECCKT field on the LSR. Colorado QPAP Docket 01I-041T.

Status History

Date Action Description
Release Information IMA Release 8.01 
9/28/2001 CR Submitted CR transferred from legacy database to CMP database 
10/18/2001 Discussed at Monthly CMP Meeting Presented at Oct CMP meeting, status changed to development 
10/25/2001 Qwest Response Issued Qwest response included with CLEC prioritization request 
11/9/2001 Record Update CR scheduled for production in 12/08/01 patch 
1/3/2002 Status Changed Work was completed on December 14, 2001 

Project Meetings

CenturyLink Response

Archived System CR 29731 Detail

 
Title: USOC Identification for Total Reach
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

29731 Withdrawn
2/14/2002
750 - 3000  IMA Common/ Total Reach
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

Loop Extension Technology offers the Competitive Local Exchange Carriers (CLEC’s) additional loop extension technology for ISDN (BRI) and xDSL-I capable unbundled loops only. In order to successfully provision and install a CLEC request for an xDSL-I or Basic Rate ISDN capable loop over metallic cable pair, loop loss and characteristics may require the placement of Extension Technology equipment on the requested Unbundled Loop. The addition of this equipment will ensure that the network interface to network interface requirements meet the ANSI Standards as set in ANSI T1.601.

Status History

Date Action Description
9/28/2001 CR Submitted CR transferred from legacy database to CMP database 
10/18/2001 Discussed at Monthly CMP Meeting Presented at Oct CMP meeting 
10/25/2001 Status Changed Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. 29731 ranked 44 
1/17/2002 Status Changed CR # 29731 status updated to 'Presented; CR was not packaged as part of 10.0 and is eligible for ranking in 11.0' 
2/13/2002 Record Update LOE Updated from Small to Medium 
2/14/2002 Status Changed Status updated from Presented to Pending Withdrawal; submitter no longer wishes to pursue CR 
2/21/2002 CLEC Requested Info Eschelon wants to know more about what this CR was intended to provide. Connie Winston will provide that information. 
2/21/2002 Discussed at Monthly CMP Meeting 29731 discussed during 'CRs to consider for Closure' portion of February Systems CMP Monthly meeting; please see Attachment E of February Systems CMP Distribution Package 
2/26/2002 Additional Information Mark Routh sent the information to Bonnie Johnson. 
3/8/2002 Status Changed This CR was presented at the Feb. CMP meeting for witdrawl. Eschelon requested that the withdrawl be delayed to give Eschelon time to investigate if they wanted to sponsor it. Eschelon has decided not to sponsor this CR. 

Project Meetings

CenturyLink Response

Archived System CR 20608 Detail

 
Title: CSRR: Wrong data returned in ECCKT field
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

20608 Completed
12/20/2001
-   IMA Common/8
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Gallegos, John
Director:
CR PM: Routh, Mark

Description Of Change

Status History

Date Action Description
Release Information IMA Release 8.02 
11/8/2001 CR Submitted CR transferred from legacy database to CMP database 
11/9/2001 Status Changed CR is in Development status. Scheduled for production in 12/08/01 patch 
12/20/2001 Status Changed In production according to Gerry Mohatt e-mail 

Project Meetings

CenturyLink Response

Archived System CR 30618 Detail

 
Title: IBA PO7 IMA Change FOC status after LSR completion
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

30618 Completed
12/20/2001
-   IMA Common/8
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Gallegos, John
Director:
CR PM: Routh, Mark

Description Of Change

Currently, after an FOC is issued to the CLEC, it is possible to issue an additional FOC. This can happen with a change notification. Since this can cause confusion with the CLEC, there needs to be an edit that will not allow additional FOCs to be issued after LSR completion.

Revision 1: Added IBA Explanation. Removed Status = Issued FOC from the detailed description.

Once an FOC has been issued, IMA shall not allow an additional FOC to be issued if the Status = Cancelled, Order Completion, Request Billing Complete, or Request Completed.

Status History

Date Action Description
Release Information IMA Release 8.02 
11/8/2001 CR Submitted CR transferred from legacy database to CMP database 
11/9/2001 Status Changed CR is in Development status. Scheduled for production in 12/08/01 patch 
12/20/2001 Status Changed In production according to Gerry Mohatt e-mail 

Project Meetings

CenturyLink Response

Archived System CR 25436 Detail

 
Title: PO3A & B, PO4 (Long Term)
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

25436 Completed
12/20/2001
-   IMA Common/8
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Gallegos, John
Director:
CR PM: Routh, Mark

Description Of Change

Status History

Date Action Description
Release Information IMA Release 8.02 
11/8/2001 CR Submitted CR transferred from legacy database to CMP database 
11/9/2001 Status Changed CR is in Development status. Scheduled for production in 12/08/01 patch 
12/20/2001 Status Changed In production according to Gerry Mohatt e-mail 

Project Meetings

CenturyLink Response

Archived System CR 31674 Detail

 
Title: Cancel SUP’s REQTYP BB
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

31674 Completed
12/20/2001
-   IMA Common/8
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Gallegos, John
Director:
CR PM: Routh, Mark

Description Of Change

Status History

Date Action Description
Release Information IMA Release 8.02 
11/8/2001 CR Submitted CR transferred from legacy database to CMP database 
11/9/2001 Status Changed CR is in Development status. Scheduled for production in 12/08/01 patch 
12/20/2001 Status Changed In production according to Gerry Mohatt e-mail 

Project Meetings

CenturyLink Response

Archived System CR 32012 Detail

 
Title: CR25436 Enhancement Gap for PO3A&B, PO4 data retention
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

32012 Completed
12/20/2001
-   IMA Common/8
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Gallegos, John
Director:
CR PM: Routh, Mark

Description Of Change

Status History

Date Action Description
Release Information IMA Release 8.02 
11/8/2001 CR Submitted CR transferred from legacy database to CMP database 
11/9/2001 Status Changed CR is in Development status. Scheduled for production in 12/08/01 patch 
12/20/2001 Status Changed In production according to Gerry Mohatt e-mail 

Project Meetings

CenturyLink Response

Archived System CR 29822 Detail

 
Title: CHANGE_INDICATOR being sent incorrectly when SC/AI change
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

29822 Completed
12/20/2001
-   IMA Common/8
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Gallegos, John
Director:
CR PM: Routh, Mark

Description Of Change

Status History

Date Action Description
Release Information IMA Release 8.02 
11/8/2001 CR Submitted CR transferred from legacy database to CMP database 
11/9/2001 Status Changed CR is in Development status. Scheduled for production in 12/08/01 patch 
12/20/2001 Status Changed In production according to Gerry Mohatt e-mail 

Project Meetings

CenturyLink Response

Archived System CR 29912 Detail

 
Title: IBA – Prevent Duplicate FOC’s
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

29912 Completed
12/20/2001
-   IMA Common/8
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Gallegos, John
Director:
CR PM: Routh, Mark

Description Of Change

Status History

Date Action Description
Release Information IMA Release 8.02 
11/8/2001 CR Submitted CR transferred from legacy database to CMP database 
11/9/2001 Status Changed CR is in Development status. Scheduled for production in 12/08/01 patch 
12/20/2001 Status Changed In production according to Gerry Mohatt e-mail 

Project Meetings

CenturyLink Response

Archived System CR SCR110901-1 Detail

 
Title: Require the SBN/MAN or Circuit ID (ecckt) be placed in the Trunk CSR as a normal course of business and be accessible (viewable) by the CLEC.
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR110901-1 Withdrawn
8/7/2005
-   Wholesale Billing Interfaces/ Pre-ordering Resale IT1, DSS, PRI, and UNE-P DSS, PRI
Originator: Paxton, Mallory
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Stecklein, Lynn

Description Of Change

Scenario:

The CLEC is attempting to electronically obtain the Facility CSR.

Current Method:

In order to do this, they must know the SBN/MAN or circuit id (ecckt). The CLEC typically obtains SBN/MAN or circuit id from the end user bill, which includes this information. However, when the CLEC does not have immediate access to the information, it can sometimes be found on the Trunk CSR.

When the Trunk CSR is accessed by the CLEC and the Trunk CSR does not have the SBN/MAN or circuit id information, the CLEC can call the Qwest Center to obtain the information. The service center representative will access the Truck CSR to see if the information is in an area the CLEC can not see, i.e., “retained remarks” section. If not, they will typically access TIRKS to obtain the information for the CLEC.

Qwest has not required facility account number information be placed in the Trunk CSR. There are no practices or system supports in place to support such a requirement. Very few requests from the CLEC come to the services center.

Request:

Develop procedures, along with system support, requiring the SBN/MAN or circuit id (ecckt) be placed in a field on the Trunk CSR, visible to the CLEC.

Status History

Date Action Description
11/9/2001 CR Submitted CR was submitted on behalf of the CLEC community. 
11/12/2001 Clarification Meeting Scheduled Clarification meeting scheduled for November 13, 2001. 
11/13/2001 Clarification Meeting Held Clarification meeting held, notes emailed. 
11/26/2001 Qwest Response Issued Qwest Response Issued 
11/26/2001 LOE Issued Level of effort provided in Qwest Response 
1/17/2002 Discussed at Monthly CMP Meeting CR # SCR110901-1 discussed at January CMP meeting 
1/18/2002 Status Changed Updated to 'Evaluation' status 
6/10/2002 Qwest Response Issued Revised response issued 
6/13/2002 Status Changed Status set to deferred 
6/20/2002 Discussed at Monthly CMP Meeting SCR110901-1 discussed at June Systems CMP Monthly meeting; please see Systems CMP Distribution Package June CMP -- Attachment I; CR will remain in deferred status to be reviewed in July of 2003. 
8/17/2005 Status Changed Status changed to Withdrawn 
8/29/2005 Discussed at Monthly CMP Meeting Discussed at the August Monthly CMP Meeting - See Attachment G in the Systems Distribution Package 

Project Meetings

8/17/05 Systems CMP Meeting

Jill Martain - Qwest stated that this CR was in a deferred status because it was not economically not feasible to deploy. Jill said that we are withdrawing this CR.

01/17/02 CMP Meeting Discussion:

Mallory Paxton/Qwest presented and explained CR that develops procedures along with system requiring SBN/MAN or circuit id be placed in a field on the trunk CSR that would be visible to the CLEC. This request was initiated by Qwest to require cross-referencing of the facility and the trunk CSR’s on product’s where have both. Mallory advised that the level of effort was Large. This includes Resale Integrated T1, Resale DSS, Resale PRI, UNE-P DSS, and UNE-P PRI. Mallory advised that currently there is a CSR for facility and one or more CSR’s for trunk. There is no current edit to enforce cross-referencing of CSR’s. The process in place is to use Remarks and the CLEC’s can’t see Remarks. When placing an order, need to look at both CSR’s. This is not a problem for the trunk side. The T1 CSR is a problem. The SBN or MAN number, or circuit ID is needed to retrieve the CSR. The circuit ID is in CLS format. The existing process to obtain the CSR is to have the CLEC call the ISC, it is not automated. Requesting a system edit in the SOP to cross-reference. Mallory asked how much interest is there from the CLEC community to work CR? Carla Pardee/AT&T asked if Qwest could add UNE-P to products impacted. Mallory/Qwest advised that it should already be included, T1 products and DSS allows multiple products. Karen Clauson/Eschelon stated that products don’t mention UNE-P and asked if it was included. Mallory/Qwest responded - yes, the CR will be updated to reflect the impacted products. Karen/Eschelon asked if a field is being added. Mallory/Qwest advised yes, a FID could be used. It is a Wholesale requirement that the cross-reference be in Remarks of the CSR, on the service order, not on the LSR. There is no system edit to enforce it or require it. Today the CLECs contact Qwest to get circuit ID’s, is a manual process. Jeff Thompson/Qwest advised that the only difference that the CLEC will see is the CLEC will start seeing cross-referencing on the CSR. Karen Clauson/Eschelon stated that this sounds like a good change. Bonnie Johnson/Eschelon stated that Eschelon would support CR. Carla Pardee/AT&T stated that AT&T supports CR. Mike Buck/Qwest stated that the CR needs to be updated to add UNE-P. Mike Buck/Qwest stated that this CR will move to Evaluation status.

11/13/01 - Clarification Meeting Notes In attendance: Joseph Bradley/Qwest IT SDA, Peggy Esquibel-Reed/Qwest CR PM, Mallory Paxton/Qwest originator and Process Specialist Reviewed CR Description. Area & Products Impacted: CRIS/CRIS SOPs for ISDN PRI, ISDN Resale, and PBX. CLEC Expectation: CLECs need to know electronically the circuit id/ecckt to pull a facility CSR.

CenturyLink Response

DRAFT RESPONSE For Review by the CLEC Community and Discussion at December CMP Meeting

November 26, 2001

Mallory Paxton for the CLEC Community Qwest Process Specialist

CC: Mike Hummer Gerald Mohatt Joseph J. Bradley This letter is in response to your CLEC Change Request Form, number SCR110901-1 dated November 8, 2001. CR Title: Require the SBN/MAN or Circuit ID (ecckt) be placed in the Trunk CSR as a normal course of business and be accessible (viewable) by the CLEC.

CR Description: Scenario - The CLEC is attempting to electronically obtain the Facility CSR.

Current Method - In order to do this, they must know the SBN/MAN or circuit id (ecckt). The CLEC typically obtains SBN/MAN or circuit id from the end user bill, which includes this information. However, when the CLEC does not have immediate access to the information, it can sometimes be found on the Trunk CSR.

When the Trunk CSR is accessed by the CLEC and the Trunk CSR does not have the SBN/MAN or circuit id information, the CLEC can call the Qwest Center to obtain the information. The service center representative will access the Truck CSR to see if the information is in an area the CLEC can not see, i.e., “retained remarks” section. If not, they will typically access TIRKS to obtain the information for the CLEC or will obtain the information by putting the CFA from the Trunk CSR into BOSS/CARS..

Qwest has not required facility account number information be placed in the Trunk CSR. There are no practices or system supports in place to support such a requirement. Very few CSR requests (5 or 6 per year) from the CLEC’s for this type of information come to the Interconnect Service Center.

Request - Develop procedures, along with system support, requiring the SBN/MAN or circuit id (ecckt) be placed in a field on the Trunk CSR, visible to the CLEC.

Qwest Response: Based on the above noted information, the level of effort for this request is large.

Sincerely, John Gallegos Information Technologies Manager

REVISED RESPONSE

June 10, 2001

RE: SCR110901-1 (Require the SBN/MAN or Circuit ID (ecckt) be placed in the Trunk CSR)

At the January Monthly Systems CMP Meeting Qwest indicated its willingness to evaluate the feasibility and possible approaches for implementing changes to allow circuit ID to be accessible via the Trunk CSR.

The current data suggest that demand for this functionality is low while the effort to implement this functionality is high. Qwest believes that the existing process that allows access to circuit ID is satisfactory given the current level of demand for this information.

Based upon the results of this evaluation, Qwest is updating this Change Request to a "Deferred" status. Qwest will review the status of this Change Request after July 1, 2003. At that time, Qwest will re-evaluate the demand and the ability of existing processes to meet that demand. Upon review, if conditions warrant, Qwest may further explore options for implementing this change.

Sincerely, Jeff Thompson Director, Information Technologies

Archived System CR SCR122701-6 Detail

 
Title: SATE Add Facility Based Directory Listings
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR122701-6 Completed
11/21/2002
700 - 1200  SATE/11 All
Originator: Green, Wendy
Originator Company Name: Qwest Corporation
Owner: Green, Wendy
Director:
CR PM: Esquibel-Reed, Peggy

Description Of Change

This change is submitted by Qwest on behalf of NightFire Software. SATE must support Facility Based Directory Listings and all its activities. Scenarios for Facility Based Directory Listings should be added to the EDI SATE Data Document

Status History

Date Action Description
12/27/2001 CR Submitted  
1/3/2002 Clarification Meeting Scheduled Clarification Meeting Scheduled for January 8, 2002 
1/8/2002 Clarification Meeting Held Clarification Meeting Held. See Project Meeting Notes. 
1/10/2002 LOE Issued Received LOE of Extra Large from IT. 
1/10/2002 Draft Response Issued Issued draft response. 
1/17/2002 Discussed at Monthly CMP Meeting CR # SCR122701-4 'Presented' at January CMP meeting 
2/25/2002 Additional Information SATE Ranking will be in the March 2002 CMP Meeting. 
4/1/2002 Release Ranking Ranking for SATE following the March 2002 Systems CMP Meeting. SCR122701-6 ranked number 03 
6/7/2002 Status Changed SCR122701-6 status updated to 'Packaged' for SATE release associated with IMA 11.0 based upon outcome of Packaging Selection vote 
8/5/2002 Status Changed Status changed from 'Packaged' to 'Development', targeted implementation date is 10/19/02 
8/22/2002 Discussed at Monthly CMP Meeting SCR122701-6 discussed at August Systems CMP Monthly meeting; please see Systems CMP Distribution Package August CMP -- Attachment R 
10/17/2002 Discussed at Monthly CMP Meeting SCR122701-6 discussed at October Systems CMP Monthly meeting; please see Systems CMP Distribution Package October CMP -- Attachment L 
10/29/2002 Status Changed Status changed to CLEC Test due to October 19th deployment. 
11/21/2002 Discussed at Monthly CMP Meeting SCR122701-6 discussed at November Systems CMP Monthly meeting; please see Systems CMP Distribution Package November CMP -- Attachment G 

Project Meetings

November 21, 2002 Systems CMP Meeting Discussion: Wendy Green-Qwest stated that the CR could be closed.

August Systems CMP Meeting Discussion: Attachment R = Change Requests Committed for IMA Release 11.0 Connie Winston/Qwest - we have one small issue requiring the Sup 2 (SCR013002-8 Flowthrough on Sup 2 Category Due Date) to be a spillover for 11.1. She explained why this will be a spillover into the point release. She noted that resale and UNE sup 2 due date change orders will flow through. The unbundled loop will drop out to the Center and will be updated by the Center until 11.1. Donna Osborne-Miller/AT&T - that’s line item #4 in the Attachment? Connie Winston/Qwest - yes. Michael Buck/Qwest - stated that the NOTE at the bottom of the page needs to be changed from 'In Definition' to 'Packaged'. Liz Balvin/WorldCom - asked how the 11.0 PO2 CR is different than the one in 12.0. Connie Winston/Qwest - they are just different edits. The edits are noted on each of the 2 CRs. Liz Balvin/WorldCom - with 12.0, would you say that any of the hours devoted to this would lower the 8,000 hours? Are you looking at that when you do the design? Connie Winston/Qwest - we always look at that, but the edits are different so I could expect a reduction in the LOEs. As we get further in design, we do update the LOE. Attachment R = Change Requests Committed for SATE Release 11.0 Connie Winston/Qwest - SATE has the same spillover candidate for 11.1, SCR013002-8 Sup 2. Michael Buck/Qwest - noted that items 3, 5, and 7 are SATE specific candidates. The others are IMA with SATE impacts. Wendy Green/Qwest - noted that the SATE side has a shorter list because of the GUI only impacting CRs going into IMA having no impact to SATE. Michael Buck/Qwest - any other questions in the room or on the bridge? None.

01/17/02 CMP Meeting Discussion: Wendy Green/Qwest presented CR., originated by Qwest on behalf of NightFire., and stated that this CR came out of the SATE User’s Group and is co-sponsored by Qwest and the CLEC’s. Wendy advised that this CR is similar to line and loop splitting. Bill asked if this was facility based and not product 14. Wendy/Qwest responded - right, product 14 is already supported. Wendy advised that the level of effort is Extra Large. Michael Buck/Qwest stated that this CR will move into Presented status and the ranking of SATE requests will take place at February CMP.

01/08/02 - Clarification Meeting Notes: Attendees were Ian Coleman/Allegiance, Ken Wilson/AT&T, Bob Carias/Nightfire, Peggy Esquibel-Reed/Qwest, Donna Montarone/Qwest, Jake Perlman/Qwest, Wendy Green/Qwest, Ellen Cross/Qwest, Francois Morel/Qwest, Nancy Denny/Qwest. SATE must support Facility Based Directory Listings and all its activities. Scenarios for Facility Based Directory Listings should be added to the EDI SATE Data Document. Meeting notes emailed to all participants.

CenturyLink Response

DRAFT RESPONSE For Review by the CLEC Community and Discussion at January CMP Meeting

January 10, 2002

Wendy Green Qwest

This letter is in response to your CLEC Change Request Form, number SCR122701-6 dated December 27, 2001, CR Title: SATE - Add Facility Based Directory Listings.

CR Description: SATE must support Facility Based Directory Listings and all its activities. Scenarios for Facility Based Directory Listings should be added to the EDI SATE Data Document.

Qwest Response: The Clarification meeting for this request was held on January 8, 2002. There were no questions raised for this request. Based on the above noted information, the level of effort for this request is Extra Large. This request is an eligible CR for prioritization in February 2002.

Sincerely, Jeff Thompson Director, Information Technologies

Archived System CR SCR102901-2 Detail

 
Title: Make field for yield to glare information remove from comment in remark section.
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR102901-2 Withdrawn
8/21/2003
1800 - 3000  IMA Common/ ISDN, PRI, Resale, UNE-P, UNE-P ISDN PRI
Originator: Pennington, Freddi
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Stecklein, Lynn

Description Of Change

New field to populate "Yield to Glare" data for ISDN – PRI orders.

There are several types of hunting available with UNE-P ISDN PRI. They vary by switch type. If the CPE is set to hunt, the Central Office should be set up just the opposite. This is needed in order to minimize "glare". Glare occurs when both ends of a telephone line or trunk are seized at the same time for different purposes or by different users.

"Glare Resolution" is the ability of a system to ensure that if a trunk is seized by both ends simultaneously, one caller is given priority and the other is switched to another trunk.

In the "Remarks" field of the LSR form, you must enter whom "Yields to Glare". If you enter "Qwest Yields to Glare", your end-user's call is given priority. If you enter "(Your Name) Yields to Glare", the Qwest call is given priority.

Status History

Date Action Description
10/29/2001 CR Submitted CR Submitted 
11/7/2001 Clarification Meeting Held Clarification meeting held (see minutes) 
11/15/2001 Discussed at Monthly CMP Meeting CR presented in Nov CMP meeting 
11/27/2001 Record Update Discussed OBF issue with Carol Zimmerman. OBF issue 2310 seeks enhancement to ISDN BRI ordering process. New field is being created for yield to glare. 
11/27/2001 Record Update OBF issue 2310 is independent of this Change Request. OBF issue can create a new CR as necessary. 
11/27/2001 Record Update Other information that is displayed in remarks (I.e. hunting and protocol) maybe also be addressed in OBF issue 2310. Lynn will schedule a call with Carol Z and the Process Specialist the week of 12/3/01. 
12/13/2001 Status Changed  
12/13/2001 Discussed at Monthly CMP Meeting  
1/31/2002 Record Update CR Description further defined 
2/13/2002 Record Update LOE updated from Small to Large 
2/21/2002 Discussed at Monthly CMP Meeting SCR102901-2 discussed during 'Review of 11.0 Prioritization Eligible CRs' portion of February Systems CMP Monthly meeting; please see Attachment I of February Systems CMP Distribution Package 
3/1/2002 Release Ranking Ranking for Release 11.0 following the February 2002 Systems CMP Meeting. SCR102901-2 ranked number 38 
3/1/2002 Status Changed Status updated to 'Prioritized' from 'Presented' 
6/7/2002 Status Changed SCR102901-2 status updated to 'Pending Prioritization' based upon outcome of IMA 11.0 Packaging Selection vote 
7/18/2002 Discussed at Monthly CMP Meeting SCR102901-2 discussed at July Systems CMP Monthly meeting; please see Systems CMP Distribution Package July CMP -- Attachment P 
7/26/2002 Release Ranking Ranking for Release 12.0 following the July 2002 Systems CMP Meeting. SCR102901-2 ranked number 49 (tie) 
10/30/2002 Status Changed SCR102901-2 status updated to 'Pending Prioritization' based upon outcome of release 12.0 packaging effort 
12/19/2002 Discussed at Monthly CMP Meeting SCR102901-2 discussed at December Systems CMP Monthly meeting; please see Systems CMP Distribution Package December CMP -- Attachment O 
12/31/2002 Release Ranking Ranked #34 for IMA 13.0 Release 
1/23/2003 Release Ranking Ranked #29 for IMA 13.0 after exception request SCR011303-02EX 
3/13/2003 Status Changed Status changed to Pending Prioritization after Packaging of IMA 13.0 
3/20/2003 CLEC Provided Information Products changed in CMP Meeting. Addition of UNE-P ISDN PRI 
4/7/2003 Release Ranking 14.0 Prioritization- Ranked #47out of 53 
4/29/2003 Release Ranking Rank changed due to Late Adders- Ranked #48 
5/30/2003 Release Ranking Rank changed due to Late Adders- Ranked #49 
7/9/2003 Status Changed Status changed to pending prioritization with release of I MA 14.0 Packaging. 
8/21/2003 Status Changed Requested withdrawal during IMA 15.0 prioritization. CMP agreed 

Project Meetings

8/21/03 CMP systems meeting

Connie Winston/Qwest stated that Qwest wanted to withdraw this CR and not have it on prioritization.

7/18/02 CMP Systems Meeting Connie Winston/Qwest stated that this is not a high priority for Qwest. There were no questions.

11:30 a,m. (MDT) Thursday November 7, 2001 SCR102901-2 Attendees Pam O Connell Gin Sakal Marlene Dimanna Lynn Stecklein, Qwest JJ Bradley Qwest Jerry Mohatt Qwest

1.1 Introduction of participants on the Conference Call was made. 1.2 The purpose of the call was to clarify SCR102901-2. 2.0 Review of Response 2.1 Description of Change: New field to populate Yield to Glare data for ISDN - PRI 2.2 Premier is requesting a field for the Yield to Glare data on the LSR in lieu of displaying information in the remarks section. 2.3 Marlene also indicated that Yield to Glare is not the only information that is place in the remarks section on the LSR. There is other information such as hunting, protocol etc where there is not field. 2.4 Marlene said that if we are going to pursue adding a field for Yield to Glare we might as well pursue fields for the other information that is displayed in remarks. She will provide the information that is shown in the remarks section by Monday, Nov 12.. Information was received from Marlene on Nov 8 as follows: For both UNE-P PRI and resale PRI, two requests, one for facility and one for trunks, Facility- configuration USOC and protocol type, Trunk Yield to glare and hunting. 2.5 Carol Zimmerman needs to be notified to determine if these fields are being addressed in OBF. LSOG 6 may be addressing hunting. Lynn will notify Carol. 2.6 Pam O Connell will determine who will present this CR at the CMP meeting on November 15.

CenturyLink Response

12/4/01 Description of Change - New Field to populate "Yield to Glare" data for ISDN - PRI orders. Qwest Response - The clarification meeting to discuss this Change Request was held on November 7, 2001. The level of effort is 1800 to 3000 hours.

Archived System CR 22107 Detail

 
Title: LSOG 5 Address
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

22107 Completed
3/21/2002
-   IMA Common/9 All
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

Update IMA pre-order and order forms for address information to LSOG5 guidelines.

Status History

Date Action Description
Release Information IMA Release 9.00 
10/23/2001 CR Submitted CR transferred from legacy database to CMP database 
10/24/2001 Baseline Candidate Selection CLECs notified this CR was a selected CR Baseline Candidate. 
1/17/2002 Discussed at Monthly CMP Meeting CR # 22107 discussed during 9.0 Candidate discussion (Attachment H in January Distribution Package)' 
2/25/2002 Status Changed 22107 status updated to 'CLEC Test' based upon 2/25/02 implementation of IMA 9.0 
3/21/2002 Status Changed Reviewed in the 3/21/02 CMP meeting and Closed. 
3/21/2002 Discussed at Monthly CMP Meeting 22107 discussed March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP - Attachment E 

Project Meetings

CenturyLink Response

Archived System CR 23930 Detail

 
Title: LSOG 5 Loop Qual
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

23930 Completed
3/21/2002
-   IMA Common/9 All
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

Update IMA Loop Qual to LSOG5 guidelines.

Status History

Date Action Description
Release Information IMA Release 9.00 
10/23/2001 CR Submitted CR transferred from legacy database to CMP database 
10/24/2001 Baseline Candidate Selection CLECs notified this CR was a selected CR Baseline Candidate. 
1/17/2002 Discussed at Monthly CMP Meeting CR # 23930 discussed during 9.0 Candidate discussion (Attachment H in January Distribution Package)' 
2/25/2002 Status Changed 23930 status updated to 'CLEC Test' based upon 2/25/02 implementation of IMA 9.0 
3/21/2002 Status Changed Reviewed in the 3/21/02 CMP meeting and Closed. 
3/21/2002 Discussed at Monthly CMP Meeting 23930 discussed March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP - Attachment E 

Project Meetings

CenturyLink Response

Archived System CR 27604 Detail

 
Title: Address Validation Worksheet Changes
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

27604 Completed
3/21/2002
-   IMA Common/9 All products
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

On the Address Validation, the following fields have valid values of 'n': AVR27 (AHN) and AVR80 (AHN).

Status History

Date Action Description
Release Information IMA Release 9.00 
10/23/2001 CR Submitted CR transferred from legacy database to CMP database 
11/15/2001 Baseline Candidate Selection CLECs notified this CR was a selected CR Baseline Candidate. 
1/31/2002 Status Changed Status updated to "Development"; determined that CR27604 is in development for 9.0 
2/25/2002 Status Changed 27604 status updated to 'CLEC Test' based upon 2/25/02 implementation of IMA 9.0 
3/21/2002 Status Changed Reviewed in the 3/21/02 CMP meeting and Closed. 
3/21/2002 Discussed at Monthly CMP Meeting 27604 discussed March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP - Attachment E 

Project Meetings

CenturyLink Response

Archived System CR 29574 Detail

 
Title: DL Form Should Be Optional for UNE P Centrex when Act = C
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

29574 Completed
3/21/2002
-   IMA Common/9 UNE_P, Centrex
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

This CR changes the Negotiated Business Rule for ACT = C for UNE-P Centrex to be the same as the Resale Centrex rule.

Status History

Date Action Description
Release Information IMA Release 9.00 
10/23/2001 CR Submitted CR transferred from legacy database to CMP database 
10/24/2001 Baseline Candidate Selection CLECs notified this CR was a selected CR Baseline Candidate. 
1/31/2002 Status Changed Status updated to "Development"; determined that CR29574 is in development for 9.0 
2/25/2002 Status Changed 29574 status updated to 'CLEC Test' based upon 2/25/02 implementation of IMA 9.0 
3/21/2002 Status Changed Reviewed in the 3/21/02 CMP meeting and Closed. 
3/21/2002 Discussed at Monthly CMP Meeting 29574 discussed March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP - Attachment E 

Project Meetings

CenturyLink Response

Archived System CR 25142 Detail

 
Title: Convert Line Not on Account
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

25142 Completed
3/21/2002
-   IMA Common/9 All products that use TN
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

IMA will edit against existing CSR data to verify that TNs submitted for conversion exist on the account being converted. LSRs will reject when invalid TNs are submitted for conversion, thus enforcing existing business rules reflected in I charts.

Status History

Date Action Description
Release Information IMA Release 9.00 
10/23/2001 CR Submitted CR transferred from legacy database to CMP database 
10/24/2001 Baseline Candidate Selection CLECs notified this CR was a selected CR Baseline Candidate. 
1/17/2002 Discussed at Monthly CMP Meeting CR # 25142 discussed during 9.0 Candidate discussion (Attachment H in January Distribution Package)' 
2/25/2002 Status Changed 25142 status updated to 'CLEC Test' based upon 2/25/02 implementation of IMA 9.0 
3/21/2002 Status Changed Reviewed in the 3/21/02 CMP meeting and Closed. 
3/21/2002 Discussed at Monthly CMP Meeting 25142 discussed March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP - Attachment E 

Project Meetings

CenturyLink Response

Archived System CR 28218 Detail

 
Title: Enhance the Loop Qual Tool Add Yellow Status Long Term
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

28218 Withdrawn
1/15/2002
-   IMA Common/9 DSL
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Gallegos, John
Director:
CR PM: Routh, Mark

Description Of Change

YELLOW STATUS - This enhancement would allow the CLEC to view the yellow status returned on a Qwest DSL loop qual. The yellow status is returned, if full qualification cannot be made due to missing data.

Status History

Date Action Description
Release Information IMA Release 9.00 
10/23/2001 CR Submitted CR transferred from legacy database to CMP database 
10/24/2001 Baseline Candidate Selection CLECs notified this CR was a selected CR Baseline Candidate. 
1/17/2002 Discussed at Monthly CMP Meeting CR # 28218 discussed during 9.0 Candidate discussion (Attachment H in January Distribution Package)' 
1/17/2002 Status Changed CR was withdrawn by Qwest 

Project Meetings

CenturyLink Response

Archived System CR 27086 Detail

 
Title: Appointment Scheduler EDI Unbundled Loop
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

27086 Completed
3/21/2002
-   IMA EDI/9 UBL & LSNP
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

Enhance IMA EDI pre-order process to allow appointment scheduling for Unbundled Loop LSRs (Product Types UBL and LSNP).

Status History

Date Action Description
Release Information IMA Release 9.00 
10/23/2001 CR Submitted CR transferred from legacy database to CMP database 
10/24/2001 Baseline Candidate Selection CLECs notified this CR was a selected CR Baseline Candidate. 
1/17/2002 Discussed at Monthly CMP Meeting CR # 27086 discussed during 9.0 Candidate discussion (Attachment H in January Distribution Package)' 
2/25/2002 Status Changed 27086 status updated to 'CLEC Test' based upon 2/25/02 implementation of IMA 9.0 
3/21/2002 Status Changed Reviewed in the 3/21/02 CMP meeting and Closed. 
3/21/2002 Discussed at Monthly CMP Meeting 27086 discussed March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP - Attachment E 

Project Meetings

CenturyLink Response

Archived System CR 24997 Detail

 
Title: UNE STAR Centrex Pre order, order and order creation functionality in IMA.
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

24997 Completed
3/21/2002
-   IMA Common/9 UNE-STAR
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

Establish UNE-STAR Classes of Service for the MB req. type in IMA. Add UNE-STAR Centrex Plus (RHGXX), UNE-STAR Centron (RHTXX), and UNE-STAR Centrex 21 (RH3XX) ordering capability to IMA. UNE-STAR is Negotiated Business to Business Agreement between Qwest and a CLEC. This candidate is for pre-order and ordering for all UNE-STAR Centrex Service and order creation for UNE-STAR Centrex Plus Service.

Status History

Date Action Description
Release Information IMA Release 9.00 
10/23/2001 CR Submitted CR transferred from legacy database to CMP database 
10/24/2001 Baseline Candidate Selection CLECs notified this CR was a selected CR Baseline Candidate. 
1/17/2002 Discussed at Monthly CMP Meeting CR # 24997 discussed during 9.0 Candidate discussion (Attachment H in January Distribution Package)' 
2/25/2002 Status Changed 24997 status updated to 'CLEC Test' based upon 2/25/02 implementation of IMA 9.0 
3/21/2002 Status Changed Reviewed in the 3/21/02 CMP meeting and Closed. 
3/21/2002 Discussed at Monthly CMP Meeting 24997 discussed March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP - Attachment E 

Project Meetings

CenturyLink Response

Archived System CR 24998 Detail

 
Title: UNE STAR POTS Pre order, order and flow through functionality in IMA.
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

24998 Completed
3/21/2002
-   IMA Common/9 UNE-Star POTs
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

Establish the ability for the CLEC to issue a LSR for UNE-STAR POTs service with MB req. type in IMA and order creation. UNE-STAR is Negotiated Business to Business Agreement between Qwest and a CLEC. This candidate is for pre-order, order and order creation for UNE-STAR POTS Service.

Status History

Date Action Description
Release Information IMA Release 9.00 
10/23/2001 CR Submitted CR transferred from legacy database to CMP database 
10/24/2001 Baseline Candidate Selection CLECs notified this CR was a selected CR Baseline Candidate. 
1/17/2002 Discussed at Monthly CMP Meeting CR # 24998 discussed during 9.0 Candidate discussion (Attachment H in January Distribution Package)' 
2/25/2002 Status Changed 24998 status updated to 'CLEC Test' based upon 2/25/02 implementation of IMA 9.0 
3/21/2002 Status Changed Reviewed in the 3/21/02 CMP meeting and Closed. 
3/21/2002 Discussed at Monthly CMP Meeting 24998 discussed March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP - Attachment E 

Project Meetings

CenturyLink Response

Archived System CR 27205 Detail

 
Title: Allow CLEC to retrieve Vanity/Custom Telephone Numbers
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

27205 Completed
1/31/2002
-   IMA Common/9 All products that use TN
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

Provide Co-providers with access to the TAG system, allowing them to retrieve Vanity/Custom telephone numbers without contacting the service center.

Status History

Date Action Description
Release Information IMA Release 
10/23/2001 CR Submitted CR transferred from legacy database to CMP database 
10/24/2001 Baseline Candidate Selection CLECs notified this CR was a selected CR Baseline Candidate. 
1/31/2002 Status Changed Status updated from "Presented" to "Development"; during validation of Rank eligible CR's for February meeting determined that short term solution is already completed and long-term solution is CR27205 (UR2119) in development for 9.0 (internal CR26638) 
4/10/2002 Status Changed Status upated from 'Development' to 'CLEC Test.' This CR will be reviewed for closure in the April CMP meeting. 
4/18/2002 Discussed at Monthly CMP Meeting 27205 discussed at April Systems CMP Monthly meeting; please see Systems CMP Distribution Package April CMP -- Attachment E 
4/18/2002 Status Changed Completed as a CTAG change in the IMA 9.0 implementation. 

Project Meetings

CenturyLink Response

Archived System CR 26638 Detail

 
Title: Allow CLEC to retrieve Vanity/Custom Telephone Numbers Short Term Solution
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

26638 Completed
3/21/2002
-   IMA Common/9 All Products that use TN
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

Provide Co-providers with access to the TAG system, allowing them to retrieve Vanity/Custom telephone numbers without contacting the service center.

Status History

Date Action Description
Release Information IMA Release 9.00 
10/23/2001 CR Submitted CR transferred from legacy database to CMP database 
10/24/2001 Baseline Candidate Selection CLECs notified this CR was a selected CR Baseline Candidate. 
1/17/2002 Discussed at Monthly CMP Meeting CR # 26638 discussed during 9.0 Candidate discussion (Attachment H in January Distribution Package)' 
2/25/2002 Status Changed 26638 status updated to 'CLEC Test' based upon 2/25/02 implementation of IMA 9.0 
3/21/2002 Status Changed Reviewed in the 3/21/02 CMP meeting and Closed. 
3/21/2002 Discussed at Monthly CMP Meeting 26638 discussed March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP - Attachment E 

Project Meetings

CenturyLink Response

Archived System CR 27552 Detail

 
Title: Retrieve Raw Loop Data from Qserv
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

27552 Completed
3/21/2002
-   IMA Common/9 DSL
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

Performance Enhancement to current functionality; reduction in response time.

Status History

Date Action Description
Release Information IMA Release 9.00 
10/23/2001 CR Submitted CR transferred from legacy database to CMP database 
10/24/2001 Baseline Candidate Selection CLECs notified this CR was a selected CR Baseline Candidate. 
1/17/2002 Discussed at Monthly CMP Meeting CR # 27552 discussed during 9.0 Candidate discussion (Attachment H in January Distribution Package)' 
2/25/2002 Status Changed 27552 status updated to 'CLEC Test' based upon 2/25/02 implementation of IMA 9.0 
3/21/2002 Status Changed Reviewed in the 3/21/02 CMP meeting and Closed. 
3/21/2002 Discussed at Monthly CMP Meeting 27552 discussed March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP - Attachment E 

Project Meetings

CenturyLink Response

Archived System CR 31935 Detail

 
Title: USOC To USOC Edit without CSR edits
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

31935 Completed
3/21/2002
-   IMA EDI/9
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

This UR will prevent the submission of invalid USOC combinations based on data found on the LSR and/or CSR. All line Level USOCs must be specified.

Status History

Date Action Description
Release Information IMA Release 9.00 
10/23/2001 CR Submitted CR transferred from legacy database to CMP database 
10/24/2001 Baseline Candidate Selection CLECs notified this CR was a selected CR Baseline Candidate. 
1/31/2002 Status Changed Status updated to "Development"; determined that CR31935 (UR2282) is in development for 9.0 
2/25/2002 Status Changed 31935 status updated to 'CLEC Test' based upon 2/25/02 implementation of IMA 9.0 
3/21/2002 Status Changed Reviewed in the 3/21/02 CMP meeting and Closed. 
3/21/2002 Discussed at Monthly CMP Meeting 31935 discussed March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP - Attachment E 

Project Meetings

CenturyLink Response

Archived System CR 28259 Detail

 
Title: Create a Disconnect Flag on the CSR, when disconnect order completes.
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

28259 Completed
3/21/2002
-   IMA Common/9 All Products
Originator: Sumner, Steve
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

When a CLEC places a request for a disconnect, the normal process is for the CSR to remain in “LIVE” status until the final bill runs, the timing which of which is dependant upon the Bill Pull/Print Date associated with the CSR’s billing account number. This enhancement would create a Disconnect Flag on the CSR, upon completion of the disconnect service order. The Disconnect Flag would alert the CLEC that a disconnect order has completed on the account.

Status History

Date Action Description
Release Information IMA Release 9.00 
10/23/2001 CR Submitted CR transferred from legacy database to CMP database 
10/24/2001 Baseline Candidate Selection CLECs notified this CR was a selected CR Baseline Candidate. 
1/17/2002 Discussed at Monthly CMP Meeting CR # 28259 discussed during 9.0 Candidate discussion (Attachment H in January Distribution Package)' 
2/25/2002 Status Changed 28259 status updated to 'CLEC Test' based upon 2/25/02 implementation of IMA 9.0 
3/21/2002 Status Changed Reviewed in the 3/21/02 CMP meeting and Closed. 
3/21/2002 Discussed at Monthly CMP Meeting 28259 discussed March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP - Attachment E 

Project Meetings

CenturyLink Response

Archived System CR 29460 Detail

 
Title: Prevent LSR submissions for embargoed Central Office
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

29460 Completed
3/21/2002
-   IMA Common/9 All
Originator: Lawson, Mary
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

An up front edit is needed in IMA to prevent LSRs from being submitted, when the Desired Due Date (DDD) coincides with an embargo in the requested central office.

Status History

Date Action Description
Release Information IMA Release 9.00 
10/23/2001 CR Submitted CR transferred from legacy database to CMP database 
10/24/2001 Baseline Candidate Selection CLECs notified this CR was a selected CR Baseline Candidate. 
1/17/2002 Discussed at Monthly CMP Meeting CR # 29460 discussed during 9.0 Candidate discussion (Attachment H in January Distribution Package)' 
2/25/2002 Status Changed 29460 status updated to 'CLEC Test' based upon 2/25/02 implementation of IMA 9.0 
3/21/2002 Status Changed Reviewed in the 3/21/02 CMP meeting and Closed. 
3/21/2002 Discussed at Monthly CMP Meeting 29460 discussed March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP - Attachment E 

Project Meetings

CenturyLink Response

Archived System CR 30214 Detail

 
Title: Flow Through SUP 1 Handling
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

30214 Completed
3/21/2002
-   IMA Common/9 All
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

All SUP 1 LSRs currently flow through. New connects cannot be cancelled automatically because the AN is not available. As a result, all SUP 1 LSRs with ACT=N error.

Status History

Date Action Description
Release Information IMA Release 9.00 
10/23/2001 CR Submitted CR transferred from legacy database to CMP database 
10/24/2001 Baseline Candidate Selection CLECs notified this CR was a selected CR Baseline Candidate. 
1/17/2002 Discussed at Monthly CMP Meeting CR # 30214 discussed during 9.0 Candidate discussion (Attachment H in January Distribution Package)' 
2/25/2002 Status Changed 30214 status updated to 'CLEC Test' based upon 2/25/02 implementation of IMA 9.0 
3/21/2002 Status Changed Reviewed in the 3/21/02 CMP meeting and Closed. 
3/21/2002 Discussed at Monthly CMP Meeting 30214 discussed March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP - Attachment E 

Project Meetings

CenturyLink Response

Archived System CR 30215 Detail

 
Title: Wholesale Local Exchange Freeze
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

30215 Completed
4/17/2003
450 - 650  IMA Common/12 All
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Esquibel-Reed, Peggy

Description Of Change

Implement IMA local freeze editing against the local freeze repository for immediate rejects on frozen accounts. This validation would provide for same day due date for freeze and unfreeze requests

Status History

Date Action Description
10/23/2001 CR Submitted CR transferred from legacy database to CMP database 
10/23/2001 Clarification Meeting Held Clarified this CR with John Gallegos. 
10/24/2001 Baseline Candidate Selection CLECs notified this CR was a selected CR Baseline Candidate. 
2/13/2002 Record Update LOE updated from N/A to Large 
2/21/2002 Discussed at Monthly CMP Meeting Eligible for the IMA 11.0 Prioritization. 
2/21/2002 Discussed at Monthly CMP Meeting 30215 discussed during 'Review of 11.0 Prioritization Eligible CRs' portion of February Systems CMP Monthly meeting; please see Attachment I of February Systems CMP Distribution Package 
3/1/2002 Release Ranking Ranking for Release 11.0 following the February 2002 Systems CMP Meeting. 30215 ranked number 22 
3/1/2002 Status Changed Status updated to 'Prioritized' from 'Presented' 
4/1/2002 Release Ranking Ranking for SATE following the March 2002 Systems CMP Meeting. 30215 ranked number 26 for SATE 
4/2/2002 Record Update Description of CR updated 
4/18/2002 Discussed at Monthly CMP Meeting 30215 discussed at April Systems CMP Monthly meeting; please see Systems CMP Distribution Package April CMP - Walk On 
6/7/2002 Status Changed 30215 status updated to 'Pending Prioritization' based upon outcome of IMA 11.0 Packaging Selection vote 
7/18/2002 Discussed at Monthly CMP Meeting 30215 discussed at July Systems CMP Monthly meeting; please see Systems CMP Distribution Package July CMP -- Attachment P 
7/26/2002 Status Changed Status set to Prioritized as a result of the release prioritization for IMA 12.0 
7/26/2002 Release Ranking Ranking for Release 12.0 following the July 2002 Systems CMP Meeting. 30215 ranked number 11 (tie) 
10/30/2002 Status Changed 30215 status updated to 'Packaged' based upon outcome of release 12.0 packaging effort 
12/19/2002 Discussed at Monthly CMP Meeting 30215 discussed at December Systems CMP Monthly meeting; please see Systems CMP Distribution Package December CMP -- Attachment N 
1/16/2003 Discussed at Monthly CMP Meeting 30215 discussed at January Systems CMP Monthly meeting; please see Systems CMP Distribution Package January CMP - Attachment O. 
4/7/2003 Status Changed Status changed to CLEC Test due to IMA 12.0 deployment 
4/17/2003 Discussed at Monthly CMP Meeting 30215 discussed at April Systems CMP Monthly meeting; please see April Systems CMP Distribution Package, Attachment G. 

Project Meetings

April 17, 2003 Systems CMP Meeting Discussion: John Gallegos/Qwest stated that this item was included in the IMA 12.0 Release. John noted that the post deployment call was held and that there is no open issue regarding this CR. No comments. CR changed to 'completed' status.

January 16, 2003 Systems CMP Meeting Discussion: Connie Winston/Qwest stated that this CR has been discussed in the past. The repository update checks will be performed sooner. IMA, upfront, will check the repository for updates. The repository updates very quickly and IMA checking upfront will result in LSRs not erroring due to the repository not being updated. There were no questions or comments.

CenturyLink Response

Archived System CR 29650 Detail

 
Title: FBSADL CLEC Access to LSS through IMA
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

29650 Completed
3/21/2002
-   IMA Common/9 All
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

GUI Enhancement for Stand Alone Facilities Based Listings, Pre-order and order acceptance for listings.

Status History

Date Action Description
Release Information IMA Release 9.00 
10/23/2001 CR Submitted CR transferred from legacy database to CMP database 
10/24/2001 Baseline Candidate Selection CLECs notified this CR was a selected CR Baseline Candidate. 
1/17/2002 Discussed at Monthly CMP Meeting CR # 29650 discussed during 9.0 Candidate discussion (Attachment H in January Distribution Package)' 
2/25/2002 Status Changed 29650 status updated to 'CLEC Test' based upon 2/25/02 implementation of IMA 9.0 
3/21/2002 Status Changed Reviewed in the 3/21/02 CMP meeting and Closed. 
3/21/2002 Discussed at Monthly CMP Meeting 29650 discussed March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP - Attachment E 

Project Meetings

CenturyLink Response

Archived System CR 30486 Detail

 
Title: FBSADL CLEC Access to LSS through IMA
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

30486 Completed
3/21/2002
-   IMA Common/9 All
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

EDI Enhancement for Stand Alone Facilities Based Listings, Pre-order and order acceptance for listings.

Status History

Date Action Description
Release Information IMA Release 9.00 
10/23/2001 CR Submitted CR transferred from legacy database to CMP database 
10/24/2001 Baseline Candidate Selection CLECs notified this CR was a selected CR Baseline Candidate. 
1/17/2002 Discussed at Monthly CMP Meeting CR # 30486 discussed during 9.0 Candidate discussion (Attachment H in January Distribution Package)' 
2/25/2002 Status Changed 30486 status updated to 'CLEC Test' based upon 2/25/02 implementation of IMA 9.0 
3/21/2002 Status Changed Reviewed in the 3/21/02 CMP meeting and Closed. 
3/21/2002 Discussed at Monthly CMP Meeting 30486 discussed March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP - Attachment E 

Project Meetings

CenturyLink Response

Archived System CR 31766 Detail

 
Title: Reject Duplicate LSRs
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

31766 Completed
4/7/2003
1600 - 2400  IMA Common/12 All Products
Originator: Higer, Shon
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Stecklein, Lynn

Description Of Change

IMA should reject duplicate requests. They are currently accepted and processed as new LSRs.

A duplicate LSR can be described as any LSR requesting the same activity for the same account, telephone number(s), or circuit(s) as another pre-existing LSR from the same CLEC. The intent of this request is to mechanically reject any duplicate LSR before it is accepted in IMA. Currently, duplicate LSRs are identified and rejected manually. The current manual process to identify a duplicate is tedious and time-consuming which causes delays in notifying the CLEC.

Approximately 1,000 duplicate LSRs were measured in the month of December, 2001

Currently, LSRs that are a duplicate of another LSR can qualify for flow through. However, the duplicate should not be eligible for flowthrough. The duplicate will usually fall out for manual handling, most often because a service order associated with the first LSR is already pending.

Status History

Date Action Description
9/28/2001 CR Submitted CR transferred from legacy database to CMP database 
9/28/2001 Clarification Meeting Held Clarified this CR with Shon Higer. 
10/18/2001 Discussed at Monthly CMP Meeting Presented at Oct CMP meeting, status changed to development 
10/18/2001 Discussed at Monthly CMP Meeting Qwest is concerned that there is no CR Type that clearly encompasses these CRs. Qwest believes these CRs are most closely aligned with the Regulatory Change CR type. Qwest proposes to address this concern during the next Redesign Working Session. 
10/25/2001 Qwest Response Issued Qwest response included with CLEC prioritization request 
1/31/2002 Record Update Change Request description updated to provide additional details regarding the nature of the change 
2/21/2002 Discussed at Monthly CMP Meeting Eligible for the IMA 11.0 Prioritization. 
2/21/2002 Discussed at Monthly CMP Meeting 31766 discussed during 'Review of 11.0 Prioritization Eligible CRs' portion of February Systems CMP Monthly meeting; please see Attachment I of February Systems CMP Distribution Package 
3/1/2002 Release Ranking Ranking for Release 11.0 following the February 2002 Systems CMP Meeting. 31766 ranked number 4 
3/1/2002 Status Changed Status updated to 'Prioritized' from 'Presented' 
4/1/2002 Release Ranking Ranking for SATE following the March 2002 Systems CMP Meeting. 31766 ranked number 15 
6/7/2002 Status Changed 31766 status updated to 'Pending Prioritization' based upon outcome of IMA 11.0 Packaging Selection vote 
7/18/2002 Discussed at Monthly CMP Meeting 31766 discussed at July Systems CMP Monthly meeting; please see Systems CMP Distribution Package July CMP -- Attachment P 
7/26/2002 Status Changed Status set to Prioritized as a result of the release prioritization for IMA 12.0 
7/26/2002 Release Ranking Ranking for Release 12.0 following the July 2002 Systems CMP Meeting. 31766 ranked number 13 (tie) 
10/30/2002 Status Changed 31766 status updated to 'Packaged' based upon outcome of release 12.0 packaging effort 
12/19/2002 Discussed at Monthly CMP Meeting 31766 discussed at December Systems CMP Monthly meeting; please see Systems CMP Distribution Package December CMP -- Attachment N 
4/7/2003 Status Changed Status changed to CLEC Test due to IMA 12.0 deployment 
4/17/2003 Discussed at Monthly CMP Meeting 31766 discussed A;pril Systems CMP Monthly meeting; please see Systems CMP Distribution Package April CMP 
4/30/2003 Status Changed Status changed to completed 

Project Meetings

4/17/03 CMP Systems Meeting No Comments. CR changed to Completed Status

CenturyLink Response

Archived System CR 25152 Detail

 
Title: Enhancements for Appointment Scheduler
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

25152 Completed
3/21/2002
-   IMA GUI/9 All Products
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

Improve Wholesale customers service by scheduling appointments throughout the day, based on resource availability.

Status History

Date Action Description
Release Information IMA Release 9.00 
10/17/2001 CR Submitted CR transferred from legacy database to CMP database 
10/18/2001 Discussed at Monthly CMP Meeting CR presented at CMP meeting 
11/2/2001 Communicator Issued SRN110201 issued, advising CLECs this CR has been removed from the 8.01 candidate list and will become a candidate for IMA Release 9.0 
11/2/2001 Record Update Impacted Release updated to 9.0 
11/2/2001 Status Changed Status updated to Development 
1/17/2002 Discussed at Monthly CMP Meeting CR # 25152 discussed during 9.0 Candidate discussion (Attachment H in January Distribution Package)' 
2/25/2002 Status Changed 25152 status updated to 'CLEC Test' based upon 2/25/02 implementation of IMA 9.0 
3/21/2002 Status Changed Reviewed in the 3/21/02 CMP meeting and Closed. 
3/21/2002 Discussed at Monthly CMP Meeting 25152 discussed March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP - Attachment E 

Project Meetings

SRN110201 This Communicator is to advise you that the Enhancements for Appointment Scheduler candidate, (Qwest CR # 25152), will be removed from the IMA 8.01 Release, that is scheduled to be implemented on November 19, 2001. This was planned as a GUI only change for IMA Release 8.01. This work will be completed with the IMA EDI portion of this candidate in IMA Release 9.0, which is scheduled for February of 2002.

CenturyLink Response

Archived System CR 32350 Detail

 
Title: Automatic entry of next available TN in the LSR NAN Field Req Type CB
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

32350 Completed
1/17/2002
-   IMA Common/8 Local Number Portability
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Gallegos, John
Director:
CR PM: Routh, Mark

Description Of Change

Hard edit removed for LNP Req Type 'CB'. On a partial migration, porting the BTN does not have the NAN field populated with a positive entry. Logic will be added to locate the next available line USOC and associated TN and will populate that TN automatically in the NAN field.

Status History

Date Action Description
Release Information IMA Release 8.01 
10/17/2001 CR Submitted CR transferred from legacy database to CMP database 
10/18/2001 Discussed at Monthly CMP Meeting CR presented at CMP meeting 
10/23/2001 Communicator Issued SRN102301-Reminder 1 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
10/29/2001 Communicator Issued SRN102901-Reminder 2 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
11/6/2001 Record Update Improved CR descriptions issued to CLECs for 8.01 candidates. 
11/8/2001 Communicator Issued SRN110801-Reminder 3 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
11/12/2001 Communicator Issued IMA 8.01 Point Release Training Communiqué issued to CLECs. 
11/12/2001 CLEC Call CLEC call to discuss 8.01 candidates. 
11/16/2001 Communicator Issued IMA Release 8.01 communicator. 
11/19/2001 Status Changed 8.01 went into production. Status changed to "CLEC Test" 
1/17/2002 Discussed at Monthly CMP Meeting CR # 32350 discussed in Monthly Systems CMP Meeting; CR has been in CLEC Test; CLECs agreed that CR is Completed 
1/17/2002 Status Updated CR # 32350 status updated to 'Completed' 

Project Meetings

COMMUNICATOR To: Qwest IMA Users From: Qwest IT Wholesale Systems Communications Manager Date: November 16, 2001 Document No. SYST.11.16.01.F.2416.IMARel8.01 Subject: Final Reminder: IMA Release 8.01 to be available on Monday, November 16, 2001

This Communicator is intended to be the final reminder that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17-18, 2001. The Release Notes for this release are now available at: http://www.qwest.com/wholesale/ima/gui/release.html . Please remember that the IMA GUI and EDI interfaces will not be available from 9:00p.m. Saturday, November 17 2001 until the Release Testing interval begins on Sunday , November 18, 2001. The Release Testing Interval available is currently scheduled for 6:00 p.m. to 8:00 p.m. Mountain time on Sunday, November 18, 2001. To participate in the testing interval, the Co-Providers must: 1) On Sunday, November 18, 2001 after 4:00 p.m. Mountain time, call the Software Release Information Line prior to starting the test. This line will provide a recorded announcement confirming that testing may begin or a new estimated testing time if we should experience any delays. The phone number for this Information Line will be (303) 965-8872. 2) Consider your test activities carefully. By the time we begin the testing, IMA will have been checked out from a technical perspective. You will be testing in a live production environment. 3) At any time during the testing interval, (6:00 p.m. to 8:00 p.m. Mountain time), you may report any problems you encounter to our open conference bridge. The conference bridge number is 1-866-844-1448 with a pass code of 7233712 4) Attend a conference call at 8.00 p.m. Mountain time at the end of the testing interval for a recap of the outstanding issues and any updated status available at that time. The call in number for this conference call will be 1-866-844-1448 with a pass code of 7233712. This conference call will conclude the testing interval. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

Training Communiqué: IMA Release 8.01 Point Release Training - Update Issued: November 12, 2001 Qwest has updated the Wholesale Training web site to allow customers to register for the following conference bridge training sessions: IMA Release 8.01 Overview Tuesday, November 13, 2001 2:00 p.m. (MDT) Wednesday, November 14, 2001 10:00 a.m. (MDT) Thursday, November 15, 2001 10:00 a.m. (MDT) Thursday, November 15, 2001 2:00 p.m. (MDT) The IMA Release 8.01 CLEC Overview for training is in a downloadable format at http://www.qwest.com/wholesale/training/coursecatalog.html. Customers may now register to participate on the conference bridge at http://www.qwest.com/wholesale/training/courseregform.html. After submitting a registration the customer will receive a class confirmation with conference bridge number and passcode to attend the training.

If you would like to learn more about the IMA 8.01 point release, please go to http://www.qwest.com/wholesale/ima/gui/release.html and download the IMA Release 8.01 Release Notes.

If you have questions or comments, please contact Christel Wolberg, Registration Coordinator, at (303) 965-6164 or cwolber@qwest.com.

Helpful Hint: When visiting an updated web site, be sure to select your web browser "Reload" or "Refresh" button to prevent from viewing a dated cached web paged.

11/12/01 - CLEC call to discuss 8.01 candidates: John Gallegos-This is non impacting to the CLECs. Connie noted that an earlier mtg. with the CLECs that it was strongly supported that Qwest determine the NAN field Bob Cruise- The purpose for point release is for cleanup? Yes -John, If this was to be IMA GUI & IMA EDI-wouldn’t this impact the CLEC? If the reject associated? It will help the GUI users Purpose of the point release: to clean up past releases, trying to establish cleaner flow thru, yes it will impact GUI CLEC users in the way of ensuring they enter information better. It is not EDI impacting #13 there is a list of USOCs that will be edited again

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: November 8, 2001 Subject: Reminder: IMA Release 8.01 - SRN110801 This Communicator is to remind Qwest IMA Users that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. The Release Notes and candidate descriptions are now available and can be found at the following website: http://www.qwest.com/wholesale/ima/gui/release.html During this installation, the IMA GUI and EDI interfaces will be unavailable from 9:00 p.m. Mountain time, Saturday November 17, 2001 until the Release Testing interval begins on Sunday, November 18, 2001. Please note that the testing interval, which was previously scheduled for 6:30 p.m. – 8.30 p.m. Mountain time is now scheduled to begin at 6:00 p.m. Mountain time and will end at 8.00 p.m. Mountain time. Prior to beginning any testing related to this release, CLEC’s are required to call the Release Testing Status Line at (303) 965-8872 after 4:00 p.m. Mountain time on Sunday, November 18, 2001 to confirm their testing interval start time. A conference bridge will also be made available during this testing interval, followed by a wrap up conference call starting at 8:00 p.m. Mountain Time. The call in number for the Release Testing Interval and the Wrap up Conference call will be 1-866-844-1448 with a participant code of 7233712. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: October 29, 2001 Subject: Reminder: IMA Release 8.01 - SRN102901 This Communicator is to remind Qwest IMA Users that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. The Release Notes Candidate descriptions are now available and can be found at the following website: http://www.qwest.com/wholesale/ima/gui/release.html During this installation, the IMA GUI and EDI interfaces will be unavailable from 12:01 a.m. Saturday, November 17, 2001 until the Release Testing interval begins on Sunday, November 18, 2001 currently scheduled for 6:30 p.m. to 8:30 p.m. Mountain time. Please note the time change of the testing interval start time, from 6:00 p.m. to 6:30 p.m. Prior to beginning any testing related to this release, CLEC’s are required to call the Release Testing Status Line at (303) 965-8872 after 5:00 p.m. Mountain time on Sunday, November 18, 2001 to confirm their testing interval start time. A conference bridge will also be made available during this testing interval, followed by a wrap up conference call starting at 8:30 p.m. Mountain time. The conference bridge number will be communicated during the week prior to installation and testing. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: October 23, 2001 Subject: Reminder: IMA Release 8.01 to be available on Monday, November 19, 2001 - SRN102301 This Communicator is intended to be a reminder that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. Please remember that the IMA GUI and EDI interfaces will not be available from 12:01 a.m. Saturday, November 17, 2001 until the Release Testing interval begins on Sunday , November 18 2001. The Release Testing Interval is currently scheduled for 6:00 p.m. to 8:30 p.m. Mountain time on Sunday, November 18, 2001. Prior to beginning any testing, CLEC’s should call the Release Testing Status Line at (303) 965-8872 after 5:00 p.m. Mountain time on Sunday to confirm the start time for the testing interval. A conference bridge will also be available during this testing interval, followed by a wrap up conference call at 8:30 p.m. Mountain time. The call in number for the Release Testing Interval and the Wrap up Conference call will be made available prior to the Release. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

CenturyLink Response

Archived System CR 23980 Detail

 
Title: LSR Reject Reason Standardization
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

23980 Completed
1/17/2002
-   IMA Common/8 All Products
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Gallegos, John
Director:
CR PM: Routh, Mark

Description Of Change

The purpose of the UR is to develop standardized CRM rejection codes. This candidate will establish a standardized list of approved reject codes and descriptions that apply consistently to all rejected LSRs.

Status History

Date Action Description
Release Information IMA Release 8.01 
10/17/2001 CR Submitted CR transferred from legacy database to CMP database 
10/18/2001 Discussed at Monthly CMP Meeting CR presented at CMP meeting 
10/23/2001 Communicator Issued SRN102301-Reminder 1 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
10/29/2001 Communicator Issued SRN102901-Reminder 2 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
11/6/2001 Record Update Improved CR descriptions issued to CLECs for 8.01 candidates. 
11/8/2001 Communicator Issued SRN110801-Reminder 3 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
11/12/2001 CLEC Call CLEC call to discuss 8.01 candidates. 
11/12/2001 Communicator Issued IMA 8.01 Point Release Training Communiqué issued to CLECs. 
11/16/2001 Communicator Issued IMA Release 8.01 communicator. 
11/19/2001 Status Changed 8.01 went into production. Status changed to "CLEC Test" 
1/17/2002 Discussed at Monthly CMP Meeting CR # 23980 discussed in Monthly Systems CMP Meeting; CR has been in CLEC Test; CLECs agreed that CR is Completed 
1/17/2002 Status Updated CR # 23980 status updated to 'Completed' 

Project Meetings

COMMUNICATOR To: Qwest IMA Users From: Qwest IT Wholesale Systems Communications Manager Date: November 16, 2001 Document No. SYST.11.16.01.F.2416.IMARel8.01 Subject: Final Reminder: IMA Release 8.01 to be available on Monday, November 16, 2001

This Communicator is intended to be the final reminder that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17-18, 2001. The Release Notes for this release are now available at: http://www.qwest.com/wholesale/ima/gui/release.html . Please remember that the IMA GUI and EDI interfaces will not be available from 9:00p.m. Saturday, November 17 2001 until the Release Testing interval begins on Sunday , November 18, 2001. The Release Testing Interval available is currently scheduled for 6:00 p.m. to 8:00 p.m. Mountain time on Sunday, November 18, 2001. To participate in the testing interval, the Co-Providers must: 1) On Sunday, November 18, 2001 after 4:00 p.m. Mountain time, call the Software Release Information Line prior to starting the test. This line will provide a recorded announcement confirming that testing may begin or a new estimated testing time if we should experience any delays. The phone number for this Information Line will be (303) 965-8872. 2) Consider your test activities carefully. By the time we begin the testing, IMA will have been checked out from a technical perspective. You will be testing in a live production environment. 3) At any time during the testing interval, (6:00 p.m. to 8:00 p.m. Mountain time), you may report any problems you encounter to our open conference bridge. The conference bridge number is 1-866-844-1448 with a pass code of 7233712 4) Attend a conference call at 8.00 p.m. Mountain time at the end of the testing interval for a recap of the outstanding issues and any updated status available at that time. The call in number for this conference call will be 1-866-844-1448 with a pass code of 7233712. This conference call will conclude the testing interval. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

Training Communiqué: IMA Release 8.01 Point Release Training - Update Issued: November 12, 2001 Qwest has updated the Wholesale Training web site to allow customers to register for the following conference bridge training sessions: IMA Release 8.01 Overview Tuesday, November 13, 2001 2:00 p.m. (MDT) Wednesday, November 14, 2001 10:00 a.m. (MDT) Thursday, November 15, 2001 10:00 a.m. (MDT) Thursday, November 15, 2001 2:00 p.m. (MDT) The IMA Release 8.01 CLEC Overview for training is in a downloadable format at http://www.qwest.com/wholesale/training/coursecatalog.html. Customers may now register to participate on the conference bridge at http://www.qwest.com/wholesale/training/courseregform.html. After submitting a registration the customer will receive a class confirmation with conference bridge number and passcode to attend the training.

If you would like to learn more about the IMA 8.01 point release, please go to http://www.qwest.com/wholesale/ima/gui/release.html and download the IMA Release 8.01 Release Notes.

If you have questions or comments, please contact Christel Wolberg, Registration Coordinator, at (303) 965-6164 or cwolber@qwest.com.

Helpful Hint: When visiting an updated web site, be sure to select your web browser "Reload" or "Refresh" button to prevent from viewing a dated cached web paged.

11/12/01 - CLEC call to discuss 8.01 candidates: John Gallegos Bonnie-will this fix where they can find 20 different ways to say if address is right? So there is a standardized comment Mark Coyne- that’s true, this will fix that.

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: November 8, 2001 Subject: Reminder: IMA Release 8.01 - SRN110801 This Communicator is to remind Qwest IMA Users that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. The Release Notes and candidate descriptions are now available and can be found at the following website: http://www.qwest.com/wholesale/ima/gui/release.html During this installation, the IMA GUI and EDI interfaces will be unavailable from 9:00 p.m. Mountain time, Saturday November 17, 2001 until the Release Testing interval begins on Sunday, November 18, 2001. Please note that the testing interval, which was previously scheduled for 6:30 p.m. – 8.30 p.m. Mountain time is now scheduled to begin at 6:00 p.m. Mountain time and will end at 8.00 p.m. Mountain time. Prior to beginning any testing related to this release, CLEC’s are required to call the Release Testing Status Line at (303) 965-8872 after 4:00 p.m. Mountain time on Sunday, November 18, 2001 to confirm their testing interval start time. A conference bridge will also be made available during this testing interval, followed by a wrap up conference call starting at 8:00 p.m. Mountain Time. The call in number for the Release Testing Interval and the Wrap up Conference call will be 1-866-844-1448 with a participant code of 7233712. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: October 29, 2001 Subject: Reminder: IMA Release 8.01 - SRN102901 This Communicator is to remind Qwest IMA Users that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. The Release Notes Candidate descriptions are now available and can be found at the following website: http://www.qwest.com/wholesale/ima/gui/release.html During this installation, the IMA GUI and EDI interfaces will be unavailable from 12:01 a.m. Saturday, November 17, 2001 until the Release Testing interval begins on Sunday, November 18, 2001 currently scheduled for 6:30 p.m. to 8:30 p.m. Mountain time. Please note the time change of the testing interval start time, from 6:00 p.m. to 6:30 p.m. Prior to beginning any testing related to this release, CLEC’s are required to call the Release Testing Status Line at (303) 965-8872 after 5:00 p.m. Mountain time on Sunday, November 18, 2001 to confirm their testing interval start time. A conference bridge will also be made available during this testing interval, followed by a wrap up conference call starting at 8:30 p.m. Mountain time. The conference bridge number will be communicated during the week prior to installation and testing. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: October 23, 2001 Subject: Reminder: IMA Release 8.01 to be available on Monday, November 19, 2001 - SRN102301 This Communicator is intended to be a reminder that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. Please remember that the IMA GUI and EDI interfaces will not be available from 12:01 a.m. Saturday, November 17, 2001 until the Release Testing interval begins on Sunday , November 18 2001. The Release Testing Interval is currently scheduled for 6:00 p.m. to 8:30 p.m. Mountain time on Sunday, November 18, 2001. Prior to beginning any testing, CLEC’s should call the Release Testing Status Line at (303) 965-8872 after 5:00 p.m. Mountain time on Sunday to confirm the start time for the testing interval. A conference bridge will also be available during this testing interval, followed by a wrap up conference call at 8:30 p.m. Mountain time. The call in number for the Release Testing Interval and the Wrap up Conference call will be made available prior to the Release. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

CenturyLink Response

Archived System CR 22512 Detail

 
Title: DSL Flowthrough Re Branding
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

22512 Completed
1/17/2002
-   IMA Common/8 DSL
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Gallegos, John
Director:
CR PM: Routh, Mark

Description Of Change

Re branding of Megabit to Qwest DSL. Changes all referencing of Megabit in GUI, EDI and Documentation.

Status History

Date Action Description
Release Information IMA Release 8.01 
10/17/2001 CR Submitted CR transferred from legacy database to CMP database 
10/18/2001 Discussed at Monthly CMP Meeting CR presented at CMP meeting 
10/23/2001 Communicator Issued SRN102301-Reminder 1 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
10/29/2001 Communicator Issued SRN102901-Reminder 2 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
11/6/2001 Record Update Improved CR descriptions issued to CLECs for 8.01 candidates. 
11/8/2001 Communicator Issued SRN110801-Reminder 3 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
11/12/2001 CLEC Call CLEC call to discuss 8.01 candidates. 
11/12/2001 Communicator Issued IMA 8.01 Point Release Training Communiqué issued to CLECs. 
11/16/2001 Communicator Issued IMA Release 8.01 communicator. 
11/19/2001 Status Changed 8.01 went into production. Status changed to "CLEC Test" 
1/17/2002 Discussed at Monthly CMP Meeting CR # 22512 discussed in Monthly Systems CMP Meeting; CR has been in CLEC Test; CLECs agreed that CR is Completed 
1/17/2002 Status Updated CR # 22512 status updated to 'Completed' 

Project Meetings

COMMUNICATOR To: Qwest IMA Users From: Qwest IT Wholesale Systems Communications Manager Date: November 16, 2001 Document No. SYST.11.16.01.F.2416.IMARel8.01 Subject: Final Reminder: IMA Release 8.01 to be available on Monday, November 16, 2001

This Communicator is intended to be the final reminder that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17-18, 2001. The Release Notes for this release are now available at: http://www.qwest.com/wholesale/ima/gui/release.html . Please remember that the IMA GUI and EDI interfaces will not be available from 9:00p.m. Saturday, November 17 2001 until the Release Testing interval begins on Sunday , November 18, 2001. The Release Testing Interval available is currently scheduled for 6:00 p.m. to 8:00 p.m. Mountain time on Sunday, November 18, 2001. To participate in the testing interval, the Co-Providers must: 1) On Sunday, November 18, 2001 after 4:00 p.m. Mountain time, call the Software Release Information Line prior to starting the test. This line will provide a recorded announcement confirming that testing may begin or a new estimated testing time if we should experience any delays. The phone number for this Information Line will be (303) 965-8872. 2) Consider your test activities carefully. By the time we begin the testing, IMA will have been checked out from a technical perspective. You will be testing in a live production environment. 3) At any time during the testing interval, (6:00 p.m. to 8:00 p.m. Mountain time), you may report any problems you encounter to our open conference bridge. The conference bridge number is 1-866-844-1448 with a pass code of 7233712 4) Attend a conference call at 8.00 p.m. Mountain time at the end of the testing interval for a recap of the outstanding issues and any updated status available at that time. The call in number for this conference call will be 1-866-844-1448 with a pass code of 7233712. This conference call will conclude the testing interval. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

Training Communiqué: IMA Release 8.01 Point Release Training - Update Issued: November 12, 2001 Qwest has updated the Wholesale Training web site to allow customers to register for the following conference bridge training sessions: IMA Release 8.01 Overview Tuesday, November 13, 2001 2:00 p.m. (MDT) Wednesday, November 14, 2001 10:00 a.m. (MDT) Thursday, November 15, 2001 10:00 a.m. (MDT) Thursday, November 15, 2001 2:00 p.m. (MDT) The IMA Release 8.01 CLEC Overview for training is in a downloadable format at http://www.qwest.com/wholesale/training/coursecatalog.html. Customers may now register to participate on the conference bridge at http://www.qwest.com/wholesale/training/courseregform.html. After submitting a registration the customer will receive a class confirmation with conference bridge number and passcode to attend the training.

If you would like to learn more about the IMA 8.01 point release, please go to http://www.qwest.com/wholesale/ima/gui/release.html and download the IMA Release 8.01 Release Notes.

If you have questions or comments, please contact Christel Wolberg, Registration Coordinator, at (303) 965-6164 or cwolber@qwest.com.

Helpful Hint: When visiting an updated web site, be sure to select your web browser "Reload" or "Refresh" button to prevent from viewing a dated cached web paged.

11/12/01 - CLEC call to discuss 8.01 candidates: John Gallegos present- No questions

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: November 8, 2001 Subject: Reminder: IMA Release 8.01 - SRN110801 This Communicator is to remind Qwest IMA Users that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. The Release Notes and candidate descriptions are now available and can be found at the following website: http://www.qwest.com/wholesale/ima/gui/release.html During this installation, the IMA GUI and EDI interfaces will be unavailable from 9:00 p.m. Mountain time, Saturday November 17, 2001 until the Release Testing interval begins on Sunday, November 18, 2001. Please note that the testing interval, which was previously scheduled for 6:30 p.m. – 8.30 p.m. Mountain time is now scheduled to begin at 6:00 p.m. Mountain time and will end at 8.00 p.m. Mountain time. Prior to beginning any testing related to this release, CLEC’s are required to call the Release Testing Status Line at (303) 965-8872 after 4:00 p.m. Mountain time on Sunday, November 18, 2001 to confirm their testing interval start time. A conference bridge will also be made available during this testing interval, followed by a wrap up conference call starting at 8:00 p.m. Mountain Time. The call in number for the Release Testing Interval and the Wrap up Conference call will be 1-866-844-1448 with a participant code of 7233712. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: October 29, 2001 Subject: Reminder: IMA Release 8.01 - SRN102901 This Communicator is to remind Qwest IMA Users that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. The Release Notes Candidate descriptions are now available and can be found at the following website: http://www.qwest.com/wholesale/ima/gui/release.html During this installation, the IMA GUI and EDI interfaces will be unavailable from 12:01 a.m. Saturday, November 17, 2001 until the Release Testing interval begins on Sunday, November 18, 2001 currently scheduled for 6:30 p.m. to 8:30 p.m. Mountain time. Please note the time change of the testing interval start time, from 6:00 p.m. to 6:30 p.m. Prior to beginning any testing related to this release, CLEC’s are required to call the Release Testing Status Line at (303) 965-8872 after 5:00 p.m. Mountain time on Sunday, November 18, 2001 to confirm their testing interval start time. A conference bridge will also be made available during this testing interval, followed by a wrap up conference call starting at 8:30 p.m. Mountain time. The conference bridge number will be communicated during the week prior to installation and testing. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: October 23, 2001 Subject: Reminder: IMA Release 8.01 to be available on Monday, November 19, 2001 - SRN102301 This Communicator is intended to be a reminder that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. Please remember that the IMA GUI and EDI interfaces will not be available from 12:01 a.m. Saturday, November 17, 2001 until the Release Testing interval begins on Sunday , November 18 2001. The Release Testing Interval is currently scheduled for 6:00 p.m. to 8:30 p.m. Mountain time on Sunday, November 18, 2001. Prior to beginning any testing, CLEC’s should call the Release Testing Status Line at (303) 965-8872 after 5:00 p.m. Mountain time on Sunday to confirm the start time for the testing interval. A conference bridge will also be available during this testing interval, followed by a wrap up conference call at 8:30 p.m. Mountain time. The call in number for the Release Testing Interval and the Wrap up Conference call will be made available prior to the Release. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

CenturyLink Response

Archived System CR 22751 Detail

 
Title: UNE C PL should be changes to EEL
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

22751 Completed
1/17/2002
-   IMA Common/8 UNE-C & EEL
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Gallegos, John
Director:
CR PM: Routh, Mark

Description Of Change

Change existing references to UNE-C in IMA to new name EEL. Changes all references in GUI, EDI and Documentation.

Status History

Date Action Description
Release Information IMA Release 8.01 
10/17/2001 CR Submitted CR transferred from legacy database to CMP database 
10/18/2001 Discussed at Monthly CMP Meeting CR presented at CMP meeting 
10/23/2001 Communicator Issued SRN102301-Reminder 1 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
10/29/2001 Communicator Issued SRN102901-Reminder 2 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
11/6/2001 Record Update Improved CR descriptions issued to CLECs for 8.01 candidates. 
11/8/2001 Communicator Issued SRN110801-Reminder 3 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
11/12/2001 CLEC Call CLEC call to discuss 8.01 candidates. 
11/12/2001 Communicator Issued IMA 8.01 Point Release Training Communiqué issued to CLECs. 
11/16/2001 Communicator Issued IMA Release 8.01 communicator. 
11/19/2001 Status Changed 8.01 went into production. Status changed to "CLEC Test" 
1/17/2002 Discussed at Monthly CMP Meeting CR # 22751 discussed in Monthly Systems CMP Meeting; CR has been in CLEC Test; CLECs agreed that CR is Completed 
1/17/2002 Status Updated CR # 22751 status updated to 'Completed' 

Project Meetings

COMMUNICATOR To: Qwest IMA Users From: Qwest IT Wholesale Systems Communications Manager Date: November 16, 2001 Document No. SYST.11.16.01.F.2416.IMARel8.01 Subject: Final Reminder: IMA Release 8.01 to be available on Monday, November 16, 2001

This Communicator is intended to be the final reminder that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17-18, 2001. The Release Notes for this release are now available at: http://www.qwest.com/wholesale/ima/gui/release.html . Please remember that the IMA GUI and EDI interfaces will not be available from 9:00p.m. Saturday, November 17 2001 until the Release Testing interval begins on Sunday , November 18, 2001. The Release Testing Interval available is currently scheduled for 6:00 p.m. to 8:00 p.m. Mountain time on Sunday, November 18, 2001. To participate in the testing interval, the Co-Providers must: 1) On Sunday, November 18, 2001 after 4:00 p.m. Mountain time, call the Software Release Information Line prior to starting the test. This line will provide a recorded announcement confirming that testing may begin or a new estimated testing time if we should experience any delays. The phone number for this Information Line will be (303) 965-8872. 2) Consider your test activities carefully. By the time we begin the testing, IMA will have been checked out from a technical perspective. You will be testing in a live production environment. 3) At any time during the testing interval, (6:00 p.m. to 8:00 p.m. Mountain time), you may report any problems you encounter to our open conference bridge. The conference bridge number is 1-866-844-1448 with a pass code of 7233712 4) Attend a conference call at 8.00 p.m. Mountain time at the end of the testing interval for a recap of the outstanding issues and any updated status available at that time. The call in number for this conference call will be 1-866-844-1448 with a pass code of 7233712. This conference call will conclude the testing interval. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

Training Communiqué: IMA Release 8.01 Point Release Training - Update Issued: November 12, 2001 Qwest has updated the Wholesale Training web site to allow customers to register for the following conference bridge training sessions: IMA Release 8.01 Overview Tuesday, November 13, 2001 2:00 p.m. (MDT) Wednesday, November 14, 2001 10:00 a.m. (MDT) Thursday, November 15, 2001 10:00 a.m. (MDT) Thursday, November 15, 2001 2:00 p.m. (MDT) The IMA Release 8.01 CLEC Overview for training is in a downloadable format at http://www.qwest.com/wholesale/training/coursecatalog.html. Customers may now register to participate on the conference bridge at http://www.qwest.com/wholesale/training/courseregform.html. After submitting a registration the customer will receive a class confirmation with conference bridge number and passcode to attend the training.

If you would like to learn more about the IMA 8.01 point release, please go to http://www.qwest.com/wholesale/ima/gui/release.html and download the IMA Release 8.01 Release Notes.

If you have questions or comments, please contact Christel Wolberg, Registration Coordinator, at (303) 965-6164 or cwolber@qwest.com.

Helpful Hint: When visiting an updated web site, be sure to select your web browser "Reload" or "Refresh" button to prevent from viewing a dated cached web paged.

11/12/01 - CLEC call to discuss 8.01 candidates: John Gallegos present- No questions

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: November 8, 2001 Subject: Reminder: IMA Release 8.01 - SRN110801 This Communicator is to remind Qwest IMA Users that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. The Release Notes and candidate descriptions are now available and can be found at the following website: http://www.qwest.com/wholesale/ima/gui/release.html During this installation, the IMA GUI and EDI interfaces will be unavailable from 9:00 p.m. Mountain time, Saturday November 17, 2001 until the Release Testing interval begins on Sunday, November 18, 2001. Please note that the testing interval, which was previously scheduled for 6:30 p.m. – 8.30 p.m. Mountain time is now scheduled to begin at 6:00 p.m. Mountain time and will end at 8.00 p.m. Mountain time. Prior to beginning any testing related to this release, CLEC’s are required to call the Release Testing Status Line at (303) 965-8872 after 4:00 p.m. Mountain time on Sunday, November 18, 2001 to confirm their testing interval start time. A conference bridge will also be made available during this testing interval, followed by a wrap up conference call starting at 8:00 p.m. Mountain Time. The call in number for the Release Testing Interval and the Wrap up Conference call will be 1-866-844-1448 with a participant code of 7233712. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: October 29, 2001 Subject: Reminder: IMA Release 8.01 - SRN102901 This Communicator is to remind Qwest IMA Users that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. The Release Notes Candidate descriptions are now available and can be found at the following website: http://www.qwest.com/wholesale/ima/gui/release.html During this installation, the IMA GUI and EDI interfaces will be unavailable from 12:01 a.m. Saturday, November 17, 2001 until the Release Testing interval begins on Sunday, November 18, 2001 currently scheduled for 6:30 p.m. to 8:30 p.m. Mountain time. Please note the time change of the testing interval start time, from 6:00 p.m. to 6:30 p.m. Prior to beginning any testing related to this release, CLEC’s are required to call the Release Testing Status Line at (303) 965-8872 after 5:00 p.m. Mountain time on Sunday, November 18, 2001 to confirm their testing interval start time. A conference bridge will also be made available during this testing interval, followed by a wrap up conference call starting at 8:30 p.m. Mountain time. The conference bridge number will be communicated during the week prior to installation and testing. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: October 23, 2001 Subject: Reminder: IMA Release 8.01 to be available on Monday, November 19, 2001 - SRN102301 This Communicator is intended to be a reminder that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. Please remember that the IMA GUI and EDI interfaces will not be available from 12:01 a.m. Saturday, November 17, 2001 until the Release Testing interval begins on Sunday , November 18 2001. The Release Testing Interval is currently scheduled for 6:00 p.m. to 8:30 p.m. Mountain time on Sunday, November 18, 2001. Prior to beginning any testing, CLEC’s should call the Release Testing Status Line at (303) 965-8872 after 5:00 p.m. Mountain time on Sunday to confirm the start time for the testing interval. A conference bridge will also be available during this testing interval, followed by a wrap up conference call at 8:30 p.m. Mountain time. The call in number for the Release Testing Interval and the Wrap up Conference call will be made available prior to the Release. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

CenturyLink Response

Archived System CR 23928 Detail

 
Title: IMA User Profile Modifications
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

23928 Completed
1/17/2002
-   IMA GUI/8 No Products
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Gallegos, John
Director:
CR PM: Routh, Mark

Description Of Change

Modify the external customer user profile to indicate desired method for receiving Notices. Also require user profile to be completed for all users before they are allowed to access system functionality.

Status History

Date Action Description
Release Information IMA Release 8.01 
10/17/2001 CR Submitted CR transferred from legacy database to CMP database 
10/18/2001 Discussed at Monthly CMP Meeting CR presented at CMP meeting 
10/23/2001 Communicator Issued SRN102301-Reminder 1 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
10/29/2001 Communicator Issued SRN102901-Reminder 2 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
11/6/2001 Record Update Improved CR descriptions issued to CLECs for 8.01 candidates. 
11/8/2001 Communicator Issued SRN110801-Reminder 3 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
11/12/2001 CLEC Call CLEC call to discuss 8.01 candidates. 
11/12/2001 Communicator Issued IMA 8.01 Point Release Training Communiqué issued to CLECs. 
11/16/2001 Communicator Issued IMA Release 8.01 communicator. 
11/19/2001 Status Changed 8.01 went into production. Status changed to "CLEC Test" 
1/17/2002 Discussed at Monthly CMP Meeting CR # 23928 discussed in Monthly Systems CMP Meeting; CR has been in CLEC Test; CLECs agreed that CR is Completed 
1/17/2002 Status Updated CR # 23928 status updated to 'Completed' 

Project Meetings

COMMUNICATOR To: Qwest IMA Users From: Qwest IT Wholesale Systems Communications Manager Date: November 16, 2001 Document No. SYST.11.16.01.F.2416.IMARel8.01 Subject: Final Reminder: IMA Release 8.01 to be available on Monday, November 16, 2001

This Communicator is intended to be the final reminder that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17-18, 2001. The Release Notes for this release are now available at: http://www.qwest.com/wholesale/ima/gui/release.html . Please remember that the IMA GUI and EDI interfaces will not be available from 9:00p.m. Saturday, November 17 2001 until the Release Testing interval begins on Sunday , November 18, 2001. The Release Testing Interval available is currently scheduled for 6:00 p.m. to 8:00 p.m. Mountain time on Sunday, November 18, 2001. To participate in the testing interval, the Co-Providers must: 1) On Sunday, November 18, 2001 after 4:00 p.m. Mountain time, call the Software Release Information Line prior to starting the test. This line will provide a recorded announcement confirming that testing may begin or a new estimated testing time if we should experience any delays. The phone number for this Information Line will be (303) 965-8872. 2) Consider your test activities carefully. By the time we begin the testing, IMA will have been checked out from a technical perspective. You will be testing in a live production environment. 3) At any time during the testing interval, (6:00 p.m. to 8:00 p.m. Mountain time), you may report any problems you encounter to our open conference bridge. The conference bridge number is 1-866-844-1448 with a pass code of 7233712 4) Attend a conference call at 8.00 p.m. Mountain time at the end of the testing interval for a recap of the outstanding issues and any updated status available at that time. The call in number for this conference call will be 1-866-844-1448 with a pass code of 7233712. This conference call will conclude the testing interval. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

Training Communiqué: IMA Release 8.01 Point Release Training - Update Issued: November 12, 2001 Qwest has updated the Wholesale Training web site to allow customers to register for the following conference bridge training sessions: IMA Release 8.01 Overview Tuesday, November 13, 2001 2:00 p.m. (MDT) Wednesday, November 14, 2001 10:00 a.m. (MDT) Thursday, November 15, 2001 10:00 a.m. (MDT) Thursday, November 15, 2001 2:00 p.m. (MDT) The IMA Release 8.01 CLEC Overview for training is in a downloadable format at http://www.qwest.com/wholesale/training/coursecatalog.html. Customers may now register to participate on the conference bridge at http://www.qwest.com/wholesale/training/courseregform.html. After submitting a registration the customer will receive a class confirmation with conference bridge number and passcode to attend the training.

If you would like to learn more about the IMA 8.01 point release, please go to http://www.qwest.com/wholesale/ima/gui/release.html and download the IMA Release 8.01 Release Notes.

If you have questions or comments, please contact Christel Wolberg, Registration Coordinator, at (303) 965-6164 or cwolber@qwest.com.

Helpful Hint: When visiting an updated web site, be sure to select your web browser "Reload" or "Refresh" button to prevent from viewing a dated cached web paged.

11/12/01 - CLEC call to discuss 8.01 candidates: John Gallegos present Bonnie (Eschelon) along with this, weren’t they going to change it so that you didn’t have to have both fax & email--this is number 14 on the list

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: November 8, 2001 Subject: Reminder: IMA Release 8.01 - SRN110801 This Communicator is to remind Qwest IMA Users that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. The Release Notes and candidate descriptions are now available and can be found at the following website: http://www.qwest.com/wholesale/ima/gui/release.html During this installation, the IMA GUI and EDI interfaces will be unavailable from 9:00 p.m. Mountain time, Saturday November 17, 2001 until the Release Testing interval begins on Sunday, November 18, 2001. Please note that the testing interval, which was previously scheduled for 6:30 p.m. – 8.30 p.m. Mountain time is now scheduled to begin at 6:00 p.m. Mountain time and will end at 8.00 p.m. Mountain time. Prior to beginning any testing related to this release, CLEC’s are required to call the Release Testing Status Line at (303) 965-8872 after 4:00 p.m. Mountain time on Sunday, November 18, 2001 to confirm their testing interval start time. A conference bridge will also be made available during this testing interval, followed by a wrap up conference call starting at 8:00 p.m. Mountain Time. The call in number for the Release Testing Interval and the Wrap up Conference call will be 1-866-844-1448 with a participant code of 7233712. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: October 29, 2001 Subject: Reminder: IMA Release 8.01 - SRN102901 This Communicator is to remind Qwest IMA Users that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. The Release Notes Candidate descriptions are now available and can be found at the following website: http://www.qwest.com/wholesale/ima/gui/release.html During this installation, the IMA GUI and EDI interfaces will be unavailable from 12:01 a.m. Saturday, November 17, 2001 until the Release Testing interval begins on Sunday, November 18, 2001 currently scheduled for 6:30 p.m. to 8:30 p.m. Mountain time. Please note the time change of the testing interval start time, from 6:00 p.m. to 6:30 p.m. Prior to beginning any testing related to this release, CLEC’s are required to call the Release Testing Status Line at (303) 965-8872 after 5:00 p.m. Mountain time on Sunday, November 18, 2001 to confirm their testing interval start time. A conference bridge will also be made available during this testing interval, followed by a wrap up conference call starting at 8:30 p.m. Mountain time. The conference bridge number will be communicated during the week prior to installation and testing. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: October 23, 2001 Subject: Reminder: IMA Release 8.01 to be available on Monday, November 19, 2001 - SRN102301 This Communicator is intended to be a reminder that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. Please remember that the IMA GUI and EDI interfaces will not be available from 12:01 a.m. Saturday, November 17, 2001 until the Release Testing interval begins on Sunday , November 18 2001. The Release Testing Interval is currently scheduled for 6:00 p.m. to 8:30 p.m. Mountain time on Sunday, November 18, 2001. Prior to beginning any testing, CLEC’s should call the Release Testing Status Line at (303) 965-8872 after 5:00 p.m. Mountain time on Sunday to confirm the start time for the testing interval. A conference bridge will also be available during this testing interval, followed by a wrap up conference call at 8:30 p.m. Mountain time. The call in number for the Release Testing Interval and the Wrap up Conference call will be made available prior to the Release. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

CenturyLink Response

Archived System CR 23981 Detail

 
Title: IMA UNE P BRI
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

23981 Completed
1/17/2002
-   IMA Common/8 UNE-P
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Gallegos, John
Director:
CR PM: Routh, Mark

Description Of Change

Change UNE-P BRI in IMA to allow "Conversion As Is" along with "Conversion As Specified". This product is a result of the FCC Remand.

Status History

Date Action Description
Release Information IMA Release 8.01 
10/17/2001 CR Submitted CR transferred from legacy database to CMP database 
10/18/2001 Discussed at Monthly CMP Meeting CR presented at CMP meeting 
10/23/2001 Communicator Issued SRN102301-Reminder 1 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
10/29/2001 Communicator Issued SRN102901-Reminder 2 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
11/6/2001 Record Update Improved CR descriptions issued to CLECs for 8.01 candidates. 
11/8/2001 Communicator Issued SRN110801-Reminder 3 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
11/12/2001 Communicator Issued IMA 8.01 Point Release Training Communiqué issued to CLECs. 
11/12/2001 CLEC Call CLEC call to discuss 8.01 candidates. 
11/16/2001 Communicator Issued IMA Release 8.01 communicator. 
11/19/2001 Status Changed 8.01 went into production. Status changed to "CLEC Test" 
1/17/2002 Discussed at Monthly CMP Meeting CR # 23981 discussed in Monthly Systems CMP Meeting; CR has been in CLEC Test; CLECs agreed that CR is Completed 
1/17/2002 Status Updated CR # 23981 status updated to 'Completed' 

Project Meetings

COMMUNICATOR To: Qwest IMA Users From: Qwest IT Wholesale Systems Communications Manager Date: November 16, 2001 Document No. SYST.11.16.01.F.2416.IMARel8.01 Subject: Final Reminder: IMA Release 8.01 to be available on Monday, November 16, 2001

This Communicator is intended to be the final reminder that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17-18, 2001. The Release Notes for this release are now available at: http://www.qwest.com/wholesale/ima/gui/release.html . Please remember that the IMA GUI and EDI interfaces will not be available from 9:00p.m. Saturday, November 17 2001 until the Release Testing interval begins on Sunday , November 18, 2001. The Release Testing Interval available is currently scheduled for 6:00 p.m. to 8:00 p.m. Mountain time on Sunday, November 18, 2001. To participate in the testing interval, the Co-Providers must: 1) On Sunday, November 18, 2001 after 4:00 p.m. Mountain time, call the Software Release Information Line prior to starting the test. This line will provide a recorded announcement confirming that testing may begin or a new estimated testing time if we should experience any delays. The phone number for this Information Line will be (303) 965-8872. 2) Consider your test activities carefully. By the time we begin the testing, IMA will have been checked out from a technical perspective. You will be testing in a live production environment. 3) At any time during the testing interval, (6:00 p.m. to 8:00 p.m. Mountain time), you may report any problems you encounter to our open conference bridge. The conference bridge number is 1-866-844-1448 with a pass code of 7233712 4) Attend a conference call at 8.00 p.m. Mountain time at the end of the testing interval for a recap of the outstanding issues and any updated status available at that time. The call in number for this conference call will be 1-866-844-1448 with a pass code of 7233712. This conference call will conclude the testing interval. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

Training Communiqué: IMA Release 8.01 Point Release Training - Update Issued: November 12, 2001 Qwest has updated the Wholesale Training web site to allow customers to register for the following conference bridge training sessions: IMA Release 8.01 Overview Tuesday, November 13, 2001 2:00 p.m. (MDT) Wednesday, November 14, 2001 10:00 a.m. (MDT) Thursday, November 15, 2001 10:00 a.m. (MDT) Thursday, November 15, 2001 2:00 p.m. (MDT) The IMA Release 8.01 CLEC Overview for training is in a downloadable format at http://www.qwest.com/wholesale/training/coursecatalog.html. Customers may now register to participate on the conference bridge at http://www.qwest.com/wholesale/training/courseregform.html. After submitting a registration the customer will receive a class confirmation with conference bridge number and passcode to attend the training.

If you would like to learn more about the IMA 8.01 point release, please go to http://www.qwest.com/wholesale/ima/gui/release.html and download the IMA Release 8.01 Release Notes.

If you have questions or comments, please contact Christel Wolberg, Registration Coordinator, at (303) 965-6164 or cwolber@qwest.com.

Helpful Hint: When visiting an updated web site, be sure to select your web browser "Reload" or "Refresh" button to prevent from viewing a dated cached web paged.

11/12/01 - CLEC call to discuss 8.01 candidates: John Gallegos- No questions

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: November 8, 2001 Subject: Reminder: IMA Release 8.01 - SRN110801 This Communicator is to remind Qwest IMA Users that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. The Release Notes and candidate descriptions are now available and can be found at the following website: http://www.qwest.com/wholesale/ima/gui/release.html During this installation, the IMA GUI and EDI interfaces will be unavailable from 9:00 p.m. Mountain time, Saturday November 17, 2001 until the Release Testing interval begins on Sunday, November 18, 2001. Please note that the testing interval, which was previously scheduled for 6:30 p.m. – 8.30 p.m. Mountain time is now scheduled to begin at 6:00 p.m. Mountain time and will end at 8.00 p.m. Mountain time. Prior to beginning any testing related to this release, CLEC’s are required to call the Release Testing Status Line at (303) 965-8872 after 4:00 p.m. Mountain time on Sunday, November 18, 2001 to confirm their testing interval start time. A conference bridge will also be made available during this testing interval, followed by a wrap up conference call starting at 8:00 p.m. Mountain Time. The call in number for the Release Testing Interval and the Wrap up Conference call will be 1-866-844-1448 with a participant code of 7233712. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: October 29, 2001 Subject: Reminder: IMA Release 8.01 - SRN102901 This Communicator is to remind Qwest IMA Users that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. The Release Notes Candidate descriptions are now available and can be found at the following website: http://www.qwest.com/wholesale/ima/gui/release.html During this installation, the IMA GUI and EDI interfaces will be unavailable from 12:01 a.m. Saturday, November 17, 2001 until the Release Testing interval begins on Sunday, November 18, 2001 currently scheduled for 6:30 p.m. to 8:30 p.m. Mountain time. Please note the time change of the testing interval start time, from 6:00 p.m. to 6:30 p.m. Prior to beginning any testing related to this release, CLEC’s are required to call the Release Testing Status Line at (303) 965-8872 after 5:00 p.m. Mountain time on Sunday, November 18, 2001 to confirm their testing interval start time. A conference bridge will also be made available during this testing interval, followed by a wrap up conference call starting at 8:30 p.m. Mountain time. The conference bridge number will be communicated during the week prior to installation and testing. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: October 23, 2001 Subject: Reminder: IMA Release 8.01 to be available on Monday, November 19, 2001 - SRN102301 This Communicator is intended to be a reminder that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. Please remember that the IMA GUI and EDI interfaces will not be available from 12:01 a.m. Saturday, November 17, 2001 until the Release Testing interval begins on Sunday , November 18 2001. The Release Testing Interval is currently scheduled for 6:00 p.m. to 8:30 p.m. Mountain time on Sunday, November 18, 2001. Prior to beginning any testing, CLEC’s should call the Release Testing Status Line at (303) 965-8872 after 5:00 p.m. Mountain time on Sunday to confirm the start time for the testing interval. A conference bridge will also be available during this testing interval, followed by a wrap up conference call at 8:30 p.m. Mountain time. The call in number for the Release Testing Interval and the Wrap up Conference call will be made available prior to the Release. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

CenturyLink Response

Archived System CR 27509 Detail

 
Title: PON re use: Not checking 24 month window to avoid reuse
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

27509 Completed
1/17/2002
-   IMA Common/8 All Products
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Gallegos, John
Director:
CR PM: Routh, Mark

Description Of Change

Correct a problem with the functionality that does not allow a CLEC to reuse the same PON / VERs within a 24 month period.

Status History

Date Action Description
Release Information IMA Release 8.01 
10/17/2001 CR Submitted CR transferred from legacy database to CMP database 
10/18/2001 Discussed at Monthly CMP Meeting CR presented at CMP meeting 
10/23/2001 Communicator Issued SRN102301-Reminder 1 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
10/29/2001 Communicator Issued SRN102901-Reminder 2 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
11/6/2001 Record Update Improved CR descriptions issued to CLECs for 8.01 candidates. 
11/8/2001 Communicator Issued SRN110801-Reminder 3 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
11/12/2001 Communicator Issued IMA 8.01 Point Release Training Communiqué issued to CLECs. 
11/12/2001 CLEC Call CLEC call to discuss 8.01 candidates. 
11/16/2001 Communicator Issued IMA Release 8.01 communicator. 
11/19/2001 Status Changed 8.01 went into production. Status changed to "CLEC Test" 
1/17/2002 Discussed at Monthly CMP Meeting CR # 27509 discussed in Monthly Systems CMP Meeting; CR has been in CLEC Test; CLECs agreed that CR is Completed 
1/17/2002 Status Updated CR # 27509 status updated to 'Completed' 

Project Meetings

COMMUNICATOR To: Qwest IMA Users From: Qwest IT Wholesale Systems Communications Manager Date: November 16, 2001 Document No. SYST.11.16.01.F.2416.IMARel8.01 Subject: Final Reminder: IMA Release 8.01 to be available on Monday, November 16, 2001

This Communicator is intended to be the final reminder that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17-18, 2001. The Release Notes for this release are now available at: http://www.qwest.com/wholesale/ima/gui/release.html . Please remember that the IMA GUI and EDI interfaces will not be available from 9:00p.m. Saturday, November 17 2001 until the Release Testing interval begins on Sunday , November 18, 2001. The Release Testing Interval available is currently scheduled for 6:00 p.m. to 8:00 p.m. Mountain time on Sunday, November 18, 2001. To participate in the testing interval, the Co-Providers must: 1) On Sunday, November 18, 2001 after 4:00 p.m. Mountain time, call the Software Release Information Line prior to starting the test. This line will provide a recorded announcement confirming that testing may begin or a new estimated testing time if we should experience any delays. The phone number for this Information Line will be (303) 965-8872. 2) Consider your test activities carefully. By the time we begin the testing, IMA will have been checked out from a technical perspective. You will be testing in a live production environment. 3) At any time during the testing interval, (6:00 p.m. to 8:00 p.m. Mountain time), you may report any problems you encounter to our open conference bridge. The conference bridge number is 1-866-844-1448 with a pass code of 7233712 4) Attend a conference call at 8.00 p.m. Mountain time at the end of the testing interval for a recap of the outstanding issues and any updated status available at that time. The call in number for this conference call will be 1-866-844-1448 with a pass code of 7233712. This conference call will conclude the testing interval. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

Training Communiqué: IMA Release 8.01 Point Release Training - Update Issued: November 12, 2001 Qwest has updated the Wholesale Training web site to allow customers to register for the following conference bridge training sessions: IMA Release 8.01 Overview Tuesday, November 13, 2001 2:00 p.m. (MDT) Wednesday, November 14, 2001 10:00 a.m. (MDT) Thursday, November 15, 2001 10:00 a.m. (MDT) Thursday, November 15, 2001 2:00 p.m. (MDT) The IMA Release 8.01 CLEC Overview for training is in a downloadable format at http://www.qwest.com/wholesale/training/coursecatalog.html. Customers may now register to participate on the conference bridge at http://www.qwest.com/wholesale/training/courseregform.html. After submitting a registration the customer will receive a class confirmation with conference bridge number and passcode to attend the training.

If you would like to learn more about the IMA 8.01 point release, please go to http://www.qwest.com/wholesale/ima/gui/release.html and download the IMA Release 8.01 Release Notes.

If you have questions or comments, please contact Christel Wolberg, Registration Coordinator, at (303) 965-6164 or cwolber@qwest.com.

Helpful Hint: When visiting an updated web site, be sure to select your web browser "Reload" or "Refresh" button to prevent from viewing a dated cached web paged.

11/12/01 - CLEC call to discuss 8.01 candidates: John Gallegos- This is around how we archive our LSRs that include PON information

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: November 8, 2001 Subject: Reminder: IMA Release 8.01 - SRN110801 This Communicator is to remind Qwest IMA Users that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. The Release Notes and candidate descriptions are now available and can be found at the following website: http://www.qwest.com/wholesale/ima/gui/release.html During this installation, the IMA GUI and EDI interfaces will be unavailable from 9:00 p.m. Mountain time, Saturday November 17, 2001 until the Release Testing interval begins on Sunday, November 18, 2001. Please note that the testing interval, which was previously scheduled for 6:30 p.m. – 8.30 p.m. Mountain time is now scheduled to begin at 6:00 p.m. Mountain time and will end at 8.00 p.m. Mountain time. Prior to beginning any testing related to this release, CLEC’s are required to call the Release Testing Status Line at (303) 965-8872 after 4:00 p.m. Mountain time on Sunday, November 18, 2001 to confirm their testing interval start time. A conference bridge will also be made available during this testing interval, followed by a wrap up conference call starting at 8:00 p.m. Mountain Time. The call in number for the Release Testing Interval and the Wrap up Conference call will be 1-866-844-1448 with a participant code of 7233712. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: October 29, 2001 Subject: Reminder: IMA Release 8.01 - SRN102901 This Communicator is to remind Qwest IMA Users that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. The Release Notes Candidate descriptions are now available and can be found at the following website: http://www.qwest.com/wholesale/ima/gui/release.html During this installation, the IMA GUI and EDI interfaces will be unavailable from 12:01 a.m. Saturday, November 17, 2001 until the Release Testing interval begins on Sunday, November 18, 2001 currently scheduled for 6:30 p.m. to 8:30 p.m. Mountain time. Please note the time change of the testing interval start time, from 6:00 p.m. to 6:30 p.m. Prior to beginning any testing related to this release, CLEC’s are required to call the Release Testing Status Line at (303) 965-8872 after 5:00 p.m. Mountain time on Sunday, November 18, 2001 to confirm their testing interval start time. A conference bridge will also be made available during this testing interval, followed by a wrap up conference call starting at 8:30 p.m. Mountain time. The conference bridge number will be communicated during the week prior to installation and testing. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: October 23, 2001 Subject: Reminder: IMA Release 8.01 to be available on Monday, November 19, 2001 - SRN102301 This Communicator is intended to be a reminder that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. Please remember that the IMA GUI and EDI interfaces will not be available from 12:01 a.m. Saturday, November 17, 2001 until the Release Testing interval begins on Sunday , November 18 2001. The Release Testing Interval is currently scheduled for 6:00 p.m. to 8:30 p.m. Mountain time on Sunday, November 18, 2001. Prior to beginning any testing, CLEC’s should call the Release Testing Status Line at (303) 965-8872 after 5:00 p.m. Mountain time on Sunday to confirm the start time for the testing interval. A conference bridge will also be available during this testing interval, followed by a wrap up conference call at 8:30 p.m. Mountain time. The call in number for the Release Testing Interval and the Wrap up Conference call will be made available prior to the Release. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

CenturyLink Response

Archived System CR 28185 Detail

 
Title: UBL IMA NC/NCI Table
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

28185 Completed
1/17/2002
-   IMA Common/8 All Products
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Gallegos, John
Director:
CR PM: Routh, Mark

Description Of Change

The NC/NCI codes (both CO and EU) for ADSL Qualified Loops need to be updated to match Tech Pub 77384.

Status History

Date Action Description
Release Information IMA Release 8.01 
10/17/2001 CR Submitted CR transferred from legacy database to CMP database 
10/18/2001 Discussed at Monthly CMP Meeting CR presented at CMP meeting 
10/23/2001 Communicator Issued SRN102301-Reminder 1 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
10/29/2001 Communicator Issued SRN102901-Reminder 2 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
11/6/2001 Record Update Improved CR descriptions issued to CLECs for 8.01 candidates. 
11/8/2001 Communicator Issued SRN110801-Reminder 3 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
11/12/2001 CLEC Call CLEC call to discuss 8.01 candidates. 
11/12/2001 Communicator Issued IMA 8.01 Point Release Training Communiqué issued to CLECs. 
11/16/2001 Communicator Issued IMA Release 8.01 communicator. 
11/19/2001 Status Changed 8.01 went into production. Status changed to "CLEC Test" 
1/17/2002 Discussed at Monthly CMP Meeting CR # 28185 discussed in Monthly Systems CMP Meeting; CR has been in CLEC Test; CLECs agreed that CR is Completed 
1/17/2002 Status Updated CR # 28185 status updated to 'Completed' 

Project Meetings

COMMUNICATOR To: Qwest IMA Users From: Qwest IT Wholesale Systems Communications Manager Date: November 16, 2001 Document No. SYST.11.16.01.F.2416.IMARel8.01 Subject: Final Reminder: IMA Release 8.01 to be available on Monday, November 16, 2001

This Communicator is intended to be the final reminder that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17-18, 2001. The Release Notes for this release are now available at: http://www.qwest.com/wholesale/ima/gui/release.html . Please remember that the IMA GUI and EDI interfaces will not be available from 9:00p.m. Saturday, November 17 2001 until the Release Testing interval begins on Sunday , November 18, 2001. The Release Testing Interval available is currently scheduled for 6:00 p.m. to 8:00 p.m. Mountain time on Sunday, November 18, 2001. To participate in the testing interval, the Co-Providers must: 1) On Sunday, November 18, 2001 after 4:00 p.m. Mountain time, call the Software Release Information Line prior to starting the test. This line will provide a recorded announcement confirming that testing may begin or a new estimated testing time if we should experience any delays. The phone number for this Information Line will be (303) 965-8872. 2) Consider your test activities carefully. By the time we begin the testing, IMA will have been checked out from a technical perspective. You will be testing in a live production environment. 3) At any time during the testing interval, (6:00 p.m. to 8:00 p.m. Mountain time), you may report any problems you encounter to our open conference bridge. The conference bridge number is 1-866-844-1448 with a pass code of 7233712 4) Attend a conference call at 8.00 p.m. Mountain time at the end of the testing interval for a recap of the outstanding issues and any updated status available at that time. The call in number for this conference call will be 1-866-844-1448 with a pass code of 7233712. This conference call will conclude the testing interval. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

Training Communiqué: IMA Release 8.01 Point Release Training - Update Issued: November 12, 2001 Qwest has updated the Wholesale Training web site to allow customers to register for the following conference bridge training sessions: IMA Release 8.01 Overview Tuesday, November 13, 2001 2:00 p.m. (MDT) Wednesday, November 14, 2001 10:00 a.m. (MDT) Thursday, November 15, 2001 10:00 a.m. (MDT) Thursday, November 15, 2001 2:00 p.m. (MDT) The IMA Release 8.01 CLEC Overview for training is in a downloadable format at http://www.qwest.com/wholesale/training/coursecatalog.html. Customers may now register to participate on the conference bridge at http://www.qwest.com/wholesale/training/courseregform.html. After submitting a registration the customer will receive a class confirmation with conference bridge number and passcode to attend the training.

If you would like to learn more about the IMA 8.01 point release, please go to http://www.qwest.com/wholesale/ima/gui/release.html and download the IMA Release 8.01 Release Notes.

If you have questions or comments, please contact Christel Wolberg, Registration Coordinator, at (303) 965-6164 or cwolber@qwest.com.

Helpful Hint: When visiting an updated web site, be sure to select your web browser "Reload" or "Refresh" button to prevent from viewing a dated cached web paged.

11/12/01 - CLEC call to discuss 8.01 candidates: John Gallegos- No questions

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: November 8, 2001 Subject: Reminder: IMA Release 8.01 - SRN110801 This Communicator is to remind Qwest IMA Users that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. The Release Notes and candidate descriptions are now available and can be found at the following website: http://www.qwest.com/wholesale/ima/gui/release.html During this installation, the IMA GUI and EDI interfaces will be unavailable from 9:00 p.m. Mountain time, Saturday November 17, 2001 until the Release Testing interval begins on Sunday, November 18, 2001. Please note that the testing interval, which was previously scheduled for 6:30 p.m. – 8.30 p.m. Mountain time is now scheduled to begin at 6:00 p.m. Mountain time and will end at 8.00 p.m. Mountain time. Prior to beginning any testing related to this release, CLEC’s are required to call the Release Testing Status Line at (303) 965-8872 after 4:00 p.m. Mountain time on Sunday, November 18, 2001 to confirm their testing interval start time. A conference bridge will also be made available during this testing interval, followed by a wrap up conference call starting at 8:00 p.m. Mountain Time. The call in number for the Release Testing Interval and the Wrap up Conference call will be 1-866-844-1448 with a participant code of 7233712. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: October 29, 2001 Subject: Reminder: IMA Release 8.01 - SRN102901 This Communicator is to remind Qwest IMA Users that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. The Release Notes Candidate descriptions are now available and can be found at the following website: http://www.qwest.com/wholesale/ima/gui/release.html During this installation, the IMA GUI and EDI interfaces will be unavailable from 12:01 a.m. Saturday, November 17, 2001 until the Release Testing interval begins on Sunday, November 18, 2001 currently scheduled for 6:30 p.m. to 8:30 p.m. Mountain time. Please note the time change of the testing interval start time, from 6:00 p.m. to 6:30 p.m. Prior to beginning any testing related to this release, CLEC’s are required to call the Release Testing Status Line at (303) 965-8872 after 5:00 p.m. Mountain time on Sunday, November 18, 2001 to confirm their testing interval start time. A conference bridge will also be made available during this testing interval, followed by a wrap up conference call starting at 8:30 p.m. Mountain time. The conference bridge number will be communicated during the week prior to installation and testing. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: October 23, 2001 Subject: Reminder: IMA Release 8.01 to be available on Monday, November 19, 2001 - SRN102301 This Communicator is intended to be a reminder that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. Please remember that the IMA GUI and EDI interfaces will not be available from 12:01 a.m. Saturday, November 17, 2001 until the Release Testing interval begins on Sunday , November 18 2001. The Release Testing Interval is currently scheduled for 6:00 p.m. to 8:30 p.m. Mountain time on Sunday, November 18, 2001. Prior to beginning any testing, CLEC’s should call the Release Testing Status Line at (303) 965-8872 after 5:00 p.m. Mountain time on Sunday to confirm the start time for the testing interval. A conference bridge will also be available during this testing interval, followed by a wrap up conference call at 8:30 p.m. Mountain time. The call in number for the Release Testing Interval and the Wrap up Conference call will be made available prior to the Release. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

CenturyLink Response

Archived System CR 27361 Detail

 
Title: CSR I/F returning 0 chars and sending to FTS
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

27361 Completed
1/17/2002
-   IMA Common/8 All Products
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Gallegos, John
Director:
CR PM: Routh, Mark

Description Of Change

CSR retrievals are being attempted by flow through when the eu_csr_btn field is not populated in the end users table. This results in no CSR being sent to downstream systems. This candidate corrects an error condition that should not occur.

Status History

Date Action Description
Release Information IMA Release 8.01 
10/17/2001 CR Submitted CR transferred from legacy database to CMP database 
10/18/2001 Discussed at Monthly CMP Meeting CR presented at CMP meeting 
10/23/2001 Communicator Issued SRN102301-Reminder 1 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
10/29/2001 Communicator Issued SRN102901-Reminder 2 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
11/6/2001 Record Update Improved CR descriptions issued to CLECs for 8.01 candidates. 
11/8/2001 Communicator Issued SRN110801-Reminder 3 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
11/12/2001 CLEC Call CLEC call to discuss 8.01 candidates. 
11/12/2001 Communicator Issued IMA 8.01 Point Release Training Communiqué issued to CLECs. 
11/16/2001 Communicator Issued IMA Release 8.01 communicator. 
11/19/2001 Status Changed 8.01 went into production. Status changed to "CLEC Test" 
1/17/2002 Discussed at Monthly CMP Meeting CR # 27361 discussed in Monthly Systems CMP Meeting; CR has been in CLEC Test; CLECs agreed that CR is Completed 
1/17/2002 Status Updated CR # 27361 status updated to 'Completed' 

Project Meetings

COMMUNICATOR To: Qwest IMA Users From: Qwest IT Wholesale Systems Communications Manager Date: November 16, 2001 Document No. SYST.11.16.01.F.2416.IMARel8.01 Subject: Final Reminder: IMA Release 8.01 to be available on Monday, November 16, 2001

This Communicator is intended to be the final reminder that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17-18, 2001. The Release Notes for this release are now available at: http://www.qwest.com/wholesale/ima/gui/release.html . Please remember that the IMA GUI and EDI interfaces will not be available from 9:00p.m. Saturday, November 17 2001 until the Release Testing interval begins on Sunday , November 18, 2001. The Release Testing Interval available is currently scheduled for 6:00 p.m. to 8:00 p.m. Mountain time on Sunday, November 18, 2001. To participate in the testing interval, the Co-Providers must: 1) On Sunday, November 18, 2001 after 4:00 p.m. Mountain time, call the Software Release Information Line prior to starting the test. This line will provide a recorded announcement confirming that testing may begin or a new estimated testing time if we should experience any delays. The phone number for this Information Line will be (303) 965-8872. 2) Consider your test activities carefully. By the time we begin the testing, IMA will have been checked out from a technical perspective. You will be testing in a live production environment. 3) At any time during the testing interval, (6:00 p.m. to 8:00 p.m. Mountain time), you may report any problems you encounter to our open conference bridge. The conference bridge number is 1-866-844-1448 with a pass code of 7233712 4) Attend a conference call at 8.00 p.m. Mountain time at the end of the testing interval for a recap of the outstanding issues and any updated status available at that time. The call in number for this conference call will be 1-866-844-1448 with a pass code of 7233712. This conference call will conclude the testing interval. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

Training Communiqué: IMA Release 8.01 Point Release Training - Update Issued: November 12, 2001 Qwest has updated the Wholesale Training web site to allow customers to register for the following conference bridge training sessions: IMA Release 8.01 Overview Tuesday, November 13, 2001 2:00 p.m. (MDT) Wednesday, November 14, 2001 10:00 a.m. (MDT) Thursday, November 15, 2001 10:00 a.m. (MDT) Thursday, November 15, 2001 2:00 p.m. (MDT) The IMA Release 8.01 CLEC Overview for training is in a downloadable format at http://www.qwest.com/wholesale/training/coursecatalog.html. Customers may now register to participate on the conference bridge at http://www.qwest.com/wholesale/training/courseregform.html. After submitting a registration the customer will receive a class confirmation with conference bridge number and passcode to attend the training.

If you would like to learn more about the IMA 8.01 point release, please go to http://www.qwest.com/wholesale/ima/gui/release.html and download the IMA Release 8.01 Release Notes.

If you have questions or comments, please contact Christel Wolberg, Registration Coordinator, at (303) 965-6164 or cwolber@qwest.com.

Helpful Hint: When visiting an updated web site, be sure to select your web browser "Reload" or "Refresh" button to prevent from viewing a dated cached web paged.

11/12/01 - CLEC call to discuss 8.01 candidates: John Gallegos Connie Winston noted that this is an interface system change, (non-impacting to CLEC) but it will improve CLEC flow through

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: November 8, 2001 Subject: Reminder: IMA Release 8.01 - SRN110801 This Communicator is to remind Qwest IMA Users that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. The Release Notes and candidate descriptions are now available and can be found at the following website: http://www.qwest.com/wholesale/ima/gui/release.html During this installation, the IMA GUI and EDI interfaces will be unavailable from 9:00 p.m. Mountain time, Saturday November 17, 2001 until the Release Testing interval begins on Sunday, November 18, 2001. Please note that the testing interval, which was previously scheduled for 6:30 p.m. – 8.30 p.m. Mountain time is now scheduled to begin at 6:00 p.m. Mountain time and will end at 8.00 p.m. Mountain time. Prior to beginning any testing related to this release, CLEC’s are required to call the Release Testing Status Line at (303) 965-8872 after 4:00 p.m. Mountain time on Sunday, November 18, 2001 to confirm their testing interval start time. A conference bridge will also be made available during this testing interval, followed by a wrap up conference call starting at 8:00 p.m. Mountain Time. The call in number for the Release Testing Interval and the Wrap up Conference call will be 1-866-844-1448 with a participant code of 7233712. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: October 29, 2001 Subject: Reminder: IMA Release 8.01 - SRN102901 This Communicator is to remind Qwest IMA Users that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. The Release Notes Candidate descriptions are now available and can be found at the following website: http://www.qwest.com/wholesale/ima/gui/release.html During this installation, the IMA GUI and EDI interfaces will be unavailable from 12:01 a.m. Saturday, November 17, 2001 until the Release Testing interval begins on Sunday, November 18, 2001 currently scheduled for 6:30 p.m. to 8:30 p.m. Mountain time. Please note the time change of the testing interval start time, from 6:00 p.m. to 6:30 p.m. Prior to beginning any testing related to this release, CLEC’s are required to call the Release Testing Status Line at (303) 965-8872 after 5:00 p.m. Mountain time on Sunday, November 18, 2001 to confirm their testing interval start time. A conference bridge will also be made available during this testing interval, followed by a wrap up conference call starting at 8:30 p.m. Mountain time. The conference bridge number will be communicated during the week prior to installation and testing. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: October 23, 2001 Subject: Reminder: IMA Release 8.01 to be available on Monday, November 19, 2001 - SRN102301 This Communicator is intended to be a reminder that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. Please remember that the IMA GUI and EDI interfaces will not be available from 12:01 a.m. Saturday, November 17, 2001 until the Release Testing interval begins on Sunday , November 18 2001. The Release Testing Interval is currently scheduled for 6:00 p.m. to 8:30 p.m. Mountain time on Sunday, November 18, 2001. Prior to beginning any testing, CLEC’s should call the Release Testing Status Line at (303) 965-8872 after 5:00 p.m. Mountain time on Sunday to confirm the start time for the testing interval. A conference bridge will also be available during this testing interval, followed by a wrap up conference call at 8:30 p.m. Mountain time. The call in number for the Release Testing Interval and the Wrap up Conference call will be made available prior to the Release. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

CenturyLink Response

Archived System CR 18889 Detail

 
Title: CSR Match Rework
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

18889 Completed
2/22/2002
-   IMA Common/8 All Products
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

Currently a name and address match is performed on CLEC requests. During the editing process, a high number of requests are being flagged as near matches when they are in fact an exact match. Flagging a request as a near match can create manual work for the Interconnect Service Center and a delay in processing the CLEC order.

Status History

Date Action Description
Release Information IMA Release 8.01 
10/17/2001 CR Submitted CR transferred from legacy database to CMP database 
10/18/2001 Discussed at Monthly CMP Meeting CR presented at CMP meeting 
10/23/2001 Communicator Issued SRN102301-Reminder 1 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
10/29/2001 Communicator Issued SRN102901-Reminder 2 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
11/6/2001 Record Update Improved CR descriptions issued to CLECs for 8.01 candidates. 
11/8/2001 Communicator Issued SRN110801-Reminder 3 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
11/12/2001 CLEC Call CLEC call to discuss 8.01 candidates. 
11/12/2001 Communicator Issued IMA 8.01 Point Release Training Communiqué issued to CLECs. 
11/16/2001 Communicator Issued IMA Release 8.01 communicator. 
11/19/2001 Status Changed 8.01 went into production. Status changed to "CLEC Test" 
2/22/2002 Status Changed CR was declared completed as of 11/17/01 by Qwest. 

Project Meetings

COMMUNICATOR To: Qwest IMA Users From: Qwest IT Wholesale Systems Communications Manager Date: November 16, 2001 Document No. SYST.11.16.01.F.2416.IMARel8.01 Subject: Final Reminder: IMA Release 8.01 to be available on Monday, November 16, 2001

This Communicator is intended to be the final reminder that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17-18, 2001. The Release Notes for this release are now available at: http://www.qwest.com/wholesale/ima/gui/release.html . Please remember that the IMA GUI and EDI interfaces will not be available from 9:00p.m. Saturday, November 17 2001 until the Release Testing interval begins on Sunday , November 18, 2001. The Release Testing Interval available is currently scheduled for 6:00 p.m. to 8:00 p.m. Mountain time on Sunday, November 18, 2001. To participate in the testing interval, the Co-Providers must: 1) On Sunday, November 18, 2001 after 4:00 p.m. Mountain time, call the Software Release Information Line prior to starting the test. This line will provide a recorded announcement confirming that testing may begin or a new estimated testing time if we should experience any delays. The phone number for this Information Line will be (303) 965-8872. 2) Consider your test activities carefully. By the time we begin the testing, IMA will have been checked out from a technical perspective. You will be testing in a live production environment. 3) At any time during the testing interval, (6:00 p.m. to 8:00 p.m. Mountain time), you may report any problems you encounter to our open conference bridge. The conference bridge number is 1-866-844-1448 with a pass code of 7233712 4) Attend a conference call at 8.00 p.m. Mountain time at the end of the testing interval for a recap of the outstanding issues and any updated status available at that time. The call in number for this conference call will be 1-866-844-1448 with a pass code of 7233712. This conference call will conclude the testing interval. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

Training Communiqué: IMA Release 8.01 Point Release Training - Update Issued: November 12, 2001 Qwest has updated the Wholesale Training web site to allow customers to register for the following conference bridge training sessions: IMA Release 8.01 Overview Tuesday, November 13, 2001 2:00 p.m. (MDT) Wednesday, November 14, 2001 10:00 a.m. (MDT) Thursday, November 15, 2001 10:00 a.m. (MDT) Thursday, November 15, 2001 2:00 p.m. (MDT) The IMA Release 8.01 CLEC Overview for training is in a downloadable format at http://www.qwest.com/wholesale/training/coursecatalog.html. Customers may now register to participate on the conference bridge at http://www.qwest.com/wholesale/training/courseregform.html. After submitting a registration the customer will receive a class confirmation with conference bridge number and passcode to attend the training.

If you would like to learn more about the IMA 8.01 point release, please go to http://www.qwest.com/wholesale/ima/gui/release.html and download the IMA Release 8.01 Release Notes.

If you have questions or comments, please contact Christel Wolberg, Registration Coordinator, at (303) 965-6164 or cwolber@qwest.com.

Helpful Hint: When visiting an updated web site, be sure to select your web browser "Reload" or "Refresh" button to prevent from viewing a dated cached web paged.

11/12/01 - CLEC call to discuss 8.01 candidates: John Gallegos present- No questions

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: November 8, 2001 Subject: Reminder: IMA Release 8.01 - SRN110801 This Communicator is to remind Qwest IMA Users that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. The Release Notes and candidate descriptions are now available and can be found at the following website: http://www.qwest.com/wholesale/ima/gui/release.html During this installation, the IMA GUI and EDI interfaces will be unavailable from 9:00 p.m. Mountain time, Saturday November 17, 2001 until the Release Testing interval begins on Sunday, November 18, 2001. Please note that the testing interval, which was previously scheduled for 6:30 p.m. – 8.30 p.m. Mountain time is now scheduled to begin at 6:00 p.m. Mountain time and will end at 8.00 p.m. Mountain time. Prior to beginning any testing related to this release, CLEC’s are required to call the Release Testing Status Line at (303) 965-8872 after 4:00 p.m. Mountain time on Sunday, November 18, 2001 to confirm their testing interval start time. A conference bridge will also be made available during this testing interval, followed by a wrap up conference call starting at 8:00 p.m. Mountain Time. The call in number for the Release Testing Interval and the Wrap up Conference call will be 1-866-844-1448 with a participant code of 7233712. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: October 29, 2001 Subject: Reminder: IMA Release 8.01 - SRN102901 This Communicator is to remind Qwest IMA Users that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. The Release Notes Candidate descriptions are now available and can be found at the following website: http://www.qwest.com/wholesale/ima/gui/release.html During this installation, the IMA GUI and EDI interfaces will be unavailable from 12:01 a.m. Saturday, November 17, 2001 until the Release Testing interval begins on Sunday, November 18, 2001 currently scheduled for 6:30 p.m. to 8:30 p.m. Mountain time. Please note the time change of the testing interval start time, from 6:00 p.m. to 6:30 p.m. Prior to beginning any testing related to this release, CLEC’s are required to call the Release Testing Status Line at (303) 965-8872 after 5:00 p.m. Mountain time on Sunday, November 18, 2001 to confirm their testing interval start time. A conference bridge will also be made available during this testing interval, followed by a wrap up conference call starting at 8:30 p.m. Mountain time. The conference bridge number will be communicated during the week prior to installation and testing. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: October 23, 2001 Subject: Reminder: IMA Release 8.01 to be available on Monday, November 19, 2001 - SRN102301 This Communicator is intended to be a reminder that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. Please remember that the IMA GUI and EDI interfaces will not be available from 12:01 a.m. Saturday, November 17, 2001 until the Release Testing interval begins on Sunday , November 18 2001. The Release Testing Interval is currently scheduled for 6:00 p.m. to 8:30 p.m. Mountain time on Sunday, November 18, 2001. Prior to beginning any testing, CLEC’s should call the Release Testing Status Line at (303) 965-8872 after 5:00 p.m. Mountain time on Sunday to confirm the start time for the testing interval. A conference bridge will also be available during this testing interval, followed by a wrap up conference call at 8:30 p.m. Mountain time. The call in number for the Release Testing Interval and the Wrap up Conference call will be made available prior to the Release. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

CenturyLink Response

Archived System CR 28191 Detail

 
Title: USOC To USOC Edit
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

28191 Completed
1/17/2002
-   IMA Common/8 Pots Resale and UNE-P Pots
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Gallegos, John
Director:
CR PM: Routh, Mark

Description Of Change

This UR will prevent the submission of invalid USOC combinations based on data found on the LSR and/or CSR. Types of edits to be added are: 1) Cannot add USOC already on line, 2) Cannot act on USOC not already on

line, 3) Every T USOC must have a C, 4) Same USOC/FID cannot be Repeated, 5) USOC requires selection from set of other USOCs, 6)Conflicting USOCs on line.

Status History

Date Action Description
Release Information IMA Release 8.01 
10/17/2001 CR Submitted CR transferred from legacy database to CMP database 
10/18/2001 Discussed at Monthly CMP Meeting CR presented at CMP meeting 
10/23/2001 Communicator Issued SRN102301-Reminder 1 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
10/29/2001 Communicator Issued SRN102901-Reminder 2 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
11/6/2001 Record Update Improved CR descriptions issued to CLECs for 8.01 candidates. 
11/8/2001 Communicator Issued SRN110801-Reminder 3 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
11/12/2001 Communicator Issued IMA 8.01 Point Release Training Communiqué issued to CLECs. 
11/12/2001 CLEC Call CLEC call to discuss 8.01 candidates. 
11/16/2001 Communicator Issued IMA Release 8.01 communicator. 
11/19/2001 Status Changed 8.01 went into production. Status changed to "CLEC Test" 
1/17/2002 Discussed at Monthly CMP Meeting CR # 28191 discussed in Monthly Systems CMP Meeting; CR has been in CLEC Test; CLECs agreed that CR is Completed 
1/17/2002 Status Updated CR # 28191 status updated to 'Completed' 

Project Meetings

COMMUNICATOR To: Qwest IMA Users From: Qwest IT Wholesale Systems Communications Manager Date: November 16, 2001 Document No. SYST.11.16.01.F.2416.IMARel8.01 Subject: Final Reminder: IMA Release 8.01 to be available on Monday, November 16, 2001

This Communicator is intended to be the final reminder that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17-18, 2001. The Release Notes for this release are now available at: http://www.qwest.com/wholesale/ima/gui/release.html . Please remember that the IMA GUI and EDI interfaces will not be available from 9:00p.m. Saturday, November 17 2001 until the Release Testing interval begins on Sunday , November 18, 2001. The Release Testing Interval available is currently scheduled for 6:00 p.m. to 8:00 p.m. Mountain time on Sunday, November 18, 2001. To participate in the testing interval, the Co-Providers must: 1) On Sunday, November 18, 2001 after 4:00 p.m. Mountain time, call the Software Release Information Line prior to starting the test. This line will provide a recorded announcement confirming that testing may begin or a new estimated testing time if we should experience any delays. The phone number for this Information Line will be (303) 965-8872. 2) Consider your test activities carefully. By the time we begin the testing, IMA will have been checked out from a technical perspective. You will be testing in a live production environment. 3) At any time during the testing interval, (6:00 p.m. to 8:00 p.m. Mountain time), you may report any problems you encounter to our open conference bridge. The conference bridge number is 1-866-844-1448 with a pass code of 7233712 4) Attend a conference call at 8.00 p.m. Mountain time at the end of the testing interval for a recap of the outstanding issues and any updated status available at that time. The call in number for this conference call will be 1-866-844-1448 with a pass code of 7233712. This conference call will conclude the testing interval. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

Training Communiqué: IMA Release 8.01 Point Release Training - Update Issued: November 12, 2001 Qwest has updated the Wholesale Training web site to allow customers to register for the following conference bridge training sessions: IMA Release 8.01 Overview Tuesday, November 13, 2001 2:00 p.m. (MDT) Wednesday, November 14, 2001 10:00 a.m. (MDT) Thursday, November 15, 2001 10:00 a.m. (MDT) Thursday, November 15, 2001 2:00 p.m. (MDT) The IMA Release 8.01 CLEC Overview for training is in a downloadable format at http://www.qwest.com/wholesale/training/coursecatalog.html. Customers may now register to participate on the conference bridge at http://www.qwest.com/wholesale/training/courseregform.html. After submitting a registration the customer will receive a class confirmation with conference bridge number and passcode to attend the training.

If you would like to learn more about the IMA 8.01 point release, please go to http://www.qwest.com/wholesale/ima/gui/release.html and download the IMA Release 8.01 Release Notes.

If you have questions or comments, please contact Christel Wolberg, Registration Coordinator, at (303) 965-6164 or cwolber@qwest.com.

Helpful Hint: When visiting an updated web site, be sure to select your web browser "Reload" or "Refresh" button to prevent from viewing a dated cached web paged.

11/12/01 - CLEC call to discuss 8.01 candidates: John Gallegos- No questions

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: November 8, 2001 Subject: Reminder: IMA Release 8.01 - SRN110801 This Communicator is to remind Qwest IMA Users that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. The Release Notes and candidate descriptions are now available and can be found at the following website: http://www.qwest.com/wholesale/ima/gui/release.html During this installation, the IMA GUI and EDI interfaces will be unavailable from 9:00 p.m. Mountain time, Saturday November 17, 2001 until the Release Testing interval begins on Sunday, November 18, 2001. Please note that the testing interval, which was previously scheduled for 6:30 p.m. – 8.30 p.m. Mountain time is now scheduled to begin at 6:00 p.m. Mountain time and will end at 8.00 p.m. Mountain time. Prior to beginning any testing related to this release, CLEC’s are required to call the Release Testing Status Line at (303) 965-8872 after 4:00 p.m. Mountain time on Sunday, November 18, 2001 to confirm their testing interval start time. A conference bridge will also be made available during this testing interval, followed by a wrap up conference call starting at 8:00 p.m. Mountain Time. The call in number for the Release Testing Interval and the Wrap up Conference call will be 1-866-844-1448 with a participant code of 7233712. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: October 29, 2001 Subject: Reminder: IMA Release 8.01 - SRN102901 This Communicator is to remind Qwest IMA Users that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. The Release Notes Candidate descriptions are now available and can be found at the following website: http://www.qwest.com/wholesale/ima/gui/release.html During this installation, the IMA GUI and EDI interfaces will be unavailable from 12:01 a.m. Saturday, November 17, 2001 until the Release Testing interval begins on Sunday, November 18, 2001 currently scheduled for 6:30 p.m. to 8:30 p.m. Mountain time. Please note the time change of the testing interval start time, from 6:00 p.m. to 6:30 p.m. Prior to beginning any testing related to this release, CLEC’s are required to call the Release Testing Status Line at (303) 965-8872 after 5:00 p.m. Mountain time on Sunday, November 18, 2001 to confirm their testing interval start time. A conference bridge will also be made available during this testing interval, followed by a wrap up conference call starting at 8:30 p.m. Mountain time. The conference bridge number will be communicated during the week prior to installation and testing. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: October 23, 2001 Subject: Reminder: IMA Release 8.01 to be available on Monday, November 19, 2001 - SRN102301 This Communicator is intended to be a reminder that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. Please remember that the IMA GUI and EDI interfaces will not be available from 12:01 a.m. Saturday, November 17, 2001 until the Release Testing interval begins on Sunday , November 18 2001. The Release Testing Interval is currently scheduled for 6:00 p.m. to 8:30 p.m. Mountain time on Sunday, November 18, 2001. Prior to beginning any testing, CLEC’s should call the Release Testing Status Line at (303) 965-8872 after 5:00 p.m. Mountain time on Sunday to confirm the start time for the testing interval. A conference bridge will also be available during this testing interval, followed by a wrap up conference call at 8:30 p.m. Mountain time. The call in number for the Release Testing Interval and the Wrap up Conference call will be made available prior to the Release. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

CenturyLink Response

Archived System CR 30209 Detail

 
Title: UBL COS EDIT
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

30209 Completed
1/17/2002
-   IMA Common/8 Unbundled Loop
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Gallegos, John
Director:
CR PM: Routh, Mark

Description Of Change

This request is being issued to have IMA (GUI and EDI) perform an edit check to determine valid UBL COS’s. If the request type is for Unbundled Loop and the action is a disconnect, change or outside move; the COS must be for Unbundled Loop. The COS must be XBMXN, XUH3X, HUHHX, HUHJX, XUHKX, or XUHLX.

Status History

Date Action Description
Release Information IMA Release 8.01 
10/17/2001 CR Submitted CR transferred from legacy database to CMP database 
10/18/2001 Discussed at Monthly CMP Meeting CR presented at CMP meeting 
10/23/2001 Communicator Issued SRN102301-Reminder 1 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
10/29/2001 Communicator Issued SRN102901-Reminder 2 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
11/6/2001 Record Update Improved CR descriptions issued to CLECs for 8.01 candidates. 
11/8/2001 Communicator Issued SRN110801-Reminder 3 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
11/12/2001 CLEC Call CLEC call to discuss 8.01 candidates. 
11/12/2001 Communicator Issued IMA 8.01 Point Release Training Communiqué issued to CLECs. 
11/16/2001 Communicator Issued IMA Release 8.01 communicator. 
11/19/2001 Status Changed 8.01 went into production. Status changed to "CLEC Test" 
1/17/2002 Discussed at Monthly CMP Meeting CR # 30209 discussed in Monthly Systems CMP Meeting; CR has been in CLEC Test; CLECs agreed that CR is Completed 
1/17/2002 Status Updated CR # 30209 status updated to 'Completed' 

Project Meetings

COMMUNICATOR To: Qwest IMA Users From: Qwest IT Wholesale Systems Communications Manager Date: November 16, 2001 Document No. SYST.11.16.01.F.2416.IMARel8.01 Subject: Final Reminder: IMA Release 8.01 to be available on Monday, November 16, 2001

This Communicator is intended to be the final reminder that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17-18, 2001. The Release Notes for this release are now available at: http://www.qwest.com/wholesale/ima/gui/release.html . Please remember that the IMA GUI and EDI interfaces will not be available from 9:00p.m. Saturday, November 17 2001 until the Release Testing interval begins on Sunday , November 18, 2001. The Release Testing Interval available is currently scheduled for 6:00 p.m. to 8:00 p.m. Mountain time on Sunday, November 18, 2001. To participate in the testing interval, the Co-Providers must: 1) On Sunday, November 18, 2001 after 4:00 p.m. Mountain time, call the Software Release Information Line prior to starting the test. This line will provide a recorded announcement confirming that testing may begin or a new estimated testing time if we should experience any delays. The phone number for this Information Line will be (303) 965-8872. 2) Consider your test activities carefully. By the time we begin the testing, IMA will have been checked out from a technical perspective. You will be testing in a live production environment. 3) At any time during the testing interval, (6:00 p.m. to 8:00 p.m. Mountain time), you may report any problems you encounter to our open conference bridge. The conference bridge number is 1-866-844-1448 with a pass code of 7233712 4) Attend a conference call at 8.00 p.m. Mountain time at the end of the testing interval for a recap of the outstanding issues and any updated status available at that time. The call in number for this conference call will be 1-866-844-1448 with a pass code of 7233712. This conference call will conclude the testing interval. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

Training Communiqué: IMA Release 8.01 Point Release Training - Update Issued: November 12, 2001 Qwest has updated the Wholesale Training web site to allow customers to register for the following conference bridge training sessions: IMA Release 8.01 Overview Tuesday, November 13, 2001 2:00 p.m. (MDT) Wednesday, November 14, 2001 10:00 a.m. (MDT) Thursday, November 15, 2001 10:00 a.m. (MDT) Thursday, November 15, 2001 2:00 p.m. (MDT) The IMA Release 8.01 CLEC Overview for training is in a downloadable format at http://www.qwest.com/wholesale/training/coursecatalog.html. Customers may now register to participate on the conference bridge at http://www.qwest.com/wholesale/training/courseregform.html. After submitting a registration the customer will receive a class confirmation with conference bridge number and passcode to attend the training.

If you would like to learn more about the IMA 8.01 point release, please go to http://www.qwest.com/wholesale/ima/gui/release.html and download the IMA Release 8.01 Release Notes.

If you have questions or comments, please contact Christel Wolberg, Registration Coordinator, at (303) 965-6164 or cwolber@qwest.com.

Helpful Hint: When visiting an updated web site, be sure to select your web browser "Reload" or "Refresh" button to prevent from viewing a dated cached web paged.

11/12/01 - CLEC call to discuss 8.01 candidates: John Gallegos- No questions

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: November 8, 2001 Subject: Reminder: IMA Release 8.01 - SRN110801 This Communicator is to remind Qwest IMA Users that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. The Release Notes and candidate descriptions are now available and can be found at the following website: http://www.qwest.com/wholesale/ima/gui/release.html During this installation, the IMA GUI and EDI interfaces will be unavailable from 9:00 p.m. Mountain time, Saturday November 17, 2001 until the Release Testing interval begins on Sunday, November 18, 2001. Please note that the testing interval, which was previously scheduled for 6:30 p.m. – 8.30 p.m. Mountain time is now scheduled to begin at 6:00 p.m. Mountain time and will end at 8.00 p.m. Mountain time. Prior to beginning any testing related to this release, CLEC’s are required to call the Release Testing Status Line at (303) 965-8872 after 4:00 p.m. Mountain time on Sunday, November 18, 2001 to confirm their testing interval start time. A conference bridge will also be made available during this testing interval, followed by a wrap up conference call starting at 8:00 p.m. Mountain Time. The call in number for the Release Testing Interval and the Wrap up Conference call will be 1-866-844-1448 with a participant code of 7233712. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: October 29, 2001 Subject: Reminder: IMA Release 8.01 - SRN102901 This Communicator is to remind Qwest IMA Users that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. The Release Notes Candidate descriptions are now available and can be found at the following website: http://www.qwest.com/wholesale/ima/gui/release.html During this installation, the IMA GUI and EDI interfaces will be unavailable from 12:01 a.m. Saturday, November 17, 2001 until the Release Testing interval begins on Sunday, November 18, 2001 currently scheduled for 6:30 p.m. to 8:30 p.m. Mountain time. Please note the time change of the testing interval start time, from 6:00 p.m. to 6:30 p.m. Prior to beginning any testing related to this release, CLEC’s are required to call the Release Testing Status Line at (303) 965-8872 after 5:00 p.m. Mountain time on Sunday, November 18, 2001 to confirm their testing interval start time. A conference bridge will also be made available during this testing interval, followed by a wrap up conference call starting at 8:30 p.m. Mountain time. The conference bridge number will be communicated during the week prior to installation and testing. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: October 23, 2001 Subject: Reminder: IMA Release 8.01 to be available on Monday, November 19, 2001 - SRN102301 This Communicator is intended to be a reminder that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. Please remember that the IMA GUI and EDI interfaces will not be available from 12:01 a.m. Saturday, November 17, 2001 until the Release Testing interval begins on Sunday , November 18 2001. The Release Testing Interval is currently scheduled for 6:00 p.m. to 8:30 p.m. Mountain time on Sunday, November 18, 2001. Prior to beginning any testing, CLEC’s should call the Release Testing Status Line at (303) 965-8872 after 5:00 p.m. Mountain time on Sunday to confirm the start time for the testing interval. A conference bridge will also be available during this testing interval, followed by a wrap up conference call at 8:30 p.m. Mountain time. The call in number for the Release Testing Interval and the Wrap up Conference call will be made available prior to the Release. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

CenturyLink Response

Archived System CR 30140 Detail

 
Title: DLR Location A & Z field edits insufficient
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

30140 Completed
1/17/2002
-   IMA Common/8 Design Layout Record Form
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Gallegos, John
Director:
CR PM: Routh, Mark

Description Of Change

The Design Layout Record (DLR) Return defines the "Location A" and "Location Z" fields as a length of 11 with a minimum entry of 8 characters. It does not indicate that the fields must be either 8 or 11 characters only. The BPL is not enforcing only 8 or 11 characters and therefore an error is

being returned from downstream systems if 9 or 10 characters are entered. The BPL should enforce the 8 or 11 character rule before submitting the transaction to downstream systems.

Status History

Date Action Description
Release Information IMA Release 8.01 
10/17/2001 CR Submitted CR transferred from legacy database to CMP database 
10/18/2001 Discussed at Monthly CMP Meeting CR presented at CMP meeting 
10/23/2001 Communicator Issued SRN102301-Reminder 1 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
10/29/2001 Communicator Issued SRN102901-Reminder 2 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
11/6/2001 Record Update Improved CR descriptions issued to CLECs for 8.01 candidates. 
11/8/2001 Communicator Issued SRN110801-Reminder 3 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
11/12/2001 CLEC Call CLEC call to discuss 8.01 candidates. 
11/12/2001 Communicator Issued IMA 8.01 Point Release Training Communiqué issued to CLECs. 
11/16/2001 Communicator Issued IMA Release 8.01 communicator. 
11/19/2001 Status Changed 8.01 went into production. Status changed to "CLEC Test" 
1/17/2002 Discussed at Monthly CMP Meeting CR # 30140 discussed in Monthly Systems CMP Meeting; CR has been in CLEC Test; CLECs agreed that CR is Completed 
1/17/2002 Status Updated CR # 30140 status updated to 'Completed' 

Project Meetings

COMMUNICATOR To: Qwest IMA Users From: Qwest IT Wholesale Systems Communications Manager Date: November 16, 2001 Document No. SYST.11.16.01.F.2416.IMARel8.01 Subject: Final Reminder: IMA Release 8.01 to be available on Monday, November 16, 2001

This Communicator is intended to be the final reminder that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17-18, 2001. The Release Notes for this release are now available at: http://www.qwest.com/wholesale/ima/gui/release.html . Please remember that the IMA GUI and EDI interfaces will not be available from 9:00p.m. Saturday, November 17 2001 until the Release Testing interval begins on Sunday , November 18, 2001. The Release Testing Interval available is currently scheduled for 6:00 p.m. to 8:00 p.m. Mountain time on Sunday, November 18, 2001. To participate in the testing interval, the Co-Providers must: 1) On Sunday, November 18, 2001 after 4:00 p.m. Mountain time, call the Software Release Information Line prior to starting the test. This line will provide a recorded announcement confirming that testing may begin or a new estimated testing time if we should experience any delays. The phone number for this Information Line will be (303) 965-8872. 2) Consider your test activities carefully. By the time we begin the testing, IMA will have been checked out from a technical perspective. You will be testing in a live production environment. 3) At any time during the testing interval, (6:00 p.m. to 8:00 p.m. Mountain time), you may report any problems you encounter to our open conference bridge. The conference bridge number is 1-866-844-1448 with a pass code of 7233712 4) Attend a conference call at 8.00 p.m. Mountain time at the end of the testing interval for a recap of the outstanding issues and any updated status available at that time. The call in number for this conference call will be 1-866-844-1448 with a pass code of 7233712. This conference call will conclude the testing interval. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

Training Communiqué: IMA Release 8.01 Point Release Training - Update Issued: November 12, 2001 Qwest has updated the Wholesale Training web site to allow customers to register for the following conference bridge training sessions: IMA Release 8.01 Overview Tuesday, November 13, 2001 2:00 p.m. (MDT) Wednesday, November 14, 2001 10:00 a.m. (MDT) Thursday, November 15, 2001 10:00 a.m. (MDT) Thursday, November 15, 2001 2:00 p.m. (MDT) The IMA Release 8.01 CLEC Overview for training is in a downloadable format at http://www.qwest.com/wholesale/training/coursecatalog.html. Customers may now register to participate on the conference bridge at http://www.qwest.com/wholesale/training/courseregform.html. After submitting a registration the customer will receive a class confirmation with conference bridge number and passcode to attend the training.

If you would like to learn more about the IMA 8.01 point release, please go to http://www.qwest.com/wholesale/ima/gui/release.html and download the IMA Release 8.01 Release Notes.

If you have questions or comments, please contact Christel Wolberg, Registration Coordinator, at (303) 965-6164 or cwolber@qwest.com.

Helpful Hint: When visiting an updated web site, be sure to select your web browser "Reload" or "Refresh" button to prevent from viewing a dated cached web paged.

11/12/01 - CLEC call to discuss 8.01 candidates: John Gallegos- Again this should increase flow thru

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: November 8, 2001 Subject: Reminder: IMA Release 8.01 - SRN110801 This Communicator is to remind Qwest IMA Users that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. The Release Notes and candidate descriptions are now available and can be found at the following website: http://www.qwest.com/wholesale/ima/gui/release.html During this installation, the IMA GUI and EDI interfaces will be unavailable from 9:00 p.m. Mountain time, Saturday November 17, 2001 until the Release Testing interval begins on Sunday, November 18, 2001. Please note that the testing interval, which was previously scheduled for 6:30 p.m. – 8.30 p.m. Mountain time is now scheduled to begin at 6:00 p.m. Mountain time and will end at 8.00 p.m. Mountain time. Prior to beginning any testing related to this release, CLEC’s are required to call the Release Testing Status Line at (303) 965-8872 after 4:00 p.m. Mountain time on Sunday, November 18, 2001 to confirm their testing interval start time. A conference bridge will also be made available during this testing interval, followed by a wrap up conference call starting at 8:00 p.m. Mountain Time. The call in number for the Release Testing Interval and the Wrap up Conference call will be 1-866-844-1448 with a participant code of 7233712. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: October 29, 2001 Subject: Reminder: IMA Release 8.01 - SRN102901 This Communicator is to remind Qwest IMA Users that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. The Release Notes Candidate descriptions are now available and can be found at the following website: http://www.qwest.com/wholesale/ima/gui/release.html During this installation, the IMA GUI and EDI interfaces will be unavailable from 12:01 a.m. Saturday, November 17, 2001 until the Release Testing interval begins on Sunday, November 18, 2001 currently scheduled for 6:30 p.m. to 8:30 p.m. Mountain time. Please note the time change of the testing interval start time, from 6:00 p.m. to 6:30 p.m. Prior to beginning any testing related to this release, CLEC’s are required to call the Release Testing Status Line at (303) 965-8872 after 5:00 p.m. Mountain time on Sunday, November 18, 2001 to confirm their testing interval start time. A conference bridge will also be made available during this testing interval, followed by a wrap up conference call starting at 8:30 p.m. Mountain time. The conference bridge number will be communicated during the week prior to installation and testing. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: October 23, 2001 Subject: Reminder: IMA Release 8.01 to be available on Monday, November 19, 2001 - SRN102301 This Communicator is intended to be a reminder that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. Please remember that the IMA GUI and EDI interfaces will not be available from 12:01 a.m. Saturday, November 17, 2001 until the Release Testing interval begins on Sunday , November 18 2001. The Release Testing Interval is currently scheduled for 6:00 p.m. to 8:30 p.m. Mountain time on Sunday, November 18, 2001. Prior to beginning any testing, CLEC’s should call the Release Testing Status Line at (303) 965-8872 after 5:00 p.m. Mountain time on Sunday to confirm the start time for the testing interval. A conference bridge will also be available during this testing interval, followed by a wrap up conference call at 8:30 p.m. Mountain time. The call in number for the Release Testing Interval and the Wrap up Conference call will be made available prior to the Release. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

CenturyLink Response

Archived System CR 30154 Detail

 
Title: TNS from Resale form not lined up in Print Preview
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

30154 Completed
1/17/2002
-   IMA GUI/8 Resale Products
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Gallegos, John
Director:
CR PM: Routh, Mark

Description Of Change

GUI - Print preview of Resale Form Header TNS does not line up with the actual value in the field. Currently data is spread out over two screens when it does not have to. This will be corrected to be on one screen

Status History

Date Action Description
Release Information IMA Release 8.01 
10/17/2001 CR Submitted CR transferred from legacy database to CMP database 
10/18/2001 Discussed at Monthly CMP Meeting CR presented at CMP meeting 
10/23/2001 Communicator Issued SRN102301-Reminder 1 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
10/29/2001 Communicator Issued SRN102901-Reminder 2 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
11/6/2001 Record Update Improved CR descriptions issued to CLECs for 8.01 candidates. 
11/8/2001 Communicator Issued SRN110801-Reminder 3 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
11/12/2001 CLEC Call CLEC call to discuss 8.01 candidates. 
11/12/2001 Communicator Issued IMA 8.01 Point Release Training Communiqué issued to CLECs. 
11/16/2001 Communicator Issued IMA Release 8.01 communicator. 
11/19/2001 Status Changed 8.01 went into production. Status changed to "CLEC Test" 
1/17/2002 Discussed at Monthly CMP Meeting CR # 30154 discussed in Monthly Systems CMP Meeting; CR has been in CLEC Test; CLECs agreed that CR is Completed 
1/17/2002 Status Updated CR # 30154 status updated to 'Completed' 

Project Meetings

COMMUNICATOR To: Qwest IMA Users From: Qwest IT Wholesale Systems Communications Manager Date: November 16, 2001 Document No. SYST.11.16.01.F.2416.IMARel8.01 Subject: Final Reminder: IMA Release 8.01 to be available on Monday, November 16, 2001

This Communicator is intended to be the final reminder that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17-18, 2001. The Release Notes for this release are now available at: http://www.qwest.com/wholesale/ima/gui/release.html . Please remember that the IMA GUI and EDI interfaces will not be available from 9:00p.m. Saturday, November 17 2001 until the Release Testing interval begins on Sunday , November 18, 2001. The Release Testing Interval available is currently scheduled for 6:00 p.m. to 8:00 p.m. Mountain time on Sunday, November 18, 2001. To participate in the testing interval, the Co-Providers must: 1) On Sunday, November 18, 2001 after 4:00 p.m. Mountain time, call the Software Release Information Line prior to starting the test. This line will provide a recorded announcement confirming that testing may begin or a new estimated testing time if we should experience any delays. The phone number for this Information Line will be (303) 965-8872. 2) Consider your test activities carefully. By the time we begin the testing, IMA will have been checked out from a technical perspective. You will be testing in a live production environment. 3) At any time during the testing interval, (6:00 p.m. to 8:00 p.m. Mountain time), you may report any problems you encounter to our open conference bridge. The conference bridge number is 1-866-844-1448 with a pass code of 7233712 4) Attend a conference call at 8.00 p.m. Mountain time at the end of the testing interval for a recap of the outstanding issues and any updated status available at that time. The call in number for this conference call will be 1-866-844-1448 with a pass code of 7233712. This conference call will conclude the testing interval. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

Training Communiqué: IMA Release 8.01 Point Release Training - Update Issued: November 12, 2001 Qwest has updated the Wholesale Training web site to allow customers to register for the following conference bridge training sessions: IMA Release 8.01 Overview Tuesday, November 13, 2001 2:00 p.m. (MDT) Wednesday, November 14, 2001 10:00 a.m. (MDT) Thursday, November 15, 2001 10:00 a.m. (MDT) Thursday, November 15, 2001 2:00 p.m. (MDT) The IMA Release 8.01 CLEC Overview for training is in a downloadable format at http://www.qwest.com/wholesale/training/coursecatalog.html. Customers may now register to participate on the conference bridge at http://www.qwest.com/wholesale/training/courseregform.html. After submitting a registration the customer will receive a class confirmation with conference bridge number and passcode to attend the training.

If you would like to learn more about the IMA 8.01 point release, please go to http://www.qwest.com/wholesale/ima/gui/release.html and download the IMA Release 8.01 Release Notes.

If you have questions or comments, please contact Christel Wolberg, Registration Coordinator, at (303) 965-6164 or cwolber@qwest.com.

Helpful Hint: When visiting an updated web site, be sure to select your web browser "Reload" or "Refresh" button to prevent from viewing a dated cached web paged.

11/12/01 - CLEC call to discuss 8.01 candidates: John Gallegos- John--This is GUI Impacting

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: November 8, 2001 Subject: Reminder: IMA Release 8.01 - SRN110801 This Communicator is to remind Qwest IMA Users that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. The Release Notes and candidate descriptions are now available and can be found at the following website: http://www.qwest.com/wholesale/ima/gui/release.html During this installation, the IMA GUI and EDI interfaces will be unavailable from 9:00 p.m. Mountain time, Saturday November 17, 2001 until the Release Testing interval begins on Sunday, November 18, 2001. Please note that the testing interval, which was previously scheduled for 6:30 p.m. – 8.30 p.m. Mountain time is now scheduled to begin at 6:00 p.m. Mountain time and will end at 8.00 p.m. Mountain time. Prior to beginning any testing related to this release, CLEC’s are required to call the Release Testing Status Line at (303) 965-8872 after 4:00 p.m. Mountain time on Sunday, November 18, 2001 to confirm their testing interval start time. A conference bridge will also be made available during this testing interval, followed by a wrap up conference call starting at 8:00 p.m. Mountain Time. The call in number for the Release Testing Interval and the Wrap up Conference call will be 1-866-844-1448 with a participant code of 7233712. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: October 29, 2001 Subject: Reminder: IMA Release 8.01 - SRN102901 This Communicator is to remind Qwest IMA Users that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. The Release Notes Candidate descriptions are now available and can be found at the following website: http://www.qwest.com/wholesale/ima/gui/release.html During this installation, the IMA GUI and EDI interfaces will be unavailable from 12:01 a.m. Saturday, November 17, 2001 until the Release Testing interval begins on Sunday, November 18, 2001 currently scheduled for 6:30 p.m. to 8:30 p.m. Mountain time. Please note the time change of the testing interval start time, from 6:00 p.m. to 6:30 p.m. Prior to beginning any testing related to this release, CLEC’s are required to call the Release Testing Status Line at (303) 965-8872 after 5:00 p.m. Mountain time on Sunday, November 18, 2001 to confirm their testing interval start time. A conference bridge will also be made available during this testing interval, followed by a wrap up conference call starting at 8:30 p.m. Mountain time. The conference bridge number will be communicated during the week prior to installation and testing. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: October 23, 2001 Subject: Reminder: IMA Release 8.01 to be available on Monday, November 19, 2001 - SRN102301 This Communicator is intended to be a reminder that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. Please remember that the IMA GUI and EDI interfaces will not be available from 12:01 a.m. Saturday, November 17, 2001 until the Release Testing interval begins on Sunday , November 18 2001. The Release Testing Interval is currently scheduled for 6:00 p.m. to 8:30 p.m. Mountain time on Sunday, November 18, 2001. Prior to beginning any testing, CLEC’s should call the Release Testing Status Line at (303) 965-8872 after 5:00 p.m. Mountain time on Sunday to confirm the start time for the testing interval. A conference bridge will also be available during this testing interval, followed by a wrap up conference call at 8:30 p.m. Mountain time. The call in number for the Release Testing Interval and the Wrap up Conference call will be made available prior to the Release. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

CenturyLink Response

Archived System CR 30564 Detail

 
Title: Remove JAVA GUI "Fax Number Required" edit
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

30564 Completed
1/17/2002
-   IMA GUI/8 No Products
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Gallegos, John
Director:
CR PM: Routh, Mark

Description Of Change

User-Profile Modification - CLEC to input either an email address, a fax number, or both in order to indicate how notifications are to be received.

Status History

Date Action Description
Release Information IMA Release 8.01 
10/17/2001 CR Submitted CR transferred from legacy database to CMP database 
10/18/2001 Discussed at Monthly CMP Meeting CR presented at CMP meeting 
10/23/2001 Communicator Issued SRN102301-Reminder 1 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
10/29/2001 Communicator Issued SRN102901-Reminder 2 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
11/6/2001 Record Update Improved CR descriptions issued to CLECs for 8.01 candidates. 
11/8/2001 Communicator Issued SRN110801-Reminder 3 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
11/12/2001 CLEC Call CLEC call to discuss 8.01 candidates. 
11/12/2001 Communicator Issued IMA 8.01 Point Release Training Communiqué issued to CLECs. 
11/16/2001 Communicator Issued IMA Release 8.01 communicator. 
11/19/2001 Status Changed 8.01 went into production. Status changed to "CLEC Test" 
1/17/2002 Discussed at Monthly CMP Meeting CR # 30564 discussed in Monthly Systems CMP Meeting; CR has been in CLEC Test; CLECs agreed that CR is Completed 
1/17/2002 Status Updated CR # 30564 status updated to 'Completed' 

Project Meetings

COMMUNICATOR To: Qwest IMA Users From: Qwest IT Wholesale Systems Communications Manager Date: November 16, 2001 Document No. SYST.11.16.01.F.2416.IMARel8.01 Subject: Final Reminder: IMA Release 8.01 to be available on Monday, November 16, 2001

This Communicator is intended to be the final reminder that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17-18, 2001. The Release Notes for this release are now available at: http://www.qwest.com/wholesale/ima/gui/release.html . Please remember that the IMA GUI and EDI interfaces will not be available from 9:00p.m. Saturday, November 17 2001 until the Release Testing interval begins on Sunday , November 18, 2001. The Release Testing Interval available is currently scheduled for 6:00 p.m. to 8:00 p.m. Mountain time on Sunday, November 18, 2001. To participate in the testing interval, the Co-Providers must: 1) On Sunday, November 18, 2001 after 4:00 p.m. Mountain time, call the Software Release Information Line prior to starting the test. This line will provide a recorded announcement confirming that testing may begin or a new estimated testing time if we should experience any delays. The phone number for this Information Line will be (303) 965-8872. 2) Consider your test activities carefully. By the time we begin the testing, IMA will have been checked out from a technical perspective. You will be testing in a live production environment. 3) At any time during the testing interval, (6:00 p.m. to 8:00 p.m. Mountain time), you may report any problems you encounter to our open conference bridge. The conference bridge number is 1-866-844-1448 with a pass code of 7233712 4) Attend a conference call at 8.00 p.m. Mountain time at the end of the testing interval for a recap of the outstanding issues and any updated status available at that time. The call in number for this conference call will be 1-866-844-1448 with a pass code of 7233712. This conference call will conclude the testing interval. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

Training Communiqué: IMA Release 8.01 Point Release Training - Update Issued: November 12, 2001 Qwest has updated the Wholesale Training web site to allow customers to register for the following conference bridge training sessions: IMA Release 8.01 Overview Tuesday, November 13, 2001 2:00 p.m. (MDT) Wednesday, November 14, 2001 10:00 a.m. (MDT) Thursday, November 15, 2001 10:00 a.m. (MDT) Thursday, November 15, 2001 2:00 p.m. (MDT) The IMA Release 8.01 CLEC Overview for training is in a downloadable format at http://www.qwest.com/wholesale/training/coursecatalog.html. Customers may now register to participate on the conference bridge at http://www.qwest.com/wholesale/training/courseregform.html. After submitting a registration the customer will receive a class confirmation with conference bridge number and passcode to attend the training.

If you would like to learn more about the IMA 8.01 point release, please go to http://www.qwest.com/wholesale/ima/gui/release.html and download the IMA Release 8.01 Release Notes.

If you have questions or comments, please contact Christel Wolberg, Registration Coordinator, at (303) 965-6164 or cwolber@qwest.com.

Helpful Hint: When visiting an updated web site, be sure to select your web browser "Reload" or "Refresh" button to prevent from viewing a dated cached web paged.

11/12/01 - CLEC call to discuss 8.01 candidates: John Gallegos John--this is the one that Bonnie referred to earlier. Deb Osbourne--if there are product specific rules that require a fax #, those will still be in place

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: November 8, 2001 Subject: Reminder: IMA Release 8.01 - SRN110801 This Communicator is to remind Qwest IMA Users that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. The Release Notes and candidate descriptions are now available and can be found at the following website: http://www.qwest.com/wholesale/ima/gui/release.html During this installation, the IMA GUI and EDI interfaces will be unavailable from 9:00 p.m. Mountain time, Saturday November 17, 2001 until the Release Testing interval begins on Sunday, November 18, 2001. Please note that the testing interval, which was previously scheduled for 6:30 p.m. – 8.30 p.m. Mountain time is now scheduled to begin at 6:00 p.m. Mountain time and will end at 8.00 p.m. Mountain time. Prior to beginning any testing related to this release, CLEC’s are required to call the Release Testing Status Line at (303) 965-8872 after 4:00 p.m. Mountain time on Sunday, November 18, 2001 to confirm their testing interval start time. A conference bridge will also be made available during this testing interval, followed by a wrap up conference call starting at 8:00 p.m. Mountain Time. The call in number for the Release Testing Interval and the Wrap up Conference call will be 1-866-844-1448 with a participant code of 7233712. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: October 29, 2001 Subject: Reminder: IMA Release 8.01 - SRN102901 This Communicator is to remind Qwest IMA Users that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. The Release Notes Candidate descriptions are now available and can be found at the following website: http://www.qwest.com/wholesale/ima/gui/release.html During this installation, the IMA GUI and EDI interfaces will be unavailable from 12:01 a.m. Saturday, November 17, 2001 until the Release Testing interval begins on Sunday, November 18, 2001 currently scheduled for 6:30 p.m. to 8:30 p.m. Mountain time. Please note the time change of the testing interval start time, from 6:00 p.m. to 6:30 p.m. Prior to beginning any testing related to this release, CLEC’s are required to call the Release Testing Status Line at (303) 965-8872 after 5:00 p.m. Mountain time on Sunday, November 18, 2001 to confirm their testing interval start time. A conference bridge will also be made available during this testing interval, followed by a wrap up conference call starting at 8:30 p.m. Mountain time. The conference bridge number will be communicated during the week prior to installation and testing. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: October 23, 2001 Subject: Reminder: IMA Release 8.01 to be available on Monday, November 19, 2001 - SRN102301 This Communicator is intended to be a reminder that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. Please remember that the IMA GUI and EDI interfaces will not be available from 12:01 a.m. Saturday, November 17, 2001 until the Release Testing interval begins on Sunday , November 18 2001. The Release Testing Interval is currently scheduled for 6:00 p.m. to 8:30 p.m. Mountain time on Sunday, November 18, 2001. Prior to beginning any testing, CLEC’s should call the Release Testing Status Line at (303) 965-8872 after 5:00 p.m. Mountain time on Sunday to confirm the start time for the testing interval. A conference bridge will also be available during this testing interval, followed by a wrap up conference call at 8:30 p.m. Mountain time. The call in number for the Release Testing Interval and the Wrap up Conference call will be made available prior to the Release. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

CenturyLink Response

Archived System CR 31347 Detail

 
Title: Modify edits for ROOMMAILSTOP and BLDG
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

31347 Completed
1/17/2002
-   IMA GUI/8 Stand Alone Directory Listings
Originator: Gallegos, John
Originator Company Name: Qwest Corporation
Owner: Gallegos, John
Director:
CR PM: Routh, Mark

Description Of Change

Field: ROOM/MAIL STOP: This entry is used for APT, LOT, RM, SLIP, UNIT, and SUIT. Valid Values: A-Z,0-9, hyphen, parenthesis, space, virgule (/). Example: APT 3F. Field: BLDG -Change the Negotiated Business Rules as indicated: From: This entry is used for BLDG, WING, and PIER. To: This entry is used for BLDG, WNG, PIER. Valid Values: A-Z, 0-9, parenthesis, space. Example: BLDG 12B. These fields are on the DSR and DL forms.

Status History

Date Action Description
Release Information IMA Release 8.01 
10/17/2001 CR Submitted CR transferred from legacy database to CMP database 
10/18/2001 Discussed at Monthly CMP Meeting CR presented at CMP meeting 
10/23/2001 Communicator Issued SRN102301-Reminder 1 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
10/29/2001 Communicator Issued SRN102901-Reminder 2 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
11/6/2001 Record Update Improved CR descriptions issued to CLECs for 8.01 candidates. 
11/8/2001 Communicator Issued SRN110801-Reminder 3 of Release 8.01 to be installed during the weekend of November 17-18, 2001. 
11/12/2001 Communicator Issued IMA 8.01 Point Release Training Communiqué issued to CLECs. 
11/12/2001 CLEC Call CLEC call to discuss 8.01 candidates. 
11/16/2001 Communicator Issued IMA Release 8.01 communicator. 
11/19/2001 Status Changed 8.01 went into production. Status changed to "CLEC Test" 
1/17/2002 Discussed at Monthly CMP Meeting CR # 31347 discussed in Monthly Systems CMP Meeting; CR has been in CLEC Test; CLECs agreed that CR is Completed 
1/17/2002 Status Updated CR # 31347 status updated to 'Completed' 

Project Meetings

COMMUNICATOR To: Qwest IMA Users From: Qwest IT Wholesale Systems Communications Manager Date: November 16, 2001 Document No. SYST.11.16.01.F.2416.IMARel8.01 Subject: Final Reminder: IMA Release 8.01 to be available on Monday, November 16, 2001

This Communicator is intended to be the final reminder that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17-18, 2001. The Release Notes for this release are now available at: http://www.qwest.com/wholesale/ima/gui/release.html . Please remember that the IMA GUI and EDI interfaces will not be available from 9:00p.m. Saturday, November 17 2001 until the Release Testing interval begins on Sunday , November 18, 2001. The Release Testing Interval available is currently scheduled for 6:00 p.m. to 8:00 p.m. Mountain time on Sunday, November 18, 2001. To participate in the testing interval, the Co-Providers must: 1) On Sunday, November 18, 2001 after 4:00 p.m. Mountain time, call the Software Release Information Line prior to starting the test. This line will provide a recorded announcement confirming that testing may begin or a new estimated testing time if we should experience any delays. The phone number for this Information Line will be (303) 965-8872. 2) Consider your test activities carefully. By the time we begin the testing, IMA will have been checked out from a technical perspective. You will be testing in a live production environment. 3) At any time during the testing interval, (6:00 p.m. to 8:00 p.m. Mountain time), you may report any problems you encounter to our open conference bridge. The conference bridge number is 1-866-844-1448 with a pass code of 7233712 4) Attend a conference call at 8.00 p.m. Mountain time at the end of the testing interval for a recap of the outstanding issues and any updated status available at that time. The call in number for this conference call will be 1-866-844-1448 with a pass code of 7233712. This conference call will conclude the testing interval. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

Training Communiqué: IMA Release 8.01 Point Release Training - Update Issued: November 12, 2001 Qwest has updated the Wholesale Training web site to allow customers to register for the following conference bridge training sessions: IMA Release 8.01 Overview Tuesday, November 13, 2001 2:00 p.m. (MDT) Wednesday, November 14, 2001 10:00 a.m. (MDT) Thursday, November 15, 2001 10:00 a.m. (MDT) Thursday, November 15, 2001 2:00 p.m. (MDT) The IMA Release 8.01 CLEC Overview for training is in a downloadable format at http://www.qwest.com/wholesale/training/coursecatalog.html. Customers may now register to participate on the conference bridge at http://www.qwest.com/wholesale/training/courseregform.html. After submitting a registration the customer will receive a class confirmation with conference bridge number and passcode to attend the training.

If you would like to learn more about the IMA 8.01 point release, please go to http://www.qwest.com/wholesale/ima/gui/release.html and download the IMA Release 8.01 Release Notes.

If you have questions or comments, please contact Christel Wolberg, Registration Coordinator, at (303) 965-6164 or cwolber@qwest.com.

Helpful Hint: When visiting an updated web site, be sure to select your web browser "Reload" or "Refresh" button to prevent from viewing a dated cached web paged.

11/12/01 - CLEC call to discuss 8.01 candidates: John Gallegos Bob Cruise- In communication with Beth King, this is GUI impacting only. Beth confirmed

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: November 8, 2001 Subject: Reminder: IMA Release 8.01 - SRN110801 This Communicator is to remind Qwest IMA Users that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. The Release Notes and candidate descriptions are now available and can be found at the following website: http://www.qwest.com/wholesale/ima/gui/release.html During this installation, the IMA GUI and EDI interfaces will be unavailable from 9:00 p.m. Mountain time, Saturday November 17, 2001 until the Release Testing interval begins on Sunday, November 18, 2001. Please note that the testing interval, which was previously scheduled for 6:30 p.m. – 8.30 p.m. Mountain time is now scheduled to begin at 6:00 p.m. Mountain time and will end at 8.00 p.m. Mountain time. Prior to beginning any testing related to this release, CLEC’s are required to call the Release Testing Status Line at (303) 965-8872 after 4:00 p.m. Mountain time on Sunday, November 18, 2001 to confirm their testing interval start time. A conference bridge will also be made available during this testing interval, followed by a wrap up conference call starting at 8:00 p.m. Mountain Time. The call in number for the Release Testing Interval and the Wrap up Conference call will be 1-866-844-1448 with a participant code of 7233712. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: October 29, 2001 Subject: Reminder: IMA Release 8.01 - SRN102901 This Communicator is to remind Qwest IMA Users that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. The Release Notes Candidate descriptions are now available and can be found at the following website: http://www.qwest.com/wholesale/ima/gui/release.html During this installation, the IMA GUI and EDI interfaces will be unavailable from 12:01 a.m. Saturday, November 17, 2001 until the Release Testing interval begins on Sunday, November 18, 2001 currently scheduled for 6:30 p.m. to 8:30 p.m. Mountain time. Please note the time change of the testing interval start time, from 6:00 p.m. to 6:30 p.m. Prior to beginning any testing related to this release, CLEC’s are required to call the Release Testing Status Line at (303) 965-8872 after 5:00 p.m. Mountain time on Sunday, November 18, 2001 to confirm their testing interval start time. A conference bridge will also be made available during this testing interval, followed by a wrap up conference call starting at 8:30 p.m. Mountain time. The conference bridge number will be communicated during the week prior to installation and testing. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

COMMUNICATOR To: Qwest IMA Users From: Tina Hubis, Qwest IT Wholesale Systems Communications Manager Date: October 23, 2001 Subject: Reminder: IMA Release 8.01 to be available on Monday, November 19, 2001 - SRN102301 This Communicator is intended to be a reminder that the Interconnect Mediated Access (IMA) 8.01 Release will be installed during the weekend of November 17- 18, 2001. Please remember that the IMA GUI and EDI interfaces will not be available from 12:01 a.m. Saturday, November 17, 2001 until the Release Testing interval begins on Sunday , November 18 2001. The Release Testing Interval is currently scheduled for 6:00 p.m. to 8:30 p.m. Mountain time on Sunday, November 18, 2001. Prior to beginning any testing, CLEC’s should call the Release Testing Status Line at (303) 965-8872 after 5:00 p.m. Mountain time on Sunday to confirm the start time for the testing interval. A conference bridge will also be available during this testing interval, followed by a wrap up conference call at 8:30 p.m. Mountain time. The call in number for the Release Testing Interval and the Wrap up Conference call will be made available prior to the Release. If you need further assistance following the release implementation, please contact the Wholesale Systems Help Desk at 1-888-796-9102. For assistance with LSR issuance, use Option 1. For information regarding system unavailability, use Option 2. For other system related assistance, use Option 3.

CenturyLink Response

Archived System CR 5328167 Detail

 
Title: Request that loop orders be billed on a CABS bill
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

5328167 Completed
3/20/2003
-   Wholesale Billing Interfaces/ Unbundled Loop
Originator: Ayala, Joe
Originator Company Name: Rhythms
Owner: Notarianni, Lynn
Director:
CR PM: Esquibel-Reed, Peggy

Description Of Change

Today all loop orders are billed out of CRIS. The CRIS bill does not provide the level of detail required for auditing or for inventory, i.e., USOC, Circuit ID, and CSR. This information is on a CABS bill. Therefore, Rhythms requests loop orders be billed on a CABS bill.

Status History

Date Action Description
1/8/2001 Info Sent to CLEC Sent email to Joe Ayala and Connie Sanphy with updated CR. 
1/8/2001 CR Submitted New - To be Validated. 
2/2/2001 Status Changed Status changed to Evaluated - To be reviewed. 
2/2/2001 Info Sent to CLEC Sent email to Joe Ayala and Connie Sanphy with updated CR. 
2/7/2001 Status Changed Reviewed - Under Consideration 
2/7/2001 LOE Issued T-Shirt size Extra Large and options provided. Eligible for industry prioritization. 
2/8/2001 Info Sent to CLEC Sent email to Joe Ayala and Connie Sanphy with updated CR. (Rank 1) 
12/13/2001 Status Changed Status set to Development 
1/17/2002 Record Update Work is estimated to be completed by the end of June of 2002, and be available with the July billing cycle on July 1, 2002. 
3/21/2002 Discussed at Monthly CMP Meeting 5328167 discussed March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP - Attachment G 
5/16/2002 Discussed at Monthly CMP Meeting Discussed at the May Systems CMP meeting. The functionality for this CR is being deployed in phases. 
6/20/2002 Discussed at Monthly CMP Meeting 5328167 discussed at June Systems CMP Monthly meeting; please see Systems CMP Distribution Package June CMP -- Attachment K; Terry Wicks asked for clarification on the phased deployment of this Change Request 
7/18/2002 Discussed at Monthly CMP Meeting 5328167 discussed at July Systems CMP Monthly meeting; please see Systems CMP Distribution Package July CMP -- Attachment I 
8/13/2002 Info Sent to CLEC Notification Number: SYST.08.13.02.F.04143.CMP_MeetingDateChnge was sent to all CLECs 
9/10/2002 Info Sent to CLEC Notification Number: SYST.09.10.02.F.04159.IABSRelFinalTechSpec was distributed to all CLECs 
9/25/2002 Additional Information Target implementation date updated temporarily to 10/26/02 to indicate that another portion of the phased approach for this CR will be implemented 
10/14/2002 Additional Information Trouble Ticket 6060879 opened. 
10/17/2002 Discussed at Monthly CMP Meeting 5328167 discussed at October Systems CMP Monthly meeting; please see Systems CMP Distribution Package October CMP -- Attachment L 
10/25/2002 Communicator Issued PROS.10.25.02.F.00912.CRIS_V14 
10/28/2002 Communicator Issued SYST.10.28.02.F.04197.IABSRelFinalNotif 
10/29/2002 Status Changed Status changed to CLEC Test due to October 26th deployment of phase 2. Status will revert to Development after the Nov. CMP Meeting for phase 3 implementation. 
11/21/2002 Discussed at Monthly CMP Meeting 5328167 discussed at November Systems CMP Monthly meeting; please see Systems CMP Distribution Package November CMP -- Attachment G 
11/27/2002 Communicator Issued SYST.11.27.02.F.04212.IABSRelFinalNotice 
12/19/2002 Discussed at Monthly CMP Meeting 5328167 discussed at December Systems CMP Monthly meeting; please see Systems CMP Distribution Package December CMP -- Attachment L 
12/31/2002 Communicator Issued SYST.12.30.02.F.04227.IABSDecPtRel 
12/31/2002 Communicator Issued PROS.12.30.02.F.00976.CRIS_V16 
1/2/2003 Status Changed Status changed to CLEC Test due to implementation on 12/31/02 
1/16/2003 Discussed at Monthly CMP Meeting 5328167 discussed at January Systems CMP Monthly meeting; please see Systems CMP Distribution Package January CMP - Attachment G. 
2/20/2003 Discussed at Monthly CMP Meeting 5328167 discussed at February Systems CMP Monthly meeting; please see Systems CMP Distribution Package February CMP - Attachment G. 
3/20/2003 Discussed at Monthly CMP Meeting 5328167 discussed at March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP. 

Project Meetings

March 20, 2003 Systems CMP Meeting Discussion : Connie Winston/Qwest asked if this was ok to close. Liz Balvin/WorldCom stated that she is ok with closing. Stephanie Prull/McLeod stated that she is ok to close. Bonnie Johnson/Eschelon is okay to close. Sharon Van Meter/AT&T stated that Carla Pardee is ok to close this CR

- February 20, 2003 Systems CMP Meeting Discussion: Connie Winston/Qwest stated that we are looking to the CLEC Community to okay the closure of this CR. Carla Pardee/AT&T stated that AT&T is still experiencing some issues. Kit Thomte/Qwest stated that this CR would remain open.

- January 27,2003: Received voicemail from Carla Pardee/AT&T with okay to close AT&Ts SCR090601-1 UNE-P on CABS Bill. This is a related CR.

- January 16, 2003 Systems CMP Meeting Discussion: Connie Winston/Qwest stated that this effort deployed at the end of December. Carla Pardee/AT&T stated that she needs to validate the January bill and will contact Peggy Esquibel-Reed (Qwest) hopefully next week to close the AT&T CR, SCR090601-1. Connie Winston/Qwest stated that this CR would remain in CLEC Test for AT&T’s bill validation.

December 19, 2002 Systems CMP Meeting Discussion: Jonathan Spangler/AT&T noted that Carla Pardee/AT&T will be joining shortly and will want to review this CR. He said he would check with her to see if there are any issues on 5328167 (Requests that loop orders be billed on a CABS bill) and provide a response later in the day. Jonathan Spangler/AT&T will talk to Carla Pardee/AT&T offline to discuss closure. Connie Winston/Qwest said to advise Kit Thomte/Qwest if this CR can be closed.

November 21, 2002 Systems CMP Meeting Discussion: Connie Winston-Qwest stated that the CR went in with analog and that the digital part was the second phase. She noted that the analog portion was delivered and that the CR would be moved back into development until the digital portion was delivered in December. There were no questions or comments.

CenturyLink Response

REVISED RESPONSE

June 20, 2002

In the May Monthy Systems CMP Meeting Qwest presented the phased approach for the implementation of Change Request 5328167 (Request that loop orders be billed on a CABS bill). The details of the phased approach were captured in the May meeting minutes. This revised response is being issued to respond to a question raised in the June Monthly Systems CMP Meeting and to ensure that the change request record is up to date.

Qwest has enhanced the framework for producing the CRIS bills in the CABS format. Resale and UNE-P products have been added to the framework for all regions and this will be available on July 1, 2002. The Unbundled Loop Analog and Unbundled Loop Digital products will be added to the framework in subsequent phases.

The anticipated phasing for this change request is as follows:

- Phase 1 will be completed on 7/1/02 with the Billing systems implementation of the ability to provide UNE-P product orders in CABS format - Phase 2 will be implemented on 10/26/02 to provide UBL anolog 2-wire product orders in CABS format - Phase 3 will be implemented by 12/31/02 to provide UBL digital product orders in CABS format

At the June Sysetms CMP Meeting there was a question as to why this change request reflected a 12/31/02 target implementation date. While Qwest expects to provide interim deliverables, Qwest is reflecting a target implementation date of 12/31/02 to coincide with the planned date for implementation of phase 3. As Qwest implements phased deliverables for this change request Qwest will notify CMP participants at the appropriate Monthly Systems CMP Meeting.

Sincerely, Qwest

Archived System CR 5510545 Detail

 
Title: Allow Loop Qual Returns on Non Pub Numbers
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

5510545 Withdrawn
1/8/2002
-   IMA Common/ Unbundled Loop
Originator: Ayala, Joe
Originator Company Name: Rhythms
Owner: Routh, Mark
Director:
CR PM: Routh, Mark

Description Of Change

During raw loop qual transactions, Rhythms is receiving the following error message when the End User’s Number is Non-Pub: “No working, published TNs found at address.” We have validated that the addresses we are using when we get these errors are valid. Rhythms is requesting that they be able to receive the loop qual information even for numbers that are Non-Pub.

Status History

Date Action Description
Release Information IMA Release 
4/20/2001 Info Sent to CLEC Sent email to Joseph Ayala and Connie Sanphy with updated CR. 
4/20/2001 CR Submitted CR was received and the status was set to "New - To be validated". 
5/17/2001 Status Changed Status changed to "Canceled- Co-Provider" per Joseph Ayala 
5/18/2001 Info Sent to CLEC Sent email to Joseph Ayala and Connie Sanphy with updated CR. 
12/18/2001 Record Update Changed status from 'Cancelled CLEC' to 'Withdrawn' for database cleanup 

Project Meetings

CenturyLink Response

Archived System CR SCR112101-1 Detail

 
Title: SBC is requesting Qwest to identify Rated vs. Unrated usage.
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR112101-1 Withdrawn
12/19/2002
-   Wholesale Billing Interfaces/ Switched Services
Originator: Dampier, Reginald
Originator Company Name: SBC
Owner: Martinez, Dennis
Director:
CR PM: Esquibel-Reed, Peggy

Description Of Change

SBCT is receiving unrated EMI records for coin/inmate calls (10-01-31 records with Indicator 01=1 and Indicator 16=2). The billing telephone numbers are SBCT's customers. But since SBCT does not offer an "inmate" type of service to its customers, we verified the originating telephone numbers for these records and found these originating numbers not to be SBCT's customers.

Given the above, we believe that QWEST should send us rated usage records so that we can, on QWEST behalf, bill the SBCT customer that apparently accepted the call. In other words, we should receive rated records from QWEST via the standard incollect/outcollect process that is handled through CMDS. QWEST was also billing these calls on our paper bills (at a resale discount), but this is incorrect, these calls are not subject to a resale discount, since the calls were made not on a resale or facilities basis. Qwest did state that the discounted rates should have not been applied (which SBCT agrees w/). We dispute Qwest billings to SBCT of these calls.

Qwest is the only ILEC in that their daily usage file doesn’t contain rated records, and in addition, Qwest has told SBCT that we should use the calls reported on the summary bill and bill SBCT's customer at SBCT's rates.

We again explained that we could not rate the call, since the charges are QWEST's. We noted that we are not able to use the summary bill that QWEST talked about and indicated that industry practice would be for QWEST to send rated EMI records.

Status History

Date Action Description
10/2/2001 CR Submitted Product & Process CR PC100101-2 received from Reggie Dampier of SBC 
10/4/2001 Status Changed Product & Process CR PC100101-2 Status changed to Submitted 
10/4/2001 Info Sent to CLEC Updated Product & Process CR PC100101-2 sent to Reggie Dampier of SBC 
10/16/2001 Clarification Meeting Scheduled Requested "Clarification Meeting" with SBC for Product & Process CR PC100101-2. SBC (Reggie Dampier) to provide several time frames for scheduling purposes. 
10/17/2001 Discussed at Monthly CMP Meeting CMP Meeting: Reggie Dampier, SBC Telecom presented CR PC100101-2 as a walk-on agenda item for clarification. 
10/25/2001 Info Received From CLEC Letter received from SBC providing additional clarification of Product & Process CR PC100101-2 
10/29/2001 Clarification Meeting Held Clarification meeting conducted with submitting CLEC (Reggie Dampier, SBC) for Product & Process CR PC100101-2 
10/31/2001 Info Received From CLEC Clarification response received from SBC on Product & Process CR PC100101-2 
11/14/2001 Discussed at Monthly CMP Meeting CMP Meeting - Product & Process CR PC100101-2 was clarified with the CLECs. CLECs are to assess internally how they want to be rated. Qwest to prepare its draft response and a systems CR to be opened 
11/21/2001 CR Submitted Systems CR drafted by CRPM and submitted, # SCR112101-1 
11/21/2001 CR Acknowledged CR Acknowledged 
11/30/2001 Record Update Both Reggie Dampier at SBC and Alan Zimmerman at Qwest agree that another Clarification meeting is not needed. Request was thoroughly discussed via P&P CR and Alan has a full understanding of this request. 
12/13/2001 Discussed at Monthly CMP Meeting CLECs expressed desire to have Qwest communicate preliminary and final position on policy and contract implications 
12/13/2001 Status Changed Status Changed to Evaluation 
1/11/2002 Communicator Issued Notice # I.CMPR. 01.11.02.F.01214.Unrated_Usage Issued 
1/17/2002 Discussed at Monthly CMP Meeting CR # SCR112101-1 discussed at January CMP meeting during 'CRs with Outstanding Action Items' (Attachment E of Distribution Package) 
1/29/2002 Communicator Issued Notice I.CMPR. 01.29.02.F.01220.Rated_Unrated_CR sent with proposed times for meeting 
1/31/2002 Communicator Issued Notice CMPR.01.31.02.F.01221.Rated_Unrated_Mtg sent confirming meeting time for 2/5/02 
2/5/2002 Clarification Meeting Held Subsequent Meeting held with CLEC Community, see Project Meetings for notes. 
2/8/2002 Communicator Issued Notice CMPR. 02.08.02.F.01223.Rated_Unrated_CR sent with proposed times for meeting 
2/12/2002 Communicator Issued Notice CMPR. 02.15.02.F.01225.Usage_Meeting sent with proposed times for meeting 
2/18/2002 CLEC Call Conference call held, see Project Meetings for notes. 
2/21/2002 Discussed at Monthly CMP Meeting SCR112101-1 discussed at February Systems CMP Meeting; attendees agreed that attorney's for Qwest and SBC need to meet; based upon findings from meeting, CR may need to be updated 
3/8/2002 CLEC Call Conference call with Qwest and SBC, see Project Meetings. 
3/21/2002 Discussed at Monthly CMP Meeting SCR112101-1 discussed March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP - Attachment G 
4/18/2002 Discussed at Monthly CMP Meeting SCR112101-1 discussed at April Systems CMP Monthly meeting; please see Systems CMP Distribution Package April CMP - Attachment G 
5/16/2002 Discussed at Monthly CMP Meeting SCR112101-1 discussed at May Systems CMP Monthly meeting; please see Systems CMP Distribution Package May CMP - Attachment H 
6/20/2002 Discussed at Monthly CMP Meeting SCR112101-1 discussed at June Systems CMP Monthly meeting; please see Systems CMP Distribution Package June CMP -- Attachment I 
6/20/2002 Discussed at Monthly CMP Meeting SCR112101-1 discussed at June Systems CMP Monthly meeting; please see Systems CMP Distribution Package July CMP -- Attachment I 
7/18/2002 Discussed at Monthly CMP Meeting SCR112101-1 discussed at July Systems CMP Monthly meeting; please see Systems CMP Distribution Package July CMP -- Attachment I 
11/14/2002 Info Requested from CLEC Email sent to SBC for status of SBC Hold request. 
11/22/2002 Info Received From CLEC Reggie Dampier/SBC requested withdrawal of CMP CR SCR112101-1. 
12/19/2002 Discussed at Monthly CMP Meeting SCR112101-1 discussed at December Systems CMP Monthly meeting; please see Systems CMP Distribution Package December CMP -- Attachment G 

Project Meetings

December 19, 2002 Systems CMP Meeting Discussion: This CR will be withdrawn

November 22, 2002 Email from SBC to Qwest: Peggy, thanks so much for your very prompt response! I concur with your actions. Take care, and thanks! Reggie Reggie Dampier OBC 905 Chestnut, Suite 26-T-03 St. Louis, MO 63101 314-235-6369 RD5335@momail.sbc.com

November 22, 2002 Email from Qwest to SBC: I received your email and will change the status of your submitted Systems CR to 'Pending Withdrawal' due to the fact that you do not wish Qwest to proceed with this effort. Please respond with your concurrence. This CR would then be in the December Systems CMP Meeting for the actual withdrawal. Thanks, Peggy Esquibel-Reed Qwest CRPM -- Systems

November 22, 2002 Email from SBC to Qwest: Peggy, Hope all is going well w/ you! At this time, SBC Telcom, Inc. is NOT interested in pursuing a fix or change within the Change Mgmt. Process to address the "Rated vs. Unrated" Issue. Our SBCT account manager, Ms. Debbi Soriano, will contact our Qwest Account Manager to finalize or work out details associated with this effort. If you have any questions or comments, please don't hesitate to contact me. Take care! Reggie Dampier Reggie Dampier OBC 905 Chestnut, Suite 26-T-03 St. Louis, MO 63101 314-235-6369 RD5335@momail.sbc.com

November 14, 2002 Email from SBC to Qwest: Peggy, got your msg., am following up on. Thanks, Reggie D. Reggie Dampier OBC 905 Chestnut, Suite 26-T-03 St. Louis, MO 63101 314-235-6369 RD5335@momail.sbc.com

November 14, 2002 Email from Qwest to SBC: Hi Reggie -- I am following-up on the above CMP CR. Is SBC ready for us to move forward with this work effort? Please let me know. Thanks, Peggy Esquibel-Reed Qwest CRPM -- Systems pesquib@qwest.com

July 18, 2002 CMP Meeting Discussion: Michael Buck/Qwest reviewed the history associated with the open action item. Reggie Dampier/SBC said that they don’t want this CR moved to a deferred status because SBC still feels that there is an issue. He also said that the Attorney’s from Qwest and SBC have agreed on the language and are now waiting on some firm dollar figures. Jeff Thompson/Qwest asked what firm figures Reggie Dampier/SBC was referring to. Reggie Dampier/SBC said the figures referred to the dollars/cost to do this. Jeff Thompson/Qwest asked whom SBC was working with from Qwest. Reggie Dampier/SBC said that he was working with theur Account Manager, Sue Griffeth. Michael Buck/Qwest said that Qwest could certainly look into that. Reggie Dampier/Qwest said that the legal folks are involved so it is out of his scope. Michael Buck/Qwest said that this CR will remain open and this action item is closed. Jeff Thompson/Qwest asked if this means we need to take a new action item. Michael Buck/Qwest said yes.

June 20, 2002 CMP Meeting Discussion: Michael Buck (Qwest) stated that Qwest is continuing to work with SBC on this CR. Connie Winston (Qwest) asked if Qwest could place this in ‘Deferred’ status. Michael Buck (Qwest) indicated that Qwest could work with SBC on the change of the status to ‘Deferred’ right before the July CMP meeting. There were no additional comments.

May 16, 2002 Systems CMP Meeting Discussion: Peggy Esquibel-Reed/Qwest stated that SBC is continueing to hold internal meetings before scheduleing the meeting with Qwest. The SBC Action Item remains open.

April 18, 2002: April CMP Discussion: Peggy Esquibel-Reed/Qwest stated that there has been some discussion between the attorney’s but a final decision is still pending. Alan Zimmerman/Qwest is ready to proceed with the change to provide rated usage but is still waiting for SBC’s official go-ahead to proceed.

March 21, 2002 CMP Discussion: SBC was not in attendance to provide an update Michael Buck/Qwest indicated that an offline meeting was held, unfortunately the SBC attorney was unable to attend meeting and so it has to be re-scheduled. Qwest is still waiting for the SBC attorney to contact Qwest. Peggy Esquibel-Reed/Qwest indicated that Pamela Johnson (Qwest attorney) noted that the meeting has not yet taken place (as of March 21) but hoping to have it next week.

March 8, 2002 Conference call held with SBC and Qwest participants. SBC legal, Adam, was unable to attend. The CR and Qwest's proposal were discussed. Dave/SBC agreed to talk with Adam and will ask Adam to call Michelle Meske/Qwest Legal for further discussion and resolution. Adam will advise Michelle if SBC will accept Qwest's proposal to send rated messages via the DUF (Daily Usage File) and continue sending paper bills.

February 21, 2002 CMP Discussion: Alan Zimmerman/Qwest stated that can change rating on the DUF so usage can be sent rated. There are contratual issues to change how the calls are rated. It was agreed that the Qwest Account Manager for SBC would schedule a meeting with legal and the SBC Account Team to discuss the Rated vs Unrated issues. Jeff Thompson/Qwest stated that the CR may need to be updated after the discussion has taken place.

Conference call with CLEC community - February 5, 2002 Attendee’s: Kathy Stichter, Eschelon Telecom Inc. Bill Markert, Eschelon Telecom Inc. Melissa Tomlinson, Eschelon Telecom Inc. Reggie Dampier, SBCT Nick Erso, SBC Karen Miller, Southwestern Bell Lisa McNabola, MultiBand Communications LLC Lynn Daudt, USLink Deb Hoffman, USLink Pam Zimmerman, USLink Sharon Janine John Midcontinent Communications Garth Kauffman, Iowa Telecom Mary Lohnes, MMI Nancy Vogel, MMI Pamela Johnson, Qwest Alan Zimmerman, Qwest Mark Pomeroy, Qwest Freddi Pennington, Qwest Peggy Esquibel-Reed, Qwest Sue Gwin, Qwest

Alan Zimmerman/Qwest stated that he could change how Qwest passes usage and start passing rated calls, with full retail rates. This would not be a contractual issue. Changing the rates is a contractual issue. Reggie/SBC stated that calls originating from inmates and billing to a 3rd number, originating in Qwest territory are in-collect, out-collect calls and shouldn’t be special. They are recorded by Qwest and should be rated by Qwest at the normal standard industry rates. Alan/Qwest stated that the telephone service was purchased by a reseller so the retail discount applies. There is an indicator on the EMI record, if it is a prison call, can rate via the daily usage feed (DUF). Karen Miller/Southwestern Bell stated if is a resold account, agrees would get unrated record and they would rate. Reggie’s scenario is not resold and should get rated record to bill the end user. The party placing the call is not a resold account. Alan/Qwest stated that Qwest is the earning company, as the originator of the call. Qwest can rate the call on the DUF at the full retail rates any time is alternately billed. Statement was made that need to look at the originator of the call: resale customer, resold services. Freddi Pennington/Qwest asked if changes would be for all CLEC’s. Alan/Qwest responded yes. Today the 10 records/calls are unrated, the 01 records are rated, standard EMI format. 17 & 18 records could be appended if ported. Reggie/SBC stated that SBC receives itemized calls on paper bills and shouldn’t, is not the normal scope of resold. Alan/Qwest advised that is where the contractual issue is. Karen Miller/Southwestern Bell asked a Qwest customer, originating in Qwest territory, billing to an SBC customer, would that be passed via CMDS or the DUF? Alan/Qwest stated that in the previously held clarification meeting, there was not a preference as to how the calls were passed. Would be passed via the DUF. Karen/Southwestern Bell stated that it should be via CMDS, not the DUF. Reggie/SBC stated that the DUF does contain rated and unrated usage. Stated that so many have moved away from CMDS. Nick Erso/SBC stated that the calls originating in Qwest territory is not expected to be seen on the bills. Alan/Qwest advised that could do a CMDS settlement The SBC/Qwest agreement states that resold customer usage is sent unrated. It was stated, by a CLEC, that if the call originates from Qwest, it is not a resold customer, it is a Qwest customer. Alan/Qwest stated that the purchaser of the service is the billing #. CLEC stated that an SBC customer accepted the charges but did not ‘purchase’. Peggy/Qwest asked if there were any objection’s to Qwest making the change. Melissa Tomlinson/Eschelon stated was okay with the change, as did several other CLECs. Melissa/Eschelon stated that she disagrees with what the purchasing customer is. Will do whatever if Qwest can send rated messages. Karen Miller/Southwestern Bell stated wants rated if Qwest customer only. If the originating number is SBCT and customer is in Qwest territory, wants unrated on the DUF. If the originating number is Qwest and the customer is in SBC territory, wants rated, unless the Qwest call is resold. Processes all resold usage the same and won’t change her system for Qwest only. Alan/Qwest stated that originating number guiding is not in the CR. Qwest stated that based on the discussion on what the request is, the level of effort has changed from medium to extra large. The CLEC’s want more people involved, do not feel there is enough billing representation on the call. Alan/Qwest stated that is willing to send all alternately billed records on the DUF as rated, based on the billing company not the originating company. CLEC’s again stated that not enough billing people on the call. Qwest agreed to schedule another call to discuss further.

01/17/02 CMP Meeting Discussion: AI Number 1 Provide Preliminary Qwest position on policy and contract implications: The Notice was sent out. Qwest has some contractual issues for charging discounted rates. This Action Item will be closed. Reggie Dampier/SBC stated that they are Qwest calls, I don’t care about the rates since they are yours. Reggie doesn’t want discounted calls on bills. These calls were taken off and now are putting them back on. Reggie stated that is an In-collect, Out-collect issue. Alan Zimmerman/Qwest stated that there are 3rd number billed calls to a resale customer, that’s why getting billed on a resale bill. Reggie/SBC stated that he didn’t know this was a resale call. Alan/Qwest stated that a 3rd party accepted the call so Qwest bills the 3rd party. Reggie/SBC stated he is still waiting for legal review from Qwest. He advised that this was the first he had heard that these were resold calls. Stated that he thought these were regular alternately billed calls, not UNE or resale. External call is out-collect, in-collect and 3rd # call out of territory. ….Should be rated by Bell South. Qwest footpath ….. don’t know what the rate is. Alan Zimmerman responded that Qwest could send tariffed rates and there wouldn’t be any contractual issues. When we change the way we bill, that’s where the contract issues come in. Alan stated that Qwest could send unrated usage with full retail rates, but will bill this as unrated usage. Terry/Allegiance and Bonnie/Eschelon requested take off-line. Karen Clauson/Eschelon stated that she wants to understand the issue. Karen asked if this is a retail Qwest customer. Then asked if this was originating/terminating in Qwest territory. Reggie Dampier/SBC stated that feels he is the middle man and doesn’t know the rates to bill. Leilani Hines/WorlCom stated that this is casual traffic. Alan/Qwest said there is a separate agreement or contract for that. Someone said this is like 10XXX traffic. Bottom line, a re-clarification call will be scheduled.

AI Number 2 Provide final Qwest position on policy and contract implications: Remains open. As discussed when this action item was opened, it cannot be closed until February at the earliest.

12/13/01 December CMP discussion: Alan reviewed Qwest response and advised that he is still having discussions with legal to determine if Qwest can proceed with this request. Alan will provide an update at the January CMP meeting. A preliminary update will be sent to the CLEC Community for distribution to their legal departments prior to the January CMP meeting.

FROM PC100101-2 This e-mail below from SBC. It provides responses to questions raised in the clarification meeting held on 29-Oct-01.

Subject: FW: Clarification of unrated vs. rated calls, Qwest Change Date: Wed, 31 Oct 2001 10:05:59 -0600 From: "DAMPIER, REGGIE (SBCSI)" To: "Zimmerman, Alan" ,"'pwirth@qwest.com'" CC: "NAPPIER, THOMAS G (SBCSI)" ,"MUELLER, KAREN (SBCSI)" ,"DAMPIER, REGGIE (SBCSI)"

Our SME states that if a call originates w/ a Qwest customer, such as these particular collect inmate calls do, OBF standards should be followed and the calls should be rated (this is response for Questions: 1) is this change request just for the inmate collect coin calls OR is our change request pertain to ALL incollects calls? and 2) the request to rate these types of calls pertains to resale, UNE, and facility-based (same as UNE)?

Reggie Dampier OBC 905 Chestnut, Suite 26-T-03 St. Louis, MO 63101 314-235-6369 RD5335@momail.sbc.com

Alignment/Clarification Meeting 1:30 p.m. (MT) / Monday 29th October 2001

1-866-289-7092 PC741-1286 # PCCR100401-2 Provision of Rated vs. Unrated usage, when applicable, regardless of CLEC status (resale, facility based, etc.) Attendees: Peter Wirth - Qwest Alan Zimmerman - Qwest Reggie Dampier - SBC Telecommunications

Meeting Agenda: 1.0 Introduction of Attendees All attendees introduced. 2.0 Review Requested (Description of) Change {review long description from change request, confirm with all parties there is agreement on the change requested} CR description discussed & reviewed by all parties. Additional clarification from SBC required for the following: 1) Does provision of rated vs. unrated usage address all incollect or just inmate calls?; and 2) Does rated vs. unrated usage address resold or UNI, or both? SBC to provide input back to Qwest.

3.0 Confirm Areas & Products Impacted {read from change request, modify if needed} Billing.

4.0 Confirm Right Personnel Involved {ensure the Qwest SME can fully answer the CLEC request. Confirm whether anyone else within Qwest has been involved with this issue, or whether we need to bring anyone else in} Parties agreed correct personnel were on call. Karen Mueller, SBC identified as SBC SME for purposes of this CR. Contact: (314) 235-0880.

5.0 Identify/Confirm CLEC’s Expectation {Identify specific deliverables from CLEC. What does Qwest have to do in order to close this CR? (in measurable terms ie provide a documented process, change a process to include training etc)} Obtain rated equivalents for applicable records currently unrated originating from Qwest.

6.0 Identify any Dependent Systems Change Requests {Note any connected CRs and the potential impacts} None identified.

7.0 Establish Action Plan (Resolution Time Frame) {state action required, who will be responsible and by when} Proceed with CR evaluation and response development.

Letter (email) from Debbi Soriano, SBC, dated Oct 25, 2001, regarding PCCR 100401-2 To our fellow CLECs, operating within Qwest franchised territories:

I send you greetings, and wish you well.

As the billing Subject Matter Expert for SBC Telecom, Inc. (SBCT), my job duties include reviewing interconnection agreements to ensure that our billing organization has the appropriate language in place to process our end-user data, access data, reciprocal compensation data, and to ensure that our billing, and data feeds are correctly addressed.

The purpose of this letter is to provide clarification of a process change that SBCT has submitted via Qwest's change management process.

Qwest personnel have yet to contact me (as per their guidelines), to clarify this new issue. Therefore, I've included additional verbiage below, in order to help clarify the issue generating SBCT’s change request. SBCT would like your support on this issue, since it is likely your company is experiencing the same difficulty. It is SBCT’s goal to have Qwest resolve the issue in such a way that industry guidelines are met so that each company can accurately and effectively bill its end user customers.

In short, the issue is that alternately billed calls originated by Qwest end-user customers, and billed to SBCT end-user customers are being sent as unrated EMI records off of the daily usage file. Specifically, the calls that are of concern to SBCT are collect coin/inmate calls (10-01-31 records with Indicator 01=1 and Indicator 16=2). SBCT has verified that the billing (and terminating) telephone numbers are SBCT’s end-user customers. SBCT has also verified that the originating numbers are inmate facilities served by Qwest.

Normally, in the voice telephony world, all of us bill on behalf of other telco companies, since our end-user customers frequently travel to other places and have a need to place alternately billed calls. Therefore, a process, such as CMDS, has been put in place to assist in the billing and revenue settlements associated with these calls. Each of us uses either direct feeds or CMDS to deliver these types of calls to each other. The expectation being that the originating company will send rated EMI records to the billing company to eliminate the need for each of the companies to have to maintain rating tables for the entire country and to ensure that the company who incurs the cost for transporting the call also receives the revenue.

SBCT contends that Qwest is not relieved of this obligation just because a CLEC is serving its end-user customers via resale of Qwest service. The alternately billed calls in question still belong to Qwest. Since these calls are originated by Qwest customers and transverse the Qwest network, Qwest is entitled to the revenue. Only Qwest is able to determine what rates should be charged to recover the cost of setting up and transporting the call. Therefore Qwest should send rated EMI records via a CMDS or a direct feed process just as they would if the billed customer were not served via resale of Qwest service.

The process Qwest is using is wrong. Qwest is treating the rating and billing of alternately billed calls differently depending upon whether a CLEC customer to be billed, is provided service via resale of Qwest facilities or using its own facilities or being 3rd number billed for calls that do not fall under the scope of an ICA (e.g., our end-user customer has accepted charges for a call incurred within Qwest territory by a Qwest end-user customer). SBCT has repeatedly explained to Qwest personnel that SBCT could not rate the calls, since the charges are Qwest's. SBCT noted that industry practice would be for Qwest to send rated EMI records. Qwest did not agree.

Furthermore, Qwest personnel indicated that a CLEC should use the CLEC’s rates for the calls that Qwest bills on SBCT’s summary paper bills, and transpose those rates onto each call recording to bill its end-users customers. This is somewhat difficult to do. First, SBCT (or any other CLEC) would have to examine each summary bill received from Qwest and rate the unrated calls received via the daily usage file. Then get the SBCT rated calls into the files in order to guide and bill these calls to the end-user customers on behalf of Qwest.

In short, the solution to this problem is simple. Qwest should record and rate calls that belong to Qwest, and correct the edits in place at Qwest that incorrectly guide these unrated calls to any CLEC, e.g., do not use the billing telephone number edit that incorrectly guides these unrated calls to a CLEC. Furthermore, Qwest should deliver the rated calls per normal industry practices (as we all do), so these rated calls can be placed on the end-user customer's bills by the 'bill to' company.

If you have any comments, suggestions, etc., I can be reached at the below contact numbers.

Sincerely,

Reggie Dampier

Reggie Dampier OBC 905 Chestnut, Suite 26-T-03 St. Louis, MO 63101 314-235-6369 RD5335@momail.sbc.com

CenturyLink Response

December 5, 2001

Reggie Dampier, Business Manager SBC Telecom, Inc.

Cc: Susan Burson Michael Buck

DRAFT RESPONSE For Review by CLEC Community and Discussion in the December CMP Meeting

This letter in response to your CLEC Product & Process Change Request (CR) Form No. PC100401-2 "Provision of Rated vs. Unrated usage, when applicable, regardless of CLEC status (resale, facility-based, etc.).

In order to accomplish this request, modifications are required in the Qwest Customer Records Network Information (CRIS) system. Hence, this request needs to be considered as part of the Qwest Systems Change Management Process. Qwest is proposing to close out this Product & Process CR, and has opened CR No. SCR112101-1 in the Systems Change Management forum so that the system issues can be properly considered.

Sincerely,

Alan Zimmerman Qwest Wholesale Billing Manager

Archived System CR 5466837 Detail

 
Title: Electronic Completion Notices for Stand Alone Directory
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

5466837 Completed
11/30/2001
-   IMA Common/10 Stand Alone Directory Orders
Originator: Evans, Sandy
Originator Company Name: Sprint
Owner: Thompson, Jeff
Director:
CR PM: Stecklein, Lynn

Description Of Change

Provide CLEC’s electronic completions on any Stand Alone Directory order that is sent electronically. Today Qwest does not provide electronic completion information on Stand Alone Directory orders that are sent electronically to Qwest.

Qwest Business Description:

Provide electronic completion notices for any Stand Alone Directory order that is sent electronically.

Status History

Date Action Description
3/26/2001 CR Submitted Received and Logged. Status set to New -To be validated 
3/26/2001 Record Update T-shirt size and options will be discussed, and the Industry Evaluation will be completed at the April 18th CICMP meeting. 
3/26/2001 Info Sent to CLEC Sent e-mail with updated CR to Sandy Evans and Christine Pokrandt. 
4/18/2001 Discussed at Monthly CMP Meeting  
6/8/2001 Status Changed Status changed to Reviewed - Under Consideration". CR is eligible for Industry Prioritization. 
6/8/2001 LOE Issued T-shirt size Medium assigned. This CR is eligible for industry prioritization 
6/10/2001 Info Sent to CLEC Sent e-mail with updated CR to Sandy Evans and Christine Pokrandt. 
10/4/2001 Info Sent to CLEC Sent email to Sandy Evans and Christine Pokrandt with updated CR. 
10/4/2001 Record Update Received notification from Ray Wilson of the PMO that this work is completed. 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. 5466837 ranked 1 
11/16/2001 Clarification Meeting Held Clarification Meeting was held to determine if work done. 
11/19/2001 Info Received From CLEC Sandy Evans will determine if UR2458 will meet their expectations for this change request. 
11/29/2001 Info Sent to CLEC Contacted Sandy Evans to determine status. Sandy still checking with her subject matter experts. 
11/30/2001 Status Changed Sandy replied that this does meet the expectations of Sprint and that this can be closed. 
1/17/2002 Discussed at Monthly CMP Meeting CR # 5466837 discussed during 10.0 Packaging Presentation 

Project Meetings

Clarification Meeting 11/16/01

Attendees

Sandy Evans - Sprint - ILEC Relations Manager Lynn Stecklein, Qwest - Change Management Lisa Mottis Qwest - IT JJ Bradley Qwest - IT SDA Jerry Mohatt Qwest - IT Consultant Ray Wilson Qwest - PMO

Meeting Agenda

Introduction of participants on the Conference Call was made.

The purpose of the call was to clarify SCR5466837 dated 11/16/01 with Sprint.

Provide CLEC’s electronic completions on any Stand Alone directory order that is sent electronically. Today Qwest does not provide electronic completion information on Stand Alone Directory orders that are sent electronically to Qwest.

UR2458 Phase B Solution FBSADL CLEC access to LSS that Qwest is providing with 9.0 should satisfy this request.

Sprint is EDI. EDI Transaction file 850 in and 855 out.

Outbound information will include PON, CCNA, LSR ID, LTN

Sandy to determine if UR2458 will meet Sprints expectations and get back to Qwest.

CenturyLink Response

Archived System CR 5628603 Detail

 
Title: Change of BAN1 field requirements
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

5628603 Completed
10/31/2001
-   CCUR/CRIS/ Collocation, Resale, Unbundled Loop, UNE-P
Originator: Evans, Sandy
Originator Company Name: Sprint
Owner: Coyne, Mark
Director:
CR PM: Routh, Mark

Description Of Change

Change of BAN1 field requirements

Status History

Date Action Description
7/16/2001 CR Submitted Status set to New - To be validated 
7/16/2001 Info Sent to CLEC Sent email to Sandy Evans and Christine Pokrandt with updated CR. Release Baseline Candidate - post IMA 7.0. 
7/16/2001 Status Changed Received and logged 
10/25/2001 Info Sent to CLEC Sent the updated CR to Sandy Evans and Christine Pokrandt. 
10/25/2001 Info Received From CLEC Sandy Evans called to approve the closure of this CR. 
10/31/2001 Status Changed CR closed - see Qwest response 

Project Meetings

CenturyLink Response

This request has been addressed with an internal Qwest edit which was implemented in September 2001 to make the BAN1 field optional on the LSR form for both GUI and EDI users. If the request is full flow-through then FTS populates the necessary information. If the request is manual then the ISC populates the fields. All edits associated with BAN1 have been removed.

Archived System CR 5365971 Detail

 
Title: Partial Rejects on DL for REQTYP JB orders
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

5365971 Withdrawn
3/2/2001
-   Other/
Originator: Evans, Sandy
Originator Company Name: Sprint
Owner: Routh, Mark
Director:
CR PM: Routh, Mark

Description Of Change

Sprint is requesting Qwest to reject all of the order if any portion of the listing order errors on REQTYP JB orders. If any Qwest system errors on a JB order, QWEST would send a ‘REJECT’ on the entire order rather than 2 responses coming back (one for rejected listing and one for correct listing). Similar to how the other products offered by QWEST are supported today. This would allow Co-provider to send back the order with the same activity that was originally sent.

Status History

Date Action Description
1/30/2001 CR Submitted Received from Sprint and assigned status of "New - To be validated" 
1/30/2001 Info Sent to CLEC Sent email to Sandy Evans and Christine Pokrandt with updated CR. 
2/2/2001 Info Sent to CLEC Sent email to Sandy Evans and Christine Pokrandt with updated CR. 
2/2/2001 Status Changed Status changed to Evaluated - To be reviewed. 
2/8/2001 LOE Issued T-Shirt size NA and options provided. Not eligible for industry prioritization. 
2/8/2001 Status Changed Status changed to Reviewed - Under Consideration. 
2/8/2001 Info Sent to CLEC Sent email to Sandy Evans and Christine Pokrandt with updated CR. 
3/2/2001 LOE Issued T-Shirt size Large, pending the outcome of the CLEC discussion for making this a standard practice for all CLECs. This CR will become eligible for industry prioritization based on the outcome of the CLEC discussion. 
3/2/2001 Status Changed Status changed to "Canceled - Qwest" 
3/2/2001 Info Sent to CLEC Sent email to Sandy Evans and Christine Pokrandt with updated CR. 
3/15/2001 Info Sent to CLEC Sent email to Sandy Evans and Christine Pokrandt with updated CR. 
12/18/2001 Record Update Changed status from 'Cancelled CLEC' to 'Withdrawn' for database cleanup 

Project Meetings

CenturyLink Response

Archived System CR 5381075 Detail

 
Title: Code Changes in CCUR/CRIS
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

5381075 Completed
9/30/2001
-   Wholesale Billing Interfaces/ Resale
Originator: Evans, Sandy
Originator Company Name: Sprint
Owner: Routh, Mark
Director:
CR PM: Routh, Mark

Description Of Change

Sprint returns the records with 202401/02 pack headers instead of 98/99 file headers. Sprint is requesting Qwest to change code to accept the pack headers with the 202401/02.

Status History

Date Action Description
2/7/2001 CR Submitted Received and Logged as New - To be Validated. 
2/7/2001 Info Sent to CLEC Sent e-mail to Sandy Evans and Christine Pokrandt with updated CR. 
3/2/2001 Info Sent to CLEC Sent e-mail to Sandy Evans and Christine Pokrandt with updated CR. (Rank 5) 
3/2/2001 Status Changed Status changed to Reviewed - Under Consideration. 
3/2/2001 LOE Issued T-Shirt size set to Medium. This CR is eligible for industry prioritization. 
4/17/2001 Record Update CICMP vote was conducted. 
1/8/2002 Status Changed Changes were completed in 3rd quarter of 2001 

Project Meetings

CenturyLink Response

Archived System CR 5421845 Detail

 
Title: Electronic completion notices on NP and Shared Loop orders.
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

5421845 Withdrawn
1/8/2002
-   IMA EDI/ Other
Originator: Evans, Sandy
Originator Company Name: Sprint
Owner: Routh, Mark
Director:
CR PM: Routh, Mark

Description Of Change

Provide to all CLECs electronic completions on any order that is sent electronically. This would include both NP and Shared Loop orders.

Status History

Date Action Description
Release Information IMA Release 
3/2/2001 Record Update This functionality may already be built into the IMA system but needs to be repaired to work properly. This will be confirmed by 03/09/01 and an update will be provided to the CLEC. 
3/2/2001 Info Sent to CLEC Sent email to Sandy Evans and Christine Pokrandt with updated CR. 
3/2/2001 CR Submitted CR was Received and Status was set to New - To be validated. This functionality may already be built into the IMA system but needs to be repaired to work properly. This will be confirmed by 03/09/01 and an update will be provided to the CLEC. 
3/8/2001 Status Changed Status changed to Declined - Functionality already exists in IMA 6.0 
3/8/2001 Info Sent to CLEC Sent email to Sandy Evans, Christine Pokrandt and Henry Henry Rodighierowith updated CR. 
3/15/2001 Info Sent to CLEC Sent email to Sandy Evans, Christine Pokrandt and Henry Henry Rodighierowith updated CR. 
3/15/2001 Status Changed Status changed to Committed Candidate IMA 6.0 
3/21/2001 Status Changed Status changed to Canceled - by Qwest. The functionality already exists in IMA 6.0. 
3/21/2001 Info Sent to CLEC Sent email to Sandy Evans, Christine Pokrandt and Henry Henry Rodighierowith updated CR. 
12/18/2001 Record Update Changed status from 'Cancelled CLEC' to 'Withdrawn' for database cleanup 

Project Meetings

CenturyLink Response

Archived System CR SCR110601-1 Detail

 
Title: Request Qwest follow OBF standards and populate orig/term OCN info on UNE P access records.
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR110601-1 Completed
6/20/2002
-   Wholesale Billing Interfaces/ Billing Other
Originator: Hoffman, Deb
Originator Company Name: TDS Metrocom/USLink
Owner: Zimmerman, Alan
Director:
CR PM: Stecklein, Lynn

Description Of Change

Request for Qwest to follow OBF guidelines and populate orig/term OCN’s on UNE-P access records provided in our DUF file. This ensures that we are receiving our usage.

Status History

Date Action Description
11/14/2001 Clarification Meeting Held Clarification meeting was held. 
11/28/2001 Record Update Debra advised CR not on WEB. Told Debra that the Website was being enhanced for Systems CR and will available soon. 
11/28/2001 CLEC Requested Info Debra Hoffman called to determine status of CR. Advised that once clarification meeting was held the submitter will present in the next CMP meeting to the CLEC 
12/4/2001 UR Issued Carl issued UR2825. 
12/13/2001 Status Changed  
1/8/2002 Status Changed Development 
3/13/2002 Action Item Created Action Item created to provide status of SCR. Targeted implementation is in the June Release/CRIS 
3/21/2002 Discussed at Monthly CMP Meeting SCR110601-1 discussed March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP - Attachment G 
5/8/2002 Communicator Issued SYST.05.08.02.F.04046.CRIS_OCNtoAccessRcd.doc 
6/10/2002 Additional Information Deployed 6/6/02 
6/10/2002 Status Changed Status changed to CLEC test 
6/20/2002 Discussed at Monthly CMP Meeting SCR110601-1 discussed at June Systems CMP Monthly meeting; please see Systems CMP Distribution Package June CMP -- Attachment G 
6/21/2002 CLEC Provided Information Talked with Deb Hoffman - Sprint Ok to close CR 
6/21/2002 Status Changed Status changed to completed 

Project Meetings

6/21/02 - Talked with Deb Hoffman regarding closure of this Change Request. Deb Hoffman said that she confirmed that it was okay to close this change request.

6/20/02 CMP Systems Monthly Meeting Jennifer Arnold (USLink) was not able to talk to the CR for Deb Hoffman at this time. Michael Buck (Qwest) explained that the CR had been implemented on 6/6/02, and asked if any CLECs objected to Qwest working with USLink off line to close this CR? No CLECs objected.

CMP11/14/01 Clarification Meeting

Attendees: Deb Hoffman, US Link Lynn Stecklein Qwest Carl Sear Qwest Jud McDonald Qwest J J Bradley Qwest

The purpose of this meeting was to discuss SCR110601-1 Request Qwest to follow OBF standards and populate orig/term OCN infor on UNE-P access records.

Description of Change This request for Qwest to follow OBF guidelines and populate orig/term OCNs on UNE-P access records provided in our DUF file. This ensures that we are receiving our usage.

LRN section on access record. If the indicator 4 is equal to 7, we populate OCN. This is not IMA but a toll/PP42 record.

Carl will issue the UR and response.

CenturyLink Response

The level of effort is medium.

Archived System CR SCR082801-1 Detail

 
Title: Add a Read Only User access for IMA
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR082801-1 Withdrawn
6/24/2005
1075 - 1800  IMA GUI/ All Products
Originator: Angermeier, Willi
Originator Company Name: Vail Resort Telecommunications
Owner: Winston, Connie
Director:
CR PM: Stecklein, Lynn

Description Of Change

Add a Read Only User access for IMA. For users who need to access info but do not need to make changes or add orders. Such as a Salesman who wishes to Qualify a loop for DSL service. Then they can look up the information themselves and need not bother the Provisioning staff.

Status History

Date Action Description
8/28/2001 Info Sent to CLEC Sent e-mail to Willi Angermeier with updated CR. 
8/28/2001 CR Submitted Request was received and logged. Status set to New- To be validated 
10/25/2001 Status Changed Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. SCR082801-1 ranked 37 
1/17/2002 Status Changed CR # SCR082801-1 status updated to 'Presented; CR was not packaged as part of 10.0 and is eligible for ranking in 11.0' 
2/21/2002 Discussed at Monthly CMP Meeting CR is eligible for IMA 11.0 prioritization. 
2/21/2002 Discussed at Monthly CMP Meeting SCR082801-1 discussed during 'Review of 11.0 Prioritization Eligible CRs' portion of February Systems CMP Monthly meeting; please see Attachment I of February Systems CMP Distribution Package 
3/1/2002 Release Ranking Ranking for Release 11.0 following the February 2002 Systems CMP Meeting. SCR082801-1 ranked number 24 
3/1/2002 Status Changed Status updated to 'Prioritized' from 'Presented' 
6/7/2002 Status Changed SCR082801-1 status updated to 'Pending Prioritization' based upon outcome of IMA 11.0 Packaging Selection vote 
7/18/2002 Discussed at Monthly CMP Meeting SCR082801-1 discussed at July Systems CMP Monthly meeting; please see Systems CMP Distribution Package July CMP -- Attachment P 
7/26/2002 Status Changed Status set to Prioritized as a result of the release prioritization for IMA 12.0 
7/26/2002 Release Ranking Ranking for Release 12.0 following the July 2002 Systems CMP Meeting. SCR082801-1 ranked number 52 
10/30/2002 Status Changed SCR082801-1 status updated to 'Pending Prioritization' based upon outcome of release 12.0 packaging effort 
12/19/2002 Discussed at Monthly CMP Meeting SCR082801-1 discussed at December Systems CMP Monthly meeting; please see Systems CMP Distribution Package December CMP -- Attachment O 
12/31/2002 Release Ranking Ranked #42 for IMA 13.0 Release 
1/23/2003 Release Ranking Ranked #45 for IMA 13.0 after exception request SCR011303-02EX 
3/13/2003 Status Changed Status changed to Pending Prioritization after Packaging of IMA 13.0 
4/7/2003 Release Ranking 14.0 Prioritization- Ranked #35 out of 53 
4/29/2003 Release Ranking Rank changed due to Late Adders- Ranked #37 
5/30/2003 Release Ranking Rank changed due to Late Adders- Ranked #38 
7/9/2003 Status Changed Status changed to pending prioritization with release of I MA 14.0 Packaging. 
9/2/2003 Release Ranking 15.0 Prioritization- Ranked #53 out of 57 
9/29/2003 Release Ranking 15.0 Revised Prioritization, due to Late Adder - Ranked #54 out of 58 
11/5/2003 Status Changed Status changed to pending prioritization 
2/4/2004 Release Ranking 16.0 Prioritization- Ranked #44 out of 50 
3/1/2004 Related Change Request IMA 16.0 Revised Prioritization, Late Adder Ranking - #45 out of 51 
8/3/2004 Release Ranking 17.0 Prioritization- Ranked #37 out of 41 
6/13/2005 Status Changed Status changed to Pending Withdrawal 
6/15/2005 Discussed at Monthly CMP Meeting Discussed at the June CMP Systems Meeting - See attachment G in the Systems Distribution Package 

Project Meetings

6/15/05 Systems CMP Meeting

Jill Martain - Qwest stated that Vail Resort requested that this CR be withdrawn Bonnie Johnson - Eschelon said that they may want to pick up this CR. Jill Martain - Qwest said that Eschelon should send an e-mail to CMPCR@qwest.com if they wanted to sponsor this CR.

6/24/05 E-mail from Eschelon

In CMP last week, I told Qwest there were two CRs Eschelon could consider adopting. I just wanted to let you know, Eschelon has decided not to do so at this time.

Thanks,

Bonnie J. Johnson Director Carrier Relations Eschelon Telecom, Inc. Phone 612 436-6218 Fax 612 436-6318 Cell 612 743-6724 bjjohnson@eschelon.com

2/16/05 Systems CMP Meeting - IMA 18.0 Candidate Discussion

Vail Resort was not in attendance and there was no discussion on this CR

7/22/04 Systems CMP Meeting

Jill Martain/Qwest stated that Qwest would distribute the ballot on July 27th, it is due back to Qwest on July 30th, and Qwest would email the initial prioritization list to the CLECs on August 3rd. There were no questions.

The CR Originator was not on the conference bridge. The difference between this CR and a McLeod CR will be added to the meeting minutes and to the CR. This CR is for the GUI only. SCR082801-1 Add a Read Only User access for IMA This SCR is asking for Read Only access to the GUI, which I interpret as full access to PreOrder, and Read Only access to Order. SCR010902-1 Limited IMA GUI Access for Pre-Order Transactions Only This one is asking for full access to PreOrder only. PostOrder is not mentioned, so it would have to be clarified if that should be included in either or both access levels. The fact that they are different is also alluded to in the following comment in SCR 010902-1: Jonathon Spangler/AT&T asked how this CR would differ from the Vail Resorts Telecom (SCR82801-1) request around allowing the sales team the ability to browse/read only. Connie Winston/Qwest said that this CR would allow users the ability to view anything. There was a brief discussion regarding whether this CR was a duplicate of the Vail Resorts Telecom CR. The consensus was that they were different and both needed to be retained.

8/21/03 CMP systems meeting Connie Winston/Qwest stated that Qwest would contact Vail to see if they wanted to withdraw. Stephanie Prull/McLeod stated that thought that this functionality was already available with different log-in capabilities.

CenturyLink Response

Qwest can place access limits on the IMA user access. Qwest will work with the CLECs to define the requirements for those limits. (i.e. not allow the user access to the LSR portion of the system)

Archived System CR 5405937 Detail

 
Title: CLECs require availability to view completed LSR information in IMA GUI
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

5405937 Completed
12/20/2002
3000 - 5500  IMA GUI/11 Resale
Originator: Brosnan, Karl
Originator Company Name: Verizon
Owner: Bradley, J.J.
Director:
CR PM: Esquibel-Reed, Peggy

Description Of Change

Currently CLECs are unable to view any service order information for a completed LSR within IMA GUI even without the IMA system being purged (per Interconnect Helpdesk). This causes repercussion as CLECs are unable to obtain downstream information vital to maintaining accurate internal reporting information. Examples of such information include completed order numbers, date of activation, date of service delivery, accurate percentage of requested due dates with on time delivery. CLECs need to be given the ability to view their subscribers account information on an as needed basis. This request is focused on the entire CLEC community being able to access this type of information as needed. Verizon would like to have available, a record for any LSR submitted for a min of 30 days and max of 90 days to see how the account was established, to make sure that the delivery dates are met and that the account is activated as requested.

Qwest Business Description:

Need ability to view service order for completed LSR within GUI in order to access info needed for accurate internal reporting. Examples-completed order numbers, date of activation and service delivery, accurate percentage of requested due dates with on time delivery.

Status History

Date Action Description
2/21/2001 Record Update This CR will be T-Shirt sized at the 03/2/01 evaluation meeting. 
2/21/2001 CR Submitted Received and recorded. Status set to New - To be validated 
2/22/2001 Info Sent to CLEC Sent email to Karl Brosnan and Rick Wright with updated CR. 
3/20/2001 Status Changed Status changed to Reviewed - Under Consideration. 
3/20/2001 Info Sent to CLEC Sent email to Karl Brosnan and Rick Wright with updated CR. 
5/7/2001 Info Sent to CLEC Sent email to Karl Brosnan and Rick Wright with updated CR. 
5/7/2001 LOE Issued T-Shirt size of Extra Large has been assigned to this CR. 
10/5/2001 Info Received From CLEC Qwest sent email to Karl Brosnan at Verizon requesting meeting availability for clarification call. 
10/18/2001 Discussed at Monthly CMP Meeting Presented at Oct CMP meeting 
10/25/2001 Status Changed Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization 
10/29/2001 Draft Response Issued Draft response issued 
10/29/2001 Clarification Meeting Held Clarification call held (see meeting minutes). 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. 5405937 ranked 30 
1/17/2002 Status Changed CR # 5405937 status updated to 'Presented; CR was not packaged as part of 10.0 and is eligible for ranking in 11.0' 
2/21/2002 Discussed at Monthly CMP Meeting 5405937 discussed during 'Review of 11.0 Prioritization Eligible CRs' portion of February Systems CMP Monthly meeting; please see Attachment I of February Systems CMP Distribution Package 
3/1/2002 Release Ranking Ranking for Release 11.0 following the February 2002 Systems CMP Meeting. 5405937 ranked number 8 
3/1/2002 Status Changed Status updated to 'Prioritized' from 'Presented' 
6/7/2002 Status Changed 5405937 status updated to 'Packaged' for IMA 11.0 based upon outcome of Packaging Selection vote 
6/24/2002 CLEC Provided Information See Project Meetings Section For Details 
8/5/2002 Status Changed Status changed from 'Packaged' to 'Development', targeted implementation date is 11/18/02. 
8/22/2002 Discussed at Monthly CMP Meeting 5405937 discussed at August Systems CMP Monthly meeting; please see Systems CMP Distribution Package August CMP -- Attachment R 
11/18/2002 Record Update Deployed November 18, 2002 
11/21/2002 Discussed at Monthly CMP Meeting 5405937 discussed at November Systems CMP Monthly meeting; please see Systems CMP Distribution Package November CMP -- Attachment L 
12/19/2002 Discussed at Monthly CMP Meeting 5405937 discussed at December Systems CMP Monthly meeting; please see Systems CMP Distribution Package December CMP -- Attachment G 

Project Meetings

December 19, 2002 Systems CMP Meeting Discussion: This CR was completed with 11.0 and is ok to close.

August Systems CMP Meeting Discussion: Attachment R = Change Requests Committed for IMA Release 11.0 Connie Winston/Qwest - we have one small issue requiring the Sup 2 (SCR013002-8 Flowthrough on Sup 2 Category Due Date) to be a spillover for 11.1. She explained why this will be a spillover into the point release. She noted that resale and UNE sup 2 due date change orders will flow through. The unbundled loop will drop out to the Center and will be updated by the Center until 11.1. Donna Osborne-Miller/AT&T - that’s line item #4 in the Attachment? Connie Winston/Qwest - yes. Michael Buck/Qwest - stated that the NOTE at the bottom of the page needs to be changed from 'In Definition' to 'Packaged'. Liz Balvin/WorldCom - asked how the 11.0 PO2 CR is different than the one in 12.0. Connie Winston/Qwest - they are just different edits. The edits are noted on each of the 2 CRs. Liz Balvin/WorldCom - with 12.0, would you say that any of the hours devoted to this would lower the 8,000 hours? Are you looking at that when you do the design? Connie Winston/Qwest - we always look at that, but the edits are different so I could expect a reduction in the LOEs. As we get further in design, we do update the LOE. Attachment R = Change Requests Committed for SATE Release 11.0 Connie Winston/Qwest - SATE has the same spillover candidate for 11.1, SCR013002-8 Sup 2. Michael Buck/Qwest - noted that items 3, 5, and 7 are SATE specific candidates. The others are IMA with SATE impacts. Wendy Green/Qwest - noted that the SATE side has a shorter list because of the GUI only impacting CRs going into IMA having no impact to SATE. Michael Buck/Qwest - any other questions in the room or on the bridge? None.

June 27, 2002 Deb Osborne/Qwest Process Specialist needs clarification from CLEC. Asked if Verizon considers canceled LSR's as completed, should canceled LSR's be included in the view? Called Reggie Wilson/Verizon (Karl Brosnan on vacation) he advised to include completed and canceled LSRs in the view. No other questions.

February 21, 2002 CMP Discussion: This CR is eligible for the 11.0 vote.

Alignment/Clarification Meeting 1:00 p.m. (MST) / Monday 29th October 2001

CLECs Require Availability To View Completed LSR Information In IMA GUI

Attendees: Karl Brosnan / Verizon Peggy Esquibel-Reed / Qwest Joseph J. Bradley / Qwest Gerald Mohatt / Qwest Chrys Espiritu / Qwest Deborah Osborne / Qwest Ray Wilson / Qwest

CLECs require availability to view completed LSR information in IMA GUI. Interfaces: IMA GUI CLEC needs to be able to view the LSR itself. Verizon is able to view the notices, must also be able to view the LSR 30-90 days past completion.

CenturyLink Response

For Review by the CLEC Community and Discussion at November CMP Meeting DRAFT RESPONSE

October 29, 2001

Karl Brosnan Business Systems Analyst Verizon

CC: Jeffery Thompson Connie Winston Joseph J. Bradley Deborah Osborne Chrys Espiritu

This letter is in response to your CLEC Change Request Form, number 5405937, dated February 20, 2001, CR Title: CLECs Require Availability To View Completed LSR Information In IMA GUI.

CR Description: CLECs require availability to view completed LSR information in IMA GUI.

Additional clarification was received from Karl in the Clarification Meeting that was held on Monday, October 29th. The CLEC’s need to be able to view the LSR itself. Verizon is currently able to view the completion notices. The LSR must also be available to view for 30-90 days past completion.

Qwest Response: Based on the information noted above, this CR would require a medium level of effort. Qwest systems would be modified to allow completed LSRs to be viewed using the current functionality for a minimum of 30 and a maximum of 90 days. The CR is eligible for voting into the 10.0 Release.

Sincerely, Connie Winston Information Technologies Director

Archived System CR 5498578 Detail

 
Title: Ability to send dual CFA information on an LSR for HDSL orders*facility*
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

5498578 Withdrawn
9/19/2002
5125 - 8525  IMA Common/ HDSL
Originator: Rodriguez, Cecilia
Originator Company Name: WorldCom
Owner: Winston, Connie
Director:
CR PM: Routh, Mark

Description Of Change

Qwest informed WorldCom of the following ordering practices: To order 4-wire HDSL-capable loops, the LSR must populate the first of two consecutive CFAs (each CFA representing a copper pair) along with the proper NC/NCI codes to order 4-wire HDSL capable. Upon receipt, Qwest would then validate the ordered CFA plus availability of the next consecutive channel pair and populate both cable ID’s and circuit ID’s on the returned FOC. WorldCom specifically asked our Account Team what would happen if an LSR had dual CFA information populated; the response was that the order would drop out for manual handling and be rejected. Ultimately, WorldCom would like a system change that would allow the dual CFA to be populated on an LSR, and would be willing to accept the following interim solution until this CR could be implemented (next available release 9.0-4/02): Let the LSR drop out for manual handling, but instead of rejecting the order, validate the ordered CFA and the availability of the next consecutive channel pair and process the order. WCom predicts that the current loop delivery interval would be preserved with the implementation of this change.

Status History

Date Action Description
4/10/2001 CR Submitted Change Request was received and status was set to New - To be validated 
4/10/2001 Info Sent to CLEC Sent email to Liz Balvin and Judy Barkley with updated CR 
4/24/2001 Record Update Added clarification in the Additional Information section for EDI interface capability. 
4/24/2001 Info Sent to CLEC Send updated CR to Liz Balvin and Judy Barkley via email. 
4/24/2001 Status Changed Status changed to On-Hold because MCI WorldCom is not using an EDI interface at this time. 
4/25/2001 Info Sent to CLEC Send updated CR to Liz Balvin and Judy Barkley via email. 
4/25/2001 Status Changed Status changed to Reviewed - Under consideration. 
9/17/2001 Info Sent to CLEC Send updated CR to Liz Balvin and Judy Barkley via email. 
9/17/2001 LOE Issued T-Shirt size Medium and options to be presented at the September CMP meeting. 
10/25/2001 Status Changed Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. 5498578 ranked 34 
1/17/2002 Status Changed CR # 5498578 status updated to 'Presented; CR was not packaged as part of 10.0 and is eligible for ranking in 11.0' 
2/12/2002 Record Update Impacted interface updated from IMA GUI to IMA Common 
2/13/2002 Record Update LOE updated from Medium to Small 
2/21/2002 Discussed at Monthly CMP Meeting CR is eligible for IMA 11.0 prioritization. 
2/21/2002 Discussed at Monthly CMP Meeting 5498578 discussed during 'Review of 11.0 Prioritization Eligible CRs' portion of February Systems CMP Monthly meeting; please see Attachment I of February Systems CMP Distribution Package 
3/1/2002 Release Ranking Ranking for Release 11.0 following the February 2002 Systems CMP Meeting. 5498578 ranked number 14 
3/1/2002 Status Changed Status updated to 'Prioritized' from 'Presented' 
4/1/2002 Release Ranking Ranking for SATE following the March 2002 Systems CMP Meeting. 5498578 ranked number 12 
6/7/2002 Status Changed 5498578 status updated to 'Pending Prioritization' based upon outcome of IMA 11.0 Packaging Selection vote 
7/26/2002 Release Ranking Ranking for Release 12.0 following the July 2002 Systems CMP Meeting. 5498578 ranked number 51 
8/27/2002 Status Changed Status updated to "Pending Withdrawal" per e-mail received from WorldCom (see Project Meetings) 
8/28/2002 Status Changed Set to Pending Withdrawal per the 8/27/02 email from Liz Balvin 
9/19/2002 Discussed at Monthly CMP Meeting 5498578 discussed at September Systems CMP Monthly meeting; please see Systems CMP Distribution Package September CMP -- Attachment G 
9/19/2002 Status Changed Status updated to Withdrawn 

Project Meetings

Subject: Withdraw WCom CR 5498578 Date: Tue, 27 Aug 2002 15:09:52 -0600 From: Elizabeth Balvin To: mrouth@qwest.com CC: mjbuck@qwest.com, "LeiLani. Jean. Hines (E-mail)"

Mark,

WCom requests the following CR be withdrawn:

5498578 Ability to send dual CFA information on an LSR for HDSL orders

Thanks,

Liz Balvin WorldCom Carrier Management - Qwest

Internal Line - V625-7305 External Line - 303-217-7305 Pager (888) 900-7221

Discussion from the September 19 CMP meeting

Liz Balvin/WorldCom — said that this CR was submitted to ask Qwest to provide dual CFA capabilities and Qwest was willing to support it. The request would have made the secondary CFA field an optional field for HDSL orders only. WorldCom has chosen to move away from this because it was specific to HDSL orders. Mike Buck/Qwest asked if anyone was interested in picking this up. Jonathan Spangler/AT&T — said that initially when WorldCom submitted this, what was the purpose of the CR? Liz Balvin/WorldCom — IMA only allowed for a single CFA field and CLECs would have to only provide the first piece and on the FOC back Qwest would response with the secondary CFA info. That was not easily trackable from WorldCom’s perspective. Mike Buck/Qwest asked again if anyone wanted to take ownership of the CR. Based on lack of response, the CR will be updated to “Withdrawn.”

CenturyLink Response

An optional field will be added to the LSR Form for a second CFA. (This is on the IMA 10.0 Candidate list)

Archived System CR SCR082301-1 Detail

 
Title: Activity Matrix in IMA Developer Worksheets Incomplete
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR082301-1 Completed
3/21/2002
-   Process & Documentation/9 IMA Documentation
Originator: Martin, Ross
Originator Company Name: XO Communication
Owner: Routh, Mark
Director:
CR PM: Routh, Mark

Description Of Change

Qwest has instituted an additional set of edits for orders submitted via EDI. If a value is submitted to Qwest that is not in the Qwest service specific EDI Map, the Co-Provider is sent a NEGATIVE 997. These edits are not reflected in the IMA Developer Worksheets. An example of this is found in the IMA 8.0 Developer Worksheets, LSR field numbers 97 and 99. The matrix shows these as “N” (Not Required) for product # 5, but if data is sent in these fields on the NP order, the Co-Provider receives a NEGATIVE 997.

This is an unsatisfactory condition and we request that either the maps be modified to ignore (rather than reject) fields that are noted as “Not Required” in the Developer Worksheets OR the Developer Worksheets be modified to indicate “Prohibited” (P) for the fields/products that are being edited by the EDI map.

Status History

Date Action Description
Release Information IMA Release 9.00 
8/23/2001 CR Submitted CR was received and logged. 
8/24/2001 Record Update CR will be reviewed in the September Systems CMP meeting 
8/24/2001 Info Sent to CLEC Sent email with updated CR to Ross Martin and Stephanie Greenhalgh 
8/24/2001 Status Changed Status set to New - To be validated 
2/8/2002 Record Update Beth King is updating the 9.0 documentation (addendum 1) to reflect the correction. 
2/12/2002 Qwest Response Issued Qwest sent a response to Ross Martin of XO Comm. 
2/25/2002 Status Changed SCR082301-1 status updated to 'CLEC Test' based upon 2/25/02 implementation of IMA 9.0 
3/21/2002 Status Changed Reviewed in the 3/21/02 CMP meeting and Closed. 
3/21/2002 Discussed at Monthly CMP Meeting SCR082301-1 discussed March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP - Attachment E 

Project Meetings

Chapter 02 in 8.0 disclosure, EDI Introduction currently states: N - Not Required – This field is not required for this activity, for this product. If the indicator is (N) for all activities, Qwest does not map the field and will return a –997 if populated. P - Prohibited – Currently not used by Qwest.

Beth King is going to update 9.0 to reflect this in addendum #1 on 3/11/02.

CenturyLink Response

Qwest will Update the IMA 9.0 Disclosure Documentation Addendum 1 to indicate that the field is a P (Prohibited). Any data placed in the field will return a -997. Elain Sinclare (Karen Henry's group) is the POC on this issue.

Archived System CR 5529610 Detail

 
Title: TN Reservation Transaction
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

5529610 Completed
11/2/2001
-   IMA Common/8 UNE-P
Originator: Livengood, Janet
Originator Company Name: Z-Tel
Owner: Routh, Mark
Director:
CR PM: Routh, Mark

Description Of Change

The issue for Z-Tel relates to TN Reservation: The Business Rules at Section 9. Telephone Number (TN) Reservation Transaction Cycle, Section 9.1 Business Description state that TNs are automatically selected and held for 24 business hours and that after a TN Reserve pre-order transaction, a CLEC must send an order to Qwest within 24 hours of selection or TNs selected will be returned to Qwest. We are requesting that the 24 business hours be extended to 30 days to avoid duplicate or multiple entry of TN request over weekends, during holidays, during peak periods or to cover other delays in ordering. All other ILECs permit TN Reservation, at minimum, for 30 days for UNE-P customers.

Status History

Date Action Description
Release Information IMA Release 8.00 
5/2/2001 CR Submitted Received and Logged CR. Status set to New - To be validated 
5/2/2001 Info Sent to CLEC Sent email to Janet Livengood and Cindy Warren with updated CR. 
5/30/2001 Record Update Qwest and Z-Tel agreed to limit the TN Reservation to 48 hours. 
6/8/2001 Status Changed Status changed to Reviewed - Under consideration 
6/8/2001 Info Sent to CLEC Sent email to Janet Livengood and Cindy Warren with updated CR 
6/8/2001 Record Update Qwest will provide for the full 30 day TN Reservation. 
6/10/2001 Info Sent to CLEC Sent email to Richard Sampson and Cindy Warren with updated CR 
9/17/2001 Record Update This CR was implemented in an IMA Patch 

Project Meetings

CenturyLink Response

This work will be completed as of the IMA 8.0 addendum 1. This will also be backward compatible with IMA 6.0 and IMA 7.0

This was implemented in an IMA Patch on 9/17/2001

Archived System CR 5365446 Detail

 
Title: Conversion of a Customer using Migrate As Specified Command
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

5365446 Withdrawn
2/16/2001
-   IMA Common/ UNE-P
Originator: Livengood, Janet
Originator Company Name: Z-Tel
Owner: Routh, Mark
Director:
CR PM: Routh, Mark

Description Of Change

The issue for Z-Tel relates to feature activities: The Business Rules as defined in IMA EDI state that when converting a UNE-P Customer, we must explicitly address all features that the customer Currently has, using the appropriate Feature Activity (FA) for each USOC, to Indicate the end result we desire. We need to be able to convert the customer as we specify, Migrate As Specified, without having to know the features and blocking activities the customer currently has. All other ILECs permit Migrate As Specified for UNE-P customers.

Status History

Date Action Description
Release Information IMA Release 
1/29/2001 CR Submitted CR Received and status assigned as New - To be validated 
1/29/2001 Info Sent to CLEC Sent email to Janet Livengood and Cindy Warren with updated CR 
2/2/2001 Info Sent to CLEC Sent email to Janet Livengood and Cindy Warren with updated CR. 
2/2/2001 Status Changed Status changed to Evaluated - To be reviewed. 
2/7/2001 LOE Issued T-Shirt Size NA and Options provided. CR is not eligible for industry prioritization. 
2/7/2001 Status Changed Status set to Reviewed - Under consideration 
2/7/2001 Info Sent to CLEC Sent email to Janet Livengood and Cindy Warren with updated CR. 
2/16/2001 Status Changed Status changed to Cancelled - Co-Provider. 
2/16/2001 Info Sent to CLEC Sent email to Janet Livengood and Cindy Warren with updated CR. 
12/18/2001 Record Update Changed status from 'Cancelled CLEC' to 'Withdrawn' for database cleanup 

Project Meetings

CenturyLink Response

Information Current as of 1/11/2021