Title: Activity Matrix in IMA Developer Worksheets Incomplete
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR082301-1 Completed
3/21/2002
-   12/9 IMA Documentation
Originator: Martin, Ross
Originator Company Name: XO Communication
Owner: Routh, Mark
Director:
CR PM: Routh, Mark
Description Of Change
Qwest has instituted an additional set of edits for orders submitted via EDI. If a value is submitted to Qwest that is not in the Qwest service specific EDI Map, the Co-Provider is sent a NEGATIVE 997. These edits are not reflected in the IMA Developer Worksheets. An example of this is found in the IMA 8.0 Developer Worksheets, LSR field numbers 97 and 99. The matrix shows these as “N” (Not Required) for product # 5, but if data is sent in these fields on the NP order, the Co-Provider receives a NEGATIVE 997.

This is an unsatisfactory condition and we request that either the maps be modified to ignore (rather than reject) fields that are noted as “Not Required” in the Developer Worksheets OR the Developer Worksheets be modified to indicate “Prohibited” (P) for the fields/products that are being edited by the EDI map.

Status History

Date Action Description
Release Information IMA Release 9.00 
8/23/2001 CR Submitted CR was received and logged. 
8/24/2001 Record Update CR will be reviewed in the September Systems CMP meeting 
8/24/2001 Info Sent to CLEC Sent email with updated CR to Ross Martin and Stephanie Greenhalgh 
8/24/2001 Status Changed Status set to New - To be validated 
2/8/2002 Record Update Beth King is updating the 9.0 documentation (addendum 1) to reflect the correction. 
2/12/2002 Qwest Response Issued Qwest sent a response to Ross Martin of XO Comm. 
2/25/2002 Status Changed SCR082301-1 status updated to 'CLEC Test' based upon 2/25/02 implementation of IMA 9.0 
3/21/2002 Status Changed Reviewed in the 3/21/02 CMP meeting and Closed. 
3/21/2002 Discussed at Monthly CMP Meeting SCR082301-1 discussed March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP - Attachment E 

Project Meetings

Chapter 02 in 8.0 disclosure, EDI Introduction currently states: N - Not Required – This field is not required for this activity, for this product. If the indicator is (N) for all activities, Qwest does not map the field and will return a –997 if populated. P - Prohibited – Currently not used by Qwest.

Beth King is going to update 9.0 to reflect this in addendum #1 on 3/11/02.

CenturyLink Response

Qwest will Update the IMA 9.0 Disclosure Documentation Addendum 1 to indicate that the field is a P (Prohibited). Any data placed in the field will return a -997. Elain Sinclare (Karen Henry's group) is the POC on this issue.

Information Current as of 1/11/2021