Wholesale: Products & Services

Archived System CR SCR062906-01 Detail

 
Title: Ability to Download IMA GUI Line Loss Notifications
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR062906-01 Completed
12/12/2007
346 - 587   1/22 Post Order NA
Originator: Isaacs, Kim
Originator Company Name: Eschelon
Owner: Coyne, Mark
Director:
CR PM: Esquibel-Reed, Peggy
Description Of Change
Eschelon is requesting the ability to download the IMA GUI Line Loss Notification responses.. The IMA GUI Line Loss Notification responses should be modified from a read only/cosmetic page to add downloadable functionality. Allowing users the ability to save/export the summary data for a given query to a format that could be downloaded into a different format such as an excel file or a delimited text file, improves the value of the data Qwest currently provides.

Expected Deliverable:

Allowing users the ability to save/export the summary data for a given query to a format that could be downloaded into a different format such as an excel file or a delimited text file, improves the value of the data Qwest currently provides.

Status History

Date Action Description
 
6/29/2006 CR Submitted  
6/29/2006 CR Acknowledged  
7/3/2006 Clarification Meeting Scheduled Clarification Meeting Scheduled, based on Eschelon's Availability. 
7/13/2006 Clarification Meeting Held  
7/19/2006 Discussed at Monthly CMP Meeting Discussed at the July Systems CMP Meeting - See Attachment B in the Systems Distribution Package 
7/19/2006 Status Changed Status changed to presented 
7/27/2006 Status Changed Status changed to Pending Prioritization 
8/16/2006 Discussed at Monthly CMP Meeting Discussed at the August Systems CMP Monthly Meeting; please see the August Systems CMP Distribution Package, Attachment I 
8/28/2006 Release Ranking 21.0 Prioritization- Ranked #07 out of 19 
11/27/2006 Release Ranking IMA 21.0 Late Adder Ranking - #08 out of 20 
4/2/2007 Release Ranking IMA 22.0 Prioritization- Ranked #01 out of 18 
4/18/2007 Discussed at Monthly CMP Meeting Discussed at the April Systems CMP Monthly Meeting; please see the April Systems CMP Distribution Package, Attachment M 
6/20/2007 Discussed at Monthly CMP Meeting Discussed at the June Systems CMP Monthly Meeting; please see the June Systems CMP Distribution Package, Attachment M 
8/15/2007 Discussed at Monthly CMP Meeting Discussed at the August Systems CMP Monthly Meeting; please see the August Systems CMP Distribution Package, Attachment M 
8/31/2007 Communicator Issued SYST.08.31.07.F.04896.IMA_XML_22.0DrftTechSpecs 
9/12/2007 Qwest CR Review Meeting IMA 22.0 Walkthrough Held 
9/28/2007 Communicator Issued SYST.09.28.07.F.04940.IMA_XML_22.0_FNLTechSpecs 
9/28/2007 Communicator Issued SYST.09.28.07.F.04952.IMAXML_22.0_SuppDocuments 
10/12/2007 Communicator Issued PROS.10.12.07.F.04912.LSOG_PCAT_Updates_IMA_R22 (Level 2) 
10/15/2007 Communicator Issued SYST.10.15.07.F.04976.IMA_Rel22_GUI_DrftDocs 
10/17/2007 Discussed at Monthly CMP Meeting Discussed at the October Systems CMP Meeting - See Attachment K in the Distribution Package 
11/14/2007 Status Changed Status changed to CLEC Test 
11/14/2007 Discussed at Monthly CMP Meeting Discussed at the November Systems CMP Meeting - See Attachment K in the Distribution Package 
12/12/2007 Discussed at Monthly CMP Meeting Discussed at the December CMP Monthly Meeting - See Attachment G in the Distribution Package 
12/12/2007 Status Changed Status changed to Completed 

Project Meetings

November 14, 2007 Systems CMP Meeting

Susan Lorence-Qwest stated that the following CRs would move to a CLEC Test status by the end of the week - Implementation Date 11/12/07.

-- October 17, 2007 Systems CMP Meeting Mark Coyne-Qwest reviewed the following change requests and associated implementation dates. SCR062906-01 Ability to Download IMA GUI Line Loss Notifications - Implementation Date - 11/12/07

-

September 12, 2007 Combined Overview and IMA XML Disclosure Documentation Walkthrough for IMA XML Release 22.0 Attendees: Anne Pent-Qwest, Art Elser-Qwest, Becky Ferrington-Qwest, Brad Cookson-Qwest, Carol McKenzie-Qwest, Carrie Bousfield-Qwest, Chuck Anderson-Qwest, Cimberlie Chambers-Qwest, Dawn Beck-Qwest, Denise Martinez-Qwest, Donna Steele-AT&T Business, Ellen Munz-Qwest, Joyce Hui-Qwest, Judy DeRosier-Qwest, Kathy Miller-Qwest, Kim Isaaks-Eschelon, Lam Nguyen-Neustar, Lori Frederickson-Integra Telecom, Lynn Stecklein-Qwest, Matt Osielski-Qwest, Peggy Esquibel-Reed-Qwest, Sherry Zheng-Neustar, Wanda Kenney-Qwest, List may be incomplete

Introductions Carol McKenzie began the meeting by taking attendance and announcing the purpose of the meeting. Carol explained that the walkthrough would cover the candidates, candidate impacts to the associated documentation, and the IMA XML Disclosure Document. The Meeting Agenda and Candidate Overview document are attached to the Wholesale Calendar entry for the IMA XML 21.0 CLEC Walk-through, which is located at http://www.qwest.com/wholesale/calendar under today’s date. To date there have been no documentation changes identified since Draft disclosure was posted on August 31, 2007

Candidate Reviews SCR062906-01 - Ability to Download IMA GUI Line Loss Notifications Reviewer: Denise Martinez Denise Martinez reviewed the information provided in the candidate overview document and opened the floor to Questions. Kim Isaacs noted that for other IMA downloadable files, some are delivered as e-mail files while others are available in a .csv format. Kim asked which format would be used for the Line Loss files. Denise explained that they would be available in a .csv format. There were no additional questions.

IMA XML Disclosure Documentation Review Carol conducted the review of the IMA XML Disclosure Documentation. Carol noted that no documentation changes have been identified since Draft disclosure posted on August 31st. Carol noted that three questions have been submitted through the CMP channels to date. Carol reviewed those questions. Answers to the questions asked will be published with Final Disclosure documentation on Friday, September 28, 2007 at http://www.qwest.com/wholesale/ima/xml/faq.html. Carol noted that CLECs may continue to submit comments through September 18, 2007. Carol opened up the floor to questions regarding changes to the Developer Worksheets (Pre-Order, Order, Other Order and Post Order) and Product/Transaction chapters. There were no questions.

August 15, 2007 Systems CMP Meeting Discussion: Mark Coyne-Qwest stated that this attachment includes the IMA 22.0 Commitment List.

June 20, 2007 Systems CMP Meeting Discussion: Mark Coyne-Qwest stated that this is the current 22.0 Packaging and noted that there are 6 CRs packaged and stated that the LOEs are also on the document. Mark asked if there were any questions or comments. There were none.

- April 18, 2007 Systems CMP Meeting Discussion: Mark Coyne-Qwest stated that this attachment contained the Initial Prioritization List for the IMA 22.0 Release. Mark asked if there were any questions on the list. There were none. Mark then mentioned that Packaging would occur in the June timeframe and be communicated in CMP.

-- August 16, 2006 Monthly Systems CMP Meeting Discussion: Mark Coyne-Qwest stated that the LOE for this CR is 325 to 540 hours and is eligible for prioritization.

July 19, 2006 Systems CMP Meeting Discussion: Kim Isaacs/Eschelon presented the CR and stated that Eschelon is looking for similar functionality that will be implemented (SCR032202-1) in the IMA 20.0 October Release. Kim then asked for questions. None were brought forward. Mark Coyne-Qwest stated that this CR would move to Presented Status and noted that Qwest would continue to review this request and would provide the response in August.

July 13, 2006 Clarification Meeting Introduction of Attendees: Kim Isaacs-Eschelon, Steph Prull-Eschelon, Becky Ferrington-Qwest, Joanne Ragge-Qwest, Carol McKenzie-Qwest, Anders Ingemarson-Qwest, Denise Martinez-Qwest, Lee Gomez-Qwest, Anne Robberson-Qwest, Chuck Anderson-Qwest, Lynn Stecklein-Qwest, Mark Coyne-Qwest, Sandy McGee-Qwest, Shirley Tallman-Qwest, Peggy Esquibel Reed-Qwest

Review Requested (Description of) Change: Peggy Esquibel Reed-Qwest Reviewed the CRs description and asked Eschelon if they had additional information to share with the call participants. Kim Isaacs-Eschelon stated that there was no additional information; it is a pretty straight forward request. Denise Martinez-Qwest agreed and stated that this effort would be similar to the effort that was done for an IMA 20.0 candidate, SCR032202-1 IMA GUI Post/Status Updates/Posted to be Billed. There were no additional questions or comments.

Peggy Esquibel Reed-Qwest confirmed that this request is not specific to an area, such as Post Order. Peggy Esquibel Reed-Qwest confirmed that this request is for IMA GUI only. Peggy Esquibel Reed-Qwest confirmed that this request is not for a specific product set.

Establish Action Plan & Resolution Time Frame: Peggy Esquibel Reed-Qwest stated that this CR is due for presentation at the July 19, 2006 Systems CMP Meeting, Qwest would internally review the request, and that Qwest would provide the response to the CR by August 16, 2006.

CenturyLink Response

DRAFT RESPONSE

July 25, 2006

RE: SCR0062906-01 (Ability to Download IMA GUI Line Loss Notifications)

Qwest has reviewed the information submitted as part of Change Request SCR062906-01. Based upon research that was conducted following the July 13, 2006 clarification meeting, Qwest is able to provide an estimated Level of Effort (LOE) of 325 to 540 hours for this IMA GUI request. At the next Monthly Systems CMP Meeting, CMP participants will be given the opportunity to comment on this Change Request and provide additional clarifications. Any clarifications and/or modifications identified at that time will be incorporated into Qwest's further evaluation of this Change Request.

This Change Request is an eligible candidate for the IMA 21.0 prioritization vote.

Sincerely, Qwest Corporation

Information Current as of 1/11/2021