Wholesale: Products & Services

Archived System CR SCR060612-1IG Detail

 
Title: ASOG 45 Industry Release/CORA and ASR Gateway
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR060612-1IG Completed
10/17/2012
-   6/ CORA
Originator: Robberson, Anne
Originator Company Name: CenturyLink
Owner: Robberson, Anne
Director:
CR PM: Lorence, Susan
Description Of Change
ASOG 45 Industry Changes: The CORA ASR Gateway application is being updated to support changes for ASOG 45, including ASOG, Mech Spec and UOM-ASR Schema changes as mandated by OBF. Details of the ASOG 45 industry changes can be found at: http://www.atis.org/

• BUM (Broadcast, Unknown Unicast, and Multicast Option) Field added to Transport, End User Special Access, and Additional Circuit Information forms

• BI (Bundling Indicator) Field added to Transport, End User Special Access, and Additional Circuit Information forms

• OTC (Other Tranport Company) field on the Ethernet Virtual Connection form

• VACT (CE-VLAN Activity Indicatory) field added to the Ethernet Virtual Connection form

Company Specific Edits: The following changes that are customer affecting are also being implemented:

New CORA Pre-Order Validations

New CORA GUI and ASR Gateway Validations

• New Validator will reject N, C, M, and T order activity on accounts that are denied for non-payment

Changed CORA GUI and ASR Gateway Validations

• The Forbearance Validator is being modified to do a look up of the contrat number based on ACNA when the ACNA and CCNA are different

• The PSL Validator will be enhanced to look at the TQ field and accept or reject based on the results of the LERG look up and the TQ field

• The PSL Validator will be enhanced to recognize remote host clli codes

• The CORA GUI will not allow the PI field on the SALI form to be populated if the SECLOC field is populated with an “E”

• The CORA GUI will require the PI field be populated on the SALI form if the PRILOC is populated with an “E”

CORA GUI Report enhancements:

• The CORA GUI will darken the color displayed on the PDF copies of customer ASRs, DLRs, C/NRs, and FOCs

Status History

Date Action Description
6/6/2012 CR Submitted CR Submitted 
6/8/2012 CR Acknowledged CR Acknowledged 
6/20/2012 Status Changed Status changed to Presented. 
6/20/2012 Discussed at Monthly CMP Meeting Presented at June Sys CMP Meeting – See Attachment D in the Distribution package 
6/25/2012 Status Changed Status changed to Development 
7/6/2012 Communicator Issued See notice number SYST.CORA.07.06.12.F.10288.CORARel20.0DftTchSpec 
7/23/2012 General Meeting Held Walkthrough of Technical Specifications conducted. See Wholesale calendar for related documentation. Also see Project Meetings for meeting minutes. 
8/3/2012 Communicator Issued See Notice number SYST.CORA.08.03.12.F.10352.CORARel20.0FnlTchSpec. 
8/15/2012 Discussed at Monthly CMP Meeting Presented at August Sys CMP Meeting – See Attachment K in the Distribution package 
8/20/2012 Communicator Issued See notice number SYST.CORA.08.20.12.F.10284.CORAGUI_20.0_DraftRelDoc 
8/27/2012 Communicator Issued See notice number SYST.CORA.08.27.12.F.10285.CORAGUI_20.0_FNLRelDoc 
9/17/2012 Status Changed Status changed to CLEC Test. 
9/17/2012 Communicator Issued See notice number SYST.CORA.09.17.12.F.10455.CORA20.0Deplymt_SuppDoc. 
9/19/2012 Discussed at Monthly CMP Meeting Discussed at the September Systems CMP Meeting - See Attachment J and K of the Distribution package. 
10/17/2012 Status Changed Status changed to Completion. 
10/17/2012 Discussed at Monthly CMP Meeting Discussed at the November Systems CMP Meeting - See Attachment G in the Distribution Package 

Project Meetings

10/17/12 Systems CMP Meeting Mark Coyne – CenturyLink relayed that the effective date for this System update was September 17, 2012 and this CR is in CLEC test. Mark said we would like to move it to Completed status. There were no objections.

09/19/12 Systems CMP Meeting Mark Coyne – CenturyLink said that SCR060612-1IG is now in CLEC test.

08/15/12 Systems CMP Meeting Mark Coyne – CenturyLink stated that there was one CR on the list, SCR060612-1IG. It will go into effect on September 17, 2012. Mark said we will consider this CR for closure next month.

7/23/12 Technical Walkthrough conducted Attendees List* Nicole James – CenturyLink;Anne Robberson – CenturyLink;Coral Shanley - Integra;Bill West – CenturyLink;Doris Lutrell – CenturyLink; Alan Bratetic – CenturyLink;Jamie Schafe – Integra;Charity Mullen – Integra;Shelby Burleigh – Integra;Julie Pickard - ?;Karen Cain – Integra;Lori Robberson – Integra;Michelle Uton – XO Communications;Jason Randall – Integra;Alice Espindola – Integra;Rhonda Knutson – Integra *List may be incomplete

1. Introductions Nicole James, with CenturyLink, began the meeting by taking attendance and announcing the purpose of the meeting. Nicole explained that the purpose of this call is to discuss the CORA-ASR Gateway ASOG 45 Release scheduled on September 17, 2012. Nicole turned the meeting over to Anne Robberson, with CenturyLink to provide an overview of the presentation Document which is posted in the meeting materials on the day’s calendar entry on the Wholesale Calendar.

2. Candidate Reviews

Reviewer: Anne Robberson, with CenturyLink, reviewed the Customer Presentation documentation and stated that there were corrections done to Slides 4 and 5 and the version of the document attached to the calendar did not include those changes. Anne pointed out the changes that were made on each slide.

Anne then opened the floor to questions. There were no additional questions.

06/20/2012 Monthly CMP Systems Meeting Anne Robberson – CenturyLink presented the system CR that is to be effective in September. Anne asked if there were any questions. There were none.

CenturyLink Response