Title: ASOG 45 Industry Release/CORA and ASR Gateway | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
|
|||||
SCR060612-1IG |
Completed 10/17/2012 |
- | 6/ | CORA |
Originator: Robberson, Anne |
Originator Company Name: CenturyLink |
Owner: Robberson, Anne |
Director: |
CR PM: Lorence, Susan |
Description Of Change |
ASOG 45 Industry Changes: The CORA ASR Gateway application is being updated to support changes for ASOG 45, including ASOG, Mech Spec and UOM-ASR Schema changes as mandated by OBF. Details of the ASOG 45 industry changes can be found at: http://www.atis.org/ • BUM (Broadcast, Unknown Unicast, and Multicast Option) Field added to Transport, End User Special Access, and Additional Circuit Information forms • BI (Bundling Indicator) Field added to Transport, End User Special Access, and Additional Circuit Information forms • OTC (Other Tranport Company) field on the Ethernet Virtual Connection form • VACT (CE-VLAN Activity Indicatory) field added to the Ethernet Virtual Connection form
Company Specific Edits: The following changes that are customer affecting are also being implemented:
New CORA Pre-Order Validations
New CORA GUI and ASR Gateway Validations • New Validator will reject N, C, M, and T order activity on accounts that are denied for non-payment
Changed CORA GUI and ASR Gateway Validations • The Forbearance Validator is being modified to do a look up of the contrat number based on ACNA when the ACNA and CCNA are different • The PSL Validator will be enhanced to look at the TQ field and accept or reject based on the results of the LERG look up and the TQ field • The PSL Validator will be enhanced to recognize remote host clli codes • The CORA GUI will not allow the PI field on the SALI form to be populated if the SECLOC field is populated with an “E” • The CORA GUI will require the PI field be populated on the SALI form if the PRILOC is populated with an “E”
CORA GUI Report enhancements: • The CORA GUI will darken the color displayed on the PDF copies of customer ASRs, DLRs, C/NRs, and FOCs
|
Status History |
Date | Action | Description |
6/6/2012 | CR Submitted | CR Submitted |
6/8/2012 | CR Acknowledged | CR Acknowledged |
6/20/2012 | Status Changed | Status changed to Presented. |
6/20/2012 | Discussed at Monthly CMP Meeting | Presented at June Sys CMP Meeting – See Attachment D in the Distribution package |
6/25/2012 | Status Changed | Status changed to Development |
7/6/2012 | Communicator Issued | See notice number SYST.CORA.07.06.12.F.10288.CORARel20.0DftTchSpec |
7/23/2012 | General Meeting Held | Walkthrough of Technical Specifications conducted. See Wholesale calendar for related documentation. Also see Project Meetings for meeting minutes. |
8/3/2012 | Communicator Issued | See Notice number SYST.CORA.08.03.12.F.10352.CORARel20.0FnlTchSpec. |
8/15/2012 | Discussed at Monthly CMP Meeting | Presented at August Sys CMP Meeting – See Attachment K in the Distribution package |
8/20/2012 | Communicator Issued | See notice number SYST.CORA.08.20.12.F.10284.CORAGUI_20.0_DraftRelDoc |
8/27/2012 | Communicator Issued | See notice number SYST.CORA.08.27.12.F.10285.CORAGUI_20.0_FNLRelDoc |
9/17/2012 | Status Changed | Status changed to CLEC Test. |
9/17/2012 | Communicator Issued | See notice number SYST.CORA.09.17.12.F.10455.CORA20.0Deplymt_SuppDoc. |
9/19/2012 | Discussed at Monthly CMP Meeting | Discussed at the September Systems CMP Meeting - See Attachment J and K of the Distribution package. |
10/17/2012 | Status Changed | Status changed to Completion. |
10/17/2012 | Discussed at Monthly CMP Meeting | Discussed at the November Systems CMP Meeting - See Attachment G in the Distribution Package |
Project Meetings |
10/17/12 Systems CMP Meeting Mark Coyne – CenturyLink relayed that the effective date for this System update was September 17, 2012 and this CR is in CLEC test. Mark said we would like to move it to Completed status. There were no objections. 09/19/12 Systems CMP Meeting Mark Coyne – CenturyLink said that SCR060612-1IG is now in CLEC test. 08/15/12 Systems CMP Meeting Mark Coyne – CenturyLink stated that there was one CR on the list, SCR060612-1IG. It will go into effect on September 17, 2012. Mark said we will consider this CR for closure next month. 7/23/12 Technical Walkthrough conducted Attendees List* Nicole James – CenturyLink;Anne Robberson – CenturyLink;Coral Shanley - Integra;Bill West – CenturyLink;Doris Lutrell – CenturyLink; Alan Bratetic – CenturyLink;Jamie Schafe – Integra;Charity Mullen – Integra;Shelby Burleigh – Integra;Julie Pickard - ?;Karen Cain – Integra;Lori Robberson – Integra;Michelle Uton – XO Communications;Jason Randall – Integra;Alice Espindola – Integra;Rhonda Knutson – Integra *List may be incomplete 1. Introductions Nicole James, with CenturyLink, began the meeting by taking attendance and announcing the purpose of the meeting. Nicole explained that the purpose of this call is to discuss the CORA-ASR Gateway ASOG 45 Release scheduled on September 17, 2012. Nicole turned the meeting over to Anne Robberson, with CenturyLink to provide an overview of the presentation Document which is posted in the meeting materials on the day’s calendar entry on the Wholesale Calendar. 2. Candidate Reviews Reviewer: Anne Robberson, with CenturyLink, reviewed the Customer Presentation documentation and stated that there were corrections done to Slides 4 and 5 and the version of the document attached to the calendar did not include those changes. Anne pointed out the changes that were made on each slide. Anne then opened the floor to questions. There were no additional questions. 06/20/2012 Monthly CMP Systems Meeting Anne Robberson – CenturyLink presented the system CR that is to be effective in September. Anne asked if there were any questions. There were none.
|
CenturyLink Response |
|