Archived System CR SCR060607-01 Detail |
Title: UNE P in IMA | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
|
|||||
SCR060607-01 |
Withdrawn 9/19/2007 |
- | 12/ | UNE-P |
Originator: Van Dusen, Janean |
Originator Company Name: Qwest Corporation |
Owner: Van Dusen, Janean |
Director: |
CR PM: Stecklein, Lynn |
Description Of Change |
UNE P is no longer available and should be replace with a product description that will represent the commercially negotiated UNE P replacement products - Cross reference CMP CR PC050907-1
|
Status History |
Date | Action | Description |
6/6/2007 | CR Submitted | |
6/7/2007 | CR Acknowledged | |
6/20/2007 | Discussed at Monthly CMP Meeting | Discussed in the July Systems CMP Meeting - See Attachment C in the Distribution Package |
6/25/2007 | Status Changed | Status changed to Presented |
9/11/2007 | Status Changed | Status changed to pending withdrawal |
9/19/2007 | Discussed at Monthly CMP Meeting | Discussed at the September Systems CMP Meeting - See Attachment G in the Distribution Package |
9/19/2007 | Status Changed | Status changed to Withdrawn |
Project Meetings |
9/19/07 Systems CMP Meeting Mark Coyne-Qwest stated that CR was presented in the June CMP Meeting. He said that we originally thought that this effort would only include updates to the developer worksheets. Mark said that with further analysis we have determined that system work is involved and that we would like to withdraw this request. Bonnie Johnson-Eschelon asked why Qwest was withdrawing. Mark Coyne-Qwest stated that there is system work involved and that it is too costly. He said that we would readdress in the future.
-- 6/20/07 Systems CMP Meeting Janean Van Dusen-Qwest stated that UNE P is no longer available and should be replaced with a product description that will represent the commercially negotiated UNE P replacement products. Mark Coyne-Qwest asked if this was strictly a name change. Janean Van Dusen-Qwest said yes. Bonnie Johnson-Eschelon asked if this was a system CR. Lynn Stecklein-Qwest stated that this CR is a system CR with the interface identified as process and documentation. Kim Isaacs-Echelon asked if the request type was changing in IMA. Janean Van Dusen-Qwest said yes and that we need to change the name to reflect what you are ordering. Bonnie Johnson-Eschelon asked if this was a prioritizable CR. Lynn Stecklein-Qwest stated that it is not a prioritizable CR because it is considered a process and documentation change. Carol McKenzie-Qwest stated that there will be updates to the Developer Worksheets. Kim Isaacs-Eschelon asked if this was a name change only in the GUI itself. Carol McKenzie-Qwest said yes.
|
CenturyLink Response |
|
Information Current as of 1/11/2021