Wholesale: Products & Services

Archived System CR SCR060105-04 Detail

 
Title: New QORA Edits
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR060105-04 Completed
11/16/2005
5200 - 6500   24/ Ordering, Provisioning UDIT, EUDIT, CCSAC, LIS Trunks, UDF, E911 PS/ALI
Originator: Kalakis, Cindy
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Esquibel-Reed, Peggy
Description Of Change
July 13, 2005 Revision/Addition to CR Received:

Fields: LD1, LD2, LD3

ASR Practice: 015

Edit Description: Valid Qwest entries will only include the recommended abbreviations contained in the United States Postal Service Publication 28, Postal Addressing Standards Secondary Unit Designators section.

ASRs with invalid entries will be rejected.

-----------------------------------------------------

The QORA application will be updated to include up-front edits for the following fields of the ASR. If the ASR entries do not pass the validations described, the ASR will be rejected.

Field: ACTL

ASR Practice: 001

Edit Description:

When ACTL is a required field, per industry guidelines, the entry must be a valid 11-character CLLI code.

"New" is also an accepted entry in this field.

Field: ER

ASR Practice: 003, 005, 006, 007

Edit Description:

This field is required when the value in the S25 field = A or B

Field: ER_PRILOC

ASR Practice: 013

Edit Description:

This field is required when the value in the S25 field = A or B

Field: ER_SECLOC

ASR Practice: 013

Edit Description:

This field is required when the value in the S25 field = A or B

Field: CFA

ASR Practice: 005

Edit Description:

This field is required when the REQTYP = S, ACT is not D and the 10th character of the ACTL entry = G or J and the CCEA entry is blank.

Field: CCEA

ASR Practice: 005

Edit Description:

This field is required when the REQTYP = S, ACT is not D and the 10th character of the ACTL entry = G or J and the CFA entry is blank.

Field: MUXLOC

ASR Practice: 005

Edit Description:

This field is required when the CFA field is populated and the facility type for the entry in the CFA field does not begin with "OC".

This field is optional when the CFA field contains a facility type of "OC".

This field is prohibited when CFA and SCFA fields are blank and CCEA is populated.

This field is prohibited when CFA and SCFA is blank and SCCEA is populated.

Field: MUXLOC

ASR Practice: 005

Edit Description:

When MUXLOC is populated, the entry must be an 8-alpha-numeric character entry representing a valid CLLI code.

If CFA field contains a valid CFA entry, the MUXLOC entry will be compared to the CFA entry and must match the first 8-characters of the Qwest-owned CLLI contained in the CFA.

If CFA field is blank and SCFA is populated, the MUXLOC entry will be compared with the SCFA entry and must match the first 8-characters of the Qwest-owned CLLI contained in the SCFA.

When CFA entry = "New", the MUXLOC field will not be validated.

Field: MUXLOC

ASR Practice: 004

Edit Description:

This field is required when REQTYP = M or L, and the 4th position of the NC1 field = G.

Field: MUXLOC

ASR Practice: 004

Edit Description:

When this field is populated, the entry must be an 8-alpha-numeric character representing a valid CLLI code.

Field: MUXLOC

ASR Practice: 002

Edit Description:

This field is required when REQTYP = A and the 4th position of the NC1 field = G

Field: MUXLOC

ASR Practice: 002

Edit Description:

When this field is populated, the entry must be an 8-alpha-numeric character representing a valid CLLI code

Field: AFO (Pos 1)

ASR Practice: 001

Edit Description:

When the REQTYP = A, S or E and the QTY field on the ASR form is greater than "1", the first position of the AFO field entry must be "Y".

Expected Deliverable:

Upgrade QORA Application to provide upfront editing and validation of ASR entries. Need implemented with the QORA 5.0 Upgrade targeted for implementation on October 10, 2005.

Status History

Date Action Description
6/1/2005 CR Submitted  
6/2/2005 CR Acknowledged  
6/7/2005 Clarification Meeting Held  
6/15/2005 Discussed at Monthly CMP Meeting Discussed at the June Systems CMP Monthly Meeting; please see the June Systems CMP Distribution Package, Attachment C 
7/13/2005 Additional Information CR Revised to add LD1, LD2, and LD3 Fields to the CRs Description of Change 
7/20/2005 Discussed at Monthly CMP Meeting Discussed at the July Systems CMP Monthly Meeting; please see the July Systems CMP Distribution Package, Attachment I 
9/12/2005 Communicator Issued SYST.09.12.05.F.03253.QORA5.0DraftRelDocuments 
9/19/2005 Communicator Issued SYST.09.19.05.F.03301.ASRQORA5.0FinalRelDocs 
9/21/2005 Discussed at Monthly CMP Meeting Discussed at the September Systems CMP Monthly Meeting; please see the September Systems CMP Distribution Package, Attachment K 
10/10/2005 Communicator Issued Status Changed to CLEC Test due to 10/10/05 Deployment. 
10/19/2005 Discussed at Monthly CMP Meeting Discussed at the October Systems CMP Monthly Meeting; please see the October Systems CMP Distribution Package, Attachment G 
10/24/2005 Communicator Issued SYST.10.24.05.F.03404.ASRQORARel5.0TechSpecAddm 
11/16/2005 Discussed at Monthly CMP Meeting Discussed at the November Systems CMP Monthly Meeting; please see the November Systems CMP Distribution Package, Attachment G 

Project Meetings

November 16, 2005 Systems CMP Meeting Discussion: Jill Martain/Qwest stated that this CR deployed on October 10th and stated that Qwest was ready to close the CR. There was no objection. This CR is Closed.

October 19, 2005 Systems CMP Meeting Discussion: This CR deployed on 10/10/05 and will remain in CLEC Test

September 21, 2005 Systems CMP Meeting Discussion: This CR will deploy on 10/10/05.

-- July 20, 2005 Systems CMP Meeting Discussion: Cindy Kalakis-Qwest stated that this CR has been revised to add an edit that will be on the Fields: LD1, LD2, and LD3. Cindy said that this edit will ensure that only valid abbreviations per the postal standards are accepted or the ASR will be rejected. Jill Martain-Qwest stated that the LOE for this CR is 5200 to 7500 hours.

-- June 15, 2005 Systems CMP Meeting Discussion: Cindy Kalakis-Qwest presented the CR and stated that this CR is for up-front edits. Cindy stated that this CR is targeted for October 10, 2005, in conjunction with the ASOG 31 changes. Cindy stated that the impacted fields are contained in the CR and include ACTL, ER, CFA, CCEA, MUXLOX, and AFO. Cindy again noted that this CR would be implemented on October 10th. Cindy asked if there were any questions. There were no questions brought forward. This CR moves to Development status.

- June 7, 2005 Clarification Meeting Attendees: Cindy Kalakis-Qwest, Cassandra Hunt-Qwest, Peggy Esquibel Reed-Qwest

Review Requested (Description of) Change: Peggy Esquibel Reed-Qwest reviewed the CR Title and Description and asked if there was additional information to be shared. Cindy Kalakis-Qwest confirmed that this CR is for up-front edits for some of the fields on the ASR. Cindy noted that ASRs would be rejected if the ASR did not pass the specified validations in the CRs description. Cindy also stated that she would like this CR targeted for deployment on October 10, 2005, in conjunction with the ASOG 31 QORA Upgrade.

Confirmed Impacted Area(s): Peggy Esquibel Reed-Qwest confirmed that this Change Request was for Ordering and Provisioning.

Confirmed Impacted Interfaces: Peggy Esquibel Reed-Qwest confirmed that this CR was for QORA.

Confirmed Impacted Products: Peggy Esquibel Reed-Qwest confirmed that this effort impacted UDIT, EUDIT, CCSAC, LIS Trunks, UDF, and E911 PS/ALI.

Establish Action Plan & Resolution Time Frame: Peggy Esquibel Reed-Qwest stated that this CR is due for presentation at the June 15th CMP Meeting.

CenturyLink Response

DRAFT Response

July 1, 2005

RE: SCR060105-04 New QORA Edits

Qwest has reviewed the information submitted as part of Change Request (SCR060105-04). Based upon the scope of this CR as agreed to in the Clarification Meeting (held June 7, 2005) Qwest is able to provide an estimated Level of Effort (LOE) of 5200 to 6500 hours for this QORA Change Request.

This Change Request will be implemented on October 10, 2005.

Sincerely, Qwest