Wholesale: Products & Services

Archived System CR SCR052802-02 Detail

 
Title: PID Impact PO 2: Resale and UNE P POTS LSR edits
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR052802-02 Completed
4/7/2003
8000 -   3/12 UNE-P POTS, Resale
Originator: Martain, Jill
Originator Company Name: Qwest Corporation
Owner: Winston, Connie
Director:
CR PM: Nolan, Laurel
Description Of Change
This change request seeks to add the following Resale and UNE-P POTS edits to assist the CLEC in the LSR entry process. The following edits will improve the quality of Resale and UNE-P POTS requests minimizing Qwest’s manual intervention by automatically rejecting inaccuracies found on the LSRs back to the CLEC shortly after the LSR is submitted. This will ultimately improve the response times back to the CLECs on LSRs that are flow-through capable.

- Edit to require specific Feature Activity (FA) in the service detail dependent on the type of USOC and/or FID activity.

- Edit to disallow LSR ACT= N when adding new lines to an existing account. LSR ACT should = C with LNA = N.

- Edit to restrict addition of Dial Lock (OC4) or Outgoing Call Restrictions (NLUAC) when a toll block is already present on the CSR.

- Edit central region accounts to require a C.L.A.S.S. feature USOC with inward action (N, V, or T) when Call Waiting ID is requested.

- Edit to require the removal of Talking Call Waiting when a custom calling package is removed from the line.

- Edit to restrict the changing of a main line USOC to an additional line USOC and vice versa.

- Edit to ensure the RSID on the CSR and LSR match if the LSR is not for conversion or disconnect.

- Edit to establish when a restoral is for a suspended or denied account. Orders must be written different for the two scenarios.

- Establish rules to process accounts with Expanded Interconnection Channel Termination (EICT) USOCs.

- Edit for valid PIC and LPIC values.

- Edit AHN, SASN, SANO, Route, Box entries for validity.

- Edit for correct usage of the hunting section on the LSR form.

- Edit to ensure the correct USOCs are used on a residence account vs. business account.

- Edit usage of the LCC FID with blocking features.

If implemented, this CR is expected to have a positive impact on PO-2 since the edits will help improve flow through capability

Status History

Date Action Description
5/28/2002 CR Submitted  
5/28/2002 CR Acknowledged Acknowlement sent to Jill Martain 
5/29/2002 Clarification Meeting Held  
5/31/2002 CR Posted to Web  
6/20/2002 Discussed at Monthly CMP Meeting SCR052802-02 discussed at June Systems CMP Monthly meeting; please see Systems CMP Distribution Package June CMP -- Attachment C 
6/20/2002 Status Changed Status set to Pending Prioritization 
7/18/2002 Discussed at Monthly CMP Meeting SCR052802-02 discussed at July Systems CMP Monthly meeting; please see Systems CMP Distribution Package July CMP -- Attachment P 
7/26/2002 Status Changed Status set to Prioritized as a result of the release prioritization for IMA 12.0 
7/26/2002 Release Ranking Ranking for Release 12.0 following the July 2002 Systems CMP Meeting. SCR052802-02 ranked number 13 (tie) 
10/30/2002 Status Changed SCR052802-02 status updated to 'Packaged' based upon outcome of release 12.0 packaging effort 
12/19/2002 Discussed at Monthly CMP Meeting SCR052802-02 discussed at December Systems CMP Monthly meeting; please see Systems CMP Distribution Package December CMP -- Attachment N 
4/7/2003 Status Changed Status changed to CLEC Test due to IMA 12.0 deployment 
4/18/2003 Status Changed CR reviewed in CMP Monthly Meeting after 4-7-03 deployment. CR changed to Completed status. 

Project Meetings

Excerpt CMP Monthly Meeting April 17, 2003

SCR052802-02 PID Impact - PO-2: Resale and UNE-P POTS LSR Edits (Originated by Qwest) No comments. CR changed to “completed” status.

CenturyLink Response

DRAFT RESPONSE

June 12, 2002

RE: SCR052802-02 (Resale and UNE-P POTS LSR edits)

Qwest has reviewed the information submitted as part of Change Request SCR052802-02. Qwest is able to provide an estimated Level of Effort (LOE) of larger than 8000 hours for this IMA Change Request.

At the next Monthly Systems CMP Meeting, CMP participants will be given the opportunity to comment on this Change Request and provide additional clarifications. Qwest is interested in the experiences of the CMP community as relates to this issue. Qwest will incorporate any feedback received at the next Monthly Systems CMP Meeting into further evaluation of this Change Request.

This change is eligable to be prioritized in the IMA 12.0 prioritization vote which will be conducted after the CR Review in the July 18th Systems CMP monthly meeting.

Sincerely, Qwest

Information Current as of 1/11/2021