Archived System CR SCR050310-1IG Detail |
Title: ASOG 41 Industry Release/QORA and ASR Gateway Enhancements | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
|
|||||
SCR050310-1IG |
Completed 10/20/2010 |
- | 24/ | Pre-ordering |
Originator: Crotty, Tonia |
Originator Company Name: Qwest Corporation |
Owner: Crotty, Tonia |
Director: |
CR PM: Lorence, Susan |
Description Of Change |
ASOG 41 Industry Changes The QORA ASR Gateway application needs to be updated to support changes for ASOG 41, including ASOG, Mech Spec and UOM-ASR Schema changes as mandated by OBF.
Details of the ASOG 41 industry changes can be found at: http://www.atis.org/
Qwest Specific Edits: The following changes that are customer affecting are also being implemented.
New QORA Pre-Order Validations -No new edits for this release
New QORA GUI and ASR Gateway Validations
-NUT/UREF Validation- The system will validate that NUT and UREF are populated ACT=D. If not populated the ASR will be rejected.
- S-VLAN/S-VLAN ID Validation- The system will validate that neither of these fields are populated. If they are the ASR will be rejected.
- Interval Validation – The existing Interval validation will now run on SUP type 2, 3 and 4.
- ARLRN Validation- The system will validate that the NPA/NXX is available according to the SECLOC CLLI. If the CLLI is an Access Tandem the ASR will be rejected.
QORA GUI Report enhancements
- No new edits for this release
|
Status History |
Date | Action | Description |
5/3/2010 | CR Submitted | CR Submitted |
5/5/2010 | CR Acknowledged | CR Acknowledged |
5/19/2010 | Discussed at Monthly CMP Meeting | Discussed at the May Systems CMP Meeting - See Attachment D in the Distribution Package |
6/11/2010 | Status Changed | Status changed to Development |
7/9/2010 | Communicator Issued | See notice number SYST.QORA.07.09.10.F.07952.QORARel16.0DftTchSpec |
8/6/2010 | Communicator Issued | See notice number SYST.QORA.08.06.10.F.08154.QORARel16.0FnlTchSpec |
8/9/2010 | Communicator Issued | See notice number SYST.QORA.08.09.10.F.08167.QORARel16.0FnlTchSpecCORR |
8/23/2010 | Communicator Issued | See notice number PROS.MISC.08.23.10.F.08161.POA_LOA_V9 |
9/3/2010 | Communicator Issued | See notice number PROS.MISC.09.03.10.F.08221.FNL_RESP_POA_LOA_V9 |
9/15/2010 | Discussed at Monthly CMP Meeting | Discussed at the September Systems CMP Meeting - See Attachment K in the Distribution Package |
9/20/2010 | Status Changed | Status changed to CLEC Test |
10/20/2010 | Status Changed | Status Changed to Completed |
10/20/2010 | Discussed at Monthly CMP Meeting | Discussed at the October Systems CMP Meeting - See Attachment G in the Distribution Package |
Project Meetings |
10/20/10 Systems CMP Meeting Mark Coyne – Qwest indicated that this was implemented on September 20, 2010. Qwest is requesting to move this from CLEC Test to Completed. Mark asked if there were any objections to closing this CR. There were none. 09/15/10 Systems CMP Meeting Mark Coyne – Qwest indicated that the implementation date is September 20, 2010. 05/19/10 Systems CMP Meeting Tonia Crotty – Qwest relayed that QORA (Qwest Online Request Application) ASR gateway application will be updated to support the changes for ASOG 41 including the ASOG Mech Spec and UOM-ASR Schema changes as mandated by OBF. The Qwest specific edits and changes that are customer affecting are being implemented effective September 20, 2010. Details of the ASOG 41 industry changes can be found at www.atis.org. There are 4 QORA GUI and ASR Gateway Validations that will be implemented. Qwest will be implementing a NUT/UREF Validation - the system will validate that NUT and UREF are populated on ACT=D. If not populated, the ASR will be rejected. S-VLAN/S-VLAN ID Validation - the system will validate that neither of these fields are populated. If they are, the ASR will be rejected. Interval Validation - the existing Interval validation will run on SUP types 2, 3 and 4. ARLRN Validation - the system will validate that the NPA/NXX is available according to the SECLOC CLLI. If the CLLI is an Access Tandem, the ASR will be rejected. Mindy Chapman – Neustar asked Tonia if Qwest was doing everything as part of the ASOG 41 Release – supporting the EVC and all of that. Tonia Crotty – Qwest indicated that was correct. Mindy Chapman – Neustar asked if what is listed is in addition to the ASOG release. Tonia Crotty – Qwest indicated that was correct. These are more Qwest specific and she wants to make sure that everyone is aware of these. Chris Del Rio – Covad asked if Qwest knew what the NUT/UREF fields are. Steve Edwards – Qwest replied that UREF is UNI reference number. You can have up to 20 UREF entries on an EVC form and each one is numbered. NUT is the number of UNI terminations which is a count of the number of UREFs entries populated on the EVC form. Chris Del Rio – Covad asked if this is when you are disconnecting more than one line or one ASR. Dawn Beck - Qwest indicated that it was for circuits. Mark Coyne – Qwest relayed that this ASOG 41 release includes more changes than usual.
|
CenturyLink Response |
|
Information Current as of 1/11/2021