Archived System CR SCR031103-01 Detail

 
Title: 7/24/07 Revision to Title Changes to Edits or Process Regarding Complex/Caption Listings (Original Title of CR) Changes to Edits or Process Regarding Complex Listings on an ACTof N order for resale
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR031103-01 Completed
5/21/2008
3552 - 5920   3/ Ordering Resale ACT = N, C, V, T Listings ACT = R Centrex 21 ACT = V or C
Originator: Bilow, Joyce
Originator Company Name: McLeodUSA
Owner: Coyne, Mark
Director:
CR PM: Esquibel-Reed, Peggy
Description Of Change
7/24/07 - Revision to Description - Request is for change to the edits or processes regarding complex/caption listings on a resale order with the ACT = N, C, V, T. Would like Complex/Caption listings to be allowed on the provisioning order for Resale customers. At this time the CLEC has to submit a dummy listing on the DL form due to the DL form being required, then turn around and process a secondary order to remove the dummy listing and have the correct complex listing established. Would also like orders to flow through, for consistency.

Revision to Products: Resale Act = N,C,V,T

Listings Act = R

Centrex 21 Act = V or C

Original CR Description - Mcleod requests a change to the edits or processes regarding complex listings on a resale order with the ACT = N. Mcleod would either like Complex listings be allowable for resale customers on an ACT of N or we would like the DL form to become conditional based on a related HB order attached to the Provisioning order via the RPON field. At this time the CLEC has to submit a dummy listing on the DL form due to the DL form being required, then turn around and process a secondary order to remove the dummy listing and have the correct complex listing established.

Expected Deliverables/Proposed Implementation Date (if applicable):

Mcleod expects to be able to process complex listings on an ACT of N order with minimal rework required by the CLEC. This is either by the changing of the requirement of the DL form on an ACT of N for resale customers, or changing the process to allow complex listings to be established with the provisioning order. This would make the resale products more consistent with the UNE product. And allow for order flow consistency for both the CLEC and Qwest.

Status History

Date Action Description
3/11/2003 CR Submitted  
3/13/2003 CR Acknowledged  
3/13/2003 CR Posted to Web  
3/17/2003 Info Requested from CLEC  
3/18/2003 Clarification Meeting Scheduled  
3/21/2003 Clarification Meeting Held  
4/10/2003 Qwest Response Issued  
4/16/2003 Qwest Response Issued  
4/17/2003 Discussed at Monthly CMP Meeting  
8/21/2003 Discussed at Monthly CMP Meeting Discussed at the August Systems CMP Monthly Meeting; please see August Systems CMP Distribution Package, Attachment P 
9/2/2003 Release Ranking 15.0 Prioritization- Ranked #16 out of 57 
9/29/2003 Release Ranking 15.0 Revised Prioritization, due to Late Adder - Ranked #17 out of 58 
1/22/2004 Discussed at Monthly CMP Meeting Discussed at the January Systems CMP Monthly Meeting; please see January Systems CMP Distribution Package, Attachment P 
2/4/2004 Release Ranking 16.0 Prioritization- Ranked #18 out of 50 
2/19/2004 Discussed at Monthly CMP Meeting Discussed at the February Systems CMP Monthly Meeting; please see the February Systems CMP Distribution Package, Attachments H & J 
3/1/2004 Release Ranking IMA 16.0 Revised Prioritization, Late Adder Ranking - #19 out of 51 
7/22/2004 Discussed at Monthly CMP Meeting Discussed at the July Systems CMP Monthly Meeting; please see July Systems CMP Distribution Package, Attachment N 
8/3/2004 Release Ranking 17.0 Prioritization- Ranked #20 out of 41 
2/16/2005 Discussed at Monthly CMP Meeting Discussed at the February Systems CMP Monthly Meeting; please see February Systems CMP Distribution Package, Attachment M 
2/28/2005 Release Ranking 18.0 Prioritization- Ranked #18 out of 34 
7/5/2005 Additional Information QPP will benefit with the implementation of this CR 
8/1/2005 Release Ranking 19.0 Prioritization- Ranked #16 out of 26 
2/15/2006 Discussed at Monthly CMP Meeting Discussed at the February Systems CMP Monthly Meeting; please see the February Systems CMP Distribution Package, Attachment M 
2/27/2006 Release Ranking 20.0 Prioritization- Ranked # 7 out of 21 
3/13/2006 Communicator Issued SYST.03.13.06.F.03762.IMAGUI_Rel19.0DraftDoc 
3/15/2006 Discussed at Monthly CMP Meeting Discussed at the March Systems CMP Monthly Meeting; please see the March Systems CMP Distribution Package, Attachment M 
7/7/2006 Status Changed Status Changed to Pending Prioritization, for 21.0 Release. 
8/16/2006 Discussed at Monthly CMP Meeting Discussed at the August Systems CMP Monthly Meeting; please see the August Systems CMP Distribution Package, Attachment M 
8/28/2006 Release Ranking 21.0 Prioritization- Ranked #06 out of 19 
11/27/2006 Release Ranking IMA 21.0 Late Adder Ranking - #07 out of 20 
4/2/2007 Release Ranking IMA 22.0 Prioritization- Ranked #09 (tie) out of 18 
4/18/2007 Discussed at Monthly CMP Meeting Discussed at the April Systems CMP Monthly Meeting; please see the April Systems CMP Distribution Package, Attachment M 
7/16/2007 General Meeting Held See Project Meetings Section for Meeting Minutes. 
7/24/2007 Info Received From CLEC Revisions to CR Title and Description accepted by McLeod 
8/1/2007 Record Update LOE revised (from 1800-3000 hrs) due to merged information from SCR052907-01. 
8/15/2007 Discussed at Monthly CMP Meeting Discussed at the August Systems CMP Monthly Meeting; please see the August Systems CMP Distribution Package, Attachment N 
8/27/2007 Communicator Issued CMPR.08.27.07.F.04890.IMA_23.0_Prioritization 
8/27/2007 Release Ranking 23.0 Prioritization- Ranked #2 out of 10 
9/19/2007 Discussed at Monthly CMP Meeting Discussed at the September Systems CMP Monthly Meeting; please see the September Systems CMP Distribution Package, Attachment M 
12/17/2007 Status Changed Status changed to Development 
1/16/2008 Status Changed Status changed to Packaged 
5/8/2008 Status Changed Status changed to CLEC Test 
5/21/2008 Status Changed Status changed to Completed 
5/27/2008 Discussed at Monthly CMP Meeting Discussed at the May CMP Meeting - See Attachment G in the Systems Distribution Package 

Project Meetings

5/21/08 Systems CMP Meeting Mark Coyne-Qwest said that this CR was implemented in the IMA 23.0 Release on 4/21/08 and that we are looking to close. There were no objections.

September 19, 2007 Systems CMP Meeting Discussion: Mark Coyne-Qwest stated that this is the IMA 23.0 Initial Prioritization List and is the list that we would work from for the Packaging of the 23.0 Release.

-- August 15, 2007 Systems CMP Meeting Discussion: Mark Coyne-Qwest stated that IMA 23.0 is scheduled in April of 2008. Note: Kim Isaacs-Eschelon said that candidate number 7 - SCR121306-01 Enable the EOS Field on the Directory Listing Form is on the Commitment List for IMA 22.0. Peggy Esquibel-Reed-Qwest stated that we will remove that candidate from the IMA 23.0 list. Peggy Esquibel-Reed-Qwest stated that the Prioritization Instructions and spreadsheet candidate list are included in this attachment. She stated that there are 11 candidates on the list. She said that Qwest and the CLEC ranks each CR on the list by providing a point value from 1 through 11. Peggy said that the highest point value (11) should be assigned to the CR that Qwest and the CLECs wish to be implemented first. The next point value (10) should be assigned to the CR that Qwest and the CLECs wish to be implemented second and so on. The lowest point value (1) should be assigned to the least desired CR. Peggy stated that the total points will be calculated by the Qwest CMP Manager and the results will be distributed to the CLECs via mailout within 2 business days following the submission of the ranking. Peggy reviewed the timelines associated with prioritization: - Qwest Re-Distributes the Prioritization Form by 5 pm MT on August 20th - The Completed Prioritization Form will be submitted to cmpcr@qwest.com by 5 pm MT on August 23rd. - Qwest e-mails the Initital Prioritization Form by 5 pm MT on August 27th. - Peggy asked if everyone would like to provide their top 2 candidates. Kim Isaacs-Eschelon stated that their top candidate is #9 SCR062906-03 Allow End State Ordering for Resale POTS Service. Integra - no response Jeff Sonnier-Sprint said that he would send an e-mail with this information. Note: 8/17/07 - E-mail received from Sprint with top 2 candidates: 1. Change of usage of CCNA for Sprint on LNP Orders 2. Allow NP Bus Name on Residential Account TDS - no response Verizon Business - no response Sue Wright-XO Communications stated that she had nothing to share. Janet Harper-Bresnan Communications stated that she did not have anything to share. McLeod-no response Synchronous-no response Peggy Esquibel-Reed-Qwest stated that Qwest’s top 2 candidates are #10 SCR110106-02 Allow NP Bus Name on Residential Account and #11 SCR071307-01 Add TSP Reject Code.

July 24, 2007 Email Sent to McLeodUSA: Hi Joyce, Thanks for your response. I have attached a current copy of your CR with the revisions we discussed. Let me know if you have any questions. Thanks, Lynn Stecklein Qwest Wholesale CMP

- July 23, 2007 Email Received From McLeodUSA: Peggy: McLeod does accept the revisions below. Sorry for the delay I've been away from the office. Joyce Bilow (319) 790-7186 jbilow@mcleodusa.com

- July 20, 2007 Email Sent to McLeodUSA: Hi Joyce, Have you yet had an opportunity to review the proposed revision to your CR below? Please let me know if the proposed revision is acceptable. Also let me know if you would like to change the proposed revision. Once I have your acceptance, I can revise the actual CR and send you the revised copy. I have received the okay from BendTel and will await your okay before I make any changes. Thanks much, Peggy Esquibel-Reed Qwest Wholesale CMP

- July 17, 2007 Email Received From BendTel: Peggy That sounds fine to me. Thanks. Kay Griffith

- July 17, 2007 Email Sent to McLeod and BendTel: Good Morning, Thank you for meeting with us yesterday and discussing your CRs for Complex/Caption Listings. Below is a proposed change to the CR Title, Description, and Impacted Products for McLeod USAs Change Request. McLeod's CR will then reflect the request from BendTel's CR as well. Please let me know if the below revision, for McLeods CR, is okay. I will then make the actual revision to McLeods CR. BendTels CR is currently in Pending Withdrawal Status and will be withdrawn at the July CMP Meeting. Proposed Revision: TITLE: Changes to Edits or Process Regarding Complex/Caption Listings DESCRIPTION: Request is for changes to the edits or processes regarding complex/caption listings on a resale order with the ACT = N, C, V, T. Would like Complex/Caption listings to be allowed on the provisioning order for Resale customers. At this time the CLEC has to submit a dummy listing on the DL form due to the DL form being required, then turn around and process a secondary order to remove the dummy listing and have the correct complex listing established. Would also like orders to flow through, for consistency. PRODUCTS: Resale Act = N, C, V, T Listings Act = R Centrex 21 Act = V or C Thank you. Peggy Esquibel-Reed Qwest Wholesale CMP

- July 16, 2007 Conference Call Attendees: Joyce Bilow-McLeodUSA, Kay Griffith-BendTel, Lynn Stecklein-Qwest, Peggy Esquibel Reed-Qwest, Chuck Anderson-Qwest, Carol McKenzie-Qwest, Rossana Robinson-Qwest, Anne Pent-Qwest

Lynn Stecklein-Qwest stated that the purpose of the call was in order to discuss CRs that were submitted by McLeod and by BendTel. Lynn stated that Qwest has reviewed the two requests and that as Qwest was looking at the requirements for these CRs, Qwest found that there are possible synergies and that is what we want to discuss on the call. Carol McKenzie-Qwest stated that Qwest analysts looked at the two requests and did find them to be similar as they are both asking for the ability of one provisioning order on caption listings. Carol stated that the CRs could be combined and could cover the applicable products and make it flow through. Carol stated that this work would benefit the CLECs and Qwest and the combining of the CRs would eliminate additional work that would need to be done for separate CRs. Carol stated that Qwest would like to propose that the two CRs be combined with the McLeod CR being revised to include the information from the BendTel CR and that BendTels CR could then be withdrawn. Carol stated that it would then make flowthrough reasonable. Carol then asked for comments from McLeod and BendTel. Joyce Bilow-McLeodUSA agreed to the Qwest proposal and stated that McLeod had wanted to previously add to their CR but that the LOE would have increased. Joyce stated that Qwests proposal is a better solution because it would cover all areas and Activities of N, C, V, T, and Listings only. Kay Griffith-BendTel also agreed to the proposal. Carol McKenzie-Qwest stated that Qwest would then ask that McLeod’s CR be revised since it was submitted a few years ago and that BendTels CR be withdrawn. Kay Griffith-BendTel asked if Qwest really thought that complex listings could flow through. Carol McKenzie-Qwest stated that the effort was reviewed and that Qwest believes it to be workable. Carol then stated that this would be a large request but noted that it would benefit everyone. Lynn Stecklein-Qwest then stated that the next step would be for McLeod’s CR to be revised and BendTels CR to be placed in pending withdrawal status. Lynn then noted that the revised McLeod CR would be eligible for the IMA 23.0 Prioritization exercise. Carol McKenzie-Qwest asked if there were any additional comments, questions, or concerns. Joyce Bilow-McLeod said no. Kay Griffith-BendTel also said no. Lynn Stecklein-Qwest thanked the call participants and stated that Qwest would be contacting McLeod for the revision to their CR. The call was then concluded.

- April 18, 2007 Systems CMP Meeting Discussion: Mark Coyne-Qwest stated that this attachment contained the Initial Prioritization List for the IMA 22.0 Release. Mark asked if there were any questions on the list. There were none. Mark then mentioned that Packaging would occur in the June timeframe and be communicated in CMP.

-- August 16, 2006 Monthly Systems CMP Meeting Discussion: Peggy Esquibel Reed-Qwest stated that the list of IMA 21.0 candidates, along with the Prioritization Instructions, is located in Attachment M of the distribution Package. Peggy noted that there are 19 candidates, eligible for prioritization. And for this CR Review Exercise, as in the past, Qwest and each CLEC will indicate what their top 2 candidates are. Peggy stated that we would then follow with the review of the prioritization instructions. Peggy asked if there were any questions. There were none brought forward. Peggy then asked for the top 2 candidates, from Qwest and the CLEC Community.

Qwest Corporation SCR040306-01 Add Product Specific Reject Codes SCR053106-01 IMA Change to Allow CLEC to Use Q or Z in the NSTN Field

AT&T SCR031203-02 Resolve Disconnect of Account Number SCR040306-01 Add Product Specific Reject Codes

Covad Lynn Hankins-Covad stated that she would provide Covad’s top 2 candidates via email.

Eschelon SCR050305-01 Bulk PIC Change Process in IMA SCR062906-02 Ability to Convert FBDL Listing with Changes (FBDL ACT = V)

Integra Laurie Fredricksen-Integra stated that she would provide Integra’s top 2 candidates via email. McLeodUSA McLeod stated that they would provide their top 2 candidates via email. 8/23/06 email received with McLeod’ USA’s Top 2 picks: SCR031103-01 Changes to Edits or Process Regarding Complex Listings on an ACT of N Order for Resale SCR081203-01 Resale Page Conditional

Sprint SCR031105-01 Change of Usage of CCNA for Sprint on LNP Orders SCR062906-02 Ability to Convert FBDL Listing with Changes (FBDL ACT = V)

Time Warner SCR062906-02 Ability to Convert FBDL Listing with Changes (FBDL ACT = V)

Verizon Business Verizon Business stated that they would provide their top 2 candidates via email. 8/22/06 email received with Verizon Business’ Top 2 picks: SCR053106-01 IMA Change To Allow CLEC To Use Q or Z In The NSTN Field SCR031203-02 Resolve Disconnect of Account Number

XO Communications XO stated that they were not ready for this exercise.

Peggy Esquibel Reed-Qwest asked that for those providing their top 2 picks via email, that the emails be sent to the cmpcr@qwest.com mailbox. Peggy then asked that the information be provided within the next 2 days. Peggy then stated that she would send the information provided, via email, to the call participants. NOTE: there were no emails received prior to the distribution of the ranking form. Peggy Esquibel Reed-Qwest stated that Qwest would distribute the Prioritization Form NLT 5 p.m. MT, Monday, August 21, 2006, via the Notification Process. The completed Prioritization Forms are to be submitted to the cmpcr@qwest.com mailbox, no more that 3 business days following Qwest’s distribution of the prioritization form. Peggy then noted that the highest point value, 19, should be assigned to the CR that you wish to be implemented first. A point value of 19 would indicate your #1 ranked candidate; a point value of 18 is your second choice, etc. The point value of 1 will indicate the candidate that you wish to be ranked last. Peggy then stated that Qwest would calculate the total point values received, and that the ranking results would be distributed to the CLECs within 2 business days following the submission of the ranking and no later than 5 p.m. MT on August 28, 2006. This is also via the Notification Process. Peggy then asked if there were any questions. There were none brought forward.

- March 15, 2006 Systems CMP Meeting Discussion: Jill Martain-Qwest stated that the list of IMA 20.0 Initial Prioritization List is located in Attachment M. There were no questions or comments.

-- February 15, 2006 Systems CMP Meeting Discussion for IMA 20.0 Prioritization CR Review: Jill Martain-Qwest stated that the list of IMA 20.0 candidates is located in Attachment M. She said instead of reviewing all candidates each CLEC will indicate what their top 2 candidates are. Jill said that we will also review the prioritization and ranking instructions following this exercise. Lynn Stecklein-Qwest said that we will ask each CLEC what there top 2 candidates are based on the attendance list. Below are the top two candidates per CLEC in attendance: AT&T-Sharon Van Meter #1 SCR031203-02 Resolve Disconnect of Account Number #2 SCR040403-03 Support of Expedite Reason Field on the LSR Covad (via email) #1 SCR102102-1X Dual Inventory of DSL Tie Cables in TIRKs and SWITHCH/FOMS #2 SCR103103-01 Support of Parsed and Structured CSR #2 Eschelon-Kim Isaacs #1 SCR 050305-01 Bulk PIC Change Process in IMA #2 SCR032202-1 IMA GUI-PostOrder/Status Updates/Posted to be Billed Integra Laurie Fredricksen stated that she would have to get back to Qwest on there top 2 candidates. McleodUSA (via email) #1 SCR031103-01 Changes to Edits or Process Regarding Complex Listings on an ACT of N Order for Resale #2 SCR040403-03 Support of Expedite Reason Field on the LSR SBC Bob Eggert said he is the ASR representative and that he will refrain from the IMA 20.0 prioritization process. Time Warner-Dianne Friend #1 SCR010705-01 Directory Listing Changes in Conjunction with LNP #2 SCR042704-01 FBDL PON Field VCI No representative from VCI was present. Verizon Business-Rosalin Davis #1 SCR040403-03 Support of Expedite Reason Field on the LSR #2 Rosalin stated that she would get back to Qwest on her second candidate. Information received via e-mail: #1 SCR042704-01 FBDL PON Field #2 SCR040403-03 Support of Expedite Reason on the LSR XO No representative from XO was present. Sprint-Jeff Sonnier #1 SCR010705-01 Directory Listing Changes in Conjunction with LNP #2 SCR031105-01 Change of Usage of CCNA for Sprint on LNP Orders TDS (via email) Julie Pickar stated that she would have to get back to Qwest on there top 2 candidates. E-mail received 2/15/06 on the TDS top 2 candidates #1 SCR032202-1 IMA GUI-PostOrder/Status Updates/Posted to be Billed #2 SCR 050305-01 Bulk PIC Change Process in IMA Cox-Tom Larson #1 SCR010705-01 Directory Listing Changes in Conjunction with LNP No second pick. Qwest-Jill Martain #1 SCR021904-02 Suppression of Jeopardy Status Updates #2 SCR102505-02 Edits for the LSR Delivery Address Activity (DACT) Field Comcast (via email) #1 SCR102505-02 Edits for the LSR Delivery Address Activity (DACT) Field #2 SCR110702-01 Request to Add Ability for CLECs to Get a List of Circuit IDs or Telephone #s Associated with Active POTS-Splitter

Jill Martain-Qwest stated that we will include everyone’s top 2 candidates in the meeting minutes. Lynn Stecklein-Qwest reviewed the prioritization instructions. She said that Qwest will distribute the Prioritization Form by 5 p.m. MT on February 20, 2006. She said that the completed Prioritization Form should be submitted to cmpcr@qwest.com no more that 3 business days following Qwest’s distribution of the prioritization form. Lynn said that the total point will be calculated by the Qwest CMP Manager and the results will be distributed to the CLECs within 2 business days following the submission of the ranking and no later than 5 p.m. on February 27, 2006. Sharon Van Meter-AT&T asked if Qwest could explain how the highest point value works and how, for example, number 21 would be the top choice. Lynn Stecklein-Qwest said that the highest point value (i.e. 21) should be assigned to the CR that Qwest and CLECs wish to be implemented first. She said that the next highest point value (i.e. 20) should be assigned to the CR that Qwest and the CLECs wish to be implemented second and so on. Bonnie Johnson-Eschelon explained that we go through this exercise to take into consideration what the other CLECs top priorities are so that as each CLEC votes they could take into consideration the other CLECs top 2 as well instead of just ranking their top 2 and then going down the list. Jeff Sonnier-Sprint asked if the ballot would have a ‘Point Value’ Column. Jill Martain-Qwest said that the ballot would have the ‘Point Value’ Column and that instructions would be included with the notification. Bonnie Johnson-Eschelon asked what the IMA 20.0 capacity was, hinting at 75,000 hours Jill Martain-Qwest said that the IMA 20.0 capacity is 7,500 hours.

February 16, 2005 Systems CMP Meeting Discussion: There was no discussion on this CR.

- July 22, 2004 Systems CMP Meeting Discussion: Jill Martain/Qwest stated that Qwest would distribute the ballot on July 27th, it is due back to Qwest on July 30th, and Qwest would email the initial prioritization list to the CLECs on August 3rd. There were no questions. The CR Originator was not on the conference bridge. There were no questions.

- February 19, 2004 Systems CMP Meeting Discussion Excerpt (Attachments H & J): Judy Schultz/Qwest stated that she wanted to provide an update to the funding approval process that was discussed in the January CMP Systems Meeting. Judy referred everyone to Attachment J in the Distribution Package. She stated that all CRs are being re-evaluated and must be approved. Judy said that CRs could not be scheduled without approval. Judy stated that the CRs with an impact to the IMA interface would follow the existing prioritization process. Judy noted that the funding for IMA 15.0 and IMA 16.0 has been approved, as well as funding to begin work on IMA 17.0.

- January Systems CMP Meeting Discussion: This is a medium priority for Eschelon.

August 21, 2003 Systems CMP Meeting Discussion: Stephanie Prull/McLeod stated that this was their highest priority Kim Isaacs/Eschelon stated that Eschelon also supported this CR.

Excerpt from CMP Monthly Meeting April 22, 2003

SCR031103-01 Changes To Edits Or Process Regarding Complex Listings On An Act Of N Order For Resale (Originated by McLeodUSA) Stephanie Prull/McLeod USA reviewed the CR description of change. John Gallegos/Qwest stated that Qwest wanted to discuss how the dummy listing would be handled. He stated that the issue was discussed during the clarification call and that Qwest proposed in the response how it would be resolved. He said that Qwest assumed it would be set up as a non-pub listing, so the order would not be delayed. He said that Laurel Nolan had sent the response to Stephanie. Stephanie Prull/McLeod USA said that she hadn’t seen it, but that she would look for it. Candy Skaff/Eschelon asked if the CLECs would be charged for the dummy listing. John Gallegos/Qwest stated that they would not be charged. Stephanie Prull/McLeod USA asked how the dummy listing would be different then the non-published charge that they currently receive. John Gallegos/Qwest stated that he would take an action item to clarify how the charges worked and report back to the team. Bonnie Johnson/Eschelon asked if the CLECs were forced to do two listings because of a system limitation. John Gallegos/Qwest stated no, and that this CR is enabling the CLEC to submit without all the information on directory listings. He stated that the CLEC would come back to Qwest and provide the listing information, if they didn’t have it up front. John Gallegos/Qwest noted the LOE of 1800 to 3000 hours

Clarification Call March 21, 2003

Attendees: Stephanie Prull-McLeodUSA, John Gallegos-Qwest, Laurel Nolan-CRPM Qwest

Review of request: Nolan-Qwest reviewed the CR title and description. She asked if there were any questions or additions. Gallegos-Qwest asked about identifing the products impacted. Prull-McLeod stated that she was lery about making the DL form ocnditional. She stated that she would like to have the function at the time of provisioning the order. Gallegos-Qwest stated that it would help decrease the number of orders. Prull-McLeod stated that McLeod had had problems with publishing dummy listings. Gallegos-Qwest stated that he would research options. Prull-McLeod stated that Eschelon had also had issues with this and that if another call was needed to discuss options then they should also be included. She stated that it would occur regardless of the product.

Interfaces and Products: Nolan-Qwest reviewed the products of UNE-P, Contrex, Resale and IMA Common as the interface. She asked if there were any change. No changes or additions.

Confirm right personnel involved: Nolan-Qwest stated that the business representative was not able to attend and that Qwest would have a meeting with the business. She stated if there were any additional questions or concerns then she would contact Prull-McLeod.

CLEC Expectations: Nolan-Qwest reviewed the written expectation. "Mcleod expects to be able to process complex listings on an ACT of N order with minimal rework required by the CLEC. This is either by the changing of the requirement of the DL form on an ACT of N for resale customers, or changing the process to allow complex listings to be established with the provisioning order. This would make the resale products more consistent with the UNE product. And allow for order flow consistency for both the CLEC and Qwest."

Next steps: Nolan-Qwest stated that this CR would be presented by McLeod in the April meeting and that Qwest would provide a response prior to the meeting.

Meeting adjorned.

CenturyLink Response

REVISED RESPONSE April 16, 2003 RE:SCR031103-01

Qwest has reviewed the information submitted as part of McLeodUSA Change Request SCR031103-01. Based upon research that has been conducted following the Clarification meetings (held March 21, 2003) Qwest able to provide an LOE of 1800-3000 for IMA. There are no SATE impacts for this change. The change in edits will entail McLeod's recommendation to use the RPON field to make the DL form for a resale provisioning request with an ACT=N conditional based on a related HB (Listing Only) request.

In order for the provisioning orders to process correctly, Qwest will enter a designated non-pub listing on the provisioning order when issued, which will be removed once an order is issued and the complex listing request is completed.

At the April Systems CMP Meeting, CMP participants will be given the opportunity to comment on this Change Request and provide additional clarifications. Qwest is interested in the experiences of the CMP community as relates to this issue. Qwest will incorporate any feedback received into further evaluation of this Change Request.

This change is eligible for the IMA 15.0 prioritization.

Sincerely, Qwest

INITIAL RESPONSE April 10, 2003 RE:SCR031103-01

Qwest has reviewed the information submitted as part of McLeodUSA Change Request SCR031103-01. Based upon research that has been conducted following the Clarification meetings (held March 21, 2003) Qwest is still examining the issue. Qwest will continue to research the problem and provide an updated response at the April Systems CMP Meeting.

At the April Systems CMP Meeting, CMP participants will be given the opportunity to comment on this Change Request and provide additional clarifications. Qwest is interested in the experiences of the CMP community as relates to this issue. Qwest will incorporate any feedback received into further evaluation of this Change Request.

Sincerely, Qwest