Archived System CR SCR022702-01 Detail |
Title: Update IMA EDI Disclosure Document Developer Worksheets and Qwest LSOG for Consistency | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
|
|||||
SCR022702-01 |
Withdrawn 3/11/2002 |
5500 - 8000 | 2/ | All |
Originator: King, Elizabeth |
Originator Company Name: Qwest Corporation |
Owner: King, Elizabeth |
Director: |
CR PM: Esquibel-Reed, Peggy |
Description Of Change |
Update all IMA EDI Disclosure Document Developer Worksheets and Qwest LSOG to be consistent in the following areas: All fields with a usage of C - Conditional should have a condition stated in the business rules. All City, State and Zip fields should have consistent field lengths across the worksheets. All fields within a conditional section should be N - Not required, O - Optional or C - Conditional, not R - Required as the section itself is conditional.
|
Status History |
Date | Action | Description |
Release Information | IMA Release | |
2/27/2002 | CR Submitted | Received CR from Beth King |
2/27/2002 | CR Acknowledged | |
3/8/2002 | LOE Issued | LOE is Extra Large, 5500 - 8000 hours. |
3/11/2002 | Status Changed | Status Changed to withdrawn per Jeff Thompson and Michael Buck. |
Project Meetings |
|
CenturyLink Response |
March 15, 2002 Confirmation Email from Beth King: After discussions with Barb Brohl of regulatory regarding CMP CR SCR022702-01 it has been determined that the CMP CR will be withdrawn. This request involves more than documentation work and the Level of Effort for this request is Extra Large, 5500 - 8000 hours.
|
Information Current as of 1/11/2021