Archived System CR SCR012511-3 Detail |
Title: IMA Correct FT rule for SUP 2s with DFDT field populated | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
|
|||||
SCR012511-3 |
Completed 12/14/2011 |
220 - | 1/31 | Ordering |
Originator: Martinez, Denise |
Originator Company Name: Qwest Corporation |
Owner: Martinez, Denise |
Director: |
CR PM: Lorence, Susan |
Description Of Change |
Currently, many product requests should not populate the DFDT field. However, DFDT entries on SUP 2 requests are made causing them to drop for manual handling.
This change allows the improves flow through functionality and eliminates manual intervention.
Proposed Implementation Date: October 17, 2011
|
Status History |
Date | Action | Description |
1/25/2011 | CR Submitted | CR Submitted |
1/26/2011 | CR Acknowledged | CR Acknowledged |
2/16/2011 | Status Changed | Status changed to Presented |
2/16/2011 | Discussed at Monthly CMP Meeting | Discussed at the February Systems CMP Meeting - See Attachment C in the Distribution Package |
3/16/2011 | Discussed at Monthly CMP Meeting | Discussed at the March System CMP Meeting - See Attachment J in the Distribution Package |
3/16/2011 | LOE Issued | LOE is 220 |
4/15/2011 | Status Changed | Status changed to Packaged |
4/20/2011 | Discussed at Monthly CMP Meeting | Discussed at the April System CMP Meeting - See Attachment J in the Distribution Package |
8/5/2011 | Communicator Issued | See notice number SYST.IMAS.08.05.11.F.09327.IMAXML_31.0DrftTechSpecs |
9/2/2011 | Communicator Issued | See Notice Number SYST.IMAS.09.02.11.F.09449.IMAXML31.0FinalTechSpecs |
9/19/2011 | Communicator Issued | See notice number SYST.IMAS.09.19.11.F.09491.IMAGUI_Rel31.0_DraftDocs |
9/26/2011 | Communicator Issued | See notice number SYST.IMAS.09.26.11.F.09522.IMAGUIRel31.0Fnl_RelNotes |
10/17/2011 | Status Changed | Status changed to CLEC Test |
11/16/2011 | Discussed at Monthly CMP Meeting | Discussed at the November System CMP Meeting - See Attachment G in the Distribution Package |
12/14/2011 | Status Changed | Status changed to Completed |
12/14/2011 | Discussed at Monthly CMP Meeting | Discussed at the December System CMP Meeting - See Attachment G in the Distribution Package |
Project Meetings |
12/14/11 Systems CMP Meeting Mark Coyne – CenturyLink identified that there was a list of CRs to be considered for closure. He said the CRs were included in the IMA Release on 10/17/11 and were in CLEC test. Mark said there was a mid cycle conversion on November 19 and asked that all of these CRs be considered for closure. There were no objections. 11/16/11 Systems CMP Meeting Mark Coyne – CenturyLink said all of these relate to IMA Release 31 that went in on 10/17/11. Steph Prull – Integra asked that the following be left open: SCR012511-1, SCR012511-2, SCR012511-3, and SCR083010-1. PAETEC is moving to IMA 31.0 Release this weekend. Mark Coyne – CenturyLink said we would likely leave all of the CRs open. 4/20/11 Systems CMP Meeting Mark Coyne – Qwest referred to the CRs that were packaged for IMA Release 31.0 for October. 3/16/11 Systems CMP Meeting Mark Coyne – Qwest provided the LOE for the CR that was presented in the prior month: 220 hours 2/16/11 Systems CMP Meeting Denise Martinez – Qwest indicated we need to correct the flow through rule for SUP 2s with DFDT populated. Denise said we are receiving some requests where we should not be allowing the DFDT field to be populated, however, that is happening on SUP 2 changes which are due date changes which causes them to drop out for manual handling. By putting this edit in, we can improve our flow through functionality and we can eliminate any manual intervention. Denise asked if there were any questions. Bonnie Johnson - Integra asked if the correction to not allow population on the FDT when it is not appropriate. Denise Martinez – Qwest said yes, we are just tightening up the edit. There are a few things slipping through and we just want to tighten it up so we can eliminate that. Mark Coyne – Qwest asked if there were any other questions. There were none.
|
CenturyLink Response |
|
Information Current as of 1/11/2021