Title: Exception Request to Sunset Date of IMA 11.0
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

SCR010803-01EX Completed
1/8/2003
-   2/
Originator: Prull, Stephanie
Originator Company Name: McLeodUSA
Owner: Winston, Connie
Director:
CR PM: Nolan, Laurel
Description Of Change
McLeodusa would like to request that the Sunset Date of the 11.0 IMA/EDI Release be extended, for at the minimum, one month after the Sunset Date set at this time of October 7, 2003.

Expected Deliverables: McLeodusa would like to have the Sunset Date of 11.0 occur no earlier than November 7, 2003.

Status History

Date Action Description
1/8/2003 CR Submitted  
1/9/2003 CR Acknowledged  
1/9/2003 CR Posted to Web  
1/16/2003 Discussed at Monthly CMP Meeting Pre-Meeting at CMP Systems Meeting 
2/20/2003 Discussed at Monthly CMP Meeting Vote taken at meeting. Exception passed with a vote of 10 "yes", 0 "no", and "0" abstained. 

Project Meetings

Excerpt from January CMP Meeting on January 16, 2003

Laurel Nolan/Qwest stated that two notifications went out on January 14th, one was an exception for the sunset of IMA 11.0 (SCR010803-01EX) and the other is the exception for WorldCom’s prioritization for IMA 13.0 (SCR011303-02EX). Laurel Nolan/Qwest stated that the vote for SCR010803-01EX would be in the February Systems CMP Meeting. Laurel stated that an ad-hoc meeting would not be needed due to the timelines. Laurel reviewed McLeod’s exception request. Stephanie Prull/McLeod stated that the goal is the first or second week of Septemberr, with the earliest being around August 12. Laurel Nolan/Qwest reviewed that the “yes” vote would mean that we would move forward with changing the date, a “no” vote would mean that we would stay with the timeline as stated. She then stated that the vote would take place during the next Monthly Meeting in February. Laurel Nolan/Qwest- stated that the second exception request was submitted by WorldCom, SCR011303-02EX. Laurel stated that WorldCom is requesting to re-submit their prioritization and the exception is requesting that the prioritization results get re-calculated. A “yes” vote would mean to allow the new prioritization list as well as the recalculation. A “no” vote would mean to stay with the current calculation. We have the vote meeting scheduled for Thursday, January 23, 2003. Ian Coleman/Allegiance stated that his concern is that he would rather see Qwest recalculate the vote, he does not want WorldCom to submit a different prioritization now that they have seen the results of the vote. Judy Schultz/Qwest clarified that WorldCom is not resubmitting their vote, they are just flip-flopping the assignment. Connie Winston/Qwest asked if it was acceptable to ask how the CLECs felt about this. Bonnie Johnson/Eschelon stated that she we would support the request. Laurel Nolan/Qwest stated that she would include the attachment with the meeting notice. Liz Balvin/WorldCom stated that she has already calculated and has sent it to the CLECs. Lynn Notarianni/Qwest stated that based on the feedback from the CLECs, Qwest is to move forward with the flip-flopped list. Sue Stott/Qwest stated that time has been lost.