Open Product/Process CR PC112807-1IG Detail |
Title: High Voltage Protection (HVP) | ||||||
CR Number |
Current Status Date |
Area Impacted | Products Impacted | |||
|
||||||
PC112807-1IG |
Completed 2/20/2008 |
Private Line, Resale, Switched Service, UDIT, Unbundled Loop |
Originator: Tallman, Shirley |
Originator Company Name: Qwest Corporation |
Owner: Tallman, Shirley |
Director: |
CR PM: Stecklein, Lynn |
Description Of Change |
A new PCAT, “High Voltage Protection” (HVP) has been created to identify procedures for providing service at high voltage sites. HVP applies to both designed and non-designed service. It is intended to minimize electrical hazards to personnel engaged in construction, operation, maintenance and use of telecommunications service, limit electrical damage to telecommunications equipment, cable and wire facilities, and customer equipment, and to provide service continuity and integrity of telecommunications transmissions.
Industry Guideline Forum: NEC, NESC
|
Date | Action | Description |
11/28/2007 | CR Submitted | |
11/28/2007 | CR Acknowledged | |
12/12/2007 | Communicator Issued | Discussed at the December CMP Meeting - See Attachment D in the Distribution Package |
12/13/2007 | Status Changed | Status changed to Presented |
12/26/2007 | Communicator Issued | PROS.12.26.07.F.05102.HighVoltage_Protection_V1 |
12/27/2007 | Status Changed | Status changed to Development |
1/14/2008 | Communicator Issued | PROS.01.11.08.F.05154.FNL_HighVoltageProtection |
1/16/2008 | Discussed at Monthly CMP Meeting | Discussed at the January ProdProcCMP Meeting - See Attachment D in the Distribution Package |
1/28/2008 | Status Changed | Status changed to CLEC Test |
2/20/2008 | Status Changed | Status changed to completed |
2/20/2008 | Discussed at Monthly CMP Meeting | Discussed at the February ProdProc CMP Meeting - See Attachment D in the Distribution Package |
Project Meetings |
February 20, 2008 Product/Process CMP Meeting Mark Coyne-Qwest stated that this CR was effective on 1/28/08 and is in CLEC Test. This CR will be closed January 16, 2008 Product/Process CMP Meeting Mark Coyne-Qwest stated that the final notice was sent on 1/11/08 with an effective date of 1/28/08. -- December 12, 2007 Product/Process CMP Meeting Shirley Tallman-Qwest stated that Qwest is introducing a new PCAT, “High Voltage Protection” (HVP) that has been created to identify procedures for providing service at high voltage sites. She said that HVP applies to both designed and non-designed service. Shirley said that it is intended to minimize electrical hazards to personnel engaged in construction, operation, maintenance and use of telecommunications service, limit electrical damage to telecommunications equipment, cable and wire facilities, and customer equipment, and to provide service continuity and integrity of telecommunications transmissions. Kim Isaacs-Eschelon asked what a HVP site is. Shirley Tallman-Qwest stated that it could be an electrical ground station. Kim Isaacs-Eschelon said like an electrical substation. Shirley Tallman-Qwest said that it would be voltage in excess of protection in a normal building.
|
Information Current as of 1/11/2021