Description Of Change |
Integra is requesting the ability to choose to download and save selected or all Wire Center CLLIs as an option. We would like to be able to have a way to have the files download without manual intervention for every file. Integra would continue to see the files as .txt files. Integra expects Centurylink to provide a way to automatically download selected or all files in the Wire Center CLLI/RLD tool on the web. https://rld.qwest.com/rld/
|
Date | Action | Description |
11/8/2012 | Discussed at Monthly CMP Meeting | CR originated as a Systems CR but was crossed over to Product Process. See CR SCR082712-1 for history. |
8/27/2012 | CR Acknowledged | CR Acknowedged |
8/27/2012 | CR Submitted | CR Submitted |
9/6/2012 | Clarification Meeting Held | Clarification meeting held |
9/19/2012 | Discussed at Monthly CMP Meeting | Discussed at the September Systems CMP Meeting - See Attachment B of the Distribution package. |
9/19/2012 | Status Changed | Status changed to Presented |
9/20/2012 | Status Changed | Status changed to Evaluation. |
11/5/2012 | Draft Response Issued | CenturyLink Draft Response issued |
12/12/2012 | Discussed at Monthly CMP Meeting | Discussed at the December Prod/Proc CMP Meeting – See Attachment C in the Distribution package. |
12/12/2012 | Communicator Issued | See notice number PROS.MISC.12.12.12.F.10708.LoopQualRawLoopCLECJobAid |
12/12/2012 | Status Changed | Status changed to CLEC Test |
1/16/2013 | Discussed at Monthly CMP Meeting | Discussed at the January Prod/Proc CMP Meeting – See Attachment C in the Distribution package. |
1/16/2013 | Status Changed | Status changed to Completed. |
Project Meetings |
1/16/13 Product/Process CMP Meeting Mark Coyne – CenturyLink said the CR was discussed last month and said we would like to move the CR to a Completed status but before doing that, Mark asked if anyone had used the functionality yet. Steph Prull – Integra said that yes, Integra had successfully used the new capability and it was OK to move the CR to Completed. 12/12/12 Product/Process CMP Meeting Mark Coyne – CenturyLink said the CR was originated by Integra as System CR and was crossed over to a Product Process CR during the November CMP monthly meeting with the approval by Integra. Mark said the Level 1 notice will be a sent as a “process option that does not supercede the current process” on 12-12-12 effective immediately with an update to the Raw Loop Data Job Aid. Kim Isaacs – Integra asked about an earlier notice that had been distributed and this change. Mark Coyne – CenturyLink said that there was a mix-up in notices and that the correct notice for this CR was going out today. NOTE: The issue was that a notification had been sent on 12/3/12 that had a process option for a 30K address validation but had the document update for the wire center update associated with the above CR. There was a correction notification sent on 12/11/12 to correct the posted job aid doc on the archive site to match the 12/3/12 notice. The notice for the Wire Center CR was sent on 12/12/12 for those content updates. Mark Coyne – CenturyLink asked if there were any additional questions. There were none.
|