Description Of Change

Integra is requesting the ability to choose to download and save selected or all Wire Center CLLIs as an option. We would like to be able to have

a way to have the files download without manual intervention for every file. Integra would continue to see the files as .txt files.

Integra expects Centurylink to provide a way to automatically download selected or all files in the Wire Center CLLI/RLD tool on the web.

https://rld.qwest.com/rld/


Date Action Description
11/8/2012 Discussed at Monthly CMP Meeting CR originated as a Systems CR but was crossed over to Product Process. See CR SCR082712-1 for history. 
8/27/2012 CR Acknowledged CR Acknowedged 
8/27/2012 CR Submitted CR Submitted 
9/6/2012 Clarification Meeting Held Clarification meeting held 
9/19/2012 Discussed at Monthly CMP Meeting Discussed at the September Systems CMP Meeting - See Attachment B of the Distribution package. 
9/19/2012 Status Changed Status changed to Presented 
9/20/2012 Status Changed Status changed to Evaluation. 
11/5/2012 Draft Response Issued CenturyLink Draft Response issued 
12/12/2012 Discussed at Monthly CMP Meeting Discussed at the December Prod/Proc CMP Meeting – See Attachment C in the Distribution package. 
12/12/2012 Communicator Issued See notice number PROS.MISC.12.12.12.F.10708.LoopQualRawLoopCLECJobAid 
12/12/2012 Status Changed Status changed to CLEC Test 
1/16/2013 Discussed at Monthly CMP Meeting Discussed at the January Prod/Proc CMP Meeting – See Attachment C in the Distribution package. 
1/16/2013 Status Changed Status changed to Completed. 

Project Meetings

1/16/13 Product/Process CMP Meeting Mark Coyne – CenturyLink said the CR was discussed last month and said we would like to move the CR to a Completed status but before doing that, Mark asked if anyone had used the functionality yet.

Steph Prull – Integra said that yes, Integra had successfully used the new capability and it was OK to move the CR to Completed.

12/12/12 Product/Process CMP Meeting Mark Coyne – CenturyLink said the CR was originated by Integra as System CR and was crossed over to a Product Process CR during the November CMP monthly meeting with the approval by Integra. Mark said the Level 1 notice will be a sent as a “process option that does not supercede the current process” on 12-12-12 effective immediately with an update to the Raw Loop Data Job Aid.

Kim Isaacs – Integra asked about an earlier notice that had been distributed and this change.

Mark Coyne – CenturyLink said that there was a mix-up in notices and that the correct notice for this CR was going out today.

NOTE: The issue was that a notification had been sent on 12/3/12 that had a process option for a 30K address validation but had the document update for the wire center update associated with the above CR. There was a correction notification sent on 12/11/12 to correct the posted job aid doc on the archive site to match the 12/3/12 notice. The notice for the Wire Center CR was sent on 12/12/12 for those content updates.

Mark Coyne – CenturyLink asked if there were any additional questions. There were none.