Open Product/Process CR PC073112-1 Detail

 
Title: Retirement of MOE UNI Combinations – TLS to SPP and TLS to SMP
CR Number Current Status
Date
Area Impacted Products Impacted

PC073112-1 Completed
12/12/2012
Metro Ethernet
Originator: Brummett , Lee
Originator Company Name: CenturyLink
Owner: Brummett , Lee
Director:
CR PM: Hansen, John

Description Of Change

08/15/12 REVISED Description

Eliminating combinations of EVCs and UNIs services as a result of Network changes, specifically the EVCs connecting a TLS UNI combined with Service Provider Ports (SPP) or TLS UNI combined with Service Multiplexer Ports (SMP). No Moves, Adds, or Changes on these existing service configurations. Repair will continue to operate business as usual.

Original Description of Change: Eliminating combinations of UNI services as a result of Network changes, specifically the TLS UNI combined with Service Provider Ports (SPP) or TLS UNI combined with Service Multiplexer Ports (SMP).


Date Action Description
7/31/2012 CR Submitted CR Submitted 
8/1/2012 CR Acknowledged CR Acknowedged. 
8/15/2012 Record Update CR Description of Requested changes was revised at request of originator 
8/15/2012 Status Changed Status changed to Presented 
8/15/2012 Discussed at Monthly CMP Meeting Presented and discussed at the August Product Process CMP Meeting - see Attachment D of the package. 
8/15/2012 Discussed at Monthly CMP Meeting Discussed at the August Product Process CMP Meeting - See Attachment D of the package. 
9/10/2012 Status Changed Status changed to Development 
9/19/2012 Discussed at Monthly CMP Meeting Discussed at September Prod/Proc CMP Meeting – See Attachment D in the Distribution package. 
10/3/2012 Communicator Issued See Notice number PROD.RESL.10.03.12.F.10516.Resale_Metro_Ethernet_UNI. 
10/17/2012 Discussed at Monthly CMP Meeting Discussed at the October Prod/Proc CMP Meeting – See Attachment D in the Distribution package. 
11/2/2012 Communicator Issued See notice number PROD.RESL.11.02.12.F.10623.FNL_Resl_Metro_Ether_UNI. 
11/17/2012 Status Changed Status changed to CLEC Test 
11/14/2012 Discussed at Monthly CMP Meeting Discussed at the November Prod/Proc CMP Meeting – See Attachment D in the Distribution package. 
12/12/2012 Status Changed Status changed to Completed. 
12/12/2012 Discussed at Monthly CMP Meeting Discussed at the December Prod/Proc CMP Meeting – See Attachment D in the Distribution package. 

Project Meetings

12/12/12 Product/Process CMP Meeting Mark Coyne – CenturyLink said the CR had an effective date of 11/17/12 and that we would like to move the CR to a Completed status. There were no objections.

11/14/12 Product/Process CMP Meeting Mark Coyne – CenturyLink relayed the level 4 retirement notice was sent on 11/2/12 with an effective date of 11/17/12. There were no CLEC comments. A Technical Publication notice was sent on 11/02/12 also with an effective date of 11/17/12. Mark said CenturyLink would move the CR into CLEC Test on that date and would review the CR in December.

10/17/12 Product/Process CMP Meeting Mark Coyne – CenturyLink relayed the level 4 retirement notice was sent on 10/3/12 with an effective date of 11/17/12. A Technical Publication notice will be sent on 11/02/12 also with an effective date of 11/17/12. Mark relayed there are wholesale customers on this product.

09/19/12 Product/Process CMP Meeting Mark Coyne – CenturyLink relayed this CR was presented last month and subsequently revised the same day. Mark said the CR was revised to include EVCs combinations and also included the following statement: No Moves, Adds, or Changes on these existing service configurations. Repair will continue to operate business as usual. Mark said there is also a revised effective date which will now be mid November 2012. There will be two notices that are distributed associated with this CR – a level 4 retirement notice and additionally a Technical Publication notice. Mark asked if there were any questions. There were none.

08/15/12 Product/Process CMP Meeting Lee Brummett – CenturyLink presented the CR. Lee said he will be revising this CR to include EVCs combinations. NOTE: CR WAS REVISED ON 8/15/12. REVISIONS ARE AVAILABLE AT http://www.centurylink.com/wholesale/cmp/cr/CRPC073112-1.html. The revision includes the following statement: No Moves, Adds, or Changes on these existing service configurations. Repair will continue to operate business as usual.

Kim Isaacs – Integra asked what “retirement” means. She asked if “retirement” means the current combinations can remain on an account. She asked how this impacts moves/add/changes and if a configuration exists and a change is required, will customers be required to remove the combination.

Lee Brummett – CenturyLink said yes, current combinations that exist today can remain on an account. He said he will need to verify what occurs if there are moves, adds or changes and provide that information later. He said what exists today can stay. Lee said the planned effective is October 15, 2012.

Kim Isaacs – Integra asked what the volumes are and what the business reason was for the change. Lee Brummett – CenturyLink said he did not know the volumes but that there are wholesale customers. Lee said the equipment is no longer supported for these combinations.

Mark Coyne – CenturyLink said we will then keep this as a level 4 notification.

Susan Lorence – CenturyLink asked if we can include the information in the meeting minutes as well as updating the CR. There were no objections.

Kim Isaacs – Integra asked if something happens to the equipment, will it be supported or require a change out.

Lee Brummett – CenturyLink said existing connections will be supported but that he will validate whether there was enough equipment if something happens to an existing combination. Mark Coyne – CenturyLink asked if there were any questions. There were none.