Open Product/Process CR PC073106-2 Detail |
Title: Facility Connected (FC) Collocation Application modifications | ||||||
CR Number |
Current Status Date |
Area Impacted | Products Impacted | |||
|
||||||
PC073106-2 |
Completed 10/18/2006 |
Ordering | Facility Connected Collocation |
Originator: Mohr, Bob |
Originator Company Name: Qwest Corporation |
Owner: Mohr, Bob |
Director: |
CR PM: Stecklein, Lynn |
Description Of Change |
From analysis performed on several trouble tickets involving DS1 Facility Connected Collocation, the team is proposing modifications to the FC Collocation Application to include additional information from the CLEC with regards to the specific characteristics of the entrance cable. These additional details and also requiring a 48 hour call on DS1 FC Collocation should eliminate some of the outages that have been experienced with this Product
Expected Deliverables/Proposed Implementation Date (if applicable): (Revision 8/18/06 to CR to include additions to APOT form)- Additions to FC Collocation Application and APOT form, PCAT, Tech Pub 77368 and the LSOG. Desired implementation date is October 30, 2006 with the release of the 1st Addendum.
|
Date | Action | Description |
7/31/2006 | CR Submitted | |
7/31/2006 | CR Acknowledged | |
8/16/2006 | Discussed in the August Product/Process CMP Meeting - See Attachment D in the Distribution Package | |
8/18/2006 | Revision to CR to include additions to APOT form | |
8/21/2006 | PROD.08.21.06.F.04069.FC_Collocation - Level 4 - Proposed effective date 10/5/06 | |
8/21/2006 | Status changed to Development | |
9/20/2006 | Discussed in the September Product/Process CMP Meeting - See Attachment D in the Distribution Package | |
9/20/2006 | Status changed to CLEC Test | |
10/18/2006 | Status changed to Completed | |
10/20/2006 | Discussed in the October Product/Process CMP Meeting - See Attachment D in the Distribution Package |
Project Meetings |
10/18/06 Product/Process CMP Meeting Susan Lorence-Qwest stated that this request was implemented on October 5th and noted that Qwest was ready to close. Susan asked if there was any objection to closing the CR. There was no objection. This CR is Completed. 9/20/06 Product/Process CMP Meeting Mark Coyne-Qwest stated that a Level 4 notice was sent on 8/21/06. He stated that the comment cycle has closed and the Qwest response is due today and the effective date is October 5th. Mark then noted that this CR moves to Development. There were no questions or comments 8/16/06 Product/Process CMP Meeting Bob Mohr-Qwest said that from analysis performed on several trouble tickets involving DS1 Facility Connected Collocation, the team is proposing modifications to the FC Collocation Application to include additional information from the CLEC with regards to the specific characteristics of the entrance cable. He said that these additional details, and also requiring a 48 hour call on DS1 FC Collocation, should eliminate some of the outages that have been experienced with this Product. Kim Isaacs-Eschelon asked which application or form was being changed. Bob Mohr-Qwest stated that the Collocation Application Form (Facility Connected Collocation – Version 7) is being updated. He said that the fields that have stars have been changed or added. Kim Isaacs-Eschelon asked if the current process was changing. Bob Mohr-Qwest stated that the process itself was not changing. Steph Prull-Eschelon asked what kind of information was discussed on the 48 hour call. Bob Mohr-Qwest said that the purpose of the call was to get additional information and detail. He said that the call was optional before and is now required.
|
Information Current as of 1/11/2021