Title: Modifications to PDR Forms to Provide Additional Information on Pole Attachments | ||||||
CR Number |
Current Status Date |
Area Impacted | Products Impacted | |||
|
||||||
PC060308-01 |
Completed 9/17/2008 |
Pre-Ordering, Ordering | PDR |
Originator: Buckmaster, Cindy |
Originator Company Name: Qwest Corporation |
Owner: Buckmaster, Cindy |
Director: |
CR PM: Lorence, Susan |
Description Of Change |
Added form and required information in order to ensure safe load on aerial runs.
|
Date | Action | Description |
6/3/2008 | CR Submitted | CR Submitted |
6/3/2008 | CR Acknowledged | CR Acknowledged |
6/18/2008 | Status Changed | Status changed to Presented |
6/18/2008 | Status Changed | Status changed to Development |
6/18/2008 | Discussed at Monthly CMP Meeting | Discussed at the June Prod/Proc CMP Meeting - See Attachment D in the Distribution Package |
7/16/2008 | Discussed at Monthly CMP Meeting | Discussed in the July ProdProc CMP Meeting - See Attachment D in the Distribution Package |
7/15/2008 | Communicator Issued | PROD.07.15.08.F.05460.Access_to_PDR_V33 |
8/14/2008 | Communicator Issued | PROD.08.14.08.F.05487.FNL_Access_to_PDR_V33 |
8/18/2008 | Status Changed | Status changed to CLEC Test |
8/20/2008 | Discussed at Monthly CMP Meeting | Discussed at the August CMP Meeting - See Attachment D in the Distribution Package |
9/17/2008 | Status Changed | Status changed to Completed |
Project Meetings |
9/17/08 Product/Process CMP Meeting Susan Lorence-Qwest said that the final notice was sent on 8/14/08 with an effective of 8/29/08 and Qwest would like to close this CR. There was no objection to closure. 8/20/08 Product/Process CMP Meeting Mark Coyne-Qwest said that the final notice was sent on 8/14/08 and is now in CLEC Test. We will revisit this CR in September. 7/16/08 Product/Process CMP Meeting Mark Coyne-Qwest said that the notice for this request went out on 7/15/08. 6/18/08 Product/Process CMP Meeting Mark Coyne-Qwest said that this request is for modifications to the PDR Form to provide additional information on pole attachments. He said that the added form and required information is to ensure safe load on aerial run. Kim Isaacs-Integra said that she was not familiar with what is a safe load and asked if it had to do with the weight of the cable. Mark Coyne-Qwest said that it was associated with the weight of the cable. Kim Isaacs-Integra asked if the definition of safe load will be included in any updates. Cindy Buckmaster-Qwest confirmed that safe load is related to the weight of the aerial from an engineering perspective. Mark Coyne-Qwest asked if the definition would be included in the documentation. Cindy Buckmaster-Qwest said that she would check with engineering. She said that the definition is located in the telcordia Q&A information. She said that she would check to see if the information could be added to the PCAT.
|
Information Current as of 1/11/2021