Open Product/Process CR PC060209-1CM Detail |
Title: Update Section 5.8 of the CMP Document to add a new CR status of “Crossover” | ||||||
CR Number |
Current Status Date |
Area Impacted | Products Impacted | |||
|
||||||
PC060209-1CM |
Completed 7/27/2009 |
Originator: Stecklein, Lynn |
Originator Company Name: Qwest Corporation |
Owner: Stecklein, Lynn |
Director: |
CR PM: Stecklein, Lynn |
Description Of Change |
During the operation of this CMP, there may be situations when systems CRs have requirements for product/process discussions or solutions, or when product/process CRs require System solutions. If a CR submitted to the product/process CMP is discovered to require a mechanized solution the following will occur:
Qwest will open a new systems CR, on behalf of the original CR originator, with a reference to the product/process CR number. Qwest will close the product/process CR with a reference to the new systems CR number
If a CR submitted to the Systems CMP is discovered to require a manual solution the following will occur:
Qwest will open a product/process CR, on behalf of the original CR originator, with a reference to the systems CR number. Qwest will close the systems CR with a reference to the new product/process CR number.
In these scenarios, the CR being closed will be updated with the “crossover” status.
|
Date | Action | Description |
6/2/2009 | CR Submitted | CR Submitted |
6/3/2009 | CR Acknowledged | CR Acknowledged |
6/17/2009 | Discussed at Monthly CMP Meeting | Discussed at the June ProdProc CMP Meeting - See Attachment E in the Distribution Package |
6/17/2009 | Status Changed | Status changed to Presented |
6/26/2009 | Communicator Issued | CMPR.MEET.06.26.09.F.06585.CMP_Vote_Required |
7/22/2009 | Communicator Issued | PROS.MISC.07.22.09.F.06678.CMPDocChange_Crossover |
7/15/2009 | Discussed at Monthly CMP Meeting | Discussed at the July ProdProc CMP meeting - See attachment F in the Distribution Package |
7/20/2009 | Communicator Issued | CMPR.MEET.07.20.09.F.06670.CMPVoteDisposition |
Project Meetings |
7/15/09 Product/Process CMP Meeting Mark Coyne-Qwest This CR is proposing updates to Section 5.8 of the CMP Document to add a new CR status of “Crossover”. Lynn Stecklein-Qwest said the redline is included in the distribution package. Quorum is 7 and has been achieved. In Section 2.1 of the CMP document it states that incorporating a change into the Change Management Process requires unanimous agreement. A vote of ‘Yes’ will indicate a preference that Section 5.8 of the CMP Document will include a CR status of “Crossover”. A vote of ‘No’ will indicate a preference that Section 5.8 of the CMP Document will not include a CR status of “Crossover”. Lynn said Qwest has received 4 ‘Yes’ votes from Qwest, Verizon Business, Velocity and Comcast via e-mail. The meeting participants voted as follows: Integra – Yes, PAETEC – Yes, Covad – Yes, TDS – Yes, Time Warner Telecom – Yes The vote was granted with 9 ‘Yes’ votes, 0 ‘No’ votes and 0 ‘Abstain’ vote. A vote disposition notice will be sent and the change will be made to the CMP document. Susan Lorence-Qwest asked if everyone was agreeable to a level 1 notice and that the votes conducted today be combined on the same notice. Kim Isaacs-Integra said since there are 2 separate CRs, separate notices should be sent. 6/17/09 Product/Process CMP Meeting Lynn Stecklein-Qwest said that during the operation of this CMP, there may be situations when systems CRs have requirements for product/process discussions or solutions, or when product/process CRs require System solutions. If a CR submitted to the product/process CMP is discovered to require a mechanized solution the following will occur: Qwest will open a new systems CR, on behalf of the original CR originator, with a reference to the product/process CR number. Qwest will close the product/process CR with a reference to the new systems CR number. If a CR submitted to the Systems CMP is discovered to require a manual solution the following will occur: Qwest will open a product/process CR, on behalf of the original CR originator, with a reference to the systems CR number. Qwest will close the systems CR with a reference to the new product/process CR number. In these scenarios, the CR being closed will be updated with the “crossover” status. Lynn said that Qwest will conduct the vote in the July meeting and will send out a vote notification.
|
Information Current as of 1/11/2021