Open Product/Process CR PC031804-2 Detail |
Title: Special Service Protection (SSP) for UNE Loops | ||||||
CR Number |
Current Status Date |
Area Impacted | Products Impacted | |||
|
||||||
PC031804-2 |
Withdrawn 4/15/2009 |
Maintenance Repair, Provisioning | UNE Loop |
Originator: Berard, John |
Originator Company Name: Covad |
Owner: |
Director: |
CR PM: Andreen, Doug |
Description Of Change |
Covad proposes that a product be developed which can be ordered with a UNE Loop that will provide Special Service Protection at all cross-connects points in the Qwest network. This protection has been provided by Qwest for critical customer circuits (i.e.; alarm circuits, high capacity data circuits, emergency services circuits, etc.) for many years and Covad would like the option of ordering this for certain UNE Loops. These cross connect points, as well as the protector frame "heat coils" are either red, or have red devices attached that alert the technician to take special steps prior to initiating invasive actions for testing or maintenance. These cross connect points are "protected" at all possible points both in the central office, as well at field connection points.
Expected Deliverable: As soon as possible
|
Date | Action | Description |
3/18/2004 | Submitted | |
3/22/2004 | Acknowledged CR | |
4/15/2009 | Discussed at Monthly CMP Meeting | Discussed at the April CMP Meeting - See Attachment N in the Distribution Package |
4/21/2009 | Status Changed | Status changed to Withdrawn - CR placed in Closed status in error |
Project Meetings |
3/22/04 - March 22,2004 Dear John Berard, Thank you for participating in the Qwest Change Management Process (CMP). We have received your Change Request (CR) submission titled, "Special Service Protection (SSP) for UNE Loops." Per your discussion with Kit Thomte on March 22, 2004 we would ask that you route this request through you service manager. As you and Kit discussed, your service manager with product management can best make the determination if meeting this request would require a new product introduction. Should you and your service manager conclude that the request does not require a new product we would be glad to introduce it through the CMP process at that time. Sincerely, Doug Andreen Change Request Project Manager Qwest 303-382-5777
|
Information Current as of 1/11/2021