Wholesale: Products & Services

Open Product/Process CR PC021204-1 Detail

 
Title: Port In and Add New Non Ported Tn(s) on same LSR
CR Number Current Status
Date
Area Impacted Products Impacted

PC021204-1 Withdrawn
4/21/2004
Ordering, Provisioning Resale, UNE-P
Originator: Wells, Susie
Originator Company Name: Qwest Corporation
Owner: Wells, Susie
Director:
CR PM: Sanchez-Steinke, Linda

Description Of Change

This CR will streamline the Port In Process. Qwest will add a new scenario to existing Port In Processes which will allow the CLEC to place a Port In Request, and add additional new non ported tn(s) on the same LSR. The benefit to the CLECs is more timely and accurate completion of requests. The benefit to Qwest is more timely and accurate completion of a request.

Expected Deliverable:

Revision to the current process of submitting two separate LSRs for porting in and adding new lines at the same time for the same end user. Would like April time frame. Update to Port In PCAT will be necessary to add scenario for new process.


Date Action Description
2/12/2004 CR Submitted 
2/16/2004 CR Acknowledged 
2/19/2004 Held Clarification Meeting 
2/19/2004 CR status updated to Pending Withdrawal 
3/17/2004 March CMP Meeting - Meeting minutes will be posted to this CR's Project Meetings section. 
4/21/2004 April CMP Meeting - Meeting minutes will be posted to this CR's Project Meetings section. 

Project Meetings

04/21/04 April CMP Meeting Susie Wells with Qwest said she researched Liz Balvin’s question on the EDI disclosure document. Susie said there is no need for EDI disclosure and she would like to withdraw this CR because it is actually a Level 3 change. This CR will move to Withdrawn status.

03/17/04 March CMP Meeting Susie Wells with Qwest said she would like to withdraw this CR because it is not a level 4 change and actually is a level 3 change to an existing process. Updates will be made in the Port In PCAT. Bonnie Johnson with Eschelon said she is interested in this one because 2 LSRs are currently issued and then go to different centers. Liz Balvin with MCI asked if there would be changes to the EDI disclosure document. Susie said she would check and get back at the April meeting. Liz said that if nothing will change then it is ok, and if changes need to be made, there should be appropriate notification. This CR will remain open in Pending Withdraw status.


Information Current as of 1/11/2021