Archived System CR 5464965 Detail

 
Title: Provide location and department information in partial CSR, if continue to require this information
CR Number Current Status
Date
Level of
Effort
Interface/
Release No.
Area
Impacted
Products
Impacted

5464965 Completed
7/18/2002
-   3/10 Centrex/Western Region
Originator: Powers, Lynne
Originator Company Name: Eschelon
Owner: Winston, Connie
Director:
CR PM: Stecklein, Lynn
Description Of Change
CLEC asks Qwest to eliminate Qwest’s requirement that CLECs place complete the location and department fields in IMA-GUI (release 6.0). Orders are rejected when the LOCN or DEPT fields do not match Qwest records or if the fields are not completed. The only way to obtain the information for the fields is to pull a FULL Customer Service Record (CSR). This is extremely time consuming and inefficient. Only a certain amount of data downloads at one time, and then CLECs must sift through unneeded information to find the LOCN and DEPT information. In a separate CR, Eschelon has asked that Qwest eliminate the requirement altogether. If Qwest does not do so, at a minimum, Qwest should provide the department and location information as part of the PARTIAL CSR.

Qwest Business Description:

Provide dept and location info in partial CSR to satisfy requirement. Orders rejected when LOCN or DEPT fields do not match Qwest's records or if fields are incomplete. Inefficient to pull FULL CSR to extract info.

Status History

Date Action Description
3/26/2001 CR Submitted Received and Logged. Status set to -New - To be validated" 
3/26/2001 Info Sent to CLEC Sent e-mail with updated CR to Lynne Powers and Janet Houston 
3/26/2001 Record Update T-shirt size and options will be discussed, and the Industry Evaluation will be completed at the April 18th CICMP meeting 
4/2/2001 Status Changed Status changed to Validated - To be industry reviewed. 
4/2/2001 LOE Issued T-Shirt size Large and options to be provided at the April CICMP meeting. 
4/18/2001 Discussed at Monthly CMP Meeting  
4/18/2001 Status Changed Status changed to "Reviewed - Under Consideration" 
10/25/2001 Status Changed Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization 
10/29/2001 Record Update J Gallegos to research the status of this CR. Work may already be completed under an internal CR. 
10/31/2001 Release Ranking Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. 5464965 ranked 16 
11/17/2001 Record Update This change request was submitted 3/26/01. Work may be complete but a clarification meeting was still needed to confirm. 
11/17/2001 Clarification Meeting Held Clarification meeting was held 
1/8/2002 Status Changed Status changed to development 
1/17/2002 Discussed at Monthly CMP Meeting CR # 5464965 discussed during 10.0 Packaging Presentation 
1/17/2002 Status Changed CR # 5464965 status updated to 'Packaged' for 10.0 
3/13/2002 Status Changed Status updated from 'Packaged' to 'Development 
3/21/2002 Discussed at Monthly CMP Meeting 5464965 discussed at March Systems CMP Monthly meeting during IMA Release 10.0 Commitment Discussion (Attachment I) 
6/20/2002 Discussed at Monthly CMP Meeting 5464965 discussed at June Systems CMP Monthly meeting; please see Systems CMP Distribution Package June CMP -- Attachment N 
6/25/2002 Status Changed Status updated to CLEC Test based upon discussion at June Systems CMP Meeting and IMA 10.0 Deployment on June 17, 2002 
7/18/2002 Discussed at Monthly CMP Meeting 5464965 discussed at July Systems CMP Monthly meeting; please see Systems CMP Distribution Package July CMP -- Attachment G 
7/19/2002 Status Changed Status changed to Completed 

Project Meetings

11/17/01 - This change request was submitted 3/26/01. Work may be complete but a clarification meeting was still needed to confirm. 11/17/01 - Clarification meeting was held Attendees - Kathy Stichter, Bonnie Johnson, Monica Manning, Gerry Mohatt, J J Bradley, Lynn Stecklein Description - Provide location and department information in partial CSR, if continue to require this information. LSRs were being rejected in the Minneapolis Center for the Western Region only. An interim process was put in place not to reject the LSRs. The MN center reps were manually entering the Dept and Loc information for the CLEC until the system work could be done.

CenturyLink Response

DRAFT RESPONSE For Review by the CLEC Community and Discussion at December CMP Meeting

December 3, 2001

Kathy Stichter ILEC Relations Manager Eschelon

CC:John Gallegos Gerry Mohatt Monica Manning Michael Buck

This letter is in response to your CLEC Change Request Form, CR5464965 Provide Location and Department Information in Partial CSR

Description of Change: CLEC ask Qwest to eliminate Qwest’s requirement that CLECs place complete the location and department fields in IMA-GUI (release 6.0). Orders are rejected when the LOCN or DEPT fields do not match Qwest records or if the fields are not completed. The only way to obtain the information for the fields is to pull a Full Customer Service Record (CSR). This is extremely time consuming and inefficient. Only a certain amount of data downloads at one time, and then CLECs must sift through unneeded information to find the LOCN and DEPT information. In a separate CR, Eschelon has asked that Qwest eliminate the requirement altogether. If Qwest does not do so, at a minimum, Qwest should provide the department and location information as part of the Partial CSR.

Qwest Response: The clarification meeting to discuss this Change Request was held with Eschelon on November 19, 2001. From this meeting, the level of effort was determined to be Large. This Change Request was voted #16 as a result of the IMA 10.0 prioritization.

Sincerely,

John Gallegos Information Technologies Manager