Archived System CR 5370997 Detail |
Title: Disconnect Business Rule Change | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
|
|||||
5370997 |
Completed 3/21/2002 |
- | 3/9 | Unbundled Loop |
Originator: Wallace-Jones, Regina |
Originator Company Name: Covad |
Owner: Winston, Connie |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Covad would like the address requirement lifted from disconnect loop orders. Currently, approximately 25% of our disconnect orders receive system rejects for invalid address. Technically, only CFA and/or ILEC Circuit are required elements to successfully process a disconnect. Provided that a co-provider keeps accurate record of which ILEC Circuit has been assigned to a particular customer, there should be no need to re-validate a customer address. This change request is an effort on our part to minimize the number of system rejects that we are receiving in production. This problem has become particularly noticeable on orders which were originally placed in IMA EDI 4.2 and are now being disconnected in IMA EDI 5.0 (or greater).
|
Status History |
Date | Action | Description |
Release Information | IMA Release 9.00 | |
2/1/2001 | Record Update | T-Shirt size and options will be presented in the Feb. CICMP meeting. |
2/1/2001 | CR Submitted | CR received and status set to -New - To be validated. |
2/1/2001 | Info Sent to CLEC | Sent email to Regina Wallace-Jones and Mike Goebel with updated CR. |
2/2/2001 | Status Changed | Status changed to Evaluated - To Be Reviewed. |
2/2/2001 | Info Sent to CLEC | Sent email to Regina Wallace-Jones and Mike Goebel with updated CR. |
2/7/2001 | Status Changed | Status changed to Reviewed - Under Consideration. |
2/7/2001 | LOE Issued | T-Shirt size Small and options provided. Eligible for industry prioritization. |
2/8/2001 | Info Sent to CLEC | Sent email to Regina Wallace-Jones and Mike Goebel with updated CR. |
3/21/2001 | Info Sent to CLEC | Sent email to Regina Wallace-Jones and Mike Goebel with updated CR. |
3/21/2001 | Status Changed | Status changed to Reviewed - Release Baseline Candidate for IMA Release 9.0. |
10/24/2001 | Baseline Candidate Selection | CLECs notified this CR was a selected CR Baseline Candidate. |
10/31/2001 | Release Ranking | Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. 5370997 ranked 27 |
2/25/2002 | Status Changed | 5370997 status updated to 'CLEC Test' based upon 2/25/02 implementation of IMA 9.0 |
3/21/2002 | Status Changed | Reviewed in the 3/21/02 CMP meeting and Closed. |
3/21/2002 | Discussed at Monthly CMP Meeting | 5370997 discussed March Systems CMP Monthly meeting; please see Systems CMP Distribution Package March CMP - Attachment E |
Project Meetings |
|
CenturyLink Response |
|
Information Current as of 1/11/2021