Archived System CR 4868106 Detail |
Title: Directory Listing via Ordering Interface | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
|
|||||
4868106 |
Completed 1/12/2001 |
- | 2/7 | Directory Listings |
Originator: Powers, Lynne |
Originator Company Name: Eschelon |
Owner: Thompson, Jeff |
Director: |
CR PM: Routh, Mark |
Description Of Change |
USWest currently utilizes a separate EDI Interface (other than the Ordering interface) for Directory Listings. This interface has different connectivity requirements than EDI ordering interface. Eschelon requests USWest offer DL via the EDI ordering interface by allowing the DL information be submitted on the same EDI Ordering (850).
|
Status History |
Date | Action | Description |
Release Information | IMA Release 7.00 | |
Release Information | IMA Release 8.00 | |
6/29/2000 | CR Submitted | |
6/29/2000 | CR Acknowledged | |
6/29/2000 | Status Changed | New, To be industry evaluated. Sent email to Lynne Powers with CR # and status. |
7/19/2000 | Status Changed | Status changed to Evaluated, To be reviewed. |
7/28/2000 | Info Sent to CLEC | Sent email to Lynne Powers about status change and form change to version 05. |
8/2/2000 | Record Update | Reviewed – Under consideration |
8/16/2000 | LOE Issued | Received T-shirt size and option during industry team meeting. |
8/29/2000 | Info Sent to CLEC | Sent email to Lynne Powers with updated CR. |
10/18/2000 | LOE Issued | Status changed to Reviewed – Release Baseline Candidate. Selected as Co-Provider CR for target IMA. Release 8.0. T-shirt size Medium |
11/8/2000 | Info Sent to CLEC | Sent email to Lynne Powers with updated CR. |
1/12/2001 | Status Changed | Status changed to Completed – In Production per Kerrie Douglas |
1/12/2001 | Info Sent to CLEC | Sent email to Lynne Powers and Judy Rixe with updated CR |
2/7/2001 | Status Changed | Status changed to Reviewed – Release Baseline Candidate. Selected as Co-Provider CR for target IMA Release 8.0. |
2/8/2001 | Info Sent to CLEC | Sent email to Lynne Powers and Judy Rixe with updated CR. |
3/5/2001 | Status Changed | Status changed to Reviewed – Release Baseline Candidate. Selected as Co-Provider CR for target IMA Release 7.0. |
3/5/2001 | Info Sent to CLEC | Sent email to Lynne Powers and Judy Rixe with updated CR. |
5/16/2001 | Status Changed | Status changed to “Completed – In Production” |
5/18/2001 | Info Sent to CLEC | Sent email to Lynne Powers and Janet Houston with updated CR. |
Project Meetings |
|
CenturyLink Response |
|