Archived System CR 4261631 Detail |
Title: Enhancements to ADSL Loop Pre Qualification | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
|
|||||
4261631 |
Completed 12/20/2000 |
- | 3/6 |
Originator: Pennington, Freddi |
Originator Company Name: Covad |
Owner: Thompson, Jeff |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Provide access to the following Loop Qualification information for any loop (i.e. not just for loops that fall into the parameters that support ADSL), including but not limited to: ? Loop Length ? actual (or indicator specifying the length given if the longest designed loop for the distribution area if the actual length cannot be given) ? length by segment ? length by gauge of each segment ? Gauge of Loop ? Composition/Medium of Loop (i.e. fiber, copper etc.) ? Electrical parameters of loop ? Presence, location and type of any equipment on the loop, including but not limited to: ? Load coils and quantity ? bridged taps and length ? pair gains ? DLC's (IDLC, UDLC) ? Feeders/Disturbers in the same or adjacent binder groups ? repeaters and quantity ? DAMLs ? If the loop originates at a remote switching unit
Provide the ability to issue a single request to qualify large volumes of loops (i.e. blocks of 100, by MSA, by wire center, by state, etc)
Provide database extracts of the above listed information stored in LFACS, TIRKS, ARES/Exact and other such legacy applications. The database extracts should be made available by central office on a monthly basis.
|
Status History |
Date | Action | Description |
Release Information | IMA Release 6.00 | |
11/5/1999 | CR Submitted | CR submitted |
11/8/1999 | CR Acknowledged | Logged, validated, and updated to version 03 for CR. Received status of New To be industry evaluated. Sent email to Fred Baros with CR, Status, updated version, and prioritization category of Common |
11/11/1999 | Record Update | Industry team reviewed and prioritized. |
11/18/1999 | Status Changed | CR status change to Evaluated To be reviewed, priority level, and priority number. Sent email to Fred Baros on CR changes. |
12/3/1999 | Info Sent to CLEC | CR status change to Reviewed Under consideration. Sent email to Fred Baros on status change and that Karen Kincaid may be contacting him on some clarification. |
1/13/2000 | Info Sent to CLEC | Updated prioritization level and # and sent email to Jill Wiesner, new CR Manager and Industry |
1/24/2000 | Baseline Candidate Selection | Submitted revised CR which was combined with CR #4302410. During the Co-Provider Industry Team meeting this CR was selected as Co-Provider CR Option Release 6.0 inconjuction with implementation of the UNE |
2/1/2000 | Info Sent to CLEC | Sent email to Bodgan and Jill on CR update with changes discussed during the meeting on 01/24/00. |
12/20/2000 | Status Changed | Status changed to Completed In Production |
12/22/2000 | Info Sent to CLEC | Sent email to Joe Ayala and Connie Sanphy with updated CR. |
Project Meetings |
|
CenturyLink Response |
|