Archived System CR 30618 Detail |
Title: IBA PO7 IMA Change FOC status after LSR completion | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
|
|||||
30618 |
Completed 12/20/2001 |
- | 3/8 |
Originator: Gallegos, John |
Originator Company Name: Qwest Corporation |
Owner: Gallegos, John |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Currently, after an FOC is issued to the CLEC, it is possible to issue an additional FOC. This can happen with a change notification. Since this can cause confusion with the CLEC, there needs to be an edit that will not allow additional FOCs to be issued after LSR completion. Revision 1: Added IBA Explanation. Removed Status = Issued FOC from the detailed description.
Once an FOC has been issued, IMA shall not allow an additional FOC to be issued if the Status = Cancelled, Order Completion, Request Billing Complete, or Request Completed.
|
Status History |
Date | Action | Description |
Release Information | IMA Release 8.02 | |
11/8/2001 | CR Submitted | CR transferred from legacy database to CMP database |
11/9/2001 | Status Changed | CR is in Development status. Scheduled for production in 12/08/01 patch |
12/20/2001 | Status Changed | In production according to Gerry Mohatt e-mail |
Project Meetings |
|
CenturyLink Response |
|
Information Current as of 1/11/2021