Description Of Change |
Loop Extension Technology offers the Competitive Local Exchange Carriers (CLEC’s) additional loop extension technology for ISDN (BRI) and xDSL-I capable unbundled loops only. In order to successfully provision and install a CLEC request for an xDSL-I or Basic Rate ISDN capable loop over metallic cable pair, loop loss and characteristics may require the placement of Extension Technology equipment on the requested Unbundled Loop. The addition of this equipment will ensure that the network interface to network interface requirements meet the ANSI Standards as set in ANSI T1.601.
|
Status History |
Date | Action | Description |
9/28/2001 | CR Submitted | CR transferred from legacy database to CMP database |
10/18/2001 | Discussed at Monthly CMP Meeting | Presented at Oct CMP meeting |
10/25/2001 | Status Changed | Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization |
10/31/2001 | Release Ranking | Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. 29731 ranked 44 |
1/17/2002 | Status Changed | CR # 29731 status updated to 'Presented; CR was not packaged as part of 10.0 and is eligible for ranking in 11.0' |
2/13/2002 | Record Update | LOE Updated from Small to Medium |
2/14/2002 | Status Changed | Status updated from Presented to Pending Withdrawal; submitter no longer wishes to pursue CR |
2/21/2002 | CLEC Requested Info | Eschelon wants to know more about what this CR was intended to provide. Connie Winston will provide that information. |
2/21/2002 | Discussed at Monthly CMP Meeting | 29731 discussed during 'CRs to consider for Closure' portion of February Systems CMP Monthly meeting; please see Attachment E of February Systems CMP Distribution Package |
2/26/2002 | Additional Information | Mark Routh sent the information to Bonnie Johnson. |
3/8/2002 | Status Changed | This CR was presented at the Feb. CMP meeting for witdrawl. Eschelon requested that the withdrawl be delayed to give Eschelon time to investigate if they wanted to sponsor it. Eschelon has decided not to sponsor this CR. |