Archived System CR 23943 Detail |
Title: Shared Distribution Loop Long Term | |||||
CR Number |
Current Status Date |
Level of Effort |
Interface/ Release No. |
Area Impacted |
Products Impacted |
|
|||||
23943 |
Withdrawn 3/19/2002 |
3000 - 5500 | 3/ | SDL |
Originator: Sumner, Steve |
Originator Company Name: Qwest Corporation |
Owner: Winston, Connie |
Director: |
CR PM: Routh, Mark |
Description Of Change |
Shared Distribution Loop is defined as making available the opportunity for the CLEC to offer ADSL qualified advanced data services simultaneously with an existing end user’s analog voice grade service provided by Qwest on the distribution loop. The CLEC will use the data portion of the loop while Qwest will maintain the voice portion of the loop. The voice circuit is originating at the Qwest Central Office and terminates at the Network Interface at the customer location. The data originates at the CLECs DSLAM located at their established form of Remote Collocation and terminates at the Network Interface at the customer location.
One of the system functionalities used for all of the Shared Products is the new process of ordering line conditioning after the service has already been established. Ideally, the need for line conditioning would be detected during the Pre-Order Raw Loop Data query, where the CLEC can see if there are bridge taps or load coils that need to be removed. However, there is a possibility that the service order was completed erroneously, indicating that the service is provisioned when in fact it is inoperative, since the testing proved that the line needs conditioning. The CLEC needs a mechanism whereby they can order line conditioning on an existing service.
|
Status History |
Date | Action | Description |
9/28/2001 | CR Submitted | CR transferred from legacy database to CMP database |
10/18/2001 | Discussed at Monthly CMP Meeting | Presented at Oct CMP meeting |
10/25/2001 | Status Changed | Prioritization list sent to all CLECs for IMA 10.0 ranking, status changed to prioritization |
10/31/2001 | Release Ranking | Ranking for Release 10.0 occurred at October, 2001 CMP Meeting. 23943 ranked 48 |
1/17/2002 | Status Changed | CR # 23943 status updated to 'Presented; CR was not packaged as part of 10.0 and is eligible for ranking in 11.0' |
1/31/2002 | Status Changed | Status updated to "Pending Withdrawal" from "Presented"; submitter sought to cancel the UR in November; status updated in order to take CR to February CMP meeting |
2/13/2002 | Record Update | LOE updated from Medium to Large |
2/21/2002 | Discussed at Monthly CMP Meeting | 23943 discussed during 'CRs to consider for Closure' portion of February Systems CMP Monthly meeting; please see Attachment E of February Systems CMP Distribution Package; AT&T indicated that they might want to sponsor this CR |
3/19/2002 | Status Changed | AT&T has decided not to sponsor this CR. As a result, it is closed. |
Project Meetings |
|
CenturyLink Response |
|
Information Current as of 1/11/2021